Page 1: 2016 STS - Roy Emmert: Partnering with Ports

Partnering With Ports

Page 2: 2016 STS - Roy Emmert: Partnering with Ports

• The United States is served by some 360 commercial ports, of which more than 150 are deep draft facilities (according to the USCG)

• Safe and successful project completion requires great communication and coordination between all stake holders (Port Authority / Shipping Line / Client / Marine Surveyor / Stevedores / and possibly union representatives)

Page 3: 2016 STS - Roy Emmert: Partnering with Ports

Entry into Port Facilities requires personnel to hold TWIC cards or escort arrangements must be worked out while operating in the MARSEC area

Page 4: 2016 STS - Roy Emmert: Partnering with Ports

Know who to contact at the Port if you need assistance

Page 5: 2016 STS - Roy Emmert: Partnering with Ports

Key Planning Items:

• Determine which mode of transportation is best suited (Road / Barge / Rail)

• Load and Stow Plans

• Where and When will the cargo be ready

• Prepare an Engineered Lift Plan

Page 6: 2016 STS - Roy Emmert: Partnering with Ports

• Verify that heavy lift operators have the proper certification and training

• Verify that all lifting gear is of adequate capacity and has current certifications

• Where will the transport equipment be staged during loading / unloading

Key Planning Items:

Page 7: 2016 STS - Roy Emmert: Partnering with Ports

• Lift and set by Ships Crane / Dock Crane / Mobile Crane / Floating Crane / RORO Operation

• Verify adequate infrastructure strengths for the loads that will be placed on them while loading or unloading transport equipment (dock / pilings / pier caps)

• Pre-Planning meetings, with all stake holders present, may reveal issues that could have been overlooked during the initial load planning phase

Key Planning Items:

Page 8: 2016 STS - Roy Emmert: Partnering with Ports

Accurate cargo drawing that includes all dimensions, weights, CG and any protrusions

Page 9: 2016 STS - Roy Emmert: Partnering with Ports

Plan for the unexpected and have a back-up plan

Page 10: 2016 STS - Roy Emmert: Partnering with Ports

Challenges

• Dock Loading – Make sure transporter will meet requirements for ground loading on port structures

• Is the vessel on time or will there be an arrival delay which will impact the project

Page 11: 2016 STS - Roy Emmert: Partnering with Ports

Rail Capabilities – Ship Side or loaded to a trailer and transport to

rail siding

Page 12: 2016 STS - Roy Emmert: Partnering with Ports

Know your contract terms

Page 13: 2016 STS - Roy Emmert: Partnering with Ports

Will the staging material be pre-installed?

Page 14: 2016 STS - Roy Emmert: Partnering with Ports

Do you have your Loading / Unloading Plan Completed?

Page 15: 2016 STS - Roy Emmert: Partnering with Ports

• Direct Discharge of Cargo to Rail / Barge/ Road Transporter

• Know the crane lift capacity

• Is the rigging planned and sourced?

Page 16: 2016 STS - Roy Emmert: Partnering with Ports

Is there a tandem lift required?

Page 17: 2016 STS - Roy Emmert: Partnering with Ports

Staging for later movement

Page 18: 2016 STS - Roy Emmert: Partnering with Ports

After loading, make sure all securements are in place before moving

Inspection and sign off of the cargo. Is there any cargo damage?

Page 19: 2016 STS - Roy Emmert: Partnering with Ports

Will the transporter be able to maneuver through the port during its exit or will obstacles need to be relocated temporarily?

Do you have all necessary paperwork in order before trying to leave the port?

Page 20: 2016 STS - Roy Emmert: Partnering with Ports

Thorough Planning leads to successful projects while working at Ports

Page 21: 2016 STS - Roy Emmert: Partnering with Ports

Thank You