17 international conference & exhibition th … · 13th largest gas consumer – 61 bcm(~165...
TRANSCRIPT
<Title of Presentation>
By: <Author Name>, <Organization>
<Date>
<Title of Presentation>
By: <Author Name>, <Organization>
<Date>
17th INTERNATIONAL CONFERENCE & EXHIBITION
ON LIQUEFIED NATURAL GAS (LNG 17)
MEETING DEMAND CHALLENGES OF
AN EMERGING LNG MARKET: INDIA
By: A K Balyan,
Petronet LNG Limited April 17, 2013
17th INTERNATIONAL CONFERENCE & EXHIBITION
ON LIQUEFIED NATURAL GAS (LNG 17)
OVERVIEW
India’s Energy Consumption
Natural Gas Demand Supply Balance
Gas Infrastructure
Role of LNG & Meeting Demand Challenges
Petronet’s Terminal
2
INDIA – A MAJOR ENERGY CONSUMER
India is the 4th largest consumer of energy
in the world after USA, China and Russia
accounting for around 4.6% of world energy
consumption
The total energy requirement is projected to
grow at 6.5% per year between 2012-13
and 2016-17
While the per-capita energy consumption of
India at present is almost half the global
average i.e. 0.8 mtoe vis-a vis 1.8 mtoe,
with the rising income levels along with
growth in Indian economy, the per capita
energy consumption is likely to see a two-
fold increase in next 10 years
3
21.3%
18.5%
5.6% 4.6%
2.5%
2.2% 2.0%
1.8%
1.6%
1.0%
0.9%
0.4%
37.8%
China USA
Russia India
Germany Brazil
France Saudi Arabia
UK Australia
Thailand Kazakhstan
Rest of World
PRIMARY ENERGY CONSUMPTION (mtoe) - WORLD
Source : BP Statistical Review-June 2012
3519
3901 4059
2217
2982
3724
2157
2501
2954
617 662
791
585 627 599
0
84 195
0
500
1000
1500
2000
2500
3000
3500
4000
4500
2000 2005 2011
Coal
Oil
Gas
Hydro
Renewables
Nuclear
(39%)
(24%)
(24%)
(7%) (6%)
(37%)
(28%)
(24%)
(6%) (6%)
(1%)
(33%)
(30%)
(24%)
(6%)
(5%)
(2%)
PRIMARY ENERGY CONSUMPTION (mtoe) - INDIA
Source : BP Statistical Review-June 2012
171 184
296
38
120
162
23
32
55
17 22 30
0
2 9
4 4
7
0
50
100
150
200
250
300
350
2000 2005 2011
Coal
Oil
Gas
Hydro
Renewables
Nuclear
(68%)
(15%)
(9%) (7%)
(1%)
(51%)
(33%)
(9%)
(6%) (1%)
(1%)
(53%)
(29%)
(10%)
(5%)
(2%) (1%)
PRIMARY ENERGY SOURCES PRODUCTION CAGR
(1970-2011)
Source : Statistical Data 2012 , Ministry of Statistics 6
CURRENT GAS DEMAND & DOMESTIC SUPPLY SCENARIO
Source : Vision 2030, Natural Gas Infrastructure in India
101.1 102.5 111.26 120.63
156.7 172.2
211.79 231.42 227 248
272 307
358
442
625
713.5
0
100
200
300
400
500
600
700
800
900
1000
2012-13 2013-14 2014-15 2015-16 2016-17 2019-20 2026-27 2029-30
Demand Domestic Supply
(8.0) (8.8)
(9.6)
(10.9)
(12.7)
(15.7)
(22.2)
(25.3)
(3.6) (3.6) (3.9) (4.3) (5.6)
(6.1) (7.5)
(8.2)
(mmscmd)
(bcf/day)
7
SECTOR WISE PROJECTED GAS DEMAND
Gas Demand (mmscmd)
Source : Vision 2030, Natural Gas Infrastructure in India
0
50
100
150
200
250
300
350
400
2012-13 2013-14 2014-15 2015-16 2016-17 2019-20 2026-27 2029-30
Power
Fertilizer
City Gas
Industrial
Petchem/Refineries/InternalCons.
2012-13 2013-14 2014-15 2015-16 2016-17 2019-20
Power 86 104 122 139 157 202
Fertilizer 60 60 60 72 97 106
City Gas 15 16 17 18 22 36
Industrial 20 20 22 25 27 35
Petchem/Refineries/Internal
Consumption 38 40 42 44 47 54
Sponge Iron/Steel 7 8 8 8 8 10
Total Realistic Demand 227 248 272 307 358 443 8
INDIA – A MAJOR GAS/LNG CONSUMER
13th largest gas consumer – 61 bcm(~165 mmscmd)
5th largest LNG importer– 17 bcm(~46 mmscmd~13 mmtpa)
Economy growing at CAGR of 6-7% with similar growth in Energy Consumption
Share of Natural Gas in Indian Energy basket to increase from 10% to 20% by 2025
Despite increase in domestic gas production- dependency on imported gas to increase substantially
LNG which currently constitutes 30% of natural gas consumption in country to have a share of more than 50% by 2025
9
SNAPSHOT OF OPERATIONAL, UNDER CONSTRUCTION, PLANNED
& POSSIBLE LNG TERMINALS IN INDIA
2013 2016 2020
Existing
Dahej 10.0 15.0 20.0 Petronet LNG
Hazira 5.0 5.0 5.0 Shell & Total
Dabhol 1.2 5.0 5.0 RGPPL (GAIL & NTPC)
TOTAL 16.2 25.0 30.0
Under Construction
Kochi - 5.0 5.0 Petronet LNG
TOTAL - 5.0 5.0
Proposed
Ennore - 5.0 5.0 IOCL
Gangavaram - 5.0 5.0 Petronet LNG
Mundra - 5.0 5.0 Adani - GSPC
TOTAL - 15.0 15.0
Possible
West Coast - - 2.5 Hiranandani
Jamnagar/Kakinada - - 5.0 RIL-BP
East Coast (FSRU) - 2.5 5.0 Shell/GAIL
TOTAL - 2.5 12.5
Grand Total 16.2 44.5 60.5
mmtpa
10
Dahej LNG
Terminal
Kochi LNG
Terminal
Gangavaram LNG
Terminal
INDIA’S GAS INFRASTRUCTURE
Hazira
LNG
Terminal
Dabhol LNG
Terminal
Existing P/L Network : 11900 KMS (283 mmscmd)
Proposed additional P/L Network :
14000 KMS (540 mmscmd) by 2016-17
LNG SOURCING FOR INDIA
To ensure sustained and continuous availability of RLNG, 70-75% to be tied-up on long term basis , balance through mix of short term & spot
Current Long Term contracts:
Petronet’s Contracts
o Petronet-RasGas 7.5 mmtpa supplies commenced in 2004 o Petronet-Exxon Mobil(Gorgon) 1.5 mmtpa supplies to commence in 2015
Other Contracts
o GAIL – Cheniere Energy 3.5 mmtpa supplies likely to commence in 2018 o GAIL-GAZPROM 2.5 mmtpa supplies to commence in 2020/21 o GSPC-BG 1.25 mmtpa with option of 1.25, supplies to commence in 2015
Other Long Term Opportunities
Middle-East : Qatar, Yemen : Shipping advantage for West Coast of India
Australia : Large capacities: favourable for South & Eastern India
Mozambique : Price, Logistically favourable
Russia : Portfolio & price advantage
US : Price Advantage (indexation to HH etc), portfolio
diversification
12
KEY CHALLENGES OF INDIAN MARKET- DOMESTIC
Large appetite with high Price sensitivity and
competition with alternate fuel
Regulated power and fertilizer end use prices
5th largest coal reserves
Large consumption of liquid fuels like Diesel, FO
Development of Infrastructure
LNG terminals
Domestic and transnational pipeline networks
Gas storage
Unbundling of transmission and marketing entities
Consumers behavior
Long term / short term/ Spot – how much to be
tied-up
13
KEY CHALLENGES OF INDIAN MARKET- EXTERNAL
Competition from Global buyers : Japan, Korea, Taiwan- high paying markets New emerging markets like China, Singapore, Thailand
India becoming a fall back market on spot basis at right prices
Large capital requirements for acquisition of
upstream assets and formation of strategic partnership
Multiplicity of index like JCC/Brent/Henry Hub with
no specific index for emerging markets
14
SOURCE: Indianpetro; DGH; Company annual reports; Expert interviews; McKinsey analysis
311
High Potential
demand,
2015
388
Price of $8-
10 mmbtu
Medium Price of $11-
12/ mmbtu
276
Price of $13-
14/ mmbtu
59
171
Price of $16-
17/ mmbtu
Low
25 19
230
2010 year
end
consumption
Gas demand and supply, 2015
mmscmd, At customer gate prices
LARGE DEMAND BUT SENSITIVE TO PRICE
McKinsey Analysis 2010
1 Based on estimated LNG supply of 8 mtpa in 2015 including RasGas (7.5 mtpa) and 1.5 mtpa from Gorgon LNG in 2015
2 1 3 4
Imports
Domestic supplies
Sectors with
demand
▪ Industries
▪ CNG
transport
▪ Refineries
▪ Industries
▪ Power
cogen
▪ Peaking
power
plants
▪ Baseload
power
▪ New fertilizer
plants
Prices at Crude of $ 100/Bbl
15
SOURCE: Vision 2030. PLL analysis
103
53
156
47
156
28
156
55
156
72119 147
202
303
High Potential
demand,
2015
358
Price of
$11-12
mmbtu
Medium Price of $13-
14/ mmbtu
275
Price of $16-
17/ mmbtu
85
143
Price of $19-
20/ mmbtu
Low
40
228
2012 year
end
consumption
Petronet Analysis 2013 Gas demand and supply, 2016
mmscmd, at customer gate prices
LARGE DEMAND BUT SENSITIVE TO PRICE
Petronet Analysis-2013
2 1 3 4
Imports
Domestic supplies
Sectors with
demand
▪ Industries
▪ CNG
transport
▪ Refineries
▪ Industries
▪ New
fertilizer
plants
▪ Peaking
power
plants
▪ Base load
power
▪ Existing
fertiliser plants
Prices at Crude of $ 110/Bbl
16
32
WAY FORWARD
Development of regional LNG/GAS index to cater growing demand of emerging economies/ Indian sub continent
Robust growth in Infrastructure development
LNG Terminal
Gas Storage
Gas Pipelines on national & transnational basis
Participation by global players in India’s infrastructure development
Government support & creation of Sovereign fund to handle stiff global competition enabling acquisition of overseas upstream assets in stiff competitive environment
Consumers mindset in pricing, supply security needs to undergo change : Market driven
17
PETRONET TERMINALS
DAHEJ TERMINAL Commencement of Operations in 2004 Capacity (mmtpa) : 5.0 10.0 15.0 Truck Loading facility can handle 2500 loadings/ yr. LNG Cargoes unloaded: 1000+ cargoes
KOCHI TERMINAL Set up second LNG Terminal of 5.0 mmtpa capacity at Kochi,
State of Kerala. Tied up 1.44 mmtpa LNG from Exxon Mobil’s Gorgon Project Plant Mechanically completed, scheduled commissioning mid
2013 GANGAVARAM Pre Project activities started for the 3rd Terminal of 5 mmtpa
capacity at Gangavaram, State of Andhra Pradesh with estimated investment of US$1 Billion.
18
DAHEJ TERMINAL – FACILITIES
19
Dahej LNG
Terminal
Kochi LNG
Terminal
Gangavaram LNG
Terminal
CATCHMENT REGIONS
THANK YOU
KOCHI LNG TERMINAL
21