    INT LNG, Melkya17. January 2008

    Snhvit LNG a true adventureArctic gas to new markets

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    2/34

    2

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    3/34

    3

    SnhvitThe first gas development project in the Barents Sea

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    4/34

    4

    Snhvit factsThe first gas development project in the Barents Sea

    Discovered: 1981 84Water depth: 250 340 m

    Distance to shore: 140 kmGas in place ( GIIP): 317 GSm 3 /11.2 TCF (terra cubic feet)

    Condensate: 34 MSm 3

    Owners:

    3.26%Amerada Hess Norge AS

    2.81%RWE Dea Norge AS

    12.00%Gaz de France Norge AS

    18.40%Total E&P Norge AS

    30.00%Petoro AS

    33.53%Statoil ASA (Operator)

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    5/34

    5

    SnhvitThe first gas development project in the Barents Sea

    The first export facility for LNG inNorway and Europe

    The first offshore project in the BarentsSea

    The largest-ever industrial developmentin northern Norway

    New technology/

    new markets

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    6/34

    6

    Modultransport

    Snhvit- consists of ..

    Field developments offshore

    Pipeline to shore

    LNG plant on land for processingand liquefaction

    LNG carriers

    Gas to new markets

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    7/34

    7

    Full subsea field/remote operationRecord-distance multiphase flowCO 2 sequestration and storagePath breaking LNG technology

    Zero surface solutions from subsea to the beach

    Snhvit technology for the ArcticA benchmark project for offshore and LNG technology

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    8/34

    8

    Field developments offshore

    Remotely controlled subsea development

    No installations on the surface

    Overtrawlable subsea templates

    No toxic discharges to the sea

    Re-injection of carbon dioxides (CO 2)

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    9/34

    9

    SnhvitLNG-plant at Melkya

    Separates the various wellstream phases

    Separates CO 2 for re-injection

    Separates MEG for re-use

    Cools down gas to liquid form

    (LNG) at -163O

    C

    Refrigeration processdeveloped by Statoil/Linde

    Energy-efficient plant, self-sufficient in electricity

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    10/34

    10

    Statoil/Linde, MFC

    GG

    Pre-coolingCycle

    Lique-

    factionCycle

    Sub-coolingCycle

    S CCExp. /Gener.

    LNG Expander/Generator

    Plate FinHea tExchangers

    Spiral Wou ndHea tExchangersGenerator

    N G

    L N G

    M

    M

    M

    SCC C ompresso r

    PCC C ompresso r

    LCC C ompresso r

    ElectricPowerGener.

    5 x GE LM 6000 GTwith waste hea t recovery

    G

    G

    G

    G

    G

    Process heatconsumers

    Fuel gasA ir

    H oto ilcycle

    Electric Powerfrom the Grid

    Se awatercooling

    Cold box

    Un it 25

    Cycle compression andseawater cooling

    Un it 25

    Electric power gene rationwaste heat recovery,ho t oil cycleUnit 81 and 50

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    11/34

    11

    SnhvitTesting of compressors

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    12/34

    12

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    13/34

    13

    SnhvitCO2-injection

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    14/34

    14

    SnhvitMelkya before start-up

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    15/34

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    16/34

    16

    Prefabrication a necessityHarsh weather conditionsand limited infrastructuremake prefabrication a

    necessity

    Compact layout

    Method that can enable

    projects in other remoteareas

    Valuable lessons learnt:Technology/

    organisation/contracts

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    17/34

    17

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    18/34

    18

    Slug catcher

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    19/34

    19

    MEG-tanks

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    20/34

    20

    Kuldeboks Cold box

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    21/34

    21

    Cold box

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    22/34

    22

    SnhvitBlue Marlin and process barge in Cadiz

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    23/34

    23

    SnhvitIn-docking of process-barge

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    24/34

    24

    4 new carriersL: 290 m, W: 49 m , H: 53 m145 000 cbmMade in JapanDelivery November 2005 - April 2006.

    LNG: 70 cargoes a year

    LPG: 20 000 tonn

    Condensate: 40 000 tonn

    LPG/Condensate:

    15-20 cargoes a year

    LNG-carriers

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    25/34

    25

    Melkya - Cove Point: 20 days returnMelkya Bilbao: 12 days return

    SnhvitShipping and new markets

    Cove Point

    annually 2.4billion cubic

    metres

    Iberdrola S.A.

    annually 1.6billion cubic

    metres

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    26/34

    26

    Continued high activity parallel processes

    Final constructionactivities

    Commissioning andtesting

    Start up andoperations

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    27/34

    27

    SnhvitCompletion of all details

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    28/34

    28

    SnhvitMilestone 21. August

    Opening of wells offshoreand flow intothe pipeline

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    29/34

    29

    SnhvitFakling i oppstartsfasen

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    30/34

    30

    Hammerfest LNG

    Veske-fanger

    MottakMling

    CO2fjerning

    Vannfjerning Kvikkslvfjerning

    Flytendegjring

    av Natur Gass

    LPGTank

    KondensatTank

    MEGgjenvinning

    Kondensatbehandling

    CO2 trkingog

    rekompresjonNitrogenfjerning

    Fraksjonering

    Fyr gasssystem LNG

    Tank

    LNGTank

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    31/34

    31

    SnhvitFirst cargo left Hammerfest 20. October 2007

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    32/34

    32

    Lekkasje i sjvannsvarmeveksler

  • 8/8/2019 2008 01 17 Snhvit LNG INT LNG [Read-Only]

    33/34

    33

    Annual running costs:

    NOK 800 million250 million possibleregional spin-offs

    400500 jobs in total

    Operations organisation- 200 jobs

    Suppliers and contractors

    - 100-200 jobs

    Regional impact- another 150 jobs

    Snhvit- 25 to 30 year production period