Company Name Job Plan No.: 2008 Lead Discipline: INST. Approved By: Effective Date: 04/Oct/04 Hours Duration: 2 Frequency: 1 Yearly File Location: \\C:\Users\admin\Desktop\Masoud\Valve Safety\2008-I Valve, Pressure Safety (PSV) Test 1 yearly.doc Page 1 of 4 Note: The 12 monthly review of this Maintenance Job Plan shall be recorded on the PROCEDURE HISTORY Sheet within this Document. 1 PRESSURE SAFETY VALVE (PSV) 1.1 JOB SAFETY PLAN 1 ENSURE the proper work permit has been issued, with supporting certificates as required 2 ENSURE awareness of any other work being carried out in the same area 3 ENSURE all required energy isolations have been completed as per HES procedures and as per the Permit to Work. 4 ENSURE correct PPE is available, functional and used properly. Know the limitations of your PPE 5 ENSURE correct fire & safety equipment is on site, (I.E. fire extinguisher, fire blanket etc …) 6 CONDUCT a job specific Tool Box talk prior to commencing the work and record attendees. 7 ENSURE work area is kept clean / tidy during the work 8 ENSURE work area is clean / tidy on completion of work 9 ENSURE all un-necessary personnel are clear of area before de-isolation/start-up. 10 CHANGES in the work place/work scope or evacuation may require repeat gas tests or permit re-issue 11 CONTACT HES staff with any questions regarding any safety aspects of the work or permit 12 ENSURE awareness of Evacuation Procedures, Emergency Stop Buttons and Muster Points 13 ENSURE all work permits and associated documents are closed on completion of the work 14 ENSURE all elements of H2S safety procedures are implemented for work on this equipment to include awareness training, use of personal H2S monitors and escape BA sets. Pre-job planning must review wind direction and maintenance of clear emergency escape routes. 1.2 THIS JOB PLAN LISTS THE STEPS FOR 1 YEARLY INTERVAL CALIBRATION TESTS ON A PRESSURE SAFETY VALVE (PSV). Preamble: Pressure Safety Valves are removed from site to the maintenance workshop for calibration. For the duration of the calibration test the vessel is without normal PSV protection.

Upload: enas-al-khawaldeh

Post on 17-May-2017

221 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: 2008-I Valve, Pressure Safety (PSV) Test 1 Yearly

Company Name

Job Plan No.: 2008

Lead Discipline: INST.

Approved By:

Effective Date: 04/Oct/04

Hours Duration: 2

Frequency: 1 Yearly

File Location: \\C:\Users\admin\Desktop\Masoud\Valve Safety\2008-I Valve, Pressure Safety (PSV) Test 1 yearly.doc Page 1 of 4

Note: The 12 monthly review of this Maintenance Job Plan shall be recorded on the

PROCEDURE HISTORY Sheet within this Document.

1 PRESSURE SAFETY VALVE (PSV)

1.1 JOB SAFETY PLAN

1 ENSURE the proper work permit has been issued, with supporting certificates as required

2 ENSURE awareness of any other work being carried out in the same area

3 ENSURE all required energy isolations have been completed as per HES procedures and as per the

Permit to Work.

4 ENSURE correct PPE is available, functional and used properly. Know the limitations of your PPE

5 ENSURE correct fire & safety equipment is on site, (I.E. fire extinguisher, fire blanket etc …)

6 CONDUCT a job specific Tool Box talk prior to commencing the work and record attendees.

7 ENSURE work area is kept clean / tidy during the work

8 ENSURE work area is clean / tidy on completion of work

9 ENSURE all un-necessary personnel are clear of area before de-isolation/start-up.

10 CHANGES in the work place/work scope or evacuation may require repeat gas tests or permit re-issue

11 CONTACT HES staff with any questions regarding any safety aspects of the work or permit

12 ENSURE awareness of Evacuation Procedures, Emergency Stop Buttons and Muster Points

13 ENSURE all work permits and associated documents are closed on completion of the work

14 ENSURE all elements of H2S safety procedures are implemented for work on this equipment to include

awareness training, use of personal H2S monitors and escape BA sets. Pre-job planning must review

wind direction and maintenance of clear emergency escape routes.

1.2 THIS JOB PLAN LISTS THE STEPS FOR 1 YEARLY INTERVAL

CALIBRATION TESTS ON A PRESSURE SAFETY VALVE (PSV).

Preamble: Pressure Safety Valves are removed from site to the maintenance workshop for calibration. For the

duration of the calibration test the vessel is without normal PSV protection.

Page 2: 2008-I Valve, Pressure Safety (PSV) Test 1 Yearly

Company Name

Job Plan No.: 2008

Lead Discipline: INST.

Approved By:

Effective Date: 04/Oct/04

Hours Duration: 2

Frequency: 1 Yearly

File Location: \\C:\Users\admin\Desktop\Masoud\Valve Safety\2008-I Valve, Pressure Safety (PSV) Test 1 yearly.doc Page 2 of 4

Specialist tools: - Workshop facilities, crane and/or scaffolding (where necessary).

Procedure steps

STEP ACTION COMMENT

1 OPEN permit to work

2 VERIFY the PSV tag number matches that on the PM document

3 INSPECT the PSV in situ for leaks and corrosion

4 ISOLATE , LOCK, TAG AND TRY the upstream hand isolation

valve

Isolations may be carried out by Production staff

5 ISOLATE, LOCK, TAG AND TRY the downstream hand

isolation valve

Some PSVs vent to atmosphere without D/S isolation

6 OPEN the downstream vent valve where applicable This relieves trapped pressure in the downstream pipe

7 OPEN the upstream vent valve This relieves trapped pressure in the upstream pipe

8 REMOVE the PSV to the workshop

9 PROTECT the open ends of the PSV pipe connections from debris A piece of rag tied over the open end suffices

10 CALIBRATE the PSV in accordance with the relief pressure The relief pressure depends upon the installation

11 CLEAN the pipe connections for the PSV

12 RE-INSTAL the PSV

13 CLOSE the downstream vent valve where applicable

14 CLOSE the upstream vent valve

15 UNLOCK, OPEN and REMOVE the TAG from the downstream

hand isolation valve where applicable

De-isolations may be carried out by Production staff

16 UNLOCK, OPEN and REMOVE the TAG from the upstream

hand isolation valve

17 INSPECT the PSV for leaks

18 CLOSE permit to work

19 RECORD all data & sign off PSV Inspection Report PSV Inspection Report is attached as page 2 of 2

Page 3: 2008-I Valve, Pressure Safety (PSV) Test 1 Yearly

Company Name

Job Plan No.: 2008

Lead Discipline: INST.

Approved By:

Effective Date: 04/Oct/04

Hours Duration: 2

Frequency: 1 Yearly

Page 3 of 4

Page 4: 2008-I Valve, Pressure Safety (PSV) Test 1 Yearly

Company Name

Job Plan No.: 2008

Lead Discipline: INST.

Approved By:

Effective Date: 04/Oct/04

Hours Duration: 2

Frequency: 1 Yearly

Page 3 of 4

1.3 PROCEDURE HISTORY

OFFICIAL REVIEW The following Procedure History Sheet shall be used to record the

Current Status of the Job Plan. Subsequent sheets shall be added as

required to maintain a History of the Official review carried out.

Review/Revision

No

Date Review Next

Due

Approved By Description of Key Changes

1 20/11/07 Duncan McKenzie Replaced the words “CLOSE, LOCK

& TAG” with “ISOLATE, LOCK,

TAG AND TRY ” on sequence

numbers 4and 5.

2 20/11/07 20/11/08 Don J No Change

3 27/01/08 27/01/09 Safety Plan Included