2009 acec/odot conference odot’s 1r program liz hunt, p.e. odot pavement services engineer
TRANSCRIPT
2009 ACEC/ODOT CONFERENCE
ODOT’S 1R PROGRAM
Liz Hunt, P.E.
ODOT Pavement Services Engineer
Issue With rising material and construction
costs and declining funding it is essential that ODOT’s Highway construction and maintenance programs ensure that all available dollars are directed to activities and projects which optimize the Highway System condition as a whole.
1R Technical Bulletin
1R Program Components
Annual bucket for preservation projects requiring only a single lift of paving.
Anticipated savings from developing projects under 1R standards (currently set at $7M/year) would be used to address substandard priority safety features.
1R Projects
Address pavement feature only Adversely impacted safety features need
to be addressed like raising a guardrail to accommodate an overlay.
Safety features addressed through separate program based on priority needs.
1R Standard Approval Process
Region Pavement Services Unit FHWA
Pavement Details
Eligible Projects
Single paving lift Non-structural inlay or overlay (2 to 3”) Leveling course allowed
Safety Feature Details
1R Roadside Inventory
ROADWAY TYPICAL SECTIONS DESIGN CONSIDERATIONS (ADT – Speed) STRUCTURES SIGNS GUARDRAIL DRAINAGE FACILITIES PEDESTRIAN & BICYCLE FACILITIES SPECIAL PROBLEMS (Clear Zone Safety Hazards)
Statewide Traffic Barrier Inventory
230 Transition
High Priority Barrier Features1 - Un-connected Transitions2 - Pre 230 Terminals3 - Pre 230 Transitions4 - Tongue & Groove Concrete Barrier5 - Pre 230 Type 1 and 1A Guardrail6 - Pre 230 Type 2 Guardrail7 - Pre 230 Impact Attenuators8 - Rebar Pin & Loop Concrete Barrier9 - 4 Loop Pin & Loop Concrete Barrier10 - 230 Transitions11 - 230 Impact Attenuators
Cost to Upgrade High Priority Features
HIGH PRIORITY FEATURE NUMBER COST
UN-CONNECTED TRANSITIONS Included in Pre-230 Terminals
PRE-230 TERMINALS 11,100 units $45,000,000
PRE-230 TRANSITIONS 1,000 units $ 6,000,000
T&G CONCRETE BARRIER 7 miles $ 3,000,000
PRE-230 Type 1 GUARDRAIL 140 miles $19,000,000
PRE-230 Type 2 GUARDRAIL Included in Pre-230 Type 1
PRE-230 IMPACT ATTENUATORS 60 units $ 3,000,000
TOTAL $76,000,000
Required 1R Items
Replacement of striping and delineation Gravel shoulders matched to paved
surface elevation Replacement of signal loops if impacted Replacement of rumble strips Adjust existing features as needed Vertical clearance policy followed Traffic mobility standards followed
Benefits of a 1R Program
Provides opportunity to plan and deliver projects strategically.
Allows more timely development of single lift preservation projects.
Simplifies project delivery – only impacted features are addressed.
Questions?