2 storey 124 dunlevy avenue november, 2017
TRANSCRIPT
ALEXANDER STREET
DU
NLE
VY
AV
EN
UE
LANE
ADJACENT2 STOREYBUILDING(+/- 8.3m)
ADJACENT4 STOREYBUILDING
(+/- 12.8m)
ADJACENT5 STOREYBUILDING
(+/- 15.3m)
ADJACENT1 STOREYBUILDING(+/-3.8m)
ADJACENT2 STOREYBUILDING(+/- 6.8m)
RODDAN LODGE
JAC
KS
ON
AV
EN
UE
1CONTEXT PLAN1:1200
PROJECT AREA
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A0.0
1
NOV 6, 2017
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
COVER SHEETDRAWING LIST
DECONSTRUCTION AND DEMOLITION
124 DUNLEVY AVENUE
NOVEMBER, 2017
PROJECT INFORMATION CONSULTANTSLIST OF DRAWINGS
DYS ARCHITECTURE260 - 1770 BURRARD STVANCOUVER, BC. V6J 3G7TEL: (604) 669-7710FAX: (604) 669-6629
MECHANICAL1. ARCHITECTURAL DRAWINGS DECONSTRUCTION
AREA (SQ. M)EXISTING
LEVEL 1 923.11
LEVEL 2 782.47
LEVEL 3 782.47
LEVEL 4 782.47
LEVEL 5 850.63
LEVEL 6 826.70
ROOF 752.76
TOTAL 5,700.61
NOTE:EXISTING AREAS ARE APPROXIMATE.
LEGAL DESCRIPTION
AMENDED LOTS 1 TO 6 INCLUSIVE, BLOCK 41, DISTRICT LOT 196,PLAN 196, GROUP 1, NEW WESTMINSTER DISTRICT
CIVIC ADDRESS
124 DUNLEVY AVENUE, VANCOUVER, BC. V6A 3T6
DEMOLITION AREA SUMMARY
A0.01 DECONSTRUCTION - COVER SHEET & DRAWING LISTA0.02 DECONSTRUCTION - SURVEY PLAN
A1.01 DECONSTRUCTION - SITE PLANA1.02 DECONSTRUCTION - PHOTOS
A2.01 DECONSTRUCTION - FLOOR PLAN GROUND LEVELA2.02 DECONSTRUCTION - FLOOR PLAN LEVEL 2A2.03 DECONSTRUCTION - FLOOR PLAN LEVEL 3A2.04 DECONSTRUCTION - FLOOR PLAN LEVEL 4A2.05 DECONSTRUCTION - FLOOR PLAN LEVEL 5A2.06 DECONSTRUCTION - FLOOR PLAN LEVEL 6A2.07 DECONSTRUCTION - FLOOR PLAN ROOF PLAN
A3.01 DECONSTRUCTION - ELEVATIONS NORTH & SOUTHA3.02 DECONSTRUCTION - ELEVATIONS EAST & WEST
A4.01 DECONSTRUCTION - SECTIONS
MCW CONSULTANTS LTD1400-1185 WEST GEORGIA STVANCOUVER, B.C. V6E 4E6TEL: (604) 687-1821
ARCHITECTURAL
MCW CONSULTANTS LTD1400-1185 WEST GEORGIA STVANCOUVER, B.C. V6E 4E6TEL: (604) 687-1821
SPECIFICATIONS
LANDMARK ARCHITECTURE3841 WEST 31 AVENUEVANCOUVER, B.C. V6S 1Y2TEL: (604) 228-1243
ELECTRICAL
2. MECHANICAL DRAWINGS
M1.01 MECHANICAL DECONSTRUCTION SITE PLAN
3. ELECTRICAL DRAWINGS
ED-1 ELECTRICAL DECONSTRUCTION SITE PLAN
R.F. BINNIE & ASSOCIATES205-4946 CANADA WAYBURNABY, B.C. V5G 4H7TEL: (604) 420-1721FAX: (604) 420-4743
CIVIL
4. CIVIL
C01 COVER SHEET - LEGENDC02 DECOMMISSIONING PLAN (17-0892-DP)C03 EROSION AND SEDIMENT CONTROL PLAN (17-0892-ESC1)C04 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS (17-0892-ESC2)
CLIENT
CITY OF VANCOUVERFACILITIES DEVELOPMENT507 WEST BROADWAY, SUITE 320VANCOUVER, B.C. V5Z 084TEL: 604.871.6329
PROJECT DATA
SCOPE OF WORK -THE PROJECT CONSISTS GENERALLY OF THE DECONSTRUCTIONAND GREEN DEMOLITION OF THE RODDAN LODGE LOCATED AT124 DUNLEVY.
5. AS-BUILT DRAWINGS (1976)
ARCHITECTURAL (A1-A14)
STRUCTURAL (S1-S15)
MECHANICAL (M1-M7)
ELECTRICAL (E1-E7)
LANDSCAPE (L1)
RODDAN LODGE
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
A0.0
2
1:100
A216317
SURVEY PLAN
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
·
·
·
·
·
TREES TO BEREMOVED
TREES TO BEREMOVED
EXISTING STREET TREESALONG ALEXANDER STTO REMAIN
EXISTING STREET TREESALONG ALEXANDER STTO REMAIN
TREES TO BEREMOVED
INSTALL TREE PROTECTION FENCING.AS PER COV DIRECTION, INSTALLORANGE SNOW FENCING OR MINIMODULAR FENCING WITH REBAR INTHE CORNERS OF THE GRASSCUTOUTS. ENSURE THERE ARE NOTRIPPING HAZARDS.
INSTALL TREE PROTECTION FENCING. ASPER COV DIRECTION, INSTALL ORANGESNOW FENCING OR MINI MODULARFENCING WITH REBAR IN THE CORNERSOF THE GRASS CUTOUTS. ENSURETHERE ARE NO TRIPPING HAZARDS.
CONC CURBS TO BEREMOVED
REMOVEBENCH
REMOVE BENCH
PLANTING TOBE REMOVED
2'-0"x2'-0" CONC PAVERSTO BE REMOVED
2'-0" x 2'-0" CONC PAVERSTO BE REMOVED
EXPOSEDAGGREGATE CONCPAVERS TO BEREMOVED
PLANTING TOBE REMOVED
PLA
NTI
NG
TO
BE
RE
MO
VE
D
EXPOSED AGGCONC SIDEWALK TOBE REMOVED
PAVERS TO BEREMOVED
PAVERS TO BEREMOVED
PAVERS TO BEREMOVED
PA
VE
RS
TO
BE
RE
MO
VE
D
EXPOSEDAGGREGATE CONCPAVERS TO BEREMOVED
2'-0"x2'-0" CONC PAVERSTO BE REMOVED
SHRUBS TO BEREMOVED
RETAINING WALL TO BEREMOVED
ASHPHALTPAVING TO BEREMOVED
FENCE TO BEREMOVED
EXIST CATCH BASINTO REMAIN
FACADES OF ADJACENTBUILDINGS TO BEPROTECTED DURINGDECONSTRUCTION ANDDEMOLITION
FACADES OF ADJACENTBUILDINGS TO BEPROTECTED DURINGDECONSTRUCTION ANDDEMOLITION
FACADES OF ADJACENTBUILDINGS TO BEPROTECTED DURINGDECONSTRUCTION ANDDEMOLITION
EXISTING GAS METERSERVING ADJACENTPROPERTY TO BEPROTECTED DURINGDECONSTRUCTION ANDDEMOLITION
LINE OF CANOPY ABOVETO BE REMOVED
LINE OF CANOPY ABOVETO BE REMOVED
LINE OF CANOPY ABOVETO BE REMOVED
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A1.0
1
NOV 6, 20171:100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
SITE PLAN
NOTE:REFER TO MECHANICAL,ELECTRICAL AND CIVILDRAWINGS FOR DISCONNECTIONAND REMOVAL OF ALL UTILITIES
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A1.0
2
NOV 6, 20171:200
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
PHOTOS
VIEW OF EXISTING TREES TO REMAING ALONG ALEXANDER STREET VIEW OF HOUSE ADJACENT TO THE EAST PROPERTY LINE
VIEW OF EXISTING FENCE TO BE REMOVED FROM EAST SIDE
VIEW OF EXISTING GAS METER TO REMAIN
VIEW OF EXISTING ASPHALT PARKING AND CONC CURBS TO BE REMOVED VIEW OF EXISTING CONC PAVERS, TREES, FENCE AND SHRUBS TO BE REMOVED
VIEW OF SOUTH LANE AND EXISTING BC HYDRO POLE TO REMAIN
WEST VIEW OF PROPERTY AND LANDSCAPE TO BE REMOVED
TREE PROTECTION DETAIL
NTS
OFFICE MECHANICAL ELECT.LOBBY
H H
H H H H
H H
H H
PUBLIC
CARETAKER'S SUITE
LAU
ND
RY
WORKSHOP
LOUNGE
COMMUNAL STORAGE
A
A
EXIT CORRIDOR
EX
IT C
OR
RID
OR
ELEVATORMACHINEROOM
CHAIRSTORAGE
LOCKER RM.14 Lockers
LOCKER RM.21 Lockers
STAIR 2
STA
IR 1
VESTIBULE
1
2STAIR 3
HANDICAPPED
STOR.
JAN
1
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 12
LEGEND:
SCOPE OF WORK:THE WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL AND RECYCLING OF DOORS, WINDOWS, FIXTURES, EQUIPMENT AND APPLIANCES.
2. REMOVAL OF HAZARDOUS MATERIALS. REFER TO HAZARDOUS BUILDING MATERIAL SURVEY.
3. REMOVAL AND RECYCLING OF GYPSUM WALL BOARD PRODUCTS.
4. CRUSHING AND REMOVAL OF DEMOLISHED CONCRETE AND RECYCLING OF STEELREINFORCING. RECYCLE CONCRETE TO THE GREATEST EXTENT POSSIBLE.
5. REMOVAL OF STRUCTURAL SLAB AND FOUNDATIONS.
6. REMOVAL OF EXTERIOR PAVING, RETAINING WALLS AND LANDSCAPING.
7. REMOVAL AND RECYCLING OF EXTERIOR METAL FASCIA AND FLASHING.
8. REMOVAL AND CAPPING OFF OF ALL EXISTING UTILITIES WITHIN THE PROPERTY OF THEBUILDING BEING DEMOLISHED. REFER TO MECH, ELEC AND CIVIL DRAWINGS.
EXISTING TO BE DEMOLISHED
GENERAL NOTES:
1. THE DRAWINGS MAY NOT REPRESENT THE DETAILED ACCURATE CONFIGURATION OF THEBUILDING ; IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL SITE ANDBUILDING MEASUREMENTS AND CONDITIONS.
2. ERECT HOARDING TO CITY OF VANCOUVER STANDARDS AROUND ENTIRE PERIMETER OFSITE TO PROTECT THE PUBLIC, WORKERS, AND PUBLIC / PRIVATE PROPERTY FROM INJURYOR DAMAGE. LOCATIONS TO BE FIELD VERIFIED. MAINTAIN FOR THE DURATION OF THEWORK. PROTECTION TUNNELS TO BE CONSTRUCTED TO PROTECT THE SIDEWALKS TO THENORTH AND WEST SIDES OF THE PROJECT.
3. PROVIDE DUST PROTECTION AND DUST CONTROL AS REQUIRED BY MUNICIPAL ANDPROVINCIAL REGULATIONS.
4. DRAWINGS TO BE READ IN CONJUNCTION: WITH MECHANICAL, ELECTRICAL AND CIVILDRAWINGS AND THE PROJECT MANUAL FOR ALL OTHER DEMOLITION REQUIREMENTS.
5. CONTRACTOR TO ENGAGE AT THEIR COST A PROFESSIONAL ENGINEER REGISTERED IN BCTO DETERMINE THE ALLOWABLE LOADING FOR THE EXISTING STRUCTURE. PRECAUTIONSSHALL BE TAKEN BY THE CONTRACTOR AND SUBCONTRACTORS TO PREVENT THEOVERLOADING OF ANY PART OF THE STRUCTURE OR SCAFFOLDING DURING THEPROGRESS OF THE DEMOLITION WORK, AND ANY DAMAGE AND ANY CLAIMS RESULTINGFROM SUCH OVERLOADING SHALL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOROR SUBCONTRACTOR.
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A2.0
1
NOV 6, 20171:100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
FLOOR PLANGROUND LEVEL
1
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 121
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 12
A A A A
A A A A
B B
A A
A A
A A
A A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
JANITOR
FLAT ROOF OVERENTRANCE
GARBAGECHUTE
UP
DN
UPDN
UP DN
TEN
AN
T'S
SH
OW
ER
AN
D B
ATH
LEGEND:
SCOPE OF WORK:THE WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL AND RECYCLING OF DOORS, WINDOWS, FIXTURES, EQUIPMENT AND APPLIANCES.
2. REMOVAL OF HAZARDOUS MATERIALS. REFER TO HAZARDOUS BUILDING MATERIAL SURVEY.
3. REMOVAL AND RECYCLING OF GYPSUM WALL BOARD PRODUCTS.
4. CRUSHING AND REMOVAL OF DEMOLISHED CONCRETE AND RECYCLING OF STEELREINFORCING. RECYCLE CONCRETE TO THE GREATEST EXTENT POSSIBLE.
5. REMOVAL OF STRUCTURAL SLAB AND FOUNDATIONS.
6. REMOVAL OF EXTERIOR PAVING, RETAINING WALLS AND LANDSCAPING.
7. REMOVAL AND RECYCLING OF EXTERIOR METAL FASCIA AND FLASHING.
8. REMOVAL AND CAPPING OFF OF ALL EXISTING UTILITIES WITHIN THE PROPERTY OF THEBUILDING BEING DEMOLISHED. REFER TO MECH, ELEC AND CIVIL DRAWINGS.
EXISTING TO BE DEMOLISHED
GENERAL NOTES:
1. THE DRAWINGS MAY NOT REPRESENT THE DETAILED ACCURATE CONFIGURATION OF THEBUILDING ; IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL SITE ANDBUILDING MEASUREMENTS AND CONDITIONS.
2. ERECT HOARDING TO CITY OF VANCOUVER STANDARDS AROUND ENTIRE PERIMETER OFSITE TO PROTECT THE PUBLIC, WORKERS, AND PUBLIC / PRIVATE PROPERTY FROM INJURYOR DAMAGE. LOCATIONS TO BE FIELD VERIFIED. MAINTAIN FOR THE DURATION OF THEWORK. PROTECTION TUNNELS TO BE CONSTRUCTED TO PROTECT THE SIDEWALKS TO THENORTH AND WEST SIDES OF THE PROJECT.
3. PROVIDE DUST PROTECTION AND DUST CONTROL AS REQUIRED BY MUNICIPAL ANDPROVINCIAL REGULATIONS.
4. DRAWINGS TO BE READ IN CONJUNCTION: WITH MECHANICAL, ELECTRICAL AND CIVILDRAWINGS AND THE PROJECT MANUAL FOR ALL OTHER DEMOLITION REQUIREMENTS.
5. CONTRACTOR TO ENGAGE AT THEIR COST A PROFESSIONAL ENGINEER REGISTERED IN BCTO DETERMINE THE ALLOWABLE LOADING FOR THE EXISTING STRUCTURE. PRECAUTIONSSHALL BE TAKEN BY THE CONTRACTOR AND SUBCONTRACTORS TO PREVENT THEOVERLOADING OF ANY PART OF THE STRUCTURE OR SCAFFOLDING DURING THEPROGRESS OF THE DEMOLITION WORK, AND ANY DAMAGE AND ANY CLAIMS RESULTINGFROM SUCH OVERLOADING SHALL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOROR SUBCONTRACTOR.
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A2.0
2
NOV 6, 20171:100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
FLOOR PLANLEVEL 2
1
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 121
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 12
A A A A
A A A A
B B
A A
A A
A A
A A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
JANITOR
FLAT ROOF OVERENTRANCE
GARBAGECHUTE
UP
DN
UPDN
UP DN
TEN
AN
T'S
SH
OW
ER
AN
D B
ATH
LEGEND:
SCOPE OF WORK:THE WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL AND RECYCLING OF DOORS, WINDOWS, FIXTURES, EQUIPMENT AND APPLIANCES.
2. REMOVAL OF HAZARDOUS MATERIALS. REFER TO HAZARDOUS BUILDING MATERIAL SURVEY.
3. REMOVAL AND RECYCLING OF GYPSUM WALL BOARD PRODUCTS.
4. CRUSHING AND REMOVAL OF DEMOLISHED CONCRETE AND RECYCLING OF STEELREINFORCING. RECYCLE CONCRETE TO THE GREATEST EXTENT POSSIBLE.
5. REMOVAL OF STRUCTURAL SLAB AND FOUNDATIONS.
6. REMOVAL OF EXTERIOR PAVING, RETAINING WALLS AND LANDSCAPING.
7. REMOVAL AND RECYCLING OF EXTERIOR METAL FASCIA AND FLASHING.
8. REMOVAL AND CAPPING OFF OF ALL EXISTING UTILITIES WITHIN THE PROPERTY OF THEBUILDING BEING DEMOLISHED. REFER TO MECH, ELEC AND CIVIL DRAWINGS.
EXISTING TO BE DEMOLISHED
GENERAL NOTES:
1. THE DRAWINGS MAY NOT REPRESENT THE DETAILED ACCURATE CONFIGURATION OF THEBUILDING ; IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL SITE ANDBUILDING MEASUREMENTS AND CONDITIONS.
2. ERECT HOARDING TO CITY OF VANCOUVER STANDARDS AROUND ENTIRE PERIMETER OFSITE TO PROTECT THE PUBLIC, WORKERS, AND PUBLIC / PRIVATE PROPERTY FROM INJURYOR DAMAGE. LOCATIONS TO BE FIELD VERIFIED. MAINTAIN FOR THE DURATION OF THEWORK. PROTECTION TUNNELS TO BE CONSTRUCTED TO PROTECT THE SIDEWALKS TO THENORTH AND WEST SIDES OF THE PROJECT.
3. PROVIDE DUST PROTECTION AND DUST CONTROL AS REQUIRED BY MUNICIPAL ANDPROVINCIAL REGULATIONS.
4. DRAWINGS TO BE READ IN CONJUNCTION: WITH MECHANICAL, ELECTRICAL AND CIVILDRAWINGS AND THE PROJECT MANUAL FOR ALL OTHER DEMOLITION REQUIREMENTS.
5. CONTRACTOR TO ENGAGE AT THEIR COST A PROFESSIONAL ENGINEER REGISTERED IN BCTO DETERMINE THE ALLOWABLE LOADING FOR THE EXISTING STRUCTURE. PRECAUTIONSSHALL BE TAKEN BY THE CONTRACTOR AND SUBCONTRACTORS TO PREVENT THEOVERLOADING OF ANY PART OF THE STRUCTURE OR SCAFFOLDING DURING THEPROGRESS OF THE DEMOLITION WORK, AND ANY DAMAGE AND ANY CLAIMS RESULTINGFROM SUCH OVERLOADING SHALL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOROR SUBCONTRACTOR.
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A2.0
3
RBNOV 6, 20171:100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
FLOOR PLANLEVEL 3
1
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 121
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 12
A A A A
A A A A
B B
A A
A A
A A
A A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
JANITOR
FLAT ROOF OVERENTRANCE
GARBAGECHUTE
UP
DN
UPDN
UP DN
TEN
AN
T'S
SH
OW
ER
AN
D B
ATH
LEGEND:
SCOPE OF WORK:THE WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL AND RECYCLING OF DOORS, WINDOWS, FIXTURES, EQUIPMENT AND APPLIANCES.
2. REMOVAL OF HAZARDOUS MATERIALS. REFER TO HAZARDOUS BUILDING MATERIAL SURVEY.
3. REMOVAL AND RECYCLING OF GYPSUM WALL BOARD PRODUCTS.
4. CRUSHING AND REMOVAL OF DEMOLISHED CONCRETE AND RECYCLING OF STEELREINFORCING. RECYCLE CONCRETE TO THE GREATEST EXTENT POSSIBLE.
5. REMOVAL OF STRUCTURAL SLAB AND FOUNDATIONS.
6. REMOVAL OF EXTERIOR PAVING, RETAINING WALLS AND LANDSCAPING.
7. REMOVAL AND RECYCLING OF EXTERIOR METAL FASCIA AND FLASHING.
8. REMOVAL AND CAPPING OFF OF ALL EXISTING UTILITIES WITHIN THE PROPERTY OF THEBUILDING BEING DEMOLISHED. REFER TO MECH, ELEC AND CIVIL DRAWINGS.
EXISTING TO BE DEMOLISHED
GENERAL NOTES:
1. THE DRAWINGS MAY NOT REPRESENT THE DETAILED ACCURATE CONFIGURATION OF THEBUILDING ; IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL SITE ANDBUILDING MEASUREMENTS AND CONDITIONS.
2. ERECT HOARDING TO CITY OF VANCOUVER STANDARDS AROUND ENTIRE PERIMETER OFSITE TO PROTECT THE PUBLIC, WORKERS, AND PUBLIC / PRIVATE PROPERTY FROM INJURYOR DAMAGE. LOCATIONS TO BE FIELD VERIFIED. MAINTAIN FOR THE DURATION OF THEWORK. PROTECTION TUNNELS TO BE CONSTRUCTED TO PROTECT THE SIDEWALKS TO THENORTH AND WEST SIDES OF THE PROJECT.
3. PROVIDE DUST PROTECTION AND DUST CONTROL AS REQUIRED BY MUNICIPAL ANDPROVINCIAL REGULATIONS.
4. DRAWINGS TO BE READ IN CONJUNCTION: WITH MECHANICAL, ELECTRICAL AND CIVILDRAWINGS AND THE PROJECT MANUAL FOR ALL OTHER DEMOLITION REQUIREMENTS.
5. CONTRACTOR TO ENGAGE AT THEIR COST A PROFESSIONAL ENGINEER REGISTERED IN BCTO DETERMINE THE ALLOWABLE LOADING FOR THE EXISTING STRUCTURE. PRECAUTIONSSHALL BE TAKEN BY THE CONTRACTOR AND SUBCONTRACTORS TO PREVENT THEOVERLOADING OF ANY PART OF THE STRUCTURE OR SCAFFOLDING DURING THEPROGRESS OF THE DEMOLITION WORK, AND ANY DAMAGE AND ANY CLAIMS RESULTINGFROM SUCH OVERLOADING SHALL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOROR SUBCONTRACTOR.
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A2.0
4
NOV 6, 20171:100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
FLOOR PLANLEVEL 4
1
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 121
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 12
JANITOR
FLAT ROOF OVERENTRANCE
GARBAGECHUTE
UP
DN
UPDN
UP DN
TEN
AN
T'S
SH
OW
ER
AN
D B
ATH
LEGEND:
SCOPE OF WORK:THE WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL AND RECYCLING OF DOORS, WINDOWS, FIXTURES, EQUIPMENT AND APPLIANCES.
2. REMOVAL OF HAZARDOUS MATERIALS. REFER TO HAZARDOUS BUILDING MATERIAL SURVEY.
3. REMOVAL AND RECYCLING OF GYPSUM WALL BOARD PRODUCTS.
4. CRUSHING AND REMOVAL OF DEMOLISHED CONCRETE AND RECYCLING OF STEELREINFORCING. RECYCLE CONCRETE TO THE GREATEST EXTENT POSSIBLE.
5. REMOVAL OF STRUCTURAL SLAB AND FOUNDATIONS.
6. REMOVAL OF EXTERIOR PAVING, RETAINING WALLS AND LANDSCAPING.
7. REMOVAL AND RECYCLING OF EXTERIOR METAL FASCIA AND FLASHING.
8. REMOVAL AND CAPPING OFF OF ALL EXISTING UTILITIES WITHIN THE PROPERTY OF THEBUILDING BEING DEMOLISHED. REFER TO MECH, ELEC AND CIVIL DRAWINGS.
EXISTING TO BE DEMOLISHED
GENERAL NOTES:
1. THE DRAWINGS MAY NOT REPRESENT THE DETAILED ACCURATE CONFIGURATION OF THEBUILDING ; IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL SITE ANDBUILDING MEASUREMENTS AND CONDITIONS.
2. ERECT HOARDING TO CITY OF VANCOUVER STANDARDS AROUND ENTIRE PERIMETER OFSITE TO PROTECT THE PUBLIC, WORKERS, AND PUBLIC / PRIVATE PROPERTY FROM INJURYOR DAMAGE. LOCATIONS TO BE FIELD VERIFIED. MAINTAIN FOR THE DURATION OF THEWORK. PROTECTION TUNNELS TO BE CONSTRUCTED TO PROTECT THE SIDEWALKS TO THENORTH AND WEST SIDES OF THE PROJECT.
3. PROVIDE DUST PROTECTION AND DUST CONTROL AS REQUIRED BY MUNICIPAL ANDPROVINCIAL REGULATIONS.
4. DRAWINGS TO BE READ IN CONJUNCTION: WITH MECHANICAL, ELECTRICAL AND CIVILDRAWINGS AND THE PROJECT MANUAL FOR ALL OTHER DEMOLITION REQUIREMENTS.
5. CONTRACTOR TO ENGAGE AT THEIR COST A PROFESSIONAL ENGINEER REGISTERED IN BCTO DETERMINE THE ALLOWABLE LOADING FOR THE EXISTING STRUCTURE. PRECAUTIONSSHALL BE TAKEN BY THE CONTRACTOR AND SUBCONTRACTORS TO PREVENT THEOVERLOADING OF ANY PART OF THE STRUCTURE OR SCAFFOLDING DURING THEPROGRESS OF THE DEMOLITION WORK, AND ANY DAMAGE AND ANY CLAIMS RESULTINGFROM SUCH OVERLOADING SHALL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOROR SUBCONTRACTOR.
A A A A
A A A A
B B
A A
A A
A A
A A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A2.0
5
NOV 6, 20171:100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
FLOOR PLANLEVEL 5
1
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 121
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 12
JANITOR
FLAT ROOF OVERENTRANCE
GARBAGECHUTE
DN
DN
DN
TEN
AN
T'S
SH
OW
ER
AN
D B
ATH
LEGEND:
SCOPE OF WORK:THE WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL AND RECYCLING OF DOORS, WINDOWS, FIXTURES, EQUIPMENT AND APPLIANCES.
2. REMOVAL OF HAZARDOUS MATERIALS. REFER TO HAZARDOUS BUILDING MATERIAL SURVEY.
3. REMOVAL AND RECYCLING OF GYPSUM WALL BOARD PRODUCTS.
4. CRUSHING AND REMOVAL OF DEMOLISHED CONCRETE AND RECYCLING OF STEELREINFORCING. RECYCLE CONCRETE TO THE GREATEST EXTENT POSSIBLE.
5. REMOVAL OF STRUCTURAL SLAB AND FOUNDATIONS.
6. REMOVAL OF EXTERIOR PAVING, RETAINING WALLS AND LANDSCAPING.
7. REMOVAL AND RECYCLING OF EXTERIOR METAL FASCIA AND FLASHING.
8. REMOVAL AND CAPPING OFF OF ALL EXISTING UTILITIES WITHIN THE PROPERTY OF THEBUILDING BEING DEMOLISHED. REFER TO MECH, ELEC AND CIVIL DRAWINGS.
EXISTING TO BE DEMOLISHED
GENERAL NOTES:
1. THE DRAWINGS MAY NOT REPRESENT THE DETAILED ACCURATE CONFIGURATION OF THEBUILDING ; IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL SITE ANDBUILDING MEASUREMENTS AND CONDITIONS.
2. ERECT HOARDING TO CITY OF VANCOUVER STANDARDS AROUND ENTIRE PERIMETER OFSITE TO PROTECT THE PUBLIC, WORKERS, AND PUBLIC / PRIVATE PROPERTY FROM INJURYOR DAMAGE. LOCATIONS TO BE FIELD VERIFIED. MAINTAIN FOR THE DURATION OF THEWORK. PROTECTION TUNNELS TO BE CONSTRUCTED TO PROTECT THE SIDEWALKS TO THENORTH AND WEST SIDES OF THE PROJECT.
3. PROVIDE DUST PROTECTION AND DUST CONTROL AS REQUIRED BY MUNICIPAL ANDPROVINCIAL REGULATIONS.
4. DRAWINGS TO BE READ IN CONJUNCTION: WITH MECHANICAL, ELECTRICAL AND CIVILDRAWINGS AND THE PROJECT MANUAL FOR ALL OTHER DEMOLITION REQUIREMENTS.
5. CONTRACTOR TO ENGAGE AT THEIR COST A PROFESSIONAL ENGINEER REGISTERED IN BCTO DETERMINE THE ALLOWABLE LOADING FOR THE EXISTING STRUCTURE. PRECAUTIONSSHALL BE TAKEN BY THE CONTRACTOR AND SUBCONTRACTORS TO PREVENT THEOVERLOADING OF ANY PART OF THE STRUCTURE OR SCAFFOLDING DURING THEPROGRESS OF THE DEMOLITION WORK, AND ANY DAMAGE AND ANY CLAIMS RESULTINGFROM SUCH OVERLOADING SHALL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOROR SUBCONTRACTOR.
C C C C
C C C C
D D
C C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
D
D
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A2.0
6
NOV 6, 20171:100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
FLOOR PLANLEVEL 6
1
K
J
H
G
F
E
D
C
B
A
2 3 54 6 7 8 9 10 11 12
LEGEND:
SCOPE OF WORK:THE WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL AND RECYCLING OF DOORS, WINDOWS, FIXTURES, EQUIPMENT AND APPLIANCES.
2. REMOVAL OF HAZARDOUS MATERIALS. REFER TO HAZARDOUS BUILDING MATERIAL SURVEY.
3. REMOVAL AND RECYCLING OF GYPSUM WALL BOARD PRODUCTS.
4. CRUSHING AND REMOVAL OF DEMOLISHED CONCRETE AND RECYCLING OF STEELREINFORCING. RECYCLE CONCRETE TO THE GREATEST EXTENT POSSIBLE.
5. REMOVAL OF STRUCTURAL SLAB AND FOUNDATIONS.
6. REMOVAL OF EXTERIOR PAVING, RETAINING WALLS AND LANDSCAPING.
7. REMOVAL AND RECYCLING OF EXTERIOR METAL FASCIA AND FLASHING.
8. REMOVAL AND CAPPING OFF OF ALL EXISTING UTILITIES WITHIN THE PROPERTY OF THEBUILDING BEING DEMOLISHED. REFER TO MECH, ELEC AND CIVIL DRAWINGS.
EXISTING TO BE DEMOLISHED
GENERAL NOTES:
1. THE DRAWINGS MAY NOT REPRESENT THE DETAILED ACCURATE CONFIGURATION OF THEBUILDING ; IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL SITE ANDBUILDING MEASUREMENTS AND CONDITIONS.
2. ERECT HOARDING TO CITY OF VANCOUVER STANDARDS AROUND ENTIRE PERIMETER OFSITE TO PROTECT THE PUBLIC, WORKERS, AND PUBLIC / PRIVATE PROPERTY FROM INJURYOR DAMAGE. LOCATIONS TO BE FIELD VERIFIED. MAINTAIN FOR THE DURATION OF THEWORK. PROTECTION TUNNELS TO BE CONSTRUCTED TO PROTECT THE SIDEWALKS TO THENORTH AND WEST SIDES OF THE PROJECT.
3. PROVIDE DUST PROTECTION AND DUST CONTROL AS REQUIRED BY MUNICIPAL ANDPROVINCIAL REGULATIONS.
4. DRAWINGS TO BE READ IN CONJUNCTION: WITH MECHANICAL, ELECTRICAL AND CIVILDRAWINGS AND THE PROJECT MANUAL FOR ALL OTHER DEMOLITION REQUIREMENTS.
5. CONTRACTOR TO ENGAGE AT THEIR COST A PROFESSIONAL ENGINEER REGISTERED IN BCTO DETERMINE THE ALLOWABLE LOADING FOR THE EXISTING STRUCTURE. PRECAUTIONSSHALL BE TAKEN BY THE CONTRACTOR AND SUBCONTRACTORS TO PREVENT THEOVERLOADING OF ANY PART OF THE STRUCTURE OR SCAFFOLDING DURING THEPROGRESS OF THE DEMOLITION WORK, AND ANY DAMAGE AND ANY CLAIMS RESULTINGFROM SUCH OVERLOADING SHALL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOROR SUBCONTRACTOR.
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A2.0
7
NOV 6, 20171:100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
ROOF PLAN
2SOUTH ELEVATION1/100
1 2 3 54 6 7 8 9 10 11 121 2 3 54 6 7 8 9 10 11 12
1NORTH ELEVATION1/100
1235 4789101112 1235 46789101112
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A3.0
1
NOV 6, 20171/100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
ELEVATIONSNORTH & SOUTH
NOTE:ENTIRE BUILDING TO BEDECONSTRUCTED ANDDEMOLISHED.
3EAST ELEVATION1/100
KJHGFEDCBA
4WEST ELEVATION1/100
K J H G F E D C B A
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A3.0
2
NOV 6, 20171/100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
ELEVATIONSEAST & WEST
NOTE:ENTIRE BUILDING TO BEDECONSTRUCTED ANDDEMOLISHED.
ASECTION A-A1/100
1 2 3 54 6 7 8 9 10 11 121 2 3 54 6 7 8 9 10 11 12
BSECTION B-B1/100
KJHGFEDCBA
LEGEND:
SCOPE OF WORK:THE WORK INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1. REMOVAL AND RECYCLING OF DOORS, WINDOWS, FIXTURES, EQUIPMENT AND APPLIANCES.
2. REMOVAL OF HAZARDOUS MATERIALS. REFER TO HAZARDOUS BUILDING MATERIAL SURVEY.
3. REMOVAL AND RECYCLING OF GYPSUM WALL BOARD PRODUCTS.
4. CRUSHING AND REMOVAL OF DEMOLISHED CONCRETE AND RECYCLING OF STEELREINFORCING. RECYCLE CONCRETE TO THE GREATEST EXTENT POSSIBLE.
5. REMOVAL OF STRUCTURAL SLAB AND FOUNDATIONS.
6. REMOVAL OF EXTERIOR PAVING, RETAINING WALLS AND LANDSCAPING.
7. REMOVAL AND RECYCLING OF EXTERIOR METAL FASCIA AND FLASHING.
8. REMOVAL AND CAPPING OFF OF ALL EXISTING UTILITIES WITHIN THE PROPERTY OF THEBUILDING BEING DEMOLISHED. REFER TO MECH, ELEC AND CIVIL DRAWINGS.
EXISTING TO BE DEMOLISHED
GENERAL NOTES:
1. THE DRAWINGS MAY NOT REPRESENT THE DETAILED ACCURATE CONFIGURATION OF THEBUILDING ; IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL SITE ANDBUILDING MEASUREMENTS AND CONDITIONS.
2. ERECT HOARDING TO CITY OF VANCOUVER STANDARDS AROUND ENTIRE PERIMETER OFSITE TO PROTECT THE PUBLIC, WORKERS, AND PUBLIC / PRIVATE PROPERTY FROM INJURYOR DAMAGE. LOCATIONS TO BE FIELD VERIFIED. MAINTAIN FOR THE DURATION OF THEWORK. PROTECTION TUNNELS TO BE CONSTRUCTED TO PROTECT THE SIDEWALKS TO THENORTH AND WEST SIDES OF THE PROJECT.
3. PROVIDE DUST PROTECTION AND DUST CONTROL AS REQUIRED BY MUNICIPAL ANDPROVINCIAL REGULATIONS.
4. DRAWINGS TO BE READ IN CONJUNCTION: WITH MECHANICAL, ELECTRICAL AND CIVILDRAWINGS AND THE PROJECT MANUAL FOR ALL OTHER DEMOLITION REQUIREMENTS.
5. CONTRACTOR TO ENGAGE AT THEIR COST A PROFESSIONAL ENGINEER REGISTERED IN BCTO DETERMINE THE ALLOWABLE LOADING FOR THE EXISTING STRUCTURE. PRECAUTIONSSHALL BE TAKEN BY THE CONTRACTOR AND SUBCONTRACTORS TO PREVENT THEOVERLOADING OF ANY PART OF THE STRUCTURE OR SCAFFOLDING DURING THEPROGRESS OF THE DEMOLITION WORK, AND ANY DAMAGE AND ANY CLAIMS RESULTINGFROM SUCH OVERLOADING SHALL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOROR SUBCONTRACTOR.
This drawing, as an instrument of service, is the property of dysarchitecture and may not be reproduced without theirpermission and provided always that any production carriestheir name. All designs and other information shown on thisdrawing are for use on the specified project only and shall notbe used otherwise without written permission of dysarchitecture. Payment of all sums due to dys architecture upto the date of use of this drawing is a condition precedent to theuse thereof.
Written dimensions shall have precedence over scaleddimensions. Contractors shall verify and be responsible for alldimensions and conditions on the job and dys architecture shallbe informed of any variations from the dimensions andconditions shown on the drawings. Shop drawings shall besubmitted to dys architecture for review before proceeding withfabrication.
DATESCALE
DRAWN CHECKEDPROJECT
PROJECT
260 - 1770 Burrard Street Vancouver BC V6J 3G7tel 604.669.7710 www.dysarchitecture.com
dys architecture
CLIENT
NO. | DATE | ISSUE
NO. | DATE | REVISION
A4.0
1
NOV 6, 20171/100
RBA216317
DECONSTRUCTIONRODDAN LODGE
124 DUNLEVY AVENUE
SECTIONS