2009 boone high bridge presentation - uiuc...

71
1 Boone High Bridge Todd Wimmer – UPRR December 4, 2009 1

Upload: lamphuc

Post on 29-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

1

Boone High Bridge

Todd Wimmer – UPRR December 4, 2009

1

Page 2: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

2

Boone High Bridge

Agenda :

• History of the Kate Shelley Bridge• Reason for repairs and replacement

Ne Boone High Bridge• New Boone High Bridge• Project Construction and Issues• Questions

2

Page 3: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

3

Kate Shelley Bridge

Kate Shelley Bridge - location

Portland

SeattleEastport

Twin Cities

Duluth

Oakland SLCKC

Omaha

Twin Cities

Denver

Chicago

LA

Calexico

St. Louis

DallasMemphis

Calexico

Nogales El Paso

Eagle Pass Houston

Laredo

DallasNew

Orleans

3

BrownsvilleLaredo

Page 4: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

4

Kate Shelley Bridge - location

Location of new line and bridge location

Boonelocation.

4

Moingona

Page 5: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

5

Kate Shelley Bridge - facts Bridge Information :C&NW line Chicago to Omaha Located 155 milesOmaha. Located 155 miles east of Omaha.

Spans the Des Moines River Valley.Valley.

Construction Started early 1899.

Bridge opened May 19th, 1901.

Length : 2685’Height : 190’

22 steel formed towers resting on stone pier foundations. Spans ranging from 45’ to 75’.

5

300’ pin connected deck truss

Page 6: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

6

Kate Shelley Bridge Who is Kate Shelley ?

Bridge originally named the Boone Viaduct.

July 1881 thunderstorm flooded Des Moines river bottom washing out a bridge over a small ravine east of the river near Moingona.

A freight train derailed into the flooded waters killing the fireman whose body was never found The engineer survivednever found. The engineer survived.

Kate Shelley, then 15 yrs of age, knew of the derailment / washout and that a passenger train should soon be near. During the storm and heavy rains, with a lantern in hand, crossed the old Des Moines River bridge flagging the approaching passenger train to a stop.

6

In 1926 the bridge was dedicated to the memory of Kate Shelley.

Page 7: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

7

Kate Shelley Bridge - construction

7

Page 8: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

8

Kate Shelley Bridge – construction

8

Page 9: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

9

Kate Shelley Bridge - construction

9

Page 10: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

10

Kate Shelley Bridge - testing

10

Page 11: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

11

Kate Shelley Bridge – opened May 19th, 1901

11

Page 12: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

12

Kate Shelley Bridge - then At this time, it is said that the Boone ViaductAt this time, it is said that the Boone Viaduct was the longest railroad bridge, both for single or double track, in the world.

12

Page 13: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

13

Kate Shelley Bridge - now

13

Page 14: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

14

190 ft. high

14

Page 15: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

15

Kate Shelley Bridge – Reasons for Replacement

Prior to 2002 1 train @ 35 mph•Prior to 2002, 1 train @ 35 mph.•After 2002, 2 trains @ 25 mph.•Creates a bottleneck and traffic congestion.•Bridge is 104 years of age.•Structural wear and degradation•Structural wear and degradation.

15

Page 16: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

16

Kate Shelley Bridge – Reasons for Replacement

Crack in floor beam connection Section loss due to rusting

16

Page 17: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

17

Kate Shelley Bridge – Reasons for Replacement

Broken stiffener at a cross frameSection loss and cracking at connection

17

Page 18: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

18

Kate Shelley Bridge – Reasons for Replacement

18

Page 19: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

19

Repairs made in 2002

Kate Shelley Bridge – Repairs and strengthening

Repairs made in 2002

19

Lateral bracing rodsLateral struts and bottom diagonals

Page 20: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

20

Kate Shelley Bridge – Repairs and strengthening

Repairs made in 2002

20

Page 21: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

21

Kate Shelley Bridge – Repairs and strengthening

Top chord strengthening

Cross frame lateral bracingCross frame lateral bracing

21

Bottom diagonals

Page 22: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

22

Kate Shelley Bridge – Repairs and strengthening

22

Page 23: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

23

Kate Shelley Bridge – Repairs and strengthening

B fBefore After

23

Page 24: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

24

Kate Shelley Bridge – Repairs and strengthening

24

Page 25: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

25

Kate Shelley Bridge

25

Page 26: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

26

New Boone High Bridge

•Design speed 70 MPH.•Double Track on 20 ft centers.•Original length 2550 ft long.•Revised length 2813ft long.

•Original Project Cost : $43 millionD i d 2005 2006•Designed 2005 -2006

•Started Construction late 2006•Original completion Nov 2008•Revised completion Aug. 20, 2009

26

Page 27: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

27

New Boone High Bridge

• 26 concrete column bents ( 5 towers )• Spans ( 6@30’ PCB, 20@110’DPG and 6@70’ DPG x2 )

0 0416% d• 0.0416% grade• Nearly 560,000 yd^3 earthwork• Nearly 26,000 yd^3 concrete used• Nearly 2.9 million lbs steel rebar• Nearly 1 2 million lbs structural steel and embeds

27

• Nearly 1.2 million lbs structural steel and embeds• Total weight estimated near 13.6 million lbs

Page 28: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

28

20 ‘

15.5 ‘

7 ‘

28

Page 29: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

29

29

Page 30: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

30

30

Page 31: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

31

31

Page 32: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

32

32

Page 33: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

33

33

Page 34: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

34

34

Page 35: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

35

35

Page 36: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

36

36

Page 37: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

37

37

Page 38: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

38

38

Page 39: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

39

39

Page 40: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

40

40

Page 41: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

41

Slide plane

41

Page 42: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

42

Key :1. Original ground line2. Designed slope3. Current slope4. Approx. shale layer5 Estimated failure plane

Original Design5. Estimated failure plane

Bent #2 East Abutment

1.2.

3.

4.

5.

42

Page 43: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

43

Proposed DesignKey :1. Proposed slope2. New 70’ span3. New east approach ( 3 x 30’ spans )

1.

2.

3.

43

Page 44: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

44

Boone High Bridge – Revised DesignEastWest EastWest

New 70’ steel span

102’ new west end approach

Original Slopes

90’ new east end approach

New slopes

44

Page 45: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

45

45

Page 46: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

46

46

Page 47: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

47

47

Page 48: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

48

48

Page 49: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

49

49

Page 50: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

50

50

Page 51: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

51

51

Page 52: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

52

52

Page 53: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

53

53

Page 54: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

54

54

Page 55: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

55

55

Page 56: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

56

56

Page 57: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

57

57

Page 58: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

58

58

Page 59: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

59

59

Page 60: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

60

60

Page 61: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

61

61

Page 62: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

62

62

Page 63: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

63

63

Page 64: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

64

64

Page 65: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

65

65

Page 66: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

66

66

Page 67: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

67

67

Page 68: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

68

68

Page 69: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

69

69

Page 70: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

70

70

Page 71: 2009 Boone High Bridge presentation - UIUC RailTECrailtec.illinois.edu/CEE/pdf/PPT's/fall09/Wimmer_12-4-0… ·  · 2014-07-18Lateral struts and bottom diagonals. 20 Kate Shelley

71

Boone High BridgeTh k YThank You

71