200 8/10/2007 earthwork - kdot: home · earthwork 201 clearing and grubbing 201 . 1 202 removal of...
TRANSCRIPT
200Earthwork
201 Clearing and Grubbing 201 . 1202 Removal of Existing Structures
Removal of Existing Structures 202 . 1Recap of Removal of Existing Structures 202 . 1aRemoval and Reconstruction of Existing Structures 202 . 2Recap of Removal and Reconstruction of Existing Structures 202 1a
203 Reset Existing CulvertsReset End Section 203 . 1Reset Pipe Culvert 203 . 2
204 Excavation and Backfill for StructuresClass *** Excavation 204 1Recap of Class *** Excavation 204 . 1aGrade (**) Concrete (***) 204 2Recap of Grade (**) Concrete (***) 204 2aRecap of Reinforcing Steel 204 2bConcrete for Seal Course (Set Price) 204 3Foundation Stabilization 204 4Foundation Stabilization (Set Price) 204 4Granular Backfill 204 5Granular Backfill (Wingwalls) (Set Price) 204 5Water (Grading) (Set Price) 205 4Recap of Water Hauled 205 4aRecap of Metered Water 205 4b
205 Excavation and Embankment for HighwaysCommon Excavation 205 . 1Recap of Common Excavation 205 1aCommon Excavation (Contractor-Furnished) 205 1Recap of Common Excavation(Contractor -Furnished) 205 . 1aRock Excavation 205 1Recap of Rock Excavation 205 . 1aRock Excavation (Non-Durable Shale) 205 1Recap of Rock Excavation(Non-Durable Shale) 205 1aUnclassified Excavation 205 1Recap of Unclassified Excavation 205 1aCommon Excavation (Unstable) & (Unsuitable) 205 1Recap of Common Excavation (Unstable) & (Unsuitable) 205 1a
Plate
8/10/2007
200Earthwork
Plate
8/10/2007
Compaction of Earthwork (Type *) (MR-**) 205 2Recap of Compaction of Earthwork (Type *) (MR-**) 205 2aEstimated Daily Earthwork Quantities 205 2bEmbankment & Embankment (Contractor Furnished) 205 2Recap of Embankment & Embankment (Contractor Furnished) 205 2aEstimated Daily Earthwork Quantities 205 2bEradication of Traveled Way 205 . 11Water (Grading) (Set Price) 205 . 4Recap of Water Hauled 205 . 4aRecap of Metered Water 205 . 4b
206 Select Soil & Select Soil (Contractor-Furnished) 206 . 1
207 Overhaul 207 1
208 Linear GradingLinear Grading 208 . 1Water (Grading) (Set Price) 205 4Recap of Water Hauled 205 4aRecap of Metered Water 205 4b
CLEARING AND GRUBBING
Percent Accum %Date Side Complete Complete Remarks Insp.
VERY LIGHT VEGITATION
MONTHLY ESTIMATE NO. ______
Note: The percent was mutually agreed upon by the contractor and the engineer.
Plan Qty
Sta to StaLocation
201-1
Line No.
Structure % of Accum DateNo. Sta Side LSUM % Removed Remarks Insp
LIST OF REMOVAL OF EXISTING STRUCTURES Line No. Plan Qty.
This plate is recorded from the plans showing each structure to be removed. In computing the percent for the estimate, treat each unit as an equal computed percent for each structure compared to 100%. This plate shows five small structures and one large structure to be removed. Therefore each small structure would be equal to 10% complete when removed. When a large structure is encountered as above, the percentage value of each item should then be adjusted to fit the bid item.
202-1
SizeType of Structure
Date Reference Structure % of Accum.
Removed Bk. No. Pg. No. No. LSUM % Insp.
MONTHLY ESTIMATE NO. ______
MONTHLY ESTIMATE NO. ____
this form may also be used for removal and reconstruction of existing structures
Remarks
202-1a
RECAP OF REMOVAL OF EXISTING STRUCTURES
LIST OF REMOVE AND RECONSTRUCT EXISTING STRUCTURES
Structure % of Accum Date DateNo. Sta Side LSUM % Removed Reconstr. Insp
A breakdown should be submitted by the contractor and agreed to by the inspector that shows apercentage of the lump sum for removal and a percentage of the lump sum for reconstruction.The breakdown should total to 100%.
Line No. Plan Qty.
SizeType of Structure
202-2
This plate is recorded from the plans showing each structure to be removed and reconstructed.
RESET END SECTIONNumber Accum
of End # of EndDate Station Side Size Sections Sections Insp Remarks
203-1
Line No Plan Qty
RESET PIPE CULVERTAccum
Linear LinearDate Station Side Size Feet Feet Insp Remarks
203-2
Line No. Plan Qty
DOCUMENTATION OF CLASS I, II, III EXCAVATION
Plan Actual InspDate Structure Insp. Depth Depth Date
*
*
NOTE: THE AVERAGE WATER ELEVATION SHOULD BE * STRUCTURE AND EXCAVATION ELEVATIONS AND RECORDED FOR CLASS III EXCAVATION VERIFICATION DIMENSIONS ARE CONSTRUCTED TO REASONABLE
CONFORMITY TO PLAN REQUIREMENTS INDICATINGNO DEVIATION FROM PLAN EXCAVATIONQUANTITIES. JD
RECORD DATA OF REASONABLE COMPLIANCE OF ACTUAL TO THE PLAN DIMENSIONS AND GRADES OF THE STRUCTURE. THIS NEED ONLY BE MADE AT EXCAVATION CONTROL POINTS.RECORD FOR FILE SUCH APPROXIMATE COMPUTATIONS OF THE ACTUAL EXCAVATION QUANTITIES WHICH BY COMPARISON WITH THE PLAN QUANTITIES WILL INDICATE THESE QUANTITIES HAVE BEEN CALCULATED AND TABULATEDWITHOUT APPARENT ERROR.RECORD DATA THAT WILL SHOW BY COMPARISON TO PLAN EARTHWORK REQUIREMENTS THAT THE ACTUAL EARTHWORKWAS CONSTRUCTED IN A REASONABLE CONFORMITY TO THESE REQUIREMENTS. THIS CHECK WOULD MAKE USE OF CONSTRUCTION STAKING OF THE REQUIRED BERMS, ETC.TYPICAL PLATE EXAMPLE WHICH MAY BE ADAPTED TO THE DIFFERENT TYPE AND VARIATION OF STRUCTURES INVOLVED IS SHOWN HERE.
Earthwork
Structure Structure
Line No. Plan Qty.
RemarksPlan Dimension Actual Dimension
204-1
RECAP OF CLASS I, II, III EXCAVATION BR. NO. 16.13 Estimate Estimate Final
Plan % Cubic CompleteDate Location Quantity Complete Yards Quantity Insp
_________________________________________________________________MONTHLY ESTIMATE NO. ______
MONTHLY ESTIMATE NO. ______THIS PLATE IS INTENDED FOR USE WITH CLASS I, II, OR III FOR FINAL QUANTITY DETERMINATION, REFER TO EXCAVATION. THE ESTIMATED PERCENT COMPLETE MAY COMPUTATION FILE FOLDER * AND CHANGEBE DETERMINED BY VISUAL INSPECTION AT THE SITE OR ORDER NO. *MAY BE COOMPUTED FROM ACTUAL MEASUREMENTS. JD
Remarks
204-1a
STRUCTURE CONCRETE PLACEMENT AND TEST DATA (CLASS _______________CONCRETEDate
Structure Location
Portion Base
Mix Design
Plan Quantity
Accum Cu Yd
Lbs Steel / Cu Yd THE DATA SHOWN ON THIS PLATE IS A RECORDPay/ Qnty/ Steel OF THE ACTUAL STRUCTURE CONSTRUCTION AND SHOWS Accum/ Pay/ Qnty COMPLIANCE WITH THE SPECIFICATIONS. ALL INFORMATIONCu Yd Delivered NECESSARY TO COMPLETE THE WEEKLY REPORT IS INCLUDED.Cu Yd Waste
Lbs. Cement Used THIS PLATE IS DESIGNED FOR READY-MIX OPERATIONSYcf / Acf AND CAN BE ALTERED TO ACCOMMODATE OTHER METHODS.
Ticked #Bkt / Con - Bkt
Weight Concrete
Correction Factor
Corr. Lbs/Cu Ft
Theo. Air Free Wt.
% Air
Slump Spec/ Actual
Temp Conc/ Actual
Cylinders Made
Insp
Insp #
Remarks
204-2
Accum ReferenceDate Cu Yd Cu Yd Bk / Pg Structure Insp.
Portion of
Structure Placed Remarks
204-2a
(**) Grade of Concrete(***) AE, (air entrained), if specified
Line No. Plan Qty
Class Concrete
RECAP OF GRADE (**) __________CONCRETE (***)
RECAP OF REINFORCING STEEL
Accum Accum AccumDate Lbs. Lbs. Bk Pg Lbs. Lbs. Bk Pg Lbs. Lbs. Bk Pg Remarks Insp.
THIS PLATE PROVIDES DOCUMENTATION OF THE ACCUMULATION OF THE INDIVIDUAL PAY ITEMS LISTED
FOR ESTIMATE PURPOSES. QUANTITIES SHOWN ARE BASED ON PLAN QUANTITIES AND ARE SUBJECT
TO REVISION BASED ON FINAL COMPLETED QUANTITIES.
Line No. Plan Qty
Mesh ReinforcementReinforcing SteelRefer.
Reinforcing Steel
204-2b
Refer. Refer.
Accum Type ofDate Cu. Yds. Cu. Yds. Concrete Insp.
204-3
CONCRETE FOR SEAL COURSE Line No. Plan Qty
Location Dimensions Remarks
Accum Tons Date Depth Cu. Yds. Cu. Yds. Delivered Insp.
Line No. Plan Qty
204-4
CAN ALSO BE USED FOR FOUNDATION STABILIZATION (SET PRICE)
FOUNDATION STABILAZATION
RemarksType of
Material (*)Location
(*) USE SB-1,SB-2 OR SB-3, WHEN DEPTH IS LESS THAN 6" USE ONLY SB-3
Type of Tons Load Accum L.F.Date Material Delivered Tickets Cu. Yds. Cu. Yds. Pipe Insp.
CAN ALSO BE USED FOR GRANULAR BACKFILL (WINGWALLS) (SET PRICE)
204-5
GRANULAR BACKFILL Line No. Plan Quantity
LocationType of
Drainage Pipe (**)
Accum Accum Accum AccumAccum (Contr. Furn.) (Contr. Furn) Rock Rock Rock Excav. Rock Excav. (*) (*)
Date Common Common Common Common ExcavationExcavationNon-DurableNon-DurableExcavationExcavation Insp.
(*) May be Unclassified, Unstable, or Unsuitable.
205-1
EXCAVATION FOR HIGHWAYS Balance ____ Sta. 100+00 to 250+00Common Excavation cu. yds.
Common Excavation (Contractor Furnished) cu. yds.Rock Excavation cu. yds.
Rock Excavation (Non-Durable Shale) cu. yds. (*) Excavation cu. yds.
Accum Accum Accum AccumAccum (Contr. Furn.)(Contr. Furn) Rock Rock Rock Excav.Rock Excav. (*) (*)
Date Common Common Common Common Excav Excav (ND Shale) (ND Shale) Excav. (Excav.)
(*) May be Unclassified, Unstable, or Unsuitable.
205-1a
RECAP OF EXCAVATION FOR HIGHWAYS Contract QuantitiesCommon Excavation cu. yds.Common Excavation (Contractor Furnished) cu. yds.Rock Excavation cu. yds.Rock Excavation (Non-Durable Shale) cu. yds.
AccumDate Embkmt. Embkmt. Insp.
(*) = Type AAA, AA, A, or B, (**) = MR-0-5, 3-3, 5-5, or 90
(Contr. Furn.)Embkmt.
Accum (Contr. Furn.)Embkmt.
205-2
EMBANKMENT FOR HIGHWAYS Balance ____ Sta. 100+00 to 250+00
Compaction of Earthwork Type (*) MR (**) cu. yds.Embankment (Contractor Furnished) cu. yds.
Compaction Type (*) MR-(**)
Accum CompactionType (*) MR-(**)
Embankment cu. yds.
Accum
Date Embkmt Embkmt Insp.
205-2a
RECAP OF EMBANKMENT FOR HIGHWAYS Contract Quantities:Embankment cu. yds.
Embankment (Contractor Furnished) cu. ydsCompaction of Earthwork Type (*) MR-(**) cu. yds.
Compaction Type (*) MR-(**)
Accum CompactionType (*) MR-(**)
(*) = Type AAA, AA, A, or B, (**) = MR-0-5, 3-3, 5-5, or 90
(Contr. Furn.)Embkmt
Accum (Contr. Furn.)Embkmt
Est. Est. Est. Est. Accum AccumLoads cu. yds. cu. yds. cu. yds. cu. yds. Type of cu. yds. Type
Date Excav. per Load Excav. VMF Compact Excav. Excav. Compact Compact Insp.
2052b
ESTIMATED DAILY EARTHWORK QUANTITIES
Tank Daily Daily Ticket
Tank Size M. Gal. Total Accum NumberDate Load Tally Number M. Gal. @ Tank M. Gal. Total Issued Book Page Insp
Weekly Total
205-4
Line No Plan Qty.WATER (GRADING) Set Price
Weekly Accum Reference
Week Total Total Book EstimateEnding Ending Ending Page Number Insp.
2054a
RECAP OF WATER HAULED
CAN ALSO BE USED WITH BACKFILLING FOR STRUCTURES
LINE NO. PLAN QTY
Type ofUse Remarks
Line No. Plan Qty
Final Initial Metered Corr. Corr. Gals. Pay Accum Ticket Date Time Reading Reading Gals. Factor Gals. Waste M. Gals. M.Gals No. Insp.
2054b
RECAP OF WATER METERED
CAN ALSO BE USED WITH BACKFILLING FOR STRUCTURES
Meter No.
ERADICATION OF TRAVELED WAYPlan Quantity:
Accum %Date No of Sta No of Sta Complete Remarks Date Est. No. Insp.
LocationSta to Sta
205-11
Line No.
Accum Initial Final
Date Side Cu. Yds. Cu. Yds. Ticket Ticket Insp.
206-1
PLACING SELECT SOIL
Location Remarks
Line No. Plan Qty
CAN ALSO BE USED FOR SELECT SOIL (CONTRACTOR FURNISHED)
Sta.'s of Cu. Yd. $0.03 perDate Free Haul Overhaul Overhaul Cu. Yds. per Sta. CuYd/Sta. Insp.
OVERHAUL Line No. Plan Qty
207-1
Sta. to Sta.Accum $0.03
per Cu. Yd./Sta.
COMPUTATION OF STATIONS OF LINEAR GRADING(Kilometers Of Linear Grading)
Equiv.
Sta % Stations StaDate Length Complete Complete Complete Insp
208-1
Line No. Plan Qty.
Sta to Sta RemarksLocation