2013 road program:

1
GILMORE & ASSOCIATES, INC. Levittown Contract &A QUANTITIES CLIENT: BRISTOL TOWNSHIP PROJECT NAME: 2013 ROAD PROGRAM - CONTRACT A - LEVITTOWN PROJECT NUMBER: 2013-01051-A DATE: # DESCRIPTION # DESCRIPTION 1 Barberry Lane 24 Junewood Drive 2 Bentwood Lane 25 Magnolia Drive (Magnolia Park Lane to WBCB Driveway) 3 Birch Drive 26 Magnolia Drive (Mountain Lane to Magnolia Pass) 4 Boulder Lane 27 Magnolia Drive (Maple Lane, SE to Magnolia Drive) 5 Broadcast Lane 28 Mallow Lane 6 Daffodil Lane 29 Maple Lane 7 Dahlia Road 30 Mayflower Road 8 Daisy Road 31 Meadow Lane 9 Darkleaf Road 32 Merry Turn 10 Deep Green Road 33 Micahill Road 11 Dewberry Road 34 Mill Bend Road 12 Disk Lane 35 Mill Drive 13 Golden Turn Road 36 Mistletoe Lane 14 Good Turn Road 37 Mulberry Lane 15 Grand Pine Road 38 Myrtle Lane 16 Grand Pine Road 39 Peony Road 17 Grapevine Road 40 Pine Avenue 18 Greenbriar Road 41 Plumbtree Turn 19 Heather Lane 42 Prunewood Road 20 Holly Drive (Holly Drive to Holly Way) 43 Pumpkin Hill Road 21 Holly Hill Drive (New Falls Road to Appletree Pass) 44 Sexton Lane 22 Honeysuckle Lane 45 Starlight Lane 23 Jade Road 46 Strawberry Lane Approximate Length of Roadway = 11 miles Approximate Project Cost = $2,062,000.00 (cost based on the average unit bid costs from 2012 road paving) Approximately $220,000 of base repair is included in Project Cost Project Scope- mill 2" of existing asphalt, tack coat, place 2" of superpave 9.5mm, seal (joints, curbing, and structures), base repair as needed. 4/12/2013

Upload: bristol-township

Post on 01-Mar-2016

213 views

Category:

Documents


0 download

DESCRIPTION

List of Roads to be Paved in Levittown

TRANSCRIPT

Page 1: 2013 Road Program:

GILMORE & ASSOCIATES, INC. Levittown Contract&A QUANTITIES

CLIENT: BRISTOL TOWNSHIPPROJECT NAME:2013 ROAD PROGRAM - CONTRACT A - LEVITTOWNPROJECT NUMBER: 2013-01051-A

DATE:

# DESCRIPTION # DESCRIPTION

1 Barberry Lane 24 Junewood Drive

2 Bentwood Lane 25 Magnolia Drive (Magnolia Park Lane to WBCB Driveway)

3 Birch Drive 26 Magnolia Drive (Mountain Lane to Magnolia Pass)

4 Boulder Lane 27 Magnolia Drive (Maple Lane, SE to Magnolia Drive)

5 Broadcast Lane 28 Mallow Lane

6 Daffodil Lane 29 Maple Lane

7 Dahlia Road 30 Mayflower Road

8 Daisy Road 31 Meadow Lane

9 Darkleaf Road 32 Merry Turn

10 Deep Green Road 33 Micahill Road

11 Dewberry Road 34 Mill Bend Road

12 Disk Lane 35 Mill Drive

13 Golden Turn Road 36 Mistletoe Lane

14 Good Turn Road 37 Mulberry Lane

15 Grand Pine Road 38 Myrtle Lane

16 Grand Pine Road 39 Peony Road

17 Grapevine Road 40 Pine Avenue

18 Greenbriar Road 41 Plumbtree Turn

19 Heather Lane 42 Prunewood Road

20 Holly Drive (Holly Drive to Holly Way) 43 Pumpkin Hill Road

21 Holly Hill Drive (New Falls Road to Appletree Pass) 44 Sexton Lane

22 Honeysuckle Lane 45 Starlight Lane

23 Jade Road 46 Strawberry Lane

Approximate Length of Roadway = 11 miles

Approximate Project Cost = $2,062,000.00 (cost based on the average unit bid costs from 2012 road paving)

Approximately $220,000 of base repair is included in Project Cost

Project Scope- mill 2" of existing asphalt, tack coat, place 2" of superpave 9.5mm, seal (joints, curbing, and structures), base repair as needed.

4/12/2013