2013 ITP20 Potential Needs Maps [Draft]
2013 ITP20
October 16, 2012
1
![Page 2: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/2.jpg)
Revision History
2
Date Notes
10-16-2012 Original draft. Posted to SPP.org
![Page 3: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/3.jpg)
2013 ITP20 potential needs maps
• Four futures were evaluated in the 2013 ITP20 for reliability, policy, and economic needs.
• The potential needs highlighted on the following maps were identified in accordance with the 2013 ITP20 scope.
• Maps are draft and will be updated as the assessment progresses
3
![Page 4: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/4.jpg)
BUSINESS AS USUAL FUTURE (F1) Peak hour system flows (230 kV and above)
4
![Page 5: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/5.jpg)
5
Future 1
![Page 6: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/6.jpg)
ADDITIONAL WIND FUTURE (F2) Peak hour system flows (230 kV and above)
6
![Page 7: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/7.jpg)
7
Future 1
![Page 8: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/8.jpg)
ADDITIONAL WIND PLUS EXPORTS FUTURE (F3)
Peak hour system flows (230 kV and above)
8
![Page 9: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/9.jpg)
9
Future 1
![Page 10: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/10.jpg)
COMBINED POLICY FUTURE (F4) Peak hour system flows (230 kV and above)
10
![Page 11: 2013 ITP20 Potential Needs Maps [Draft] - SPP](https://reader031.vdocuments.site/reader031/viewer/2022012503/617db2d0f299323b2262a37a/html5/thumbnails/11.jpg)
11
Future 1