2011 11-14 mdsvp

71
ANALYST & INVEST ORT OUR November 2011

Upload: kghm

Post on 11-Jun-2015

309 views

Category:

Investor Relations


0 download

TRANSCRIPT

Page 1: 2011 11-14 mdsvp

ANALYST & INVESTOR TOURS & S O OUNovember  2011

Page 2: 2011 11-14 mdsvp

SAFETY PLANPLAN

OBJECTIVE“ i f d l h ”“ Everyone Going Home Safe and Healthy Every Day ”

• Supervisory development – every supervisor to actively participate in the presentation and facilitation of the next stage of Courageous Leadershippresentation and facilitation of the next stage of Courageous Leadership

• 5 pts Safety Card – track the effectiveness of the 5pt card boards by monitoring the response time, completion time for worker concern. Compliance data to be displayed at the board

• All Mine Standards and procedures – review one AMS or procedure weekly with dayshift crews

• Monthly Safety Theme – Promote one primary safety topic each month amongst all employees and monitor compliance during the month

• First Aid Training – 100% of employees to be trained by the end of 2011

2

Page 3: 2011 11-14 mdsvp

SUDBURY: REGIONAL GEOLOGY

N

Archean Gneissic & Migmatitic Rocks

• Levack Gneiss Complex Podolsky MineN • Levack Gneiss Complex y

Sudbury Igneous Complex

Levack Mine (Morrison Deposit)

ComplexMcCreedy West 

Mine• Ni‐SulphideDeposits are located at the 

Huronian Supergroup

base of the SIC 

310 km Victoria Project

Page 4: 2011 11-14 mdsvp

SHAFT LOCATION (LOOKING NE)

Xstrata 

LevackStrathcona Mill

Xstrata CraigMORRISON

Xstrata OnapingMcCreedy West

4

Page 5: 2011 11-14 mdsvp

LEVACK MINE & OREBODIES

West EastNo. 2 Shaft

Main Orebody No. 10 1000

1600 Level No. 71300

No. 2

No. 4Feet

0 1000

2650 Level

1900To McCreedy West Mine

2650 Level

3600 Level

No. 3No. 3 Shaft

MorrisonDeposit

3600 Level

Undefined ResourceDevelopmentFootwall DepositsContact Deposits 5

Page 6: 2011 11-14 mdsvp

LEVACK MINE: SCHEMATIC

#2 Shaft Xstrata Ni Craig ShaftN

Keel ZoneKeel Zone Main Main OrebodyOrebody

ning

 Ltd.

ning

 Ltd.

Sudbury No. 7 No. 7 OrebodyOrebody

draFNX

draFNXMi

Mi

Sudbury Breccia

1600 Level1600 LevelIgneous Complex

2650 Level2650 Level

Qua

dQua

dBreccia

3600 Level3600 Level

Morrison Morrison DepositDeposit

3600 Level3600 Level

Feet

0 1000

10000N

5000N

6

Page 7: 2011 11-14 mdsvp

MORRISON DEPOSIT: LONGITUDINAL

MD1

N

MD2

3270L

3570L

MD3MD3

4210L

500 Ft9.3 ft @18 32% Cu 1 72% Ni 10 89 g/t TPM

4620L

Drillhole intercept > $100 Value

18.32% Cu, 1.72% Ni, 10.89 g/t TPM

13.1 ft @10.74% Cu, 10.26% i /Morrison ‐ 2nd Order Wireframe

Morrison ‐ 1st Order WireframeMorrison ‐ Infrastructure

Drillhole intercept > $100 Value Ni, 26.07 g/t TPM

13.9 ft @23.00% Cu, 1.99% Ni, 46.44 g/t TPM 7

Page 8: 2011 11-14 mdsvp

OVERVIEW: SHAFT LOCATIONS

Craig Shaft(opened in 1995)

Levack #2 Shaft(sunk in 1933)

2650 L

3600 L

4300 Lore/wastepasses Current reservepasses

4900 LShaft proposed 

Current reserveCurrent mineral envelope

Looking West

Bottom down rampdevelopment

Looking West 8

Page 9: 2011 11-14 mdsvp

DRILL ACCESS: RESERVE/RESOURCE GROWTH

Current ramp face andLimit of current reserves

4210 LMD3 4210 LMD3

22.6 ft @ 26.0% Cu, 3.0% Ni, 38.9 g/t TPM

Intercept > $300 value & minimum 6 ft width

11.8 ft @ 20.0% Cu, 3.3% Ni, 60.2 g/t TPM

5000 LCurrent reserve

& minimum 6 ft. width

Current mineral envelope

19.6 ft @ 12.7% Cu, 1.0% Ni, 25.6 g/t TPM 9

Page 10: 2011 11-14 mdsvp

MORRISONMORRISON OREBODY

Page 11: 2011 11-14 mdsvp

MORRISON DEPOSIT: LONGITUDINAL

MD1

N

MD2

3270L

3570L

MD3MD3

4210L

500 Ft9.3 ft @18 32% Cu 1 72% Ni 10 89 g/t TPM

4620L

Drillhole intercept > $100 Value

18.32% Cu, 1.72% Ni, 10.89 g/t TPM

13.1 ft @10.74% Cu, 10.26% i /Morrison ‐ 2nd Order Wireframe

Morrison ‐ 1st Order WireframeMorrison ‐ Infrastructure

Drillhole intercept > $100 Value Ni, 26.07 g/t TPM

13.9 ft @23.00% Cu, 1.99% Ni, 46.44 g/t TPM 11

Page 12: 2011 11-14 mdsvp

3050 LEVEL (10070 ELEVATION)

N50 ft clipping

Large Mafic block(s)

3030Level

3050Level

100 ft

12

Page 13: 2011 11-14 mdsvp

3180 LEVEL CUT #1 ROUND 12 WEST

8.5 ft

13

Page 14: 2011 11-14 mdsvp

3450 LEVEL CUT #1

100 ft

14

Page 15: 2011 11-14 mdsvp

3450 LEVEL CUT #1 ROUND 14 WEST

15

Page 16: 2011 11-14 mdsvp

3690 LEVEL CUT #1

16

Page 17: 2011 11-14 mdsvp

3690 LEVEL CUT #1 ROUND 69 SOUTH‐EAST

5 ft5 ft

17

Page 18: 2011 11-14 mdsvp

3810 LEVEL CUT #1 ROUND 19 EAST

7.5 ft

18

Page 19: 2011 11-14 mdsvp

3810 LEVEL CUT #1 ROUND 68 SOUTH‐EAST

5 ft

19

Page 20: 2011 11-14 mdsvp

MORRISON DEPOSIT – 3810L C1 –9310 ELEVATION

N3810 Access N

2nd Order Wireframe

Access

Cut and Fill

Drillholeintercept > $1001st O d

Captive Cut and Fill Stope

intercept > $1001st Order WireframeShrink Stope

100 ft

20

Page 21: 2011 11-14 mdsvp

CAPTIVE CUT & FILL MINING METHOD

TUGGER

OVERCUT

MANWAY GEAR SLIDE WITH BUCKET

ORE LENSE

DRILLING

SLUSHER42” STEEL RING MILLHOLES

BOXHOLERAISE

DRILLINGUPPERS

CEMENTED SANDFILL FILL BULKHEADALIMAK BULKHEAD

NEST

BOXHOLECUTOUT

SILL PILLAR TO BE RECOVEREDAFTER STOPE COMPLETION CAPTIVE CUT AND FILL CAPTIVE CUT AND FILL 

TOP ACCESS STOPETOP ACCESS STOPE

UNDERCUT

CUTOUTALIMAK DRIVEN ON ORE VEIN AND TIMBERED MANWAY INSTALLED POST BREAKTHROUGH

21

Page 22: 2011 11-14 mdsvp

SHRINKAGE STOPE – TOP ACCESS

TUGGEROVERCUTACCESS

ALIMAK RAISE

SHRINKAGE STOPE SHRINKAGE STOPE ––TOP ACCESSTOP ACCESS

MANWAY

GEAR SLIDE ORE LENSE

DRILLING

ALIMAK RAISEALIMAK DRIVEN ON ORE VEIN AND TIMBERED MANWAY INSTALLED POST BREAKTHROUGH

DRILLINGUPPERS

BROKEN MUCKGEAR BUCKET

SLUSHER

MINING PILLAR

MINING PILLAR

DRAWPOINTSDRAWPOINTS

MINING PILLAR

DRAWPOINT

TIMBER MUCKWALL

ALIMAK NEST22

Page 23: 2011 11-14 mdsvp

4150 LEVEL CUT #1

23

Page 24: 2011 11-14 mdsvp

4150 LEVEL CUT #1

24

Page 25: 2011 11-14 mdsvp

SWEEPER UNIT

25

Page 26: 2011 11-14 mdsvp

BLOWPIPE

26

Page 27: 2011 11-14 mdsvp

OUR TOUR TODAY

Page 28: 2011 11-14 mdsvp

3630 LEVEL CUT #1

28

Page 29: 2011 11-14 mdsvp

3690 LEVEL CUT #2

29

Page 30: 2011 11-14 mdsvp

4030 LEVEL CUT #2

30

Page 31: 2011 11-14 mdsvp

4090 LEVEL CUT #2

31

Page 32: 2011 11-14 mdsvp

4150 LEVEL CUT #1

32

Page 33: 2011 11-14 mdsvp

4210 LEVEL CUT #1

33

Page 34: 2011 11-14 mdsvp

ENJOY YOUR TOUR!

34

Page 35: 2011 11-14 mdsvp

VICTORIA 

Page 36: 2011 11-14 mdsvp

SUDBURY: REGIONAL GEOLOGY

N

Archean Gneissic & Migmatitic Rocks

•Levack Gneiss Complex Podolsky MineN y

Sudbury Igneous Complex

Levack Mine (Morrison Deposit)

ComplexMcCreedy West 

Mine•Ni‐Sulphide Deposits are located at the 

Huronian Supergroup

base of the SIC 

36

10 kmVictoria Project

Page 37: 2011 11-14 mdsvp

VICTORIA: SURFACE GEOLOGY

Zone 2Zone 4

NoriteOlivine Diabase

Powerline ZonePowerline Zone

Metabasaltic Rocks

Quartz DioriteSudbury Breccia

bb i k

Powerline ZonePowerline Zone

Felsic Metavolcanic RocksMetasedimentary Rocks

Metagabbroic RocksW E

37Meters5000

Page 38: 2011 11-14 mdsvp

VICTORIA IN 2008: ZONES 1 & 2

FNX1172 (Zone 1 Discovery)•24.0 ft @ 1.3% Cu, 1.0% Ni, 1.6 g/t TPMs

Surface Looking North 

24.0 ft @ 1.3% Cu, 1.0% Ni, 1.6 g/t TPMs•75.0 ft @ 0.5% Cu, 1.8% Ni, 0.7 g/t TPMs

‐2000 ft

FNX1178 Ethel Lake Quartz Diorite

‐600 m

‐4000 ft‐1200 m

BH‐UTEM Plate

(Zone 2)

38

1000 ftFNX1172B•54.8 ft @ 0.5% Cu, 2.2% Ni, 0.7 g/t TPMsWorthington 

Quartz Diorite 300 m

Page 39: 2011 11-14 mdsvp

VICTORIA 2009/2010: ZONES 2 TO 4

FNX1178 Extension (Zone 2 Discovery)•57.9 ft @ 1.5% Cu, 1.6% Ni, 5.4 g/t TPMs Ethel Lake 

Q Di i‐4000 ft

Looking North 

Quartz Diorite

BH UTEM Plates

‐1200 m

Zone 2

BH‐UTEM Plates

(Zone 4)

FNX1190 (Zone 4 Discovery)

391000 ft/300m

Worthington Quartz Diorite

( y)•1367.4 ft @ 1.3% Cu, 0.6% Ni, 2.2 g/t TPMs

Page 40: 2011 11-14 mdsvp

LOOKING NE

Section 53 P345E

Zone 1Zone 1

Vent Sh

Production 

Q Di iNoriteOlivine Diabase

haft

Shaft

Metabasaltic Rocks

Quartz DioriteSudbury Breccia

Metagabbroic Rocks

Zone 2Zone 2 1400 L

Felsic Metavolcanic RocksMetasedimentary Rocks

Metagabbroic RocksZone 4Zone 4

MiniMini

1600 L

1800 L

O t d th & t th W t

40

Open at depth & to the West• BH‐UTEM responses

Page 41: 2011 11-14 mdsvp

VICTORIA: INFERRED RESOURCE

Inferred Tonnes (M)

Cu (%)

Ni (%)

Pt (g/t)

Pd (g/t)

Au (g/t)

TPMs(g/t)(M)  (%) (%) (g/t)  (g/t) (g/t) (g/t)

Zone 4 12.0 2.3 2.3 3.2 4.4 1.0 8.7

Zone 2 0 3 1 4 0 9 1 4 2 2 0 6 4 3Zone 2 0.3 1.4 0.9 1.4 2.2 0.6 4.3

Mini 0.1 1.2 0.6 0.9 0.5 0.2 1.5

Total 12.5 2.3 2.2 3.2 4.3 1.0 8.5

The Mineral Resource estimate was prepared in accordance with the “CIM Definition Standards On Mineral Resources and Mineral Reserves”, adopted by CIM Council on December 11, 2005, and the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines, adopted by CIM Council on November 23, 2003, using geostatistical and/or classical methods, plus economic and mining parameters appropriate to each operation. Definitions and guidelines can be found at www.cim.org.

S T h i l R t th Vi t i P j t D it S db O t i C d b F E t Gibbi & J l tt Fil d S d J 3 2011Source:  Technical Report on the Victoria Project Deposit, Sudbury, Ontario, Canada by Farrow, Everest, Gibbins & Jolette; Filed on Sedar June 3, 2011

41

Page 42: 2011 11-14 mdsvp

INCLINED SECTION (LOOKING NNE)

‐900L

1200LZone 4

FNX1198

FNX1190FNX1186H‐1200L

Quartz DioriteQuartz Diorite Hosted Zone 4

Zone 4 Resource Pierce PointsZone 4 Non‐Resource Pierce Points

FNX1190

FNX1186FFNX1186G

‐1500L

Quartz Diorite Hosted Zone 4Sudbury Breccia Hosted Zone 4 

FNX1195C

‐1800LFNX1200FNX1200E

FNX1195A0 500/150

F t/M t

42

FNX1200D

FNX1210

Feet/Meters

Open at depth

Page 43: 2011 11-14 mdsvp

1200 LEVEL MINERALIZATION1200 LEVEL MINERALIZATION‐2500NFNX1186H:•27.1 ft @ 1.1% Cu, 0.5% Ni & 2.7 g/t TPM•83.5 ft @ 1.1% Cu, 1.3% Ni & 2.2 g/t TPM

‐3000N

FNX1190:

FNX1198:•26.0 ft @ 1.1% Cu, 0.6% Ni & 1.1 g/t TPM

‐3500N

FNX1190:•1367.4 ft @ 1.3% Cu, 0.6% Ni & 2.2 g/t TPM

3500N

FNX1186F:98 7 ft @ 1 3% C 0 4% Ni & 1 3 /t TPM

‐4000N•98.7 ft @ 1.3% Cu, 0.4% Ni & 1.3 g/t TPM•15.5 ft @ 1.7% Cu, 0.2% Ni & 0.4 g/t TPM•108.1 ft @ 1.5% Cu, 2.2% Ni & 5.1 g/t TPM

43

‐6500E

500/150

Ft/m

0FNX1186G:•623.6 ft @ 1.9% Cu, 1.7% Ni & 4.1 g/t TPM

~500 ft/150 m clipping43

Page 44: 2011 11-14 mdsvp

1600 LEVEL MINERALIZATION

500/150

Ft/m

0‐2500N

Q t Di itQuartz DiabaseMasu‐Smas SulphideDisseminated Sulphide

FNX1195C:•308.4 ft @ 2.1% Cu, 3.1% Ni & 5.1 g/t TPM

‐3000NMetabasaltic Rocks

Quartz DioriteSudbury Breccia

Metagabbroic Rocks

3500N

Felsic Metavolcanic RocksMetasedimentary Rocks

Metagabbroic Rocks

‐3500N

‐4000N

FNX1195A:

~500 ft/150 m clipping

44

‐7500E

‐6500E

FNX1195A:•11.1 ft @ 14.5% Cu, 1.9% Ni & 21.5 g/t TPM•16.1 ft @ 2.0% Cu, 2.1% Ni & 10.3 g/t TPM•4.3 ft @ 6.2% Cu, 2.9% Ni & 0.6 g/t TPM44

Page 45: 2011 11-14 mdsvp

FNX1195C (MASSIVES SULPHIDE)

• Pyrrhotite‐rich massive sulphide with pentlandite (Ni‐mineral) & chalcopyrite (Cu‐mineral)

A – B: 15.4 ft @ 2.5% Cu, 6.3% Ni & 2.6 g/t Pt‐Pd‐AuA

B

B – C: 14.0 ft @ 4.1% Cu, 8.4% Ni & 3.6 g/t Pt‐Pd‐AuC

45

Page 46: 2011 11-14 mdsvp

1800 LEVEL MINERALIZATION‐2500N

Q t Di itQuartz DiabaseMassive‐SM SulphideDisseminated Sulphide

FNX1200

~500 ft/150 m clipping

‐3000NMetabasaltic Rocks

Quartz DioriteSudbury Breccia

Metagabbroic Rocks

FNX1200:•71.0 ft @ 4.1% Cu, 2.0% Ni & 60.1 g/t TPM

3500N

Felsic Metavolcanic RocksMetasedimentary Rocks

Metagabbroic Rocks

‐3500N

‐4000NFNX1195A:•49 3 ft @ 0 8% Cu 0 8% Ni & 6 9 g/t TPM

46

‐7500E

‐6500E

500/150

Ft/m

0

•49.3 ft @ 0.8% Cu, 0.8% Ni & 6.9 g/t TPM

Page 47: 2011 11-14 mdsvp

VICTORIA:  PLATINUM GROUP MINERALS

• Pyrrhotite‐rich massive sulphide veins with:sulphide veins with:‒ pentlandite (Ni) ‒ chalcopyrite (Cu)

• Minor quartz‐filled fractures

• Stockwork and minor i i i S db

Sperrylite, PtAs2

veining in Sudbury Breccia/metabasalt

• PGM hosted by both sulphides &sulphides & silicate/carbonate groundmass (shown here)

47

Page 48: 2011 11-14 mdsvp

MODIFIED “FROOD” ORE TYPE

•Increasing•Cu/Ni •Ni/Cu

•Decreasing

•with depth

•PGE •S

Po pn cpy massive sulphideINMS, sulphide stockworksDISU, blebby sulphides

Sudbury BrecciaCpy‐rich (+/‐ qtz, carb veining)Po, pn, cpy, high tenor veiningPo, pn, cpy, massive sulphide

di kMetagabbroMetabasaltic RocksQuartz Diorite

•High Cu/Ni (cpy, +/‐cub, +/‐ bn)•High PGE

48

Metasedimentary RocksHigh PGE•Low S•High silicate & carb alteration (amph, bio, chl, ep) Modified from: Farrow & Lightfoot, 2002; Souch & Podolsky, 1969

Page 49: 2011 11-14 mdsvp

SIZE & IN SITU VALUE

3 4 BN lb fi i

14.0

Relative Gross In‐Situ Value

• ~ 3.4 BN lbs of Cu Equiv.

NickelRim South

Onaping Depth

Victoria

10.0

12.0

Grade (%

)

• ~  1.2 BN lbs of Ni Equiv. 

DepthTotten

Kelly Lake

Victor

6 0

8.0

quivalen

t G

Fraser Morgan

y

4.0

6.0

Cu E

2.0

4.0 9.0 14.0 19.0 24.0In‐situ Tonnes (M)

Note: Cu Equivalent and in‐situ value calculation assumes three‐month trailing average commodity prices at time of Sedar technical report filing; Cu at US$4.34/lb, Ni at US$12.27/lb, Pt at US$1784oz, Pd at US$778/oz & Au at US$1426/oz. Onaping Depth & Fraser Morgan resource are as of June 30 2010. Nickel Rim South, Totten, Kelly Lake & Victor resources are as of December 31, 2005. 

49

Page 50: 2011 11-14 mdsvp

VICTORIA: GRADE COMPARISON

$0  $500  $1,000  $1,500  $2,000  $2,500 

3,400

In‐situ $ Value/Tonne 

3,900

Sudbury Basin Projects

4,400

4 900w Surface (ft)

Victoria: Avg. of 4,900

5,400

Depth Be

low

gUS$1,172/Tonne of ore

5,900

D

Cu Ni TPM

50

Note: Cu Equivalent and in‐situ value calculation assumes three‐month trailing average commodity prices as at Sedar filing; Cu at US$4.34/lb, Ni at US$12.27/lb, Pt at US$1784/oz, Pd at US$778/oz and Au at US$1426/oz. Other Sudbury projects include Onaping Depth, Fraser Morgan, Nickel Rim South, Totten, Kelly Lake and Victor.

6,400

Page 51: 2011 11-14 mdsvp

ent S

haft

oductio

n Shaft

Conceptual Mine Plan

VePro

1200L

p

• Definition drilling from ventilation shaft

1400L • Bulk scale mining methods‒ Longhole stoping

‒ Numerical geotechnical 

1400L

modelling underway

• Preliminary Capex :~$3/4 B 7

Zone 4 1600L

‒ ~$3/4 B over 7 years

1800L

51Schematic looking ENE

Page 52: 2011 11-14 mdsvp

VICTORIA: SHORT‐TERM PRIORITIES

• First Nations consultations • Environmental permitting

Q4 2011Environmental permitting

• Discussions with stakeholders & Vale• Completion of PEA engineering• Continue step out diamond drilling• Continue step‐out diamond drilling

‒ Impact system scale & infrastructure

T ti t fTargeting commencement of development in 2012

52

Page 53: 2011 11-14 mdsvp

VICTORIA: KEY HIGHLIGHTS

• Significant inferred resource, remains openSignificant inferred resource, remains open

• Impressive grades increasing with depth

• Victoria appears amenable to low cost, bulk underground mining methods

• Pursuing an aggressive development timelineExpertise in house (QUX/DMC)‒ Expertise in‐house (QUX/DMC)

• Relatively low development risk profile

53

Page 54: 2011 11-14 mdsvp

CORPORATE OVERVIEW

Page 55: 2011 11-14 mdsvp

Q3 2011 HIGHLIGHTS & MILESTONES

Production:  Significant improvements at Robinson & consistency in Sudburyy

C1 Costs decline to $2.13/lb Cu: Higher Cu volumes

Profitability: Reported EPS impacted by one time & non cash items Profitability:  Reported EPS impacted by one time & non cash items• 44% increase in CFPS vs. Q3/10

Completed Sierra Gorda JV & commenced construction

Balance sheet:  Over $1 BN in cash

Safety Record: Zero Harm remains our focusSafety Record: Zero Harm remains our focus• Sudbury at 701 days without a Lost Time Accident (LTA)• Carlota at 484 days without a LTA• Podolsky has over 900 days without a Lost Time Injury

55

Page 56: 2011 11-14 mdsvp

ASSET CONTRIBUTION

YTD Operating income* Core Assets provide ~ 90% of our 

9%

YTD Operating income   Core Assets provide   90% of our operating income• Robinson /Morrison contribute ~85%

91%91%Balance must:

• Have upside potential

Core Assets Other Assets• Provide optionality

56* Excluding the impact of inventory write downs

Page 57: 2011 11-14 mdsvp

ROBINSON: CURRENT STATUS & OUTLOOK

Q3 2011    Ruth Pit

ROBINSON • Higher grades in the bottom of the pit• Higher mining & milling – new records• Re‐sequencing due to slope stability

RobinsonOutlook• Operating flexibility & grades 

MORRISON

continue to improve• Positive momentum has continued into November

East Ramp

57

Page 58: 2011 11-14 mdsvp

ROBINSON: CURRENT PLAN

• Operating flexibility • Slope stabilityOpe at g e b ty• 1 Mt in stockpiles• Wider benches

S ope stab ty• Slope angles• Dewatering

• 3 dig faces• Additional ramp access • Haulage optimization

• Larger benches• Additional haulage & loading capacityloading capacity

• Mine Star

58

Page 59: 2011 11-14 mdsvp

ROBINSON: HISTORICAL MINERALIZATION

Keystone

Ruth

Pilot‐Taylor

Dump

Ruth East

Yellow 0 20% TCuTripp‐Veteran

Liberty Yellow ‐ 0.20% TCuRed     ‐ 0.35% TCu

LibertyRuth

5 3 BN lb f C & 3 8 M A d d59

~5.3 BN lbs of Cu & 3.8 M oz Au produced

Page 60: 2011 11-14 mdsvp

ROBINSON: LIBERTY POTENTIAL

N

RHYOLITE

60

1250 ft>0.20 % Cu >0.30 % Cu >0.40 % Cu >0.50 % Cu

Page 61: 2011 11-14 mdsvp

MORRISON: ACCESS ARRANGEMENT

Key benefits:Immediate cost savingsImmediate cost savings• Cessation of ongoing rehabilitation work on Levack #2 shaft 

Operating flexibility & efficiencies • Shorter haulage distance• Operating efficiencies of Craig infrastructure

D ill / thDrill access ‐ reserve/resource growth• Significant improvement in drill access below current reserves• Alternative diamond drill platforms to test other targetsAlternative diamond drill platforms to test other targets

61

Page 62: 2011 11-14 mdsvp

MORRISON: CURRENT STATUS & OUTLOOK

Q3 2011

Craig Shaft Levack#2 Shaft

ROBINSONQ3 2011    • Continuing strong operating performance2650 L

Haulage route up to  ~ 11 k ft of +18%

Robinson

Outlook• Strong Q4 due to high grades• Finalizing Craig agreement

4300 L

MORRISON

• Finalizing Craig agreement. Expected transition in Q1 2012Lateral Haulage 

Route to Craig Ore Pass

62Looking North West

~ 5 k ft to Craig laterally

Page 63: 2011 11-14 mdsvp

MORRISON: RESERVE/RESOURCE GROWTH

Current ramp face  &reserve limit

4210 LMD3 4210 LMD3

22.6 ft @ 26.0% Cu, 3.0% Ni, 38.9 g/t TPM 11.8 ft @ 20.0% Cu, 

3.3% Ni, 60.2 g/t TPM

5000 L

C

Intercept > $300 value & minimum 6 ft. width

Current reserveCurrent mineral envelope 19.6 ft @ 12.7% Cu, 1.0% Ni, 

25.6 g/t TPMNote: Assumes $2.75/lb Cu, $8/lb Ni,$1600/oz pt, $500/oz Pd & $1000/oz Au 63

Page 64: 2011 11-14 mdsvp

GROWTH PROJECT: SIERRA GORDA 

ROBINSON Outlook

• On time & budget‒ Shovel parts on site‒ Pre‐strip on track for March 2012

‒ Negotiating key contacts‒ First construction camp complete

‒ Site activity building rapidly 

MORRISON

64

Page 65: 2011 11-14 mdsvp

GROWTH PROJECTS: VICTORIA

ROBINSON Outlook

• Ongoing drilling confirming & expanding footprint

k h ld• Permitting & stakeholder discussions ongoing

• Engineering studies completed by 

MORRISON

g ee g s ud es co p e ed byyear‐end

65

Page 66: 2011 11-14 mdsvp

OTHER OPERATIONS

Q3 2011Franke

Outlook

ROBINSONQ3 2011• Continuing impact of high acid consumption

• Adjusting cut off to minimize acid consumption & reduce costs• Planning transition to China , which has less acid consumptionwhich has less acid consumption in H2/12 

Q3 2011

• Mining contact Ni ores

McCreedy WestOutlook

• Planned re‐start of Ni production

MORRISON

• Mining contact Ni ores• Continuing discussion with Xstrata on treatment terms

Planned re‐start of Ni production, dependent on payability terms & Ni prices

66

Page 67: 2011 11-14 mdsvp

OTHER OPERATIONS

Status     OutlookPodolsky

ROBINSON• Continuing its stable operating performance until late 2012 (end of 2000 Deposit reserves)

• Temporary closure• Reviewing remaining exploration options

Status

• Conveyor stacking has 

Outlook

• Base case: mining remaining 

Carlota

MORRISON

had a positive impact on oxides: ~ 2 years of feed

oxides & residual leach• Secondary sulphies are more challenging (higher fines)• Eder deposit provides potential

67

• Eder deposit provides potential upside & has less fines

Page 68: 2011 11-14 mdsvp

OPERATINGS COSTS (US$/lb Cu)Q2 vs. Q3/11

C1 costs positively impacted:• Higher production volumes

2011 C1 costs

‐ 23%

‐9%

$2.00

$2.50

$3.00

/lb Cu

)

• Higher production volumes (Robinson)

• Lower by product credits

+157%

$0.50

$1.00

$1.50

C1 co

sts (US$/ Lower by product credits 

(Morrison)

$0.00Robinson Morrison Total 

Q2 2011 Q3 2011

MORRISON

Q4 2011 Outlook: • Continuing positive impact of higher Cu production

68

g p p g p

Page 69: 2011 11-14 mdsvp

FINANCIAL SUMMARY  Q2 VS. Q3/11 (US$ M)

+ 10% $350 • Despite a 12% decline in the 

$200

$250

$300

llion

s

realized Cu price, there were significant improvements in all of QUX’s financial metrics in Q3 vs. 

+ 10%

+124%

$50

$100

$150

US$ M

il Q2/11 

$0Q2 2011 Q3 2011

Revenue Cash Flows Earnings

Strong balance sheet: Positioned to deliver our growth projects 

69

• Cash balance totaling $1,067 M

Page 70: 2011 11-14 mdsvp

SUMMARY

Q3 2011

• Higher production & significant improvements in C1 costs vs. Q2/11

• Despite lower Cu prices, CFPS has increased by 10% vs. Q2/11 & 44% vs Q3/10Q2/11 & 44% vs. Q3/10

• Positive operating momentum at Robinson continuesp g

• QUX will focus on its Core Assets going forward

70

Page 71: 2011 11-14 mdsvp

THANK YOU