Page 1: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2018 2019 2020 2021

Parkland CountyFour Year

Road Program

ENGINEERING SERVICES

Presented as part of 2018 Spring Budget Adjustment - April 2018

Page 2: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2018 Road Program

Page 3: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2018 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTSA1 Bridge File 82056 ( RR 274, 970m North Twp 510) Design for Bridge Repair

A2 Twp 514 (Woodbend Rd), Hwy 60 to RR 273 Conceptual Design (Upgrade)

A3 Acheson Rd, extend 200m to Spruce Valley Rd Conceptual Design (New Road)

A4 Railway Ave Extension, Fallis Design (New Road)

A5 Twp 524 (Mink Lake Rd), Hwy 770 to RR 25 Collector Road Design + Land Acquisition

A6 RR 30, Twp Rd 524A to Mayatan Subdivision Gravel Road Design + Land Acquisition

A7 RR 35, Hwy 16 to Twp Rd 533A (Kapasiwin Transfer Station) Gravel Road Design + Land Acquisition

B0 B. ROAD CONSTRUCTION PROJECTSB1 RR 274 (Campsite Rd), Twp 540 to Hwy 633 Reconstruction + Widen

B2 Twp 533A, RR 274 (Campsite Rd) to Cul-de-sac Reconstruction + ACP Surfacing

B3 Bridge File 70364 (Twp 514A, 600m West of RR25) Bridge Repair - Design + Construction

B4Gravel Road Reconstruction Program - County Wide (Locations mapped separately)

Reconstruction

C0 C. ASPHALT SURFACING PROJECTSC1 Twp 531 (Northview Rd), 279 St to 274 St and 269 St to Hwy 60) ASBC Resurfacing

C2 Twp 533, RR 13 to to Mayfair Heights ASBC Resurfacing

C3 RR 13, Hwy 16 to Mayfair Heights ASBC Resurfacing

C4 South Service Rd Hwy 16, RR 20 to RR 21 ASBC Resurfacing

C5 RR 53, Sundance Rd to Beaver Bay Estates ASBC Resurfacing

C6 RR 12, Hwy 16 to Hwy 16A ASBC Resurfacing

D0 D. SEAL COAT SURFACING PROJECTS D1 Twp 540, Hwy 779 to RR13 Seal Coating

D2 RR 21, Twp 523 to 524 Seal Coating

D3 RR 15, Twp 524 to Twp 530 Seal Coating

D4 Twp 524, RR 15 to RR 21 Seal Coating

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION SURFACING PROJECTSF1 Beaver Bay Estates - Krane Watchers Drive, RR 53 to 375m Southeast Subdivision Preservation - ASBC

F2 Cameron Heights - Cameron Dr, Avco Lane Subdivision Preservation - ASBC

F3Cameron Lake Estates - Sherman Dr, Lynn Valley Dr, Ogilvie Dr, Pincherry Lane, Cameron Lake Dr

Subdivision Preservation - ASBC

F4 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Preservation - ACP

F5 Mayfair Heights - Mayfair Dr, Mayfair Cres, Mayfair Pl Subdivision Preservation - ASBC

F6 Panorama Heights - Neumann Crescent Subdivision Preservation - ASBC

F7 Pine Valley Acres III - Spruce Ave Subdivision Preservation - ASBC

F7 Pine Valley Acres IV - Bailey Ave, Pine St, Evergreen Dr Subdivision Preservation - ASBC

F7 Pine Valley Acres - Birch Ave Subdivision Preservation - ASBC

F8 Roslaire Estates - Roslaire Dr Subdivision Preservation - ASBC

G0 G. WATERG1 Walker Lake - Lakeshore Waterloop Concept & Land Acquisition

G2 Acheson Zone 4 Reservoir Expansion Design

H0 H. WASTEWATERH1 Acheson Zone 2 Pipe Upsizing/Twinning - Parkland Business Park Design

Page 4: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

Meridian Business Park

AchesonIndustrialArea

BEACHSEBAS.V.

BETULABEACHS.V.

S.V.KAPASIWINBEACHS.V.POINT ALISON

S.V.LAKEVIEW

WABAMUN

VILLAGE OFSPRING LAKE

STONY PLAIN

SPRUCEGROVE

WABAMUNINDIAN

RESERVENo. 133A STONY PLAIN

No.135

INDIANRESERVE

WABAMUN

LAKE

ISLELAKE

GLADULAKE

BIG LAKE

TOMAHAWK

KEEPHILLS

CARVELDUFFIELD

FALLIS

MAGNOLIA

GAINFORD

ENTWISTLE

C6G2

A1

A4

B3

G1

H1

A3

A2

A5

A7

A6

B2

B1

C3 C1

C2

C5

C4

D4

D3

D2

D1

F5 F4

F2

F7

F1

F3

F8

F6

R.07R.08 R.05R.06

R.07R.08 R.02

R.01R.02

R.03

R.03

R.04

R.04

R.05R.06 R.01

R.25

R.25R.28 R.26

R.26

R.27

R.27R.28T.5

5T.5

0T.5

1T.5

3T.5

4T.4

9T.5

2

T.55

T.51

T.52

T.54

T.50

T.49

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD11

RGE RD11

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

TWP R

D53

0

TWP R

D53

0

TWP R

D53

5

TWP R

D53

5

TWP R

D53

4

TWP R

D53

4

TWP R

D53

3

TWP R

D53

3

TWP R

D52

3

TWP R

D52

3

TWP R

D53

1

TWP R

D53

1

TWP R

D52

2

TWP R

D52

2

TWP R

D52

1

TWP R

D52

1

TWP R

D52

0

TWP R

D52

0

TWP R

D51

3

TWP R

D51

3

TWP R

D51

5

TWP R

D51

5

TWP R

D51

4

TWP R

D51

4

TWP R

D54

0

TWP R

D54

0

TWP R

D52

5

TWP R

D52

5

TWP R

D52

4

TWP R

D52

4

TWP R

D54

2

TWP R

D54

2

TWP R

D51

1

TWP R

D51

1TWP R

D51

2

TWP R

D51

2

TWP R

D54

1

TWP R

D54

1

TWP R

D54

3

TWP R

D54

3TWP R

D54

4

TWP R

D54

4

TWP R

D55

0

TWP R

D55

0

TWP R

D54

5

TWP R

D54

5

TWP R

D51

0

TWP R

D51

0

TWP R

D50

3

TWP R

D50

3

TWP R

D50

5

TWP R

D50

5

TWP R

D50

4

TWP R

D50

4

TWP R

D53

2

TWP R

D53

2

Parkland CountyRoad Program

20180 4 8 12 162

Kilometers

10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/29/2018

LegendRoad Program Features 2018

A. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing Projects; C6D. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. WaterH. WastewaterB4 - See Gravel Road Reconstruction Program 2018

G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\Output\SBA_R1\Gravel Road Reconstruction Program 2018\RoadProgram2018_Features.mxd

¯

Page 5: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2018 Gravel Road Reconstruction Program Project List*B4. GRAVEL ROAD RECONSTRUCTION PROGRAM

B4 - 1 Twp 530, RR 25 - RR 23 Approx. 600m Road Reconstruction at 3 locations

B4 - 2 RR 25, Twp 524A - Twp 530 Approx. 400m Road Reconstruction at 2 locations

B4 - 3 RR 270, Hwy 628 - Twp 530 Approx. 800m Road Reconstruction and shoulder pull at 2 locations

B4 - 4 Twp 510, RR 14 - Everington Rd Approx. 300m Road Reconstruction and ditching at 1 location

B4 - 5 RR 13, Twp 512 - Twp 514 Approx. 500m Road Reconstruction at 1 location

B4 - 6 Twp 524B, Duffield to Edinburgh Park Approx. 200m Road Reconstruction at 1 location

B4 - 7 RR 14, Twp 510 - 512 Approx. 700m Road Reconstruction at 1 location

B4 - 8 RR 21, Twp 511 - Twp 512 Approx. 700m Road Reconstruction at 1 location

B4 - 9 RR 75, Twp 513 - Twp 511 Approx. 400m Intersection Reconstruction at 1 location

B4 - 10 RR 11, Twp 512 - Twp 511 Approx. 700m Road Reconstruction at 1 location

B4 - 11 RR 73, Twp 514 - Twp 520 Approx. 200m Road Reconstruction at 1 location

B4 - 12 Twp 514, RR 12 - RR 11 Approx. 200m Road Reconstruction at 1 location

B4 - 13 RR 20, Twp 510 - 511 Approx. 800m Road Reconstruction at 2 locations

B4 - 14 RR 15, Twp 514 to Twp Hwy 627 Approx. 800m Road Reconstruction at 1 locations

B4 - 15 RR 13, Twp 513 - Twp 514 Approx. 300m Road Reconstruction at 1 location

B4 - 16 Twp 524, RR 23 - RR 22 Approx. 250m Road Reconstruction at 1 location

B4 - 17 Twp 534, RR 280 - RR 275 Approx. 300m Road Reconstruction at 1 location

* Locations which are planned for the 2018 gravel road reconstruction program - not in any prioritized order. *Will be constructed as schedule efficiencies and resources allow. *Locations subject to change and re-prioritized as other locations are identified with spring conditions.

Page 6: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

B4-9

B4-2

B4-6

B4-17

B4-1

B4-11B4-12

B4-16

B4-4

B4-15

B4-5

B4-14

B4-3

B4-13

B4-8 B4-10B4-7

R.07R.08 R.05R.06

R.07R.08 R.02

R.01R.02

R.03

R.03

R.04

R.04

R.05R.06 R.01

R.25

R.25R.28 R.26

R.26

R.27

R.27R.28T.5

1T.5

5T.5

0T.5

3T.5

2T.5

4

T.55

T.51

T.52

T.54

T.50

T.49

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD11

RGE RD11

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

TWP R

D53

0

TWP R

D53

0

TWP R

D53

5

TWP R

D53

5

TWP R

D53

4

TWP R

D53

4

TWP R

D53

3

TWP R

D53

3

TWP R

D52

3

TWP R

D52

3

TWP R

D53

1

TWP R

D53

1

TWP R

D52

2

TWP R

D52

2

TWP R

D52

1

TWP R

D52

1

TWP R

D52

0

TWP R

D52

0

TWP R

D51

3

TWP R

D51

3

TWP R

D51

5

TWP R

D51

5

TWP R

D51

4

TWP R

D51

4

TWP R

D54

0

TWP R

D54

0

TWP R

D52

5

TWP R

D52

5

TWP R

D52

4

TWP R

D52

4

TWP R

D54

2

TWP R

D54

2

TWP R

D51

1

TWP R

D51

1TWP R

D51

2

TWP R

D51

2

TWP R

D54

1

TWP R

D54

1

TWP R

D54

3

TWP R

D54

3TWP R

D54

4

TWP R

D54

4

TWP R

D55

0

TWP R

D55

0

TWP R

D54

5

TWP R

D54

5

TWP R

D51

0

TWP R

D51

0

TWP R

D50

3

TWP R

D50

3

TWP R

D50

5

TWP R

D50

5

TWP R

D50

4

TWP R

D50

4

TWP R

D53

2

TWP R

D53

2

Parkland CountyRoad Program Project B4

Gravel Road ReconstructionProgram 20180 7.5 15 22.5 303.75

KilometersDrawn By: BAMDate: 3/29/2018

LegendGravel Road Reconstruction Program 2018

G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\Output\SBA_R1\Gravel Road Reconstruction Program 2018\RoadProgram_Gravel Road Reconstruction Program_2018_Features.mxd

¯

Page 7: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2019 Road Program

Page 8: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2019 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTSA1 Bridge File 09254 (RR70, 500m South Hwy 16) Design for Bridge Repair

A2 Twp 534, Hwy 44 to Hwy 779 Conceptual Design

A3 Twp 514 (Woodbend Rd), Hwy 60 to RR 270 (Part 1) Collector Road Design + Land Acquisition

A4 Twp 531A (114th Ave), 261st Street to 259th Street Collector Road Design

A5 RR 30 (Meso Rd), Cantebury Estates to Twp 535 Gravel Road Design + Land Acquisition

A6 RR 41, Twp 534 to 535 Gravel Road Design + Land Acquisition

B0 B. ROAD CONSTRUCTION PROJECTSB1 Bridge File 82056 ( RR 274, 970m North Twp 510) Bridge Repair - Design + Construction

B2 Twp 524 (Mink Lake Rd), Hwy 770 to RR 25 Reconstruction

B3 County Facility Parking Lot Extension Construction + ACP Surfacing

B4 Railway Ave Extension, Fallis Construction (New Road)

B5 RR 30, Twp Rd 524 to Mayatan Subdivision Reconstruction

B6 RR 35, Hwy 16 to Twp Rd 533A (Kapasiwin Transfer Station) Reconstruction

C0 C. ASPHALT SURFACING PROJECTSC1 Prospector's Point Rd, Twp 511 (Graminia Rd) to Parking Lot ACP Resurfacing + base/subgrade repairs

C3 RR 14, Parkland Dr to 524 ASBC Resurfacing

C4 County Facility Paving ACP Resurfacing

C5 Next Valid Petition (2) Local Improvements

D0 D. SEAL COAT SURFACING PROJECTS D1 Parkland Drive, RR 15 to RR 21 Seal Coating

D2 RR 275, Twp 532A to Westbrook Crescent Seal Coating

D3 Twp 532A, RR 274 to RR 280 Seal Coating

D4 RR 274 (Campsite Rd), Hwy 16 to Twp 540 Seal Coating

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION SURFACING PROJECTSF1 Blueberry Hills Estates Subdivision Preservation - ACP

F2 Chickakoo Estates - Mitchell Dr, Chickakoo Dr Subdivision Preservation - ASBC

F3 Country Lane Estates Subdivision Preservation - ASBC

F4 Fleming Park - Fleming Dr, Fleming Cres Subdivision Preservation - ASBC

F5 Harris Acres - Harris Dr Subdivision Preservation - ASBC

F6 Osborne Acres - Osborne Dr, Osborne Pl, 178m 279th St Subdivision Preservation - ASBC

F7 Pine Wood - Pine Wood Dr, West Rd, East Rd Subdivision Preservation - ASBC

F8 Spring Hills - Leslie Lane, Lindsay Lane Subdivision Preservation - ASBC

F9 Spruce Bluff Estates - Ulmer Dr, Grouse Pt Subdivision Preservation - ASBC

F10 Valaspen Place South - Valaspen Dr, Aspen Cres Subdivision Preservation - ASBC

F11 Wesparkdale - Marion Cres Subdivision Preservation - ASBC

F12 Willow Park - Willow Park Drive Subdivision Preservation - ASBC

F13 Woodland Acres - Woodland Drive Subdivision Preservation - ASBC

G0 G. WATERG1 Acheson Zone 4 Reservoir Expansion Design + Construction (2 years)

H0 H. WASTEWATERH1 Acheson Zone 2 Pipe Upsizing/Twinning - Parkland Business Park Construction

Page 9: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

Meridian Business Park

AchesonIndustrialArea

BEACHSEBAS.V.

BETULABEACHS.V.

S.V.KAPASIWINBEACHS.V.POINT ALISON

S.V.LAKEVIEW

WABAMUN

VILLAGE OFSPRING LAKE

STONY PLAIN

SPRUCEGROVE

WABAMUNINDIAN

RESERVENo. 133A STONY PLAIN

No.135

INDIANRESERVE

WABAMUN

LAKE

ISLELAKE

GLADULAKE

BIG LAKE

TOMAHAWK

KEEPHILLS

CARVELDUFFIELD

FALLIS

MAGNOLIA

GAINFORD

ENTWISTLE

A2

G1

A1

B1

B4

B3C4

A4A5

A3

A6

B2B5

B6

C1

C3

D1

D4D2D3

F10

F9

F8

F7

F2

F12

F1

F13

F5

F3

F4

F6

F11

R.07R.08 R.05R.06

R.07R.08 R.02

R.01R.02

R.03

R.03

R.04

R.04

R.05R.06 R.01

R.25

R.25R.28 R.26

R.26

R.27

R.27R.28T.5

5T.5

0T.5

1T.5

3T.5

4T.4

9T.5

2

T.55

T.51

T.52

T.54

T.50

T.49

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD11

RGE RD11

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

TWP R

D53

0

TWP R

D53

0

TWP R

D53

5

TWP R

D53

5

TWP R

D53

4

TWP R

D53

4

TWP R

D53

3

TWP R

D53

3

TWP R

D52

3

TWP R

D52

3

TWP R

D53

1

TWP R

D53

1

TWP R

D52

2

TWP R

D52

2

TWP R

D52

1

TWP R

D52

1

TWP R

D52

0

TWP R

D52

0

TWP R

D51

3

TWP R

D51

3

TWP R

D51

5

TWP R

D51

5

TWP R

D51

4

TWP R

D51

4

TWP R

D54

0

TWP R

D54

0

TWP R

D52

5

TWP R

D52

5

TWP R

D52

4

TWP R

D52

4

TWP R

D54

2

TWP R

D54

2

TWP R

D51

1

TWP R

D51

1TWP R

D51

2

TWP R

D51

2

TWP R

D54

1

TWP R

D54

1

TWP R

D54

3

TWP R

D54

3TWP R

D54

4

TWP R

D54

4

TWP R

D55

0

TWP R

D55

0

TWP R

D54

5

TWP R

D54

5

TWP R

D51

0

TWP R

D51

0

TWP R

D50

3

TWP R

D50

3

TWP R

D50

5

TWP R

D50

5

TWP R

D50

4

TWP R

D50

4

TWP R

D53

2

TWP R

D53

2

Parkland CountyRoad Program

20190 4 8 12 162

Kilometers

10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/29/2018

LegendRoad Program Features 2019

A. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. WaterH. Wastewater

G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\MXD\RoadProgram2019_Features_Tabloid.mxd

¯

Page 10: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2020 Road Program

Page 11: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2020 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTSA1 Bridge File 13218 (RR73, 600m South Twp 514) Design for Bridge Repair

A2 Twp 524, Stony Plain (RR12 to Hwy 770) Conceptual Design

A3 Twp 514 (Woodbend Rd), RR 270 to RR 273 (Part 2) Collector Road Design + Land Acquisition

A4 RR 274 (Campsite Rd), Hwy 628 to Spruce Grove Arterial Design + Land Acquisition

A5 Twp 534, Hwy 44 to Hwy 779 Arterial Design + Land Acquisition

A6 Twp 514, RR 20 to Hwy 770 Gravel Road Design + Land Acquisition

B0 B. ROAD CONSTRUCTION PROJECTSB1 Bridge File 09254 (RR70, 500m South Hwy 16) Bridge Repair - Design + Construction

B2 Twp 514 (Woodbend Rd), Hwy 60 to RR 270 (Part 1) Reconstruction + Widen

B3 Twp 531A (114th Ave), 261st Street to 259th Street Reconstruction + Widen + ACP Surfacing

B4 RR 30 (Meso Rd), Cantebury Estates to Twp 535 Reconstruction + ASBC Surfacing

B5 RR 41, Twp 534 to 535 Reconstruction

C0 C. ASPHALT SURFACING PROJECTSC1 Next Rd TBD ACP Resurfacing

C2 RR 20, Hwy 16A to Parkland Drive ASBC Resurfacing

C3 Twp 510, RR 55 to Hwy 759 ASBC Resurfacing + base/subgrade repairs

C4 Next Valid Petition (2) Local Improvements

D0 D. SEAL COAT SURFACING PROJECTS D1 RR 41, Hwy 16 to Twp 534 Seal Coating

D2 Twp 534, RR 41 to RR 43 Seal Coating

D3 RR 43, Twp 534 to Twp 535 Seal Coating

D4 RR 32 (Duffield Rd), Twp 530 to Hwy 16 Seal Coating

D5 RR 33 (Alberta Beach Rd), Twp 533A to 535 Seal Coating

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION SURFACING PROJECTSF1 Clearwater Estates - Robinson Dr, Allan Dr, Beaver Ave Subdivision Preservation - ASBC

F2 Deer Park II - 1st & 2nd Ave, 1st & 2nd Street Subdivision Preservation - ASBC

F3 Hubbles Lake - Diamond Dr, Diamond Rd Subdivision Preservation - ASBC

F4 Lily Lake Estates - Michelle Dr, Michelle Cres, Michelle Close Subdivision Preservation - ASBC

F5 Maude-West Acres Subdivision Preservation - ASBC

F6West Gentry - West Gentry Rd, Parkland Rd & Cres, Lakeview Cres, Hillside Dr, RR11

Subdivision Preservation - ASBC

F7 Whispering Pines - Whispering Pine Dr, Pine St, Spruce St, Valley Dr Subdivision Preservation - ASBC

Page 12: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

Meridian Business Park

AchesonIndustrialArea

BEACHSEBAS.V.

BETULABEACHS.V.

S.V.KAPASIWINBEACHS.V.POINT ALISON

S.V.LAKEVIEW

WABAMUN

VILLAGE OFSPRING LAKE

STONY PLAIN

SPRUCEGROVE

WABAMUNINDIAN

RESERVENo. 133A STONY PLAIN

No.135

INDIANRESERVE

WABAMUN

LAKE

ISLELAKE

GLADULAKE

BIG LAKE

TOMAHAWK

KEEPHILLS

CARVELDUFFIELD

FALLIS

MAGNOLIA

GAINFORD

ENTWISTLE

A3

A2A4

A6

A5

B3

B4

B2

B5

C2

C3

D1

D4

D3 D5

D2

F4

F6

F2

F7

F1

F3F5

A1

B1

R.07R.08 R.05R.06

R.07R.08 R.02

R.01R.02

R.03

R.03

R.04

R.04

R.05R.06 R.01

R.25

R.25R.28 R.26

R.26

R.27

R.27R.28T.5

1T.5

5T.5

0T.5

3T.5

2T.5

4T.4

9

T.55

T.51

T.52

T.54

T.50

T.49

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD11

RGE RD11

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

TWP R

D53

0

TWP R

D53

0

TWP R

D53

5

TWP R

D53

5

TWP R

D53

4

TWP R

D53

4

TWP R

D53

3

TWP R

D53

3

TWP R

D52

3

TWP R

D52

3

TWP R

D53

1

TWP R

D53

1

TWP R

D52

2

TWP R

D52

2

TWP R

D52

1

TWP R

D52

1

TWP R

D52

0

TWP R

D52

0

TWP R

D51

3

TWP R

D51

3

TWP R

D51

5

TWP R

D51

5

TWP R

D51

4

TWP R

D51

4

TWP R

D54

0

TWP R

D54

0

TWP R

D52

5

TWP R

D52

5

TWP R

D52

4

TWP R

D52

4

TWP R

D54

2

TWP R

D54

2

TWP R

D51

1

TWP R

D51

1TWP R

D51

2

TWP R

D51

2

TWP R

D54

1

TWP R

D54

1

TWP R

D54

3

TWP R

D54

3TWP R

D54

4

TWP R

D54

4

TWP R

D55

0

TWP R

D55

0

TWP R

D54

5

TWP R

D54

5

TWP R

D51

0

TWP R

D51

0

TWP R

D50

3

TWP R

D50

3

TWP R

D50

5

TWP R

D50

5

TWP R

D50

4

TWP R

D50

4

TWP R

D53

2

TWP R

D53

2

Parkland CountyRoad Program

20200 4 8 12 162

Kilometers

10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/19/2018

G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\MXD\RoadProgram2020_Features_Tabloid.mxd

¯

Road Program Features 2020A. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. WaterH. Wastewater

Page 13: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2021 Road Program

Page 14: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2021 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTSA1 Bridge File 70280 (RR64, 300m North Twp 504) Design for Bridge Repair

A2 Sundance Rd, RR 51 to RR 60 Concept Design

A3 Twp 534, Hwy 44 to Hwy 779 Arterial Design + Land Acquisition

A4 Twp 524, RR12 to RR14 (Phase 1) Arterial Design + Land Acquisition

A5 RR 31, Twp 531 to Twp 532 Gravel Road Design + Land Acquisition

A6 RR 22, Twp 511 to Twp 510 Gravel Road Design + Land Acquisition

B0 B. ROAD CONSTRUCTION PROJECTSB1 Bridge File 13218 (RR73, 600m South Twp 514) Bridge Repair - Design + Construction

B2 Twp 514 (Woodbend Rd), RR 270 to RR 273 (Part 2) Reconstruction + Widen

B3 RR 274 (Campsite Rd), Hwy 628 to Spruce Grove Reconstruction + Widen + ACP Surfacing

B4 Twp 514, RR 20 to Hwy 770 Reconstruction

C0 C. ASPHALT SURFACING PROJECTSC1 Next Rd TBD ACP Resurfacing

C2 Twp 514 (Millbank Rd), Hwy 22 to RR 70 ASBC Resurfacing

C3 Next Valid Petition (2) Local Improvements

D0 D. SEAL COAT SURFACING PROJECTS D1 Twp 511 (Graminia Rd), Hwy 60 to RR 271 Seal Coating

D2 Parkland Drive, Hwy 16A to RR15 Seal Coating

D3 Parkland Drive, Hwy 770 to RR 25 Seal Coating

D4 Parkland Drive, RR25 to Hwy 16 Seal Coating

D5 RR 280, Rolling Heights to Douglas Meadows Seal Coating

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION SURFACING PROJECTSF1 Aspen Hills - Aspen Dr, Aspen Place Subdivision Preservation - ASBC

F2 Birch-Hill Park - Birch Hill Dr Subdivision Preservation - ASBC

F3 Fernwood Estates - Fernwood Dr, Sudavian Cres Subdivision Preservation - ASBC

F4 Garden Grove Estates Subdivision Preservation - ASBC

F5 Grove Acres - Bruce Blvd Subdivision Preservation - ASBC

F6 Patricia Hills Subdivision Preservation - ASBC

F7 Pine Valley V Subdivision Preservation - ASBC

F8 Sunset View Acres Subdivision Preservation - ASBC

Page 15: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

Meridian Business Park

AchesonIndustrialArea

BEACHSEBAS.V.

BETULABEACHS.V.

S.V.KAPASIWINBEACHS.V.POINT ALISON

S.V.LAKEVIEW

WABAMUN

VILLAGE OFSPRING LAKE

STONY PLAIN

SPRUCEGROVE

WABAMUNINDIAN

RESERVENo. 133A STONY PLAIN

No.135

INDIANRESERVE

WABAMUN

LAKE

ISLELAKE

GLADULAKE

BIG LAKE

TOMAHAWK

KEEPHILLS

CARVELDUFFIELD

FALLIS

MAGNOLIA

GAINFORD

ENTWISTLE

A1

B1

A2

A5

A6

A4

A3

B2

B3

B4C2

D1

D5

D4

D2

D3

F6

F1

F5F4

F3

F7

F2

F8

R.07R.08 R.05R.06

R.07R.08 R.02

R.01R.02

R.03

R.03

R.04

R.04

R.05R.06 R.01

R.25

R.25R.28 R.26

R.26

R.27

R.27R.28T.5

1T.5

5T.5

0T.5

3T.5

2T.5

4T.4

9

T.55

T.51

T.52

T.54

T.50

T.49

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD11

RGE RD11

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

TWP R

D53

0

TWP R

D53

0

TWP R

D53

5

TWP R

D53

5

TWP R

D53

4

TWP R

D53

4

TWP R

D53

3

TWP R

D53

3

TWP R

D52

3

TWP R

D52

3

TWP R

D53

1

TWP R

D53

1

TWP R

D52

2

TWP R

D52

2

TWP R

D52

1

TWP R

D52

1

TWP R

D52

0

TWP R

D52

0

TWP R

D51

3

TWP R

D51

3

TWP R

D51

5

TWP R

D51

5

TWP R

D51

4

TWP R

D51

4

TWP R

D54

0

TWP R

D54

0

TWP R

D52

5

TWP R

D52

5

TWP R

D52

4

TWP R

D52

4

TWP R

D54

2

TWP R

D54

2

TWP R

D51

1

TWP R

D51

1TWP R

D51

2

TWP R

D51

2

TWP R

D54

1

TWP R

D54

1

TWP R

D54

3

TWP R

D54

3TWP R

D54

4

TWP R

D54

4

TWP R

D55

0

TWP R

D55

0

TWP R

D54

5

TWP R

D54

5

TWP R

D51

0

TWP R

D51

0

TWP R

D50

3

TWP R

D50

3

TWP R

D50

5

TWP R

D50

5

TWP R

D50

4

TWP R

D50

4

TWP R

D53

2

TWP R

D53

2

Parkland CountyRoad Program

20210 4 8 12 162

Kilometers

10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/19/2018

G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\MXD\RoadProgram2021_Features_Tabloid.mxd

¯

Road Program Features 2021A. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. WaterH. Wastewater

Page 16: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2018-2021 Road Program

Page 17: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2018-2021 Road Program Project List - SBAA0 A. DESIGN & LAND ACQUISITION PROJECTS A1 Bridge File 82056 ( RR 274, 970m North Twp 510) Design for Bridge Repair 2018

A2 Twp 514 (Woodbend Rd), Hwy 60 to RR 273 Conceptual Design (Upgrade) 2018

A3 Acheson Rd, extend 200m to Spruce Valley Rd Conceptual Design (New Road) 2018

A4 Railway Ave Extension, Fallis Design (New Road) 2018

A5 Twp 524 (Mink Lake Rd), Hwy 770 to RR 25 Collector Road Design + Land Acquisition 2018

A6 RR 30, Twp Rd 524A to Mayatan Subdivision Gravel Road Design + Land Acquisition 2018

A7 RR 35, Hwy 16 to Twp Rd 533A (Kapasiwin Transfer Station) Gravel Road Design + Land Acquisition 2018

A1 Bridge File 09254 (RR70, 500m South Hwy 16) Design for Bridge Repair 2019

A2 Twp 534, Hwy 44 to Hwy 779 Conceptual Design 2019

A3 Twp 514 (Woodbend Rd), Hwy 60 to RR 270 (Part 1) Collector Road Design + Land Acquisition 2019

A4 Twp 531A (114th Ave), 261st Street to 259th Street Collector Road Design 2019

A5 RR 30 (Meso Rd), Cantebury Estates to Twp 535 Gravel Road Design + Land Acquisition 2019

A6 RR 41, Twp 534 to 535 Gravel Road Design + Land Acquisition 2019

A1 Bridge File 13218 (RR73, 600m South Twp 514) Design for Bridge Repair 2020

A2 Twp 524, Stony Plain (RR12 to Hwy 770) Conceptual Design 2020

A3 Twp 514 (Woodbend Rd), RR 270 to RR 273 (Part 2) Collector Road Design + Land Acquisition 2020

A4 RR 274 (Campsite Rd), Hwy 628 to Spruce Grove Arterial Design + Land Acquisition 2020

A5 Twp 534, Hwy 44 to Hwy 779 Arterial Design + Land Acquisition 2020

A6 Twp 514, RR 20 to Hwy 770 Gravel Road Design + Land Acquisition 2020

A1 Bridge File 70280 (RR64, 300m North Twp 504) Design for Bridge Repair 2021

A2 Sundance Rd, RR 51 to RR 60 Concept Design 2021

A3 Twp 534, Hwy 44 to Hwy 779 Arterial Design + Land Acquisition 2021

A4 Twp 524, RR12 to RR14 (Phase 1) Arterial Design + Land Acquisition 2021

A5 RR 31, Twp 531 to Twp 532 Gravel Road Design + Land Acquisition 2021

A6 RR 22, Twp 511 to Twp 510 Gravel Road Design + Land Acquisition 2021

B0 B. ROAD CONSTRUCTION PROJECTS B1 RR 274 (Campsite Rd), Twp 540 to Hwy 633 Reconstruction + Widen 2018

B2 Twp 533A, RR 274 (Campsite Rd) to Cul-de-sac Reconstruction + ACP Surfacing 2018

B3 Bridge File 70364 (Twp 514A, 600m West of RR25) Bridge Repair - Design + Construction 2018

B4Gravel Road Reconstruction Program - County Wide (Locations mapped separately)

Reconstruction 2018

B1 Bridge File 82056 ( RR 274, 970m North Twp 510) Bridge Repair - Design + Construction 2019

B2 Twp 524 (Mink Lake Rd), Hwy 770 to RR 25 Reconstruction 2019

B3 County Facility Parking Lot Extension Construction + ACP Surfacing 2019

B4 Railway Ave Extension, Fallis Construction (New Road) 2019

B5 RR 30, Twp Rd 524 to Mayatan Subdivision Reconstruction 2019

B6 RR 35, Hwy 16 to Twp Rd 533A (Kapasiwin Transfer Station) Reconstruction 2019

B1 Bridge File 09254 (RR70, 500m South Hwy 16) Bridge Repair - Design + Construction 2020

B2 Twp 514 (Woodbend Rd), Hwy 60 to RR 270 (Part 1) Reconstruction + Widen 2020

B3 Twp 531A (114th Ave), 261st Street to 259th Street Reconstruction + Widen + ACP Surfacing 2020

B4 RR 30 (Meso Rd), Cantebury Estates to Twp 535 Reconstruction + ASBC Surfacing 2020

B5 RR 41, Twp 534 to 535 Reconstruction 2020

B1 Bridge File 13218 (RR73, 600m South Twp 514) Bridge Repair - Design + Construction 2021

B2 Twp 514 (Woodbend Rd), RR 270 to RR 273 (Part 2) Reconstruction + Widen 2021

B3 RR 274 (Campsite Rd), Hwy 628 to Spruce Grove Reconstruction + Widen + ACP Surfacing 2021

B4 Twp 514, RR 20 to Hwy 770 Reconstruction 2021

C0 C. ASPHALT SURFACING PROJECTS C1 Twp 531 (Northview Rd), 279 St to 274 St and 269 St to Hwy 60) ASBC Resurfacing 2018

C2 Twp 533, RR 13 to to Mayfair Heights ASBC Resurfacing 2018

C3 RR 13, Hwy 16 to Mayfair Heights ASBC Resurfacing 2018

C4 South Service Rd Hwy 16, RR 20 to RR 21 ASBC Resurfacing 2018

C5 RR 53, Sundance Rd to Beaver Bay Estates ASBC Resurfacing 2018

C6 RR 12, Hwy 16 to Hwy 16A ASBC Resurfacing 2018

C1 Prospector's Point Rd, Twp 511 (Graminia Rd) to Parking Lot ACP Resurfacing + base/subgrade repairs 2019

C3 RR 14, Parkland Dr to 524 ASBC Resurfacing 2019

C4 County Facility Paving ACP Resurfacing 2019

C5 Next Valid Petition (2) Local Improvements 2019

C1 Next Rd TBD ACP Resurfacing 2020

C2 RR 20, Hwy 16A to Parkland Drive ASBC Resurfacing 2020

C3 Twp 510, RR 55 to Hwy 759 ASBC Resurfacing + base/subgrade repairs 2020

C4 Next Valid Petition (2) Local Improvements 2020

C1 Next Rd TBD ACP Resurfacing 2021

C2 Twp 514 (Millbank Rd), Hwy 22 to RR 70 ASBC Resurfacing 2021

C3 Next Valid Petition (2) Local Improvements 2021

Page 18: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

D0 D. SEAL COAT SURFACING PROJECTS D1 Twp 540, Hwy 779 to RR13 Seal Coating 2018

D2 RR 21, Twp 523 to 524 Seal Coating 2018

D3 RR 15, Twp 524 to Twp 530 Seal Coating 2018

D4 Twp 524, RR 15 to RR 21 Seal Coating 2018

D1 Parkland Drive, RR 15 to RR 21 Seal Coating 2019

D2 RR 275, Twp 532A to Westbrook Crescent Seal Coating 2019

D3 Twp 532A, RR 274 to RR 280 Seal Coating 2019

D4 RR 274 (Campsite Rd), Hwy 16 to Twp 540 Seal Coating 2019

D1 RR 41, Hwy 16 to Twp 534 Seal Coating 2020

D2 Twp 534, RR 41 to RR 43 Seal Coating 2020

D3 RR 43, Twp 534 to Twp 535 Seal Coating 2020

D4 RR 32 (Duffield Rd), Twp 530 to Hwy 16 Seal Coating 2020

D5 RR 33 (Alberta Beach Rd), Twp 533A to 535 Seal Coating 2020

D1 Twp 511 (Graminia Rd), Hwy 60 to RR 271 Seal Coating 2021

D2 Parkland Drive, Hwy 16A to RR15 Seal Coating 2021

D3 Parkland Drive, Hwy 770 to RR 25 Seal Coating 2021

D4 Parkland Drive, RR25 to Hwy 16 Seal Coating 2021

D5 RR 280, Rolling Heights to Douglas Meadows Seal Coating 2021

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION SURFACING PROJECTS F1 Beaver Bay Estates - Krane Watchers Drive, RR 53 to 375m Southeast Subdivision Preservation - ASBC 2018

F2 Cameron Heights - Cameron Dr, Avco Lane Subdivision Preservation - ASBC 2018

F3Cameron Lake Estates - Sherman Dr, Lynn Valley Dr, Ogilvie Dr, Pincherry Lane, Cameron Lake Dr

Subdivision Preservation - ASBC 2018

F4 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Preservation - ACP 2018

F5 Mayfair Heights - Mayfair Dr, Mayfair Cres, Mayfair Pl Subdivision Preservation - ASBC 2018

F6 Panorama Heights - Neumann Crescent Subdivision Preservation - ASBC 2018

F7 Pine Valley Acres III - Spruce Ave Subdivision Preservation - ASBC 2018

F7 Pine Valley Acres IV - Bailey Ave, Pine St, Evergreen Dr Subdivision Preservation - ASBC 2018

F7 Pine Valley Acres - Birch Ave Subdivision Preservation - ASBC 2018

F8 Roslaire Estates - Roslaire Dr Subdivision Preservation - ASBC 2018

F1 Blueberry Hills Estates Subdivision Preservation - ACP 2019

F2 Chickakoo Estates - Mitchell Dr, Chickakoo Dr Subdivision Preservation - ASBC 2019

F3 Country Lane Estates Subdivision Preservation - ASBC 2019

F4 Fleming Park - Fleming Dr, Fleming Cres Subdivision Preservation - ASBC 2019

F5 Harris Acres - Harris Dr Subdivision Preservation - ASBC 2019

F6 Osborne Acres - Osborne Dr, Osborne Pl, 178m 279th St Subdivision Preservation - ASBC 2019

F7 Pine Wood - Pine Wood Dr, West Rd, East Rd Subdivision Preservation - ASBC 2019

F8 Spring Hills - Leslie Lane, Lindsay Lane Subdivision Preservation - ASBC 2019

F9 Spruce Bluff Estates - Ulmer Dr, Grouse Pt Subdivision Preservation - ASBC 2019

F10 Valaspen Place South - Valaspen Dr, Aspen Cres Subdivision Preservation - ASBC 2019

F11 Wesparkdale - Marion Cres Subdivision Preservation - ASBC 2019

F12 Willow Park - Willow Park Drive Subdivision Preservation - ASBC 2019

F13 Woodland Acres - Woodland Drive Subdivision Preservation - ASBC 2019

F1 Clearwater Estates - Robinson Dr, Allan Dr, Beaver Ave Subdivision Preservation - ASBC 2020

F2 Deer Park II - 1st & 2nd Ave, 1st & 2nd Street Subdivision Preservation - ASBC 2020

F3 Hubbles Lake - Diamond Dr, Diamond Rd Subdivision Preservation - ASBC 2020

F4 Lily Lake Estates - Michelle Dr, Michelle Cres, Michelle Close Subdivision Preservation - ASBC 2020

F5 Maude-West Acres Subdivision Preservation - ASBC 2020

F6West Gentry - West Gentry Rd, Parkland Rd & Cres, Lakeview Cres, Hillside Dr, RR11

Subdivision Preservation - ASBC 2020

F7 Whispering Pines - Whispering Pine Dr, Pine St, Spruce St, Valley Dr Subdivision Preservation - ASBC 2020

F1 Aspen Hills - Aspen Dr, Aspen Place Subdivision Preservation - ASBC 2021

F2 Birch-Hill Park - Birch Hill Dr Subdivision Preservation - ASBC 2021

F3 Fernwood Estates - Fernwood Dr, Sudavian Cres Subdivision Preservation - ASBC 2021

F4 Garden Grove Estates Subdivision Preservation - ASBC 2021

F5 Grove Acres - Bruce Blvd Subdivision Preservation - ASBC 2021

F6 Patricia Hills Subdivision Preservation - ASBC 2021

F7 Pine Valley V Subdivision Preservation - ASBC 2021

F8 Sunset View Acres Subdivision Preservation - ASBC 2021

G0 G. WATER 2018G1 Walker Lake - Lakeshore Waterloop Concept & Land Acquisition 2018

G2 Acheson Zone 4 Reservoir Expansion Design 2018

G1 Acheson Zone 4 Reservoir Expansion Design + Construction (2 years) 2019

H0 H. WASTEWATER 2018H1 Acheson Zone 2 Pipe Upsizing/Twinning - Parkland Business Park Design 2018

H1 Acheson Zone 2 Pipe Upsizing/Twinning - Parkland Business Park Construction 2019

Page 19: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

Meridian Business Park

AchesonIndustrialArea

BEACHSEBAS.V.

BETULABEACHS.V.

S.V.KAPASIWINBEACHS.V.POINT ALISON

S.V.LAKEVIEW

WABAMUN

VILLAGE OFSPRING LAKE

STONY PLAIN

SPRUCEGROVE

WABAMUNINDIAN

RESERVENo. 133A STONY PLAIN

No.135

INDIANRESERVE

WABAMUN

LAKE

ISLELAKE

GLADULAKE

BIG LAKE

TOMAHAWK

KEEPHILLS

CARVELDUFFIELD

FALLIS

MAGNOLIA

GAINFORD

ENTWISTLE

18-G2

19-A2

19-G1

21-A1

21-B1

21-A2

21-F6

21-A5

21-D1

21-D5

21-B2

21-F1

21-F5

21-F4

21-D4

21-F3

21-F7

21-F2

21-B3

21-A6

21-A4

21-B421-C2

21-D2

21-F8

21-D3

21-A3

20-B1

20-A120-F7

20-F3

20-F4

20-F6

20-F2

20-C2

20-F1

20-B3

20-B4

20-B2

20-D1

20-D4

20-A3

20-D320-B5

20-F5

20-C3

20-D5

20-A4

20-A2

20-A6

20-D2

20-A5

19-A1

19-B1

19-B4

19-B319-C4

19-F10

19-F9

19-F8

19-F7

19-F2

19-F12

19-A4

19-A5

19-A3

19-F1

19-D1

19-C1

19-F5

19-F13

19-A6

19-D4

19-F3

19-D2

19-F4

19-B2

19-F618-C6

19-C3

19-B519-F11

19-D319-B6

18-H1

18-A1

18-B3

18-A418-G1

18-C5

18-D2

18-D1

18-F518-F4

18-A3

18-F2

18-D4

18-F7

18-B2

18-D3

18-C3

18-F1

18-A2

18-C1

18-F318-B1

18-F8

18-C2

18-A5

18-F6

18-A6

18-C418-A7

R.07R.08 R.05R.06

R.07R.08 R.02

R.01R.02

R.03

R.03

R.04

R.04

R.05R.06 R.01

R.25

R.25R.28 R.26

R.26

R.27

R.27R.28T.5

5T.5

0T.5

1T.5

3T.5

4T.4

9T.5

2

T.55

T.51

T.52

T.54

T.50

T.49

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD11

RGE RD11

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

TWP R

D53

0

TWP R

D53

0

TWP R

D53

5

TWP R

D53

5

TWP R

D53

4

TWP R

D53

4

TWP R

D53

3

TWP R

D53

3

TWP R

D52

3

TWP R

D52

3

TWP R

D53

1

TWP R

D53

1

TWP R

D52

2

TWP R

D52

2

TWP R

D52

1

TWP R

D52

1

TWP R

D52

0

TWP R

D52

0

TWP R

D51

3

TWP R

D51

3

TWP R

D51

5

TWP R

D51

5

TWP R

D51

4

TWP R

D51

4

TWP R

D54

0

TWP R

D54

0

TWP R

D52

5

TWP R

D52

5

TWP R

D52

4

TWP R

D52

4

TWP R

D54

2

TWP R

D54

2

TWP R

D51

1

TWP R

D51

1TWP R

D51

2

TWP R

D51

2

TWP R

D54

1

TWP R

D54

1

TWP R

D54

3

TWP R

D54

3TWP R

D54

4

TWP R

D54

4

TWP R

D55

0

TWP R

D55

0

TWP R

D54

5

TWP R

D54

5

TWP R

D51

0

TWP R

D51

0

TWP R

D50

3

TWP R

D50

3

TWP R

D50

5

TWP R

D50

5

TWP R

D50

4

TWP R

D50

4

TWP R

D53

2

TWP R

D53

2

Parkland CountyRoad Program

2018-20210 4 8 12 162

Kilometers

10 TRANSVERSE MERCATOR PROJECTIONDrawn By: BAMDate: 3/29/2018

Legend2018*2018 - B4201920202021

G:\GIS\Projects\Engineering\Roads\Three Year Road Program\2018-2021\Output\SBA_R1\Gravel Road Reconstruction Program 2018\RoadProgram2018-2021_Features.mxd

¯

*18-B4 - See Gravel Road Reconstruction Program 2018

Page 20: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

1. SURFACED ROAD RECONSTRUCTION

Suggested Guidelines for Criteria Ratings

Rating Criteria 1-2

Guideline 3-4

Guideline 5-6

Guideline 7-8

Guideline 9-10

Guideline

1) Do Safety Elements and Existing Geometric Road Standards Require Improvement?

No Deficiencies Minor Alignment Problems or Sight

Distance Concerns.

Significant Deficiencies Related to

Alignment or Sight Distance, etc.

Major Deficiencies

Major Multiple Deficiencies

2) Are Maintenance Costs High? <$1,000/mile $1,000 to $2,000/mile

$2,000 to $3,000/mile

$3,000 to $4,000/mile

+$4,000/mile

3) Are Traffic Volumes High? 0-250 251-500 501-750 751-1000 +1000

4) Is this Project of Network Importance to the County?

Access Local Minor Collector Major Collector Arterial

5) Is this Project Environmentally and Socially Friendly?

Major Multiple Impacts

Major Impact Significant Impact Minor Impact Negligible Impact

6) Is there Ratepayer Consensus in the Vicinity of this Project?

Unanimous Opposition

Majority Opposition

Mixed Support/Opposition

Majority Support Unanimous Support

7) Is Construction Technically and Economically Feasible?

Major Problems Serious Problems Average Difficulty Minor Problems Negligible Problems

Page 21: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

Division Type Between Length Roadway Criteria Ratings

ROAD PROGRAM WORKSHEETUpdated Aug 2017

Surfaced Road Reconstruction List With Ratings

Number Name (km)

Safe

ty &

Sta

ndar

ds

(20%

)Main

tena

nce C

osts

(20%

)Tr

affic

Vol

ume (

25%

)Ne

twor

k Im

porta

nce

(10%

)Fr

iendl

ines

s (10

%)

Conc

ensu

s (10

%)

Feas

abilit

y (5%

)To

tal (

100%

) Comments

5 Reconstruction & ASBC Surfacing TWP 524 Mink Lake Road HWY 770- RR25 3.0 7 10 10 6 5 8 5 8.05 Grant Funding Required3 Widening & ACP Surfacing RR 274 Campsite Road TWP540-SH633 3.2 6 6 8 9 7 8 6 7.10 Grant Funding Required2 Widening & ACP Surfacing RR 274 Campsite Road TWP524-SG 1.6 4 6 10 8 4 8 4 6.70 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR263-270 4.8 5 4 10 7 7 6 6 6.60 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR270-273 4.9 5 4 10 7 7 6 6 6.60 Grant Funding Required4 Widening & ASBC Surfacing TWP 524 79TH Avenue RR12-15 4.8 3 6 10 10 5 6 4 6.60 Grant Funding Required6 Widening & ASBC Surfacing TWP 530 Sundance Road RR51-53 3.5 4 10 5 8 6 7 5 6.40 Grant Funding Required6 Widening & ASBC Surfacing TWP 530 Sundance Road RR53-60 5.0 4 10 5 8 6 7 5 6.40 Grant Funding Required

2 & 3 Widening & ACP Surfacing TWP 534 RR 271A to RR 274 6 5 10 4 10 6 5 5 6.35 Grant Funding Required2 & 3 Widening & ACP Surfacing TWP 534 RR 274 to Hwy 779 2.8 6 10 2 10 6 5 4 6.00 Grant Funding Required2 & 3 Widening & ACP Surfacing TWP 534 Hwy 44 to RR 271A 3.5 4 10 2 10 6 5 5 5.65 Grant Funding Required

3 Reconstruction & ACP Surfacing TWP 540 Hwy 779 - RR14 8 7 2 10 6 5 7 4 6.30 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 RR274-275 1.8 3 5 10 6 6 7 5 6.25 Grant Funding Required5 Reconstruction & ASBC Surfacing RR 41 TWP532-534 1.6 6 4 7 6 8 7 7 6.20 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 RR275-280 1.7 6 2 8 6 6 7 5 5.75 Grant Funding Required5 Reconstruction & ASBC Surfacing RR 32 Duffield Road TWP520-CN 7.9 8 2 6 9 4 6 4 5.60 Grant Funding Required4 Reconstruction & ASBC Surfacing SRS TWP532 RR13-13A 0.8 10 4 2 4 8 7 6 5.50 Grant Funding Required1 Widening & ACP Overlay TWP 511 Graminia Road RR261-263 3.2 5 2 8 6 6 6 4 5.40 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 SH779-RR280 1.6 4 2 8 6 5 6 5 5.15 Grant Funding Required1 Reconstruction & ASBC Surfacing RR 261 Fleming Road TWP511-512A 2.3 4 3 7 6 4 5 5 4.90 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR260-263 4.8 4 2 6 6 5 5 4 4.50 Grant Funding Required4 Reconstruction & ASBC Surfacing RR 21 Sundown Road CN-Park. Dr. 1.6 7 1 5 4 3 5 4 4.25 Grant Funding Required

2018 Road Program Project

2019 Road Program Project

2020 Road Program Project

2021 Road Program Project Within 10 Years

Page 22: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

2. GRAVEL RECONSTRUCTION

Suggested Guidelines for Criteria Ratings

Rating Criteria 1-2

Guideline 3-4

Guideline 5-6

Guideline 7-8

Guideline 9-10

Guideline

1) Do Safety Elements and Existing Geometric Road Standards Require Improvement?

No Deficiencies Minor Alignment Problems or Sight

Distance Concerns.

Significant Deficiencies Related to

Alignment or Sight Distance, etc.

Major Deficiencies

Major Multiple Deficiencies

2) Are Maintenance Costs High? <$1,000/mile $1,000 to $2,000/mile

$2,000 to $3,000/mile

$3,000 to $4,000/mile

+$4,000/mile

3) Are Traffic Volumes High? 0-50 51-150 151-250 251-400 +401

4) Is this Project of Network Importance to the County?

Access Local Minor Collector Major Collector Arterial

5) Is this Project Environmentally and Socially Friendly?

Major Multiple Impacts

Major Impact Significant Impact Minor Impact Negligible Impact

6) Is there Ratepayer Consensus in the Vicinity of this Project?

Unanimous Opposition

Majority Opposition

Mixed Support/Opposition

Majority Support Unanimous Support

7) Is Construction Technically and Economically Feasible?

Major Problems Serious Problems Average Difficulty Minor Problems Negligible Problems

Page 23: Parkland County Four Year Road Program County Four Year Road Program ENGINEERING SERVICES Presented as part of 2018 Budget - November 2017 2018 Road Program 2018 Road Program Project

Division Type Between Length Roadway

ROAD PROGRAM WORKSHEETUpdated Apr 2018

Gravel Road Reconstruction Project List With Ratings

Criteria Ratings

Number Name (km)

Safe

ty &

Sta

ndar

ds

(20%

)

Maint

enan

ce C

osts

(20%

)

Traf

fic V

olum

e (2

5%)

Networ

k Im

porta

nce

(10%

)

Frien

dlin

ess (

10%

)

Conse

nsus

(10%

)

Feas

abilit

y (5%

)

Tota

l (10

0%) Comments

5 Full Reconstruction RR 41 TWP534-535 1.6 5 7 8 4 7 7 4 6.40 Grant Funding Required5 Full Reconstruction RR 30 Meso Rd Cantebury Estates North 1.3 7 9 6 8 8 8 6.25 Grant Funding Required5 Gravel Road Reconstruction Program TWP 530 RR25 - RR23 0.6 6 7 7 4 5 5 5 6.00 Grant Funding Required5 Gravel Road Reconstruction Program RR 25 TWP524A-530 0.4 5 7 5 6 7 7 5 5.90 Grant Funding Required5 Full Reconstruction RR 35 Hwy 16 - TWP 533A 2.3 4 5 8 4 5 7 4 5.60 Grant Funding Required2 Gravel Road Reconstruction Program RR 270 Sandhills Rd Hwy 628 to Twp 530 0.8 4 7 8 5 3 4 3 5.55 Funding Required5 Full Reconstruction RR 30 TWP524A-Mayatan 2.6 6 7 4 4 7 6 5 5.55 Grant Funding Required5 Full Reconstruction RR 22 TWP510-511 0.8 9 6 4 3 5 5 5 5.55 Grant Funding Required4 Gravel Road Reconstruction Program TWP 510 Correction Road RR13-20 0.3 5 7 4 4 7 7 5 5.45 Grant Funding Required6 Gravel Road Reconstruction Program TWP 522 Hwy 22 to Hwy 759 14.8 5 7 5 8 3 4 5 5.40 Grant Funding Required5 Gravel Road Reconstruction Program RR 22 TWP510-511 1.6 8 8 2 4 5 5 5 5.35 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 Hwy 627 North 500m 0.5 5 7 4 4 6 7 4 5.30 Grant Funding Required

4 & 5 Gravel Road Reconstruction Program TWP 514 Woodbend Rd RR 20 to Hwy 770 4.8 7 8 2 4 5 5 8 5.30 Grant Funding Required4 Gravel Road Reconstruction Program RR 13 TWP512-514 0.5 4 7 4 4 7 7 6 5.30 Grant Funding Required6 Full Reconstruction TWP 512 RR75-80 1.6 5 7 4 3 7 6 6 5.30 Grant Funding Required6 Full Reconstruction TWP 512 RR74-75 1.6 5 7 4 3 7 6 6 5.30 Grant Funding Required6 Full Reconstruction RR 73 South of TWP 534 0.4 9 6 2 4 6 5 4 5.20 Grant Funding Required5 Full Reconstruction RR 42 TWP534-535 1.6 7 4 3 6 7 6 5 5.10 Grant Funding Required5 Full Reconstruction RR 31 TWP531-532 1.9 7 4 4 3 5 8 5 5.05 Grant Funding Required5 Full Reconstruction RR 44 Lakeshore-HWY 16 2.2 5 5 4 4 7 7 5 5.05 Grant Funding Required4 Full Reconstruction TWP 514 RR274-275 1.8 7 6 2 4 6 7 4 5.00 Grant Funding Required5 Full Reconstruction RR 43 Lakeshore-HWY 16 1.8 4 3 7 3 7 6 5 5.00 Grant Funding Required5 Gravel Road Reconstruction Program TWP 524B Railway Ave Duffield Duffield to Edinburgh Park 0.2 6 7 3 4 5 5 5 5.00 Grant Funding Required3 Construction TWP 532 RR13-14 0.8 6 4 4 4 6 7 5 4.95 Grant Funding Required6 Full Reconstruction TWP 530 RR70-71 1.8 6 4 3 6 6 7 4 4.85 Grant Funding Required3 Gravel Road Reconstruction Program TWP 535 Chickakoo Rd RR12 - RR 13 1.8 8 4 4 4 3 5 3 4.75 Grant Funding Required4 Gravel Road Reconstruction Program RR 14 TWP510-512 0.7 5 8 2 4 5 5 5 4.75 Grant Funding Required5 Full Reconstruction RR 24 TWP511-512 1.5 7 4 3 3 6 6 6 4.75 Grant Funding Required4 Full Reconstruction RR 21 TWP512A-513A 1.6 8 6 2 3 4 5 4 4.70 Grant Funding Required6 Full Reconstruction TWP 531A SH759-RR61 2.0 7 3 4 3 5 7 4 4.70 Grant Funding Required3 Gravel Road Reconstruction Program TWP 534 RR280 - RR275 0.3 2 7 3 9 5 5 5 4.70 Grant Funding Required

4 & 5 Gravel Road Reconstruction Program RR 21 TWP511-512 0.7 2 8 4 4 5 5 5 4.65 Grant Funding Required3 Gravel Road Reconstruction Program RR 275 Boundary Rd Westbrook Cres to Twp 534 1.1 5 5 4 4 5 5 5 4.65 Grant Funding Required5 Full Reconstruction RR 31A RR31-TWP520 2.0 8 4 3 3 4 6 4 4.65 Grant Funding Required5 Gravel Road Reconstruction Program Edinburgh Park Subdivison 524B 1.7 4 7 3 4 5 5 5 4.60 Grant Funding Required5 Gravel Road Reconstruction Program Lakeside Park Subdivison RR 25 4.1 4 7 3 4 5 5 5 4.60 Grant Funding Required6 Gravel Road Reconstruction Program RR 75 RR513 to RR511 0.4 4 7 3 4 5 5 5 4.60 Grant Funding Required4 Gravel Road Reconstruction Program RR 275 Twp 512-511 4 8 2 4 5 5 5 4.55 Grant Funding Required6 Full Reconstruction TWP 514 RR81-82 1.6 5 3 4 3 7 6 6 4.50 Grant Funding Required6 Full Reconstruction TWP 524 RR72-73 1.6 4 3 4 5 7 6 6 4.50 Grant Funding Required

1 & 4 Gravel Road Reconstruction Program TWP 510 RR273 (N) - RR 275 (S) 1.1 5 5 3 5 5 5 5 4.50 Grant Funding Required3 Full Reconstruction RR 13 TWP535-540 1.8 8 4 4 3 3 3 3 4.45 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 Hwy 627 - Twp 514 3.2 4 5 4 4 5 5 5 4.45 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 TWP 514 - 511 0.7 4 5 4 4 5 5 5 4.45 Grant Funding Required6 Gravel Road Reconstruction Program RR 73 TWP514-520 0.2 5 4 4 4 5 5 5 4.45 Grant Funding Required

2018 Gravel Spot Repair Program Candidates

2019 Road Program Project

2020 Road Program Project

2021 Road Program Project within 10 years