unbundling local loops: global experiences

17
30 December 2007 LINK Centre Unbundling local loops: global experiences Ewan Sutherland Introduction One of the policy instruments developed to facilitate the supply of telecommunications has been Local Loop Unbundling (LLU). Initially for voice telephony, it quickly became the centre of servicebased competition in broadband Internet access and the heart of a range of bundled services for the consumer market. LLU was introduced as a way to overcome the bottleneck control over the last (or first) mile of copper cable owned by incumbent operators which had proved very hard and very expensive to replicate. 1 An alternative approach, discussed by a few countries, would have been structural separation, putting the ownership of the local loops into a different company. 2 Given the costs and risks of that approach, countries preferred to rely on behavioral remedies until the introduction of an intermediate option of operational or functional separation, though without, as yet, any clear results. The initially relatively simple model of unbundling has been developed into a range of increasingly complex regulatory “products”, including shared access, Bit Stream Access (BSA), Wholesale Line Rental (WLR) and naked DSL. Further complexities are being introduced in order to adjust to the deployment by incumbent operators of Next Generation Networks (NGNs). It is further complicated by moves towards the greater supply of Fibre To The Node (FTTN) and Fibre To The Premises (FTTP) for both businesses and residences. Such models are in stark contrast to the story of telecommunications in Africa where the success has come from infrastructurebased competition, primarily wireless network operators. With few local loops to unbundle and a substantial access deficit, policy efforts have been directed at encouraging operators to construct cellular networks. This discussion paper describes the cutting and sometimes bleeding edge of broadband deployment, then it examines models of ladders of investment on fixed networks. It looks in turn at case studies: Japan, United States of America, New Zealand, Morocco and the European Union, including the United Kingdom (UK). Conclusions are then drawn for policy makers. 1 OECD (2003) Developments in local loop unbundling. DSTI/ICCP/TISP(2002)5/FINAL (Paris, Organisation for Economic Cooperation and Development). 2 OECD (2003) The benefits and costs of structural separation of the local loop DSTI/ICCP/TISP(2002)13/FINAL (Paris, Organisation for Economic Cooperation and Development).

Upload: dinhnhan

Post on 05-Jan-2017

220 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Unbundling local loops: global experiences

 

30 December 2007    LINK Centre 

 Unbundling local loops:   

global experiences  

Ewan Sutherland 

 

Introduction One of  the policy  instruments developed  to  facilitate  the supply of  telecommunications has been Local Loop Unbundling (LLU). Initially for voice telephony,  it quickly became the centre of service‐based competition  in broadband  Internet access and  the heart of a range of bundled services for the consumer market.  

LLU was  introduced as a way to overcome the bottleneck control over the  last (or first) mile of  copper  cable owned by  incumbent operators which had proved very hard and very  expensive  to  replicate.1  An  alternative  approach,  discussed  by  a  few  countries, would have been  structural  separation, putting  the ownership of  the  local  loops  into a different company.2 Given the costs and risks of that approach, countries preferred to rely on behavioral remedies until the introduction of an intermediate option of operational or functional separation, though without, as yet, any clear results.  

The  initially relatively simple model of unbundling has been developed  into a range of increasingly complex regulatory “products”,  including shared access, Bit Stream Access (BSA), Wholesale  Line  Rental  (WLR)  and  naked DSL.  Further  complexities  are  being introduced  in  order  to  adjust  to  the  deployment  by  incumbent  operators  of  Next Generation Networks  (NGNs).  It  is  further  complicated by moves  towards  the greater supply  of  Fibre  To  The  Node  (FTTN)  and  Fibre  To  The  Premises  (FTTP)  for  both businesses and residences.  

Such models are in stark contrast to the story of telecommunications in Africa where the success  has  come  from  infrastructure‐based  competition,  primarily  wireless  network operators. With few local loops to unbundle and a substantial access deficit, policy efforts have been directed at encouraging operators to construct cellular networks. 

This discussion paper describes  the cutting and sometimes bleeding edge of broadband deployment, then it examines models of ladders of investment on fixed networks. It looks in turn at case studies: Japan, United States of America, New Zealand, Morocco and the European Union,  including  the United Kingdom  (UK). Conclusions are  then drawn  for policy makers.  

                                                      1 OECD (2003) Developments in local loop unbundling. DSTI/ICCP/TISP(2002)5/FINAL (Paris, Organisation for Economic Co‐operation and Development).  2 OECD (2003) The benefits and costs of structural separation of the local loop DSTI/ICCP/TISP(2002)13/FINAL (Paris, Organisation for Economic Co‐operation and Development). 

Page 2: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

2    http://LINK.wits.ac.za/ 

The state of the art Broadband  Internet  was  initially  a  substitute  for  dial‐up  access,  with  the  added advantages of higher speeds and being always‐on, greatly facilitating its use. Where there was competition, the speeds available to consumers rose rapidly. Access has been further improved by  the  installation of Wi‐Fi  routers  in homes, allowing multiple devices and thus multiple individuals to be connected to the Internet as and when they want.  

Bandwidth available to consumers has continued to rise, though experiences vary greatly (see figure 1). In an extreme case, in June 2005, HKBN, an Internet Service Provider (ISP) in Hong Kong, launched a 1 Gbps service for HK$1,680 (ZAR 1,490) per month.3 For less demanding  customers  it  offers  a  Fibre  To  The  Home  (FTTH)  service  of  200  Mbps (symmetric) for local traffic and 20 Mbps for international traffic for HK$ 688 (ZAR 610).4  

Figure 1  Average broadband speeds5 

0

10

20

30

40

50

60

70

JapanK

oreaFinlandS

weden

FranceO

EC

D A

verageN

etherlandsP

ortugalC

anadaP

olandN

orway

Austria

Belgium

IcelandG

ermany

United S

tatesD

enmark

ItalyLuxem

bourgH

ungaryS

lovak Republic

United K

ingdomS

witzerland

New

ZealandIrelandTurkeyA

ustraliaC

zech Republic

Spain

Mexico

Greece

Meg

abits

per

sec

ond

 There  is  increasing deployment of a range of new  technologies  including ADSL 2+ and VDSL offering higher  speeds, both upload and download. To  support  these, operators are deploying more fibre in their networks, often to the street cabinet. Beyond that there is Fibre To The Home (FTTH). 

Operators  in  some  countries,  generally  in  remoter  locations,  have  retained  the  use  of “caps”, limiting the volumes of data a customer can download. They claim this is because of  the high costs of  international connectivity,  though  there  is  little evidence  to support this.  In Australia and New Zealand  the caps continue  to hamper  the use of broadband and in many ways to negate the always‐on and high bandwidth features.  

In developed  countries, operators gradually  reduced prices  to  a  level  at which  a  large part  of  the  population  was  comfortable  to  pay.  Thereafter,  they  have  preferred  to compete  by  improving  and  expanding  the  bundle  of  services  to  achieve  triple  play, comprising:6 

                                                      3 http://www.hkbn.net/bb1000/ 4 http://www.hkbn.net/bb1000/offer_ftth_bb200.html 5 Daniel K. Correa (2007) Assessing broadband in America: OECD and ITIF Broadband Rankings. (Washington DC, Information Technology and Innovation Foundation) 6 OECD (2006) Multiple play: pricing and policy trends DSTI/ICCP/TISP(2005)12/FINAL (Paris, Organisation for Economic Co‐operation and Development).  

Page 3: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

3    http://LINK.wits.ac.za/ 

• voice calls to the fixed network  

• Internet access 

• television channels, video on demand and IPTV 

In some cases they go beyond this to quadruple play7 by the addition of mobile voice and data.8 

For example, in France Free.fr offers a bundle for €29.99 (ZAR 300) per month:9 

• unlimited calls to fixed networks in France and 69 other countries 

• 100 television channels 

• ADSL2+ (up to 24 Mbps) 

Free.fr, together with a few other French ISPs, uses unbundled local loops obtained from the  incumbent  operator.  However,  they  are  now  installing  their  own  fibre  access networks. Additionally, some municipalities are laying optical fibre cables, in compliance with the European Union state aid rules that require open access to service providers in order to ensure a neutral effect on competition.  

The  implementation  of  broadband policies has  been  very  varied  across  the developed world  (see  figure  2).  The wide  diversity  of  performance  of  countries  and  individual operators will continue for years as policies are refined and as competition  is gradually raised to effective levels. 

Figure 2  Broadband in the OECD10 

0

5

10

15

20

25

30

35

Mexico

TurkeyG

reece S

lovak Republic

Poland

Czech R

epublicH

ungaryIrelandP

ortugalN

ew Zealand

ItalyS

painO

EC

D

Germ

anyA

ustriaE

U15

Australia

United S

tatesJapanFranceLuxem

bourgU

nited Kingdom

Belgium

Canada

Sw

edenFinlandN

orway

Sw

itzerlandK

oreaIcelandN

etherlandsD

enmark

lines

per

100

pop

ulat

ion

200620052004200320022001

 There are several explanations for the poorer performances: 

• the presence of a strong incumbent operator and a weak regulatory regime 

• a history of inadequate investment in infrastructure 

• low levels of PC ownership and computer literacy 

                                                      7 See, for example, Analysys (2007) Quadruple‐Play Bundling Strategies.  http://research.analysys.com/default.asp?Mode=article&iLeftArticle=2481&m=&n= 8 Sir Richard Branson prefers to call this four‐play.  9 http://www.free.fr/ 10 http://www.oecd.org/sti/ict/broadband 

Page 4: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

4    http://LINK.wits.ac.za/ 

However, it is policy bottlenecks that result in slow, capped or just expensive broadband Internet access.  

Ladders of investment The ladder of investment is a metaphor, rather than an economic model. It was intended to convey the idea of a new entrant making staged investments while also being able to generate revenues. It was an alternative to forcing a potential entrant to build a complete national network before starting to earn any revenues. 

The original rungs of the ladder were for voice telephony: 

• International Simple Resale (ISR) 

• Carrier Selection (CS) and Carrier Pre‐Selection (CPS)  

• unbundled local loops 

The new  entrant would begin  at  the  international gateway  and gradually build out  to exchanges and then to the individual locations of customers.  

Later,  the  ladder metaphor was  extended  to  Internet  access.  Initially,  through  dial‐up models,  including  Flat  Rate  Internet  Access  Origination  (FRIACO),  that  allowed  an always‐on  narrowband  service.  Then  it  was  applied  to  broadband  Internet  through shared access and unbundling of local loops.  

It had been assumed  that  it would be ISPs and Alternative Network Operators (ANOs) that would enter  the market using the  ladder. Increasingly  it has been GSM and UMTS operators wanting to add home voice and broadband services to their retail bundle.  

For example, the Vodafone Group was originally a non‐copper operator, at least as far as customers were  concerned,  though  behind  the  scenes  it was  heavily  reliant  on  leased lines usually supplied by incumbent operators. Then in 2006 it moved to offer bundles of residential services using unbundled  local  loops  from  incumbent operators. To aid  this, the Vodafone Group has bought:  

• Ya.com, an ISP in Spain  

• The Network Factory, a service provider in the Netherlands  

• Tele2, an alternative telephone operator in Italy and Spain 

• iHug, an ISP in New Zealand  

In Africa, it has preferred to combine GSM and UMTS with Fixed Wireless Access (FWA), for example, Vodafone Congo.11  

Many  developed  countries  chose  service‐based  competition  over  infrastructure‐based competition  for  fixed networks. Having done  so,  they have had  to expand  the  initially simple unbundling regulations to include: 

• shared access 

• unbundling 

• line sharing 

• Wholesale Line Rental (WLR) 

• Bitstream Access (BSA)  

                                                      11 http://www.vodacom.cd/vodanet_fixe.htm 

Page 5: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

5    http://LINK.wits.ac.za/ 

• naked DSL 

• duct sharing 

The deployment of NGN and NGA has  the potential  to undermine or  even  invalidate such  a  policy  by  introducing  yet more  ladders. By  extending  fibre  from  exchanges  to street cabinets,  it becomes necessary for alternative operators to connect at considerably more locations. Some operators have also used the large investments in such networks to call for regulatory forbearance or holidays, though with little success.  

There  are  important  differences  between  access  on  fixed  and mobile  networks. While regulated access has generally been provided on copper loops it is rare for similar terms to be provided on GSM or UMTS networks. The mobile network operators  argue  that they are in a competitive market, usually with three to five infrastructure‐based players, so that any access should be negotiated by the access seekers.  

In Africa,  the  copper  lines may not be  there  to unbundle  or  they may  address  only  a fraction  of  the market  already using GSM. Given  that mobile  network  operators  have backhaul networks and masts in place, the addition of FWA may be a simpler and more cost  effective  solution  than  seeking  to  regulate  access  to  copper  loops. However,  this presumes  that  they  have  access  to  spectrum  in  bands  for  which  there  is  affordable customer equipment.  

For African ISPs there seem to be few routes forward. It is extraordinarily unlikely they can  persuade  GSM  and  UMTS  operators  to  allow  them  wholesale  access  to  their networks. Local loop unbundling is taking so long and networks are so incomplete, that ADSL  is a very unsatisfactory and only partial solution. With  the demise of dial‐up  the role  of  the  ISP  seems  uncertain,  unless  they  can  find  the  capital  to  build  their  own networks.  

Japan Following the very early success of South Korea, Japan saw itself as a late starter but fast follower in broadband. It has been relentless in pursuing global leadership in broadband (see  figures  2  and  3).  Japan  is  also  a  leader  in  3G, with  half  of  its  population  having switched by March 2006.  

Figure 3  Japan – broadband statistics12 

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

1999 2000 2001 2002 2003 2004 2005 2006 2007-03

2007-06

2007-09

FWAFTTHDSLCable

 

There was rapid adoption by operators of shared access to local loops on the network of NTT, provided at  comparatively  low prices as was  the wholesale backhaul. There was one extremely disruptive market entrant Yahoo! BB, led by Son‐san, the CEO of Softbank. 

                                                      12 Source: Ministry of Internal affairs and Communications, Tokyo.  

Page 6: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

6    http://LINK.wits.ac.za/ 

In 2004 there was a speed war, with DSL offers  jumping from 8 to 45 Mbps.   Currently, Yahoo! BB has an offer of ADSL 50/12.5 Mbps (down/upstream) for ¥3,480 (ZAR 224) per month.13 

ADSL subscriber numbers  in Japan are now declining. The growth has shifted to FTTH and  this  is  now  the  main  focus  of  operators,  with  both  the  incumbent  (NTT)  and alternative  operators  building  their  own  networks.  FTTH  is  offered  at  100  Mbps down/upstream with relatively low prices: ¥4,000 to ¥6,000 per month (ZAR 260 to 390).14  

By February  2005,  5% of users were  already  “heavy‐hitters” up‐loading more  than  2.5 Gigabytes per day and downloading considerably more. Given the bandwidth, a growing number of customers will make use of it.  

United States of America At  times  there  has  been  an  acrimonious debate  about  the  standing  of  the USA  in  the OECD broadband statistics. It has been claimed that the numbers are incorrect, that they are not meaningful and doubt has been expressed that Japan, China, France and Iceland are  really doing better  than  the original home of  the  Internet. Nonetheless,  there have been  serious  concerns  that  consumers  in  the USA are not getting  the  same offers as  in leading countries and that this affects national competitiveness.15  

Domestic  statistics have been  criticized  for  the use of a  single  customer  in zip  code  to designate availability. Equally,  the use of  the very  low  threshold of only 200 kbps has been  criticised,  though  it allows  inclusion of  satellite and wireless  connections  that are not especially fast.  

Up to mid‐2006, the most recent FCC statistics, there has been deployment of some FTTH services (see figure 4), though not on the scale of Japan. There has been pressure from the FTTH Council for action to encourage more rapid deployment.16 

                                                      13 Such promotions change regularly.  http://bbpromo.yahoo.co.jp/promotion/adsl/regular/ http://bbpromo.yahoo.co.jp/promotion/campaign/discount1000/index.html 14 See NTT B‐Flets hikari prices at http://www.ocn.ne.jp/english/personal/broadband/hikari/ 15 See, for example, the House Sub‐Committee on Telecommunications and the Internet. http://energycommerce.house.gov/Subcommittees/telint.shtml 16 http://www.ftthcouncil.org/ 

Page 7: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

7    http://LINK.wits.ac.za/ 

Figure 4  Broadband in the USA17 

0

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

70,000,000

2000-06

2001-06

2002-06

2003-06

2004-06

2004-12

2005-06

2005-12

2006-06power-line and othersatellite and wirelessfibrecable modemSDSL & traditional wirelineADSL

 

Unbundling was implemented by statute – the Telecommunications Act 1996 – with the details  left  to  the Federal Communications Commission  (FCC). After  several  attempts, implementation  was  abandoned,  because  of  disagreements  amongst  the  five Commissioners and a series of reversals in the courts. Unbundling is now available only on commercial terms to those operators willing to take it.  

Consequently  the USA  is almost entirely reliant on duopoly competition between cable operators  and  the  few  remaining  former  Baby  Bells.  The  latter  are  constructing  new networks  and  both  groups  are  offering  customers  triple  play.  The  FCC  applied “regulatory  forbearance”  to  new  constructions  of  fibre  networks.  In  addition  to  any existing commercial rationale, this created a regulatory incentive to build new networks.  

There are two approaches being taken by Telcos, Fibre To The Node (FTTN) and Fibre To The Home (FTTH), with no clear indication yet as to the more successful model.  

AT&T U‐verse:18 

• FTTN and FTTP 

• Up to 6 Mbps downstream and 1 Mbps upstream 

• triple play 

Verizon FIOS:19 

• FTTH 

• up to 50 or 30 Mbps downstream and 4 Mbps upstream 

• triple play 

There has been a complex and still unsettled debate on “network neutrality”.20 Network owners have claimed that investments in the network cannot be recovered from customer revenues alone and that they should be allowed to charge content providers for delivery, in a two‐sided market. 

                                                      17 Federal Communications Commission (2007) High‐Speed Services for Internet Access: Status as of June 30, 2006. Industry Analysis and Technology Division. Wireline Competition Bureau. (Washington, FCC). 18 https://uverse1.att.com/launchAMSS.do 19 http://www22.verizon.com/content/consumerfios/ 20 Tim Wu & Christopher S. Yoo (2007) Keeping the Internet Neutral? Federal Communications Law Journal 59 (3) pp. 575‐592. 

Page 8: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

8    http://LINK.wits.ac.za/ 

Municipalities have  been  engaged where Telcos have  sought  to  install  fibre networks. They  have  required  that  the  networks  be  approved  as  television  franchises,  causing considerable delays, not least because of the scale of the regulatory work involved.   

New Zealand There  have  been  repeated  complaints  about  the  poor  rankings  of New Zealand  in  its broadband  performance.  It  is  argued  that  Internet  access  would  help  to  reduce  its considerable geographical isolation. 

A  vertically  integrated  and  entrenched  incumbent  operator,  Telecom  New  Zealand, extends  from  the undersea  cables  linking  to Australia  and  the USA  all  the way  to  the farmstead. There are a handful of small  to medium‐sized  ISPs, which have  little capital and  less  experience  of  network  construction.  Thus  competition  has  become  almost entirely reliant on: 

• TelstraClear (the Australian incumbent operator) 

• Vodafone Group (a GSM and UMTS operator) 

A third mobile network has not been an active player, facing substantial difficulties.21  

There is little hope of further competitive entrants, given the small and widely dispersed population, combined with relatively saturated markets  for  fixed and mobile  telephony that ensures an uphill fight to achieve economies of scale. The remoteness and the lack of neighbours also makes the market less attractive and lacking in the natural entrants from contiguous countries found in Latin America, Europe and Africa.  

There is a now an established pattern of policy swings and reversals every few years: 

• no regulation 

• some regulation but not unbundling 

• more regulation with unbundling 

Telecom NZ was successful in having unbundling omitted from the Telecommunications Act (2001), leaving the regulator to evaluate its appropriateness after a cooling off period. By  then,  it had  to be  implemented by regulation which proved  impossible, causing  the issue to revert to the political level. In 2007, following a public consultation the minister decided  to  copy  the  former  colonial  power  in  adopting  operational  separation  of  the incumbent operator.22 The minister did not provide an  impact assessment for  the policy nor were different scenarios explored. The effectiveness of this approach will take many months to evaluate, after it become operational. 

The  overall  effect  of  policy  shifts  has  been  to  destabilise  conditions  for market  entry, because of the very real fear of future policy changes. The government has failed to create competitive market  structures  for  the  provision  of  broadband, while  local  actors  have fixated on  the  introduction of unbundling as a policy  instrument, without ensuring  the conditions are there to see the loops put to use.   

Morocco One of  the  telecommunications  successes of Africa has been Morocco, especially  in  the adoption of GSM. Maroc Telecom has been able to build up a substantial customer base 

                                                      21 This was originally controlled by Econet of Zimbabwe, but has recently been restructured.  22 Operational separation of telecom. Press release by the Hon. David Cunliffe 26 September 2007. http://www.beehive.govt.nz/ViewDocument.aspx?DocumentID=30768 

Page 9: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

9    http://LINK.wits.ac.za/ 

for  broadband  (see  figure  5).  Under  the Menara  brand  it  offers  an  uncapped  ADSL service at a range of speeds.23 The prices are 256 kbps for MAD 149 (ZAR 135), 512 kbps for MAD 199 (ZAR 180), 2 Mbps for MAD 399 (ZAR 360), 4 Mbps for MAD 699 (ZAR 630) and 20 Mbps for MAD 999 (ZAR 900). 

Figure 5  Internet access in Morocco24 

050,000

100,000150,000200,000250,000300,000350,000400,000450,000500,000

2003-12

2004-03

2004-06

2004-09

2004-12

2005-03

2005-06

2005-09

2005-12

2006-03

2006-06

2006-09

2006-12

2007-03

2007-06

2007-09su

bscr

iber

line

s

otherdial-upADSL

 

There is limited service‐based competition, though there is some resale of ADSL by a few ISPs.  A  more  significant  and  quite  rapid  development  has  been  in  FWA,  with  one operator, Bayn, taking a market share of over 5 per cent, included in “other” in figure 5.25  

In  contrast  to  the  success  of  mobile  networks,  the  PSTN  had  not  grown  and  fixed teledensity had been lagging its economic rivals. The government hesitated to introduce competition  in  fixed networks, despite  its success  in mobile. However, since  the  recent introduction of operators offering  limited mobility and broadband services,  this part of the market is once again growing (see figure 6).   

Figure 6  Growth of the fixed network in Morocco26 

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

2004-12

2005-03

2005-06

2005-09

2005-12

2006-03

2006-06

2006-09

2006-12

2007-03

2007-06

2007-09N

umbe

r of l

ines

Limited mobility

Fixed PSTN

 

                                                      23 http://www.menara.ma/abonne/adsl.asp 24 “Other” includes about 1,000 leased lines. See http://www.anrt.ma/fr/ 25 http://www.bayn.ma/accueil/accueil.php 26 Agence National de Réglementation des Télécommunications (2007) Tableau de bord : Marché du fixed au Maroc.  

Page 10: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

10    http://LINK.wits.ac.za/ 

One policy  initiative  that was  thought would help  ISPs was  local  loop unbundling  to allow  them to expand  their offers.27 After some years of debate, unbundling was finally introduced  in stages, dégroupage partiel from January 2007 and dégroupage total from July 2008.28 However, whether there are sufficient traditional fixed lines and whether the ISPs will be able to compete with the rapidly growing FWA operators remains to be seen.  

European Union A single European Union Regulation unbundled all local loops on 2 January 2001.29 This legal  form was  chosen  in  the  belief  that  there would  be  no  need  for  transposition  by member  states,  avoiding  many  months  of  delay.  In  the  event,  it  proved  to  require enormous  efforts by National Regulatory  (NRAs)  and  the  addition of  several  complex variants to simple unbundling (see figure 7). 

Figure 7  Handover points between the incumbent and alternative operators 

M o d em xD S L

s p lit te r *

P O T S / IS D N(* i f n e e d e d )

(x )D S L - A cc e s s b a c kh a u l s e rv i c e

A TMW W W

( in t e rne t)

D S LA M ac ces s

P o P / T ra f f i c H a n d - o v e r

man aged IPbac kbo nene t w ork

´DSL

AM

B R A S

AT M le ve l (par en t/ d is t an t sw i tc h )

I P l ev e l(m anag ed)

w w w (unm ana ged IP )

MDF

 

By October 2006, there were only 30 million unbundled lines, out of a total of 184 million lines in the European Union, about16 per cent (see figure 8).  

                                                      27 Global Information and Communication Technologies Department (2004) Morocco: Developing Competition in Telecommunications (Washington DC, World Bank). 28 Arrêté du Premier Ministre n°3‐3‐06 du 8 moharrem 1427 fixant les dates de mise en oeuvre de la présélection du transporteur et du dégroupage de la boucle locale. (07/02/2006).  http://www.anrt.ma/fr/admin/download/upload/file_fr678.pdf 29 Regulation (2887/2000/EC) on unbundled access to the local loop. Official Journal L 336 pp 4‐8 (30 December 2000). 

Page 11: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

11    http://LINK.wits.ac.za/ 

Figure 8  Wholesale access in the European Union30 

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

35,000,000

2003 2004 2005 2006

fully unbundledshared accessbitstream accessresale

 

There are wildly varying performances across  the member  states  (see  figures 2 and 9). The poorer  results, where  incumbent operators  remain dominant, generally  arise  from the imbalance of a strong incumbent operator and a weak regulator.  

Figure 9  Broadband market share held by the incumbent operators in the EU31 

0

10

20

30

40

50

60

70

80

90

100

Czech R

ep.

Austria

Latvia

Sw

eden

Netherlands

Ireland

Lithuania

Belgium

Hungary

France

Estonia

Slovenia

Malta

Spain

Denm

ark

Greece

Italy

Slovakia

UK

Poland

Portugal

Finland

Germ

any

Luxembourg

Cyprus

perc

enta

ge

resaleretail

The purpose of  the Unbundling Regulation has  largely been absorbed  into  the  cyclical broadband market  analysis  procedure, with  a  range  of  “remedies”  being  imposed  on dominant  operators. 32  The  European  Commission  intends  to  repeal  the  Unbundling Regulation once all 27 NRAs have completed their first analysis of the relevant market.  

NRAs have  introduced complex accounting separation rules and economic cost models in order to determine the wholesale prices to be paid for the various forms of local loop. The  result  is a wide variation  in prices  (see  figure 10). While some of  these differences 

                                                      30 EC (2007) 12th Implementation Report (Brussels, European Commission).  31 EC (2007) 12th Implementation Report (Brussels, European Commission).  32 European Regulators Group (2006) Common position on best practice in bitstream access remedies imposed as a consequence of a position of significant market power in the market for wholesale broadband access. ERG (06) 69 Rev1. (Brussels, ERG). 

Page 12: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

12    http://LINK.wits.ac.za/ 

may arise from underlying costs, much  is due  to  the national approaches  to accounting practices, cost models and the differing negotiating powers of the various parties.  

Figure 10  Prices of local loops in the European Union33 

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

Netherlands

Italy

Hungary

Latvia

Greece

Portugal

Denm

ark

Estonia

France

Cyprus

Spain

Lithuania

Germ

any

Malta

Poland

Austria

Slovenia

Belgium

Luxembourg

UK

Finland

Czech R

ep.

Sw

eden

IrelandE

uros

shared accessfully unbundled

 

The  different  prices  create  a  range  of  incentives  and  profit margins which  affect  the business  models  used  by  operators  in  the  member  states.  In  several  instances  the practices  of  operators  have  given  rise  to  price  squeeze  complaints  against  incumbent operators. 

In  Eastern  and  South‐Eastern  Europe  there  are  fewer  loops  to  unbundle  and consequently much greater reliance on FWA and the licensing of spectrum.  

While the EU can claim some success it has proved to be a much tougher regulatory war than was  expected  at  the  outset.  It  has  generated many  highly  complex  documents, required discussions at  innumerable meetings and even  then produced a mixed bag of results, from world class to something close to the inert.  

United Kingdom A new  regulatory body  taking office  in 2004  initiated a “strategic  review”  that  led  to a rejection of  the 20‐year history of highly detailed and  intrusive  regulation  in  the UK.34 Instead  it set “equivalence of  input” as the new “gold standard”, with BT Retail and  its commercial  rivals  to  be  equal  in  every  way.  Under  the  Enterprise  Act,  not  the Communications Act, OFCOM negotiated a “functional separation” agreement with BT, leading  to  the  creation  of  Openreach  –  a  separate  and  distinct  entity  within  the  BT Group – that was to provide equivalent inputs to all retail operators.35  

BT Openreach publishes  a  report  of  40  indicators  for LLU  each week  (see Annex  1).36 Additionally, there are quarterly reports from the Office of Communications (OFCOM).37 A  less  well‐known  body,  the  Office  of  the  Telecommunications  Adjudicator  (OTA), provides  detailed  analysis  and  enforcement.38 In  a  recent  quarterly  report  noted  that 

                                                      33 EC (2007) 12th Implementation Report (Brussels, European Commission).  34 http://www.ofcom.org.uk/static/telecoms_review/index.htm 35 http://www.openreach.co.uk/ 36 http://www.openreach.co.uk/orpg/products/llu/kpi/kpi.do 37 http://www.ofcom.org.uk/telecoms/btundertakings/implementation/ 38 http://www.offta.org.uk/ 

Page 13: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

13    http://LINK.wits.ac.za/ 

quality  had  “shown  little  improvement”  and  that  the  underlying  failure  rate  for mainstream  repair  performance  was  at  an  unacceptably  high  level.  At  the  end  of November 2007, there were: 

• 3.55 million unbundled LLU lines (see figure 11)  

• 4.48 million WLR lines  

• 5.82 million telephone numbers using CPS 

 

Figure 11  UK unbundled loops39 

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

4,000,000

12/06/2005

12/08/2005

12/10/2005

12/12/2005

12/02/2006

12/04/2006

12/06/2006

12/08/2006

12/10/2006

12/12/2006

12/02/2007

12/04/2007

12/06/2007

12/08/2007

12/10/2007

12/12/2007

 

The UK has created a complex set of  interlocking structures  in order  to unbundle  local loops. Yet there are no clear results to show that it has proved more successful than other countries  (see  figure  2). Moreover,  there  is  a  significant  fear  is  that  there  is  a  lack  of incentives  to  improve  the services; all  that  is  required  is  that  they be equivalent  for all players. 

In  September  2007,  OFCOM  launched  a  consultation  on  the  possible migration  from copper to optical fibre local loops. There was concern at the lack of progress towards the multi‐Megabit speeds found  in economic rivals and the possible effects this was having on national competitiveness. The questions raised were: 

• When do you consider it would be timely and efficient for next generation access investment to take place in the UK? 

• Do you agree with the principles outlined for regulating next generation access? 

• How should Ofcom reflect risk in regulated access terms?  

• Do  you  agree  with  the  need  for  both  passive  and  active  access  remedies  to promote competition? 

• Do  you  consider  there  to  be  a  role  of  direct  regulatory  or  public  policy intervention to create artificial incentives for earlier investment in next generation access? 

                                                      39 http://www.openreach.co.uk/orpg/products/llu/kpi/kpi.do 

Page 14: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

14    http://LINK.wits.ac.za/ 

Given the radical nature of the Openreach reforms and their incomplete implementation, it was surprising to find Steve Robertson, CEO of BT Openreach, arguing that: “Now  is probably the time to say we need to rip up the rulebook”.40  

Duct sharing The sharing of passive infrastructure, such as masts, poles and ducts, will usually have a neutral  effect  on  competition.    In many  countries, GSM  and  3G  operators  have  been permitted  and  encouraged  to  share  masts,  to  minimize  environmental  concerns,  to accelerate network deployment and to save costs.  

Similarly,  for operators  installing  fixed  local access networks,  the ability  to  share poles and  ducts  can  allow  considerable  savings  in money  and  time.  It  reduces  the  costs  of acquiring rights of ways and in the construction of infrastructure.  

The  rapid  deployment  by  Fastweb  of  fibre  to  Italian  apartment  buildings was made possible by the use of the ducts of Telecom Italia. The Italian competition authority had forced Telecom Italia to open access in the course of a merger control case.  

ARCEP, the French regulator, has taken a lead in duct sharing in Europe.41 It sees the way forward  in  terms  of moving  towards  infrastructure  competition,  aided  by  sharing  of passive elements.  

Incumbent  operators  usually  claim  “our  ducts  are  full”,  requiring  the  introduction  of procedures  to  check whether  such  claims  are  true.  It  also  requires  dispute  resolution when complaints are made about access or damage to the cables of other operators.  

In multi‐tenant  buildings  the  owners  sometimes  allow  one  operator  to  install  a  single network on terms  that block other operators from obtaining access. A French consumer group has recently campaigned against exclusive deals because of their anti‐competitive effects.42 In  the  USA,  some  operators  are  contesting  a  ruling  by  the  FCC  that  ended exclusive internal cabling in multi‐tenant buildings. 

In  the  case  of  new  constructions  of  homes,  whether  estates  or  high‐rise  buildings, developed countries have shown it is useful to ensure a provision for future cabling with ducts open to more than one operator.  

In comparison to crafting rules for access over NGN and FTTH, it is comparatively easy to set rules for the sharing of ducts, masts and poles. Such rules save money and avoid distorting competition.  

Conclusion Unbundling has been made to work in a number of countries with relatively dense and well developed traditional copper networks. However, the conditions have been exacting, requiring: 

• customisation for the national market  

• alternative operators to enter the market 

                                                      40 Richard Wray. The bill looms for Broadband Britain. The Guardian 25 September 2007.  The regulator must soon decide who will pay to keep the internet up to speed 41 ARCEP (2007) La situation concurrentielle des fourreaux de communications électroniques et leur régulation éventuelle (Paris, Autorité de Régulation des Communications électroniques et des Postes).  42 LʹUFC‐Que Choisir mobilise les syndics contre le déploiement de la fibre optique http://www.zdnet.fr/actualites/telecoms/0,39040748,39374254,00.htm 

Page 15: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

15    http://LINK.wits.ac.za/ 

• medium‐term legal certainty for those operators 

• the incumbent operator to be sufficiently restrained 

• a powerful regulator to monitor progress and publish statistics  

• a rapid appeals process to avoid lengthy delays 

• a continuing refinement of  the regulations  

The  greatest  risk  has  been  in  the  nightmare  of  regulatory  gamesmanship  played  by certain incumbent operators. 

The  initial  hopes  for  unbundling  were  misplaced.  Interest  has  shifted  from  voice telephony  to broadband,  then NGNs  and  fibre  access networks began  to be deployed. The levels of change are not adequately represented by the static image of a single ladder of investment.  

In the USA, the Telcos and cable operators are left as a duopoly to fight it out. In Europe, a mix of very complex regulation is added to continuously in an effort to sustain service‐based competition.  

In Africa,  unbundling  the  local  loop may  not  be  the  answer  or  not  a  very  significant answer. With  the exception of a  few countries,  there are  insufficient  local  loops  for  the enormous regulatory effort to be worthwhile. There are few potential entrants and almost all of those are already GSM operators for whom FWA appears to offer a more attractive model  than  leasing copper  local  loops. Moreover,  it continues  the successful pattern of infrastructure competition, rather  than service‐based competition and helps  to close  the digital divide.  

 

Acknowledgements To colleagues at the LINK Centre for comments on drafts of this document. All errors are mine alone. 

Page 16: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

16    http://LINK.wits.ac.za/ 

Abbreviations ADSL  Asymmetric Digital Subscriber Line ARCEP  Autorité de Régulation des Communications électroniques et des Postes ATM  Asychronous Transfer Mode bps  bits per second BRAS  Broadband Remote Access Server BSA  Bit Stream Access CEO  Chief Executive Officer CPS  Carrier Pre‐Selection DSL  Digital Subscriber Line DSLAM  DSL Access Multiplexer EC  Europe Commission EU  European Union GSM  Global System for Mobile FCC  Federal Communications Commission (USA)  FRIACO  Flat Rate Internet Access Origination FTTx  Fibre To The home, premises, node, etc. FTTH  Fibre To The Home FTTN  Fibre To The Node FTTP   Fibre To The Premises FWA  Fixed Wireless Access ISDN  Integrated Services Digital Network  ISP  Internet Service Provider ISR  International Simple Resale  LER  Local Exchange Router LLU  Local Loop Unbundling MDF  Main Distribution Frame MIC  Ministry of Internal affairs and Communications (Japan) MNO  Mobile Network Operator MVNO  Mobile Virtual Network Operator NGA  Next Generation Access NGN  Next Generation Network NRA  National Regulatory Authority NTT  Nippon Telephone & Telegraph ODF  Optical Distribution Frame OECD  Organisation for Economic Cooperation and Development OFCOM  Office of Communications (UK) OLT  Optical Line Terminal OTA  Office of the Telecommunications Adjudicator (UK) POTS  Plain Old‐fashioned Telephone Service SDSL  Symmetric Digital Subscriber Line UK  United Kingdom UMTS  Universal Mobile Telecommunications System UNE  Unbundled Network Elements VDSL  Video Digital Subscriber Line WLR  Wholesale Line Rental xDSL  any type of Digital Subscriber Line ZAR  South African Rand 

Page 17: Unbundling local loops: global experiences

  UNBUNDLING LOCAL LOOPS – GLOBAL EXPERIENCES    

17    http://LINK.wits.ac.za/ 

Annex 1  BT Openreach Key Performance Indicators43  Working system size ‐ Aggregate  Volume of orders completed ‐ Aggregate % of POEʹs accepted, completed within target ‐ Shared MPF % of POEʹs accepted, completed within target ‐ MPF % of pre order enquiries non‐fatally rejected ‐ Shared MPF % of pre order enquiries non‐fatally rejected ‐ MPF % of pre order enquiries fatally rejected ‐ Shared MPF % of pre order enquiries fatally rejected ‐ MPF Average lapse time from order receipt to CAD ‐ Shared MPF (Overall) Tactical Average lapse time from order receipt to CAD ‐ MPF (Overall) Tactical % of successful delivery of the 730 code by 23:59 on the day of CAD (SMPF) % of successful delivery of the 730 code by 23:59 on the day of CAD (Provision & Transfer for MPF) % of successful delivery of the 730 code by 23:59 on the day of CAD (Provision for MPF ) % of successful delivery of the 730 code by 23:59 on the day of CAD (Transfer for MPF ) ELFʹs ‐ fault reported within 28 calendar days of installation ‐ Shared MPF ELFʹs ‐ fault reported within 28 calendar days of installation ‐ MPF   DOAʹs ‐ fault reported within 4 calendar days of installation ‐ Shared MPF DOAʹs ‐ fault reported within 4 calendar days of installation ‐ MPF SMPF 8 Day DOA ‐ Closed faults reported within 8 days of installation (Overall) SMPF 8 Day DOA ‐ Closed faults reported within 8 days of installation (Tactical Overall)   SMPF 8 Day DOA ‐ Closed faults reported within 8 days of installation (Tactical LLU) SMPF 8 Day DOA ‐ Closed faults reported within 8 days of installation (Tactical PSTN) SMPF 8 Day DOA ‐ Closed faults reported within 8 days of installation (EMP Overall) SMPF 8 Day DOA ‐ Closed faults reported within 8 days of installation (EMP LLU) SMPF 8 Day DOA ‐ Closed faults reported within 8 days of installation (EMP PSTN) MPF 8 Day DOA ‐ Closed fault reported within 8 days of installation (Overall) MPF 8 Day DOA ‐ Closed fault reported within 8 days of installation (Tactical) MPF 8 Day DOA ‐ Closed fault reported within 8 days of installation (EMP) % of Shared faults cleared ‐ 40 clock hours ‐ excludes park time % of MPF faults cleared ‐ 40 clock hours ‐ excludes park time % of Shared faults cleared ‐ Enhanced Care ‐ 20 clock hours ‐ excludes park time % of MPF faults cleared ‐ Enhanced Care ‐ 20 clock hours ‐ excludes park time LLU Plan & Build Orders Success Rate ‐ (4 week Rolling Average) First Touch Last Touch (FTLT) Including 4 Day DOA ‐ Bulk SMPF Migration First Touch Last Touch (FTLT) Including 4 Day DOA ‐ LLU ‐ Line Share MPF First Touch Last Touch (FTLT) Including 4 Day DOA ‐ Local Loop ‐ MPF Pair (New) First Touch Last Touch (FTLT) Including 4 Day DOA ‐ Local Loop ‐ MPF Pair (Trans) First Touch Last Touch (FTLT) Including 8 Day DOA ‐ Bulk SMPF Migration First Touch Last Touch (FTLT) Including 8 Day DOA ‐ LLU ‐ Line Share MPF First Touch Last Touch (FTLT) Including 8 Day DOA ‐ Local Loop ‐ MPF Pair (New) First Touch Last Touch (FTLT) Including 8 Day DOA ‐ Local Loop ‐ MPF Pair (Trans)    Abbreviations CAD  Customer Agreed Date DOA  Dead On Arrival ELF  Early Life Failure MPF  Metallic Path Facility POE  Pre‐Order Enquiry PSTN  Public Switched Telephone Network SMPF  Shared Metallic Path Facility 

                                                      43 http://www.openreach.co.uk/orpg/products/llu/kpi/kpi.do