From the Chair of the KEC.
Khaliqyar Elevator Company .LTD (KEC)
Kabul, Afghanistan
This prequalification sheet gives a brief account of our company's profile, information and history. It is
indeed our statement of qualification. Please spare some time to read about us and know firsthand about
our company's capabilities and experience.
We are a general contracting firm with a diverse team of experts spreading from management,
engineering, design, supervision and other very skillful crafts men. We are also highly focused on our
ability to meet client demands, thus enabling us to provide a business atmosphere and service that is
unrivalled in our operational market.
We also and have the capacity and experience necessary to undertake any turn-key assignment in
installing , maintainace , safety and general supplies of elevator and escalator across Afghanistan.
Please endeavor to contact the undersigned person if you have any questions or require further
explanations about us.
Sincerely:
Abdul Karim Khaliqyar
Khaliqyar Elevator Company (KEC):
Is the biggest elevator technology provider in Afghanistan, specialized in the design , install ,
maintainace , safety and service of vertical elevator and escalator with the certificate number of
16718 of Ministry of Commerce.
With more than 10 years effort, KEC now installs a variety of products to meet the customer
individuated requirement Including passenger elevator, bed elevator, home elevator,
residential elevator, car elevator, hydraulic elevator, machine room less elevator and escalator.
Nowadays KEC is already a well-known provider in home and abroad, since established in 2003,
the order quantity rise up by 20% every year and annual installation capacity of Khaliqyar
Elevator Company is 40 sets.
There are 2 branches in Kabul and one in Mazar-e-sharef province and several agents in
different provinces.
At present, we are importing elevator and escalator from Chinese , Turkish , Iranian and Italian
popular companies like Shanghai Mitsubishi Elevator , Fuji-HD Elevator , XIWU Elevator , Duoda
Elevator , FUPA Elevator, Nawen Hadad Elevator , Afraz Asanbar Tos……etc
Background and Experience:
The main purpose of the forming this company is to share our technical and financial resources
for installing or /and implementation of construction related development and rehabilitation
project in Afghanistan for have a pace in assisting the people of Afghanistan.
Khaliqyar Elevator Company (KEC) and its professional staff is all expert of installing and
maintainace of any extensive and intensive elevator and escalator related any construction and
services projects.
They have been playing their best role in the reconstruction of Afghanistan since long time.
Some member companies such as PVC, Glass, Aluminum and others are equipped to share their
resources under leading of KEC as joint venture for participating in the activities for most
projects for present best quality of work.
KEC is a well-established elevator and escalator company which through the submission of
proposals would like to successfully, manage and implement the projects.
KEC is qualified, skillful, experienced, well-equipped and dedicated registered Afghan
construction firm in the field of installing, design management and implementation as well as
installation consultancy and the member of KEC, in particular are Afghan Construction Firms
that have implemented many similar construction projects with government and private
resorts.
Gearing all these expertise towards a single objective under a well-organized leadership, results
in progression which in its turn ensures greater success of the intended project.
KEC has designed and implemented and/or implementing significant number of various
elevator and escalator projects such as Residential Area, Hospitals, Offices, Hotels, Guest
houses and other.
KEC possesses relevant knowledge and has gained valuable experience in the design of different
sorts of elevator used for different purposes.
This has given enhanced capacity to KEC and pre-positioned it to utilize its expertise in the
design, management, and implementation of new projects.
The staff of KEC is familiar with regulations and principles of international standards.
Objectives:
To promote growth and economic development through quality products and services.
Enhance the capacity building and transfer of the knowledge and new technologies.
To create a conductive environment for sound cooperation.
To privately invest and follow government’s new policy of supporting private sectors in
the country.
Utilize construction expertise that the staff of KEC has obtained during the past years.
To participate actively in the reconstruction and development of Afghanistan.
To seek financial resources and implementation possibilities for the planned
development and rehabilitation projects in Afghanistan.
To directly implement development programs and rehabilitate the economic and social
infrastructure in the war-torn Afghanistan.
Our Services:
Installation, maintainace, testing and safety of elevator and escalator.
Repairing of damaged products.
Designing of elevator structure.
Members:
Installing of PVC doors and windows.
Installing of reflex glasses.
Installing of aluminum composite.
Installing of automatic doors.
Implemented Projects.
Some of the implemented projects have been listed here in this document is a testimony of the
relevant and required capacity and capability of the KEC in the area of construction, design and
implementation in timely and quality manner.
1. AWCC Headquarter (Kabul)
2. Aziz Bank Headquarter (Kabul)
3. Ministry of Finance (Kabul)
4. AL Madina Building (Kabul)
5. Kolola Poshta Residential Town (Kabul)
6. Haji Nabi Residential Town (Kabul)
7. Alkozay Building (Kabul)
8. Shenozada Hospital (Kabul)
9. Mawlana Hospital (Mazar-e-sharif)
10. Mahtab Guest House (Kabul)
11. Motahed Business Center (Mazar-e-sharif)
12. Merwais Business Center (Qondoz)
13. Parwan Business Center (Kabul)
14. Barche Business Center (Kabul)
15. Nengarhar Business Center (Jelealabad)
16. Ayoubi Business Center (Kabul)
17. Haseeb Business Center (Kabul)
18. Amene Shopping Mall (Kabul)
19. Nasir Shopping Mall (Kabul)
20. Bayat Shopping Mall (Kabul)
21. Noor Shopping mall (Kabul)
22. Wares Shopping mall , (Kabul)
23. Gardezy Shopping Mall (Gardez)
24. City Point Shopping Mall (Kabul)
25. Rostan Haidary Shopping Mall (Kabul)
26. Haji Aynoden House (Kabul)
Methods:
For implementing of project, different methods and techniques should be applied, in other
words a methodology should be developed and necessary techniques should be utilized in
order to follow that.
The stating point of the methodology for a project is to set up a project management system in
parallel to the facts summarized in earlier section , the system should be set up in main office
realized on the site and again , traced by the main office .
The next step should be to form the technical staff according to the needs of the particular
project and the company quality system.
For this project it is estimated that technical foremen, safety office and other supporting staff
would be necessary for the completion of the project. The technical staff is planned to stay at
the site during the project and all necessary facilities will have been constructed and
mobilization will have been completed before the commencement of the construction work.
Before the start of the construction works all project and site inputs should be re-evaluated and
final decisions should be made for uncertain details.
At the same time local materials and workmanship usage should be assessed and logistics
should be studied accordingly, at this point KEC’s experience in Afghanistan is an important
factor for the successful completion of the project.
The design of the project is also to be prepared by KEC in house design team. KEC has an
experienced project design team for the purpose. This group can design for any type of building
according to the accepted standards and customer requirement.
Safety Plan:
KEC with its Main members are having a long record of its services without hazard occurrence
during their implemented projects, all performances of the company are resulted with no
considerable accident. Since is a coarse of actions taken for having a careful attention for
protecting the health of human resource and safe maintenance of material and equipment of
the projects , therefore it has been planning by the company to have Zero Accident
Performance (ZAP).
The KEC by having trained personnel in project safety and health requirements, has a careful
attention regarding the site clearance of site security, equipping of labors with safety equipping
of labors with safety equipment, hazard analysis prior to start every individual activity,
precautions for hazards, treatment of labors in case of injury occurrence, provision of potable
water for labors, training of labors and a proper reporting system to ensure safety of the
project site.
As per clear record of the companies no single fatality or injury has been happened to the
workers, staff, visitor’s governmental officials and project site neighboring inhabitants.
Although 100% safety cannot be guaranteed, but it is the plan of the KEC to identify safety
measures and requirements for applying 100% safety plan and avoiding hazard occurrence
opportunity in the site, the company will have proper plan for monitoring, management and
implementation mechanism, which in particular locates risks and hazards area and make proper
arrangement for avoiding the risks.
Also we use different recognized signs /signals , temporary non=removable obstacles and
directing boards during the work and provide the staff different tools such as masks , glasses ,
gloves , shoes , safety dress and other personal protection equipment necessary for their
safety.
Management Plan :
KEC is a local Afghan company with all Afghans in the management, technical division,
installation, maintenance, and design and construction process. Our staff is very well qualified
with vast experience in national and international organizations within Afghanistan in very
remote and high risk areas.
KEC own a large number of installation equipment, the Project Manager would be an Afghan
Engineer well qualified in the terms of installation and maintenance according to the
requirement of the project and would be supported by the main office technical division and
Program Manager, in case KEC feels that more technical personnel is needed on the project site
will support this requirement by our other technical staff at the main office.
Project Management:
KEC has always tried to implement the projects according to the contract scope of work and
technical specification to meet the customer requirement.
KEC has already selected a qualified project construction team including a Project Manager with
great experience, who successfully implemented several projects.
Financial Capacity:
The internal working structure of KEC makes it possible to have ready working capital for any
project at hand , this is because the company is owned by the top management , who all work
in Afghanistan and are able to distribute the funds over 15,000,00.00 USD , accordingly thereby
avoiding any cash-flow problems.
KEC currently uses banking services of accredited banks including Kabul Bank and our company
has the financial capacity and capability to run and execute projects with value of more than
15,000,00.00 USD inside Afghanistan.
Sigma Escalator
Installed
by KEC. LTD
Noor Shopping Center
Panoramic Elevator
6- Stop, installed by
KEC.LTD
Shanghai Mitsubishi Elevator Alkozay Center, 14-stop, Installed by KEC.LTD
Al- Wares
Shopping Center
Panoramic Elevator
6- Stop, installed by
KEC.LTD
Compound Elevator Bayad Business Center & Haseeb Center, 8-stop, Installed by KEC.LTD
Youngjin Elevator Madina Center, 12-stop, Installed by KEC.LTD
City Walk
10- Stop Fuji-HD Elevator & 35
degree Escalator, installed by
KEC.LTD
Khorshid Business
Center
8- Stop, installed by KEC.LTD
Alokozay Pepsi
5- Stop Otis Package,
installed by KEC.LTD
Visit from
Heng Da Fuji Elevator Company
By Mr. Khaliqyar
Visit from
Shanghai Mitsubishi Elevator Company
By Mr. Khaliqyar
Authorization Letter
From
FUJIHD Elevator
Authorization Letter
From
ASIA FUJI ELEVATOR
Authorization Letter
From
SYMAX LIFT
Authorization Letter
From
SANYO ELEVATORS AND ESCALATORS
Authorization distributors
From
Otis elevator
Certificates of Training
Training Course for Elevator , Escalator
installation , testing , Maintainace and safety
Branch License
Shanghai Mitsubishi Elevator License
From Iran Branch , to KEC
Business Certificate
Business Certificate from Ministry of
Commerce , Afghanistan