1tpl dismantling project review 08/12/06 bernard pégourié tore supra association euratom-cea d...
TRANSCRIPT
1TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA
D program:Specific experiments before dismantling
Purpose: find/or not significant D amount in the CFC explain the lacking D in TS particle balance Can we close the particle balance as it is ? or Do we need specific experiments ?
2TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA 1-discharge particle balance
These conditions: retained flux : 21020 D/s
Flux
Gas puff
Paroi
Pompes LPT+tore
Plasma
Post-discharge outgassing
1.5
1.0
0.5
0.0
puf
f (P
am3 s-1
)
300250200150100500
Time (s)
# TS_30425 # TS_30067 # TS_30399 # TS_30414 # TS_30448
3TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA 1-day particle balance
1200
1000
800
600
400
200
0
Par
ticl
es (
Pam
3 )
15:00 16:00 17:00 18:00 19:00 20:00 21:00Time (h)
Total Injected Pumped by the limiter Outgased between discharges Total exhausted
Tore Supra experiments
4th
December 2003 7 discharges
7 x 200 s ~ 1400 s of plasma
2.5x1023D
350
300
250
200
150
100
50
0
Par
ticle
s (P
am3 )
60x103
50403020100
Time (s)
Total injected Total Exhausted (limiter) Outgasing between discharges Total exhausted
15 x 20 s ~ 300 s of plasma
Short pulses:
particle balance closed with He glows
Long pulses:
significant contribution to wall inventory
6h of He glows : 1.5-2x1022 D recovered
2.5x1022D
4TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA global particle balance
WI = period(Qinj–Qexh)- periodQglow - periodQdisrpt - …)
No reliable estimation of the wall inventory probably > 81023 D atoms
Qinj – Qexh ~ 21020 /s for long discharges (LD)
< 1-21019 /s for short discharges (SD)
Qglow 21022 for a night of glows
Qdisrpt ~ 1021-51022 per disruption
End of 2004 : 3104 s of plasma, of which 4.5103 LD WI ~ 81023 ??? D atoms (Tsitrone, IAEA2004)
Now : 2 years, i.e. > 3104 s of plasma later SD ???
5TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA
C-layers in the close SOL: [D]/[C] ~ 1-10 %C-layers in the far SOL: [D]/[C] ~ 10-25 %
• surface/thickness of carbon layers difficult to assess• strong assumption on the D concentration profile• complete collection of carbon layers not unrealistic
Deposited C-layers found in different places (Brosset, PSI2006)TPL (upper surface / back of the tiles)neutralisersoutboard movable limiterLH launcherPoloidal inner bumpersWater-cooled copper tube of protection against ripple electrons
Importance of co-deposition
Post-mortem analyses: inventory 1023 DPresent day wall inventory: > 8 x 1023 D
> 7 x 1023 D still missing
6TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA Why a dedicated experiment ?
Good indication that deep diffusion plays a roleD-implantation in CFC does not saturate (J. Roth)
[D]/[C] ~ 0.1-1 % up to 10 m in AUG tiles
in Tore Supra PFCs : ~ 1028 C atoms[D]/[C] ~ 0.01 % in the whole PFCs[D]/[C] ~ 1 % 1 mm in the loaded zones of TPL
to account for present WI
But: no accurate value for present wall inventory Impossible to close reliably the particle balance
possibly dominated by LD performed 4 years ago Low [D]/[C] if diluted in large volume
Necessity of dedicated experiment to charge the TPL in Din a controlled way and with accurate particle balance
7TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA What do we need ?
Requirement: WI >> estimated present WI 8x1023 D
For good accuracy : WI ~ 4x1024 D (~ 5 x WI)
Retained flux ~ 2x1020 /s -> 2x104 of LD (equivalent to a year of
operation)…rough estimate… 160 LD of 2 min ~ 11 days of operation (15 LD/day)
Routine LD scenario: nl ~ 2x1019 m-2
Ip = 0.6 MA PLH ~ 2.5 MW
8TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA Why a better accuracy ?
WI = period(Qinj–Qexh)No He-glows and (hopefully) no disruptions
Characterization of the plasma outflux out and recycling:Langmuir probesH, CII, (CD ?)Time-dependence of Qinj, Qexh, retention, deposits…
(constant or changing with time / discharge n° ?)Incident flux distribution onto the TPL
…size of the reservoir if saturation observed…dependence of retention with fluence ???
(difficult because limited range of out in loaded regionsand presence of deposits in shadowed regions)
Extrapolated [D]/[C] to the TPL ~ period(Qinj–Qexh)
9TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA Main arguments
Particle balance during 1 discharge or 1 day is accuratebut we cannot estimate reliably the wall inventory overlong periods (i.e. the total wall inventory).
Significant improvement obtained by charging the wall in a controlled manner, up to values > the estimated totalwall inventory.
This can be done in about two weeks of long-dischargeoperation (well developed scenario).
Extrapolation of D content of analysed tiles can bequantitatively compared to measured integrated retention.
10TPL Dismantling Project Review 08/12/06 Bernard Pégourié
TORE SUPRAAssociationEURATOM-CEA Injection of C13H4 as a tracer
Injection C13H4 Line ‘impurities’: bumpers, outer wall, TPL
Only long distance C-transportHow much C13H4 to be measured ?
Only TPL:No toroidal distributionC(loaded) C(shadowded)
TPL + tiles (bumpers, LPA):Poloidal & toroidal distributions
More interesting but…How many tiles available ???More analysis, activation ???… if possible, needs a more detailed evaluation