Page 1: 2011-10-19 FHWA Presentation - AlexandriaVA.Gov FHWA... · 2011/10/19  · Construct short and mid-term roadway improvements to improve traffic operations on the local road network
Page 2: 2011-10-19 FHWA Presentation - AlexandriaVA.Gov FHWA... · 2011/10/19  · Construct short and mid-term roadway improvements to improve traffic operations on the local road network

Project Purpose

Construct short and mid-term roadway

improvements to improve traffic operations

on the local road network in conjunction with

occupancy of the Mark Center by Department

of Defense organizations (BRAC-133)

Page 3: 2011-10-19 FHWA Presentation - AlexandriaVA.Gov FHWA... · 2011/10/19  · Construct short and mid-term roadway improvements to improve traffic operations on the local road network

Project Area

I-395 at Seminary Road and Mark Center

Page 4: 2011-10-19 FHWA Presentation - AlexandriaVA.Gov FHWA... · 2011/10/19  · Construct short and mid-term roadway improvements to improve traffic operations on the local road network

Progress to Date• Stakeholder Meetings

� Kick-off

� Coordination with City of Alexandria, VDOT, and Department of Defense

• Data Gathering and Documentation� Preliminary field review

� Traffic counts for environmental studies and pedestrian bridge analysis

• Preliminary Roadway Engineering

Page 5: 2011-10-19 FHWA Presentation - AlexandriaVA.Gov FHWA... · 2011/10/19  · Construct short and mid-term roadway improvements to improve traffic operations on the local road network

Public Information Meeting

• Purpose: To provide the public with information

regarding the project’s preliminary design

• Date: Thursday, November 3, 2011

• Time: 6:00 p.m. to 8:00 p.m.

• Location: West End Community Redevelopment

Center at Landmark Mall

5801 Duke Street, Alexandria

Page 6: 2011-10-19 FHWA Presentation - AlexandriaVA.Gov FHWA... · 2011/10/19  · Construct short and mid-term roadway improvements to improve traffic operations on the local road network

Work in Progress / Upcoming Tasks

• Preliminary construction drawings

• Pedestrian bridge recommendations

• Environmental documentation

• Public meeting

• Design-Build contract procurement

Page 7: 2011-10-19 FHWA Presentation - AlexandriaVA.Gov FHWA... · 2011/10/19  · Construct short and mid-term roadway improvements to improve traffic operations on the local road network

Project Schedule

Item Timeframe

Preliminary Engineering August – November 2011

Public Meeting November 2011

Pedestrian Bridge Recommendation November 2011

Categorical Exclusion November 2011

Construction Begins Summer 2012