GILMORE & ASSOCIATES, INC. Levittown Contract&A QUANTITIES
CLIENT: BRISTOL TOWNSHIPPROJECT NAME:2013 ROAD PROGRAM - CONTRACT A - LEVITTOWNPROJECT NUMBER: 2013-01051-A
DATE:
# DESCRIPTION # DESCRIPTION
1 Barberry Lane 24 Junewood Drive
2 Bentwood Lane 25 Magnolia Drive (Magnolia Park Lane to WBCB Driveway)
3 Birch Drive 26 Magnolia Drive (Mountain Lane to Magnolia Pass)
4 Boulder Lane 27 Magnolia Drive (Maple Lane, SE to Magnolia Drive)
5 Broadcast Lane 28 Mallow Lane
6 Daffodil Lane 29 Maple Lane
7 Dahlia Road 30 Mayflower Road
8 Daisy Road 31 Meadow Lane
9 Darkleaf Road 32 Merry Turn
10 Deep Green Road 33 Micahill Road
11 Dewberry Road 34 Mill Bend Road
12 Disk Lane 35 Mill Drive
13 Golden Turn Road 36 Mistletoe Lane
14 Good Turn Road 37 Mulberry Lane
15 Grand Pine Road 38 Myrtle Lane
16 Grand Pine Road 39 Peony Road
17 Grapevine Road 40 Pine Avenue
18 Greenbriar Road 41 Plumbtree Turn
19 Heather Lane 42 Prunewood Road
20 Holly Drive (Holly Drive to Holly Way) 43 Pumpkin Hill Road
21 Holly Hill Drive (New Falls Road to Appletree Pass) 44 Sexton Lane
22 Honeysuckle Lane 45 Starlight Lane
23 Jade Road 46 Strawberry Lane
Approximate Length of Roadway = 11 miles
Approximate Project Cost = $2,062,000.00 (cost based on the average unit bid costs from 2012 road paving)
Approximately $220,000 of base repair is included in Project Cost
Project Scope- mill 2" of existing asphalt, tack coat, place 2" of superpave 9.5mm, seal (joints, curbing, and structures), base repair as needed.