Page 2: 2012.07. 09 board meeting pres

Gymnastics

New facility Rented for $100 per year from

Peoples State Bank

Page 3: 2012.07. 09 board meeting pres
Page 4: 2012.07. 09 board meeting pres
Page 5: 2012.07. 09 board meeting pres
Page 6: 2012.07. 09 board meeting pres
Page 7: 2012.07. 09 board meeting pres
Page 8: 2012.07. 09 board meeting pres

High School Energy Savings Envelope Back Entrance Project

Page 9: 2012.07. 09 board meeting pres
Page 10: 2012.07. 09 board meeting pres
Page 11: 2012.07. 09 board meeting pres

BAK Office Project

Page 12: 2012.07. 09 board meeting pres
Page 13: 2012.07. 09 board meeting pres

Enrollment Data

Page 14: 2012.07. 09 board meeting pres

3rd Friday Enrollment Projection

Fall 2008 Fall 2009 Fall 2010 Fall 2011 Fall 2012 Fall 2013 Fall 2014 Fall 2015 Fall 2016 Fall 2017 Fall 2018 Fall 2019 Fall 2020 Fall 20211060

1080

1100

1120

1140

1160

1180

1200

1220

1240

1215

1188

1170

11161124

11471141

1163 1160

1181

12071199

1209 1209

Guess

Page 15: 2012.07. 09 board meeting pres

HS(green)/BV(red)/BAK(blue) Projections

11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19 19-20 19-21 19-220

200

400

600

800

1000

1200

1400

254 260 259 252 252 251 250 248 246 245 243

513 506 533 559 561 574 577 569 572 569 561

355 364 361 336 356 341 360 396 387 401 411

Page 16: 2012.07. 09 board meeting pres

Resident Student Other Ed. Choices

Fall 2005 Fall 2006 Fall 2007 Fall 2008 Fall 2009 Fall 2010 Fall 20110

50

100

150

200

250

2638 42 41 42 47 43

20 19 21 23 2330 34

241 242230

221

201194

167

84 8175 71 72 71

81

5243 39 39

4638 42

OE OUT Bible Baptist Prairie Catholic Wyalusing Registered Home School

Page 17: 2012.07. 09 board meeting pres

Open enrollment History

Fall 2002 Fall 2003 Fall 2004 Fall 2005 Fall 2006 Fall 2007 Fall 2008 Fall 2009 Fall 2010 Fall 20110

5

10

15

20

25

30

35

40

45

50

5

1213

11

15

1918

1718

21

11

2019

26

38

4241

42

47

43

3 out toVirtualCharters

Red is OUT

Blue is IN

Page 18: 2012.07. 09 board meeting pres

Revenue Limit Forecast• Last year’s Revenue Limit was $10,818,000• Estimated 12-13 Revenue Limit $10,606,600

• Estimated to be down $211,400

• There is an estimated one-time “special aid” for this year of $57,250; from what is understood this is outside of the revenue limit

• So if that is added back in, we are projected to be down $154,150 in revenue from Taxes and General State Aid

Page 19: 2012.07. 09 board meeting pres

RL drop implications

• We will continue to build budget based on it being balanced – Rollover expected this week or next– Later July finance Committee; Draft for August Meeting – Balancing will not be easy, but…

• “Paying ahead” the Fund 73 OPEB liabilities was huge as that payment is freed up

• Insurance changes kept those costs in check• Stay conservative with Priorities:

– What will raise student achievement levels?– What investments will save us money down the road? (epoxy

flooring, repairing buildings, improvements to stay modern. …)

Page 20: 2012.07. 09 board meeting pres

On-line Charter School

Page 21: 2012.07. 09 board meeting pres

On-line Charter School

• Plan to start cautiously, handful of students• Target those that are OE out to on-line– Future ?? (Home School, OE in, Blended)

• School Board must authorize – Governance Council runs school – not Board– Separate School with contract– Innovation outside of control of School Board

Page 22: 2012.07. 09 board meeting pres

Compressed Natural Gas (CNG)

Page 23: 2012.07. 09 board meeting pres

Why look at this?• Current pump price for diesel is $3.72 (June

Kwik-Trip bill)• Estimated full year of diesel costs about

$54,000 at average of $3.60 per gallon• This usage in CNG would cost about $11,543– Natural Gas at school service point is $0.57 per

therm; 1.35 conversion therms to diesel gallon eq.– Would need own infrastructure (like Cadott)

• Kwik-Trip pump; $1.59 (diesel eq) = $23,850– About 8 to 10 year payback (bus fleet only, Vans etc.)

Page 24: 2012.07. 09 board meeting pres

Continue to study and possibly plan for fall of 2013 (2013-2014 budget impact)

• We have extended current contract with Southwest through the end of 2012-2013 school year (we have time but…)

• Conversion to CNG would probably entail that the district purchase the bus fleet (more options)

• Kwik-Trip may be adding a CNG island at one of their PdC stores (LaCrosse in operation)

• Another option is a slow fill (Cadott Schools)

Page 25: 2012.07. 09 board meeting pres

CNG infrastructure costs qualify as Revenue Limit Energy Exemption (EE)

• The purchase of CNG buses qualify as an eligible energy efficiency project for an exemption

• Fueling station equipment qualifies as an eligible energy efficiency project for an exemption

• The future CNG ongoing fuel costs and operating costs would not be considered part of the energy exemption; only the initial purchase is allowable under the exemption.

Page 26: 2012.07. 09 board meeting pres

Substantial Investment

• All principle and interest repayments are allowed under the EE rules and are full shared costs under state aid formula.

• With a resolution at an annual meeting; the Board could borrow for the full EE project.– The board must pass a resolution to exceed the limit

for the energy efficiency project for each year of the exemption; for example 10 years.

– Otherwise the repayment will come directly from Fund 10 –would be full shared costs under state aid.

Page 27: 2012.07. 09 board meeting pres

Savings $30,150/yr; KwikTrip Pump priceSo, what are the Costs

• High (conservative) estimate for each bus $145,800– Extra cost of CNG package $30,000 per bus (tank is costly)

– Total CNG extra cost $240,000– Price based on top of the line buses

• Fleet (8 buses) estimate for buses $1,166,400– Extension office working with us on possible zero

interest loan package– 10 year EE principal payback $116,640 per year– Buses last 15 to 25 years

8 year payback

Page 28: 2012.07. 09 board meeting pres

Savings $42,457/yr; Nat Gas priceSo, what are the Costs

• CNG slow fill station $400,000– Maintenance contract through MGE– 10 year station loan; $40,000 per year

• Cost increase – Same total extra CNG bus cost $240,000– CNG station $400,000 – Total CNG added costs $640,000

• This is feasible, but, we need to get partners to help with station costing … (business partners)

15 year payback

Page 29: 2012.07. 09 board meeting pres

District Cash Flow of potential project

• Just starting to work on this… (still many questions)

• Initial look is that it is feasible as an EE project• Cash flow for district looks real good• We need to have set-aside account for saving for

future bus and station purchases – Plan for complete replacement cycle of busses

• Start replacing busses after 10 years or if something else is out there, hydrogen etc., then do not replace and run the busses life out and save account; for example, out 15 years projected to have about 1.5 million available

– If slow fill route; plan for complete replacement of station

Page 30: 2012.07. 09 board meeting pres

CNG Study is on-going • Continue to look at all options• Kwik-Trip would like to invite us to LaCrosse to see

the CNG station in action; fill a truck, car, etc.• We could go to Cadott to see their slow fill in

operation (value ??)• MGE is willing to work with us …• At some point we need to make some decisions– We are checking on lead time to order busses etc.

• What other information do we need to gather?

Page 31: 2012.07. 09 board meeting pres

A few other notes

• All day 4K is now full– We have hit the 60 maximum– Any further 4K enrollment will be automatically

placed in the half day program and applications for the full day will be put on waiting list

• Another great problem; we are now at 88 students in Kindergarten and if we slide over 90 (91 plus) by September, we will need to add another teacher at BAK

Page 32: 2012.07. 09 board meeting pres

Thank You for Your support of

Your Public School