13-1 learning objectives explain what is meant by the term lean operations system. list each of...
TRANSCRIPT
![Page 1: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/1.jpg)
13-1
Learning ObjectivesLearning Objectives
Explain what is meant by the term lean operations system.
List each of the goals of JIT and explain its importance.
List and briefly describe the building blocks of JIT. List the benefits of the JIT system. Outline the considerations important in converting
a traditional mode of operations to a JIT system. List some of the obstacles that might be
encountered when converting to a JIT system.
![Page 2: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/2.jpg)
13-2
JIT/Lean ProductionJIT/Lean Production
Just-in-time (JIT): A highly coordinated processing system in which goods move through the system, and services are performed, just as they are needed,
JIT lean production
JIT pull (demand) system
JIT operates with very little “fat”
![Page 3: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/3.jpg)
13-3
Goal of JITGoal of JIT
The ultimate goal of JIT is a balanced system.
Achieves a smooth, rapid flow of materials through the system
![Page 4: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/4.jpg)
13-4
Summary JIT Goals and Building Summary JIT Goals and Building BlocksBlocksFigure 13.1
Product Design
ProcessDesign
PersonnelElements
Manufactur-ing Planning
Eliminate disruptions
Make the system flexible Eliminate waste
Abalancedrapid flow
UltimateGoal
SupportingGoals
BuildingBlocks
![Page 5: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/5.jpg)
13-5
Supporting GoalsSupporting Goals
Eliminate disruptions
Make system flexible
Eliminate waste, especially excess inventory
![Page 6: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/6.jpg)
13-6
Sources of WasteSources of Waste
Overproduction
Waiting time
Unnecessary transportation
Processing waste
Inefficient work methods
Product defects
![Page 7: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/7.jpg)
13-7
Kaizen PhilosophyKaizen Philosophy
Waste is the enemy Improvement should be done gradually and
continuously Everyone should be involved Built on a cheap strategy Can be applied anywhere
![Page 8: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/8.jpg)
13-8
Kaizen Philosophy (cont’d)Kaizen Philosophy (cont’d)
Supported by a visual system Focuses attention where value is created Process orienteted Stresses main effort of improvement should
come from new thinking and work style The essence of organizational learning is to
learn while doing
![Page 9: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/9.jpg)
13-9
Big JIT – broad focus Vendor relations Human relations Technology management Materials and inventory management
Little JIT – narrow focus Scheduling materials Scheduling services of production
Big vs. Little JITBig vs. Little JIT
![Page 10: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/10.jpg)
13-10
JITJIT a Building Blocksa Building Blocks
Product design
Process design
Personnel/organizationalelements
Manufacturing planning and control
![Page 11: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/11.jpg)
13-11
Product DesignProduct Design
Standard parts
Modular design
Highly capable production systems
Concurrentengineering
![Page 12: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/12.jpg)
13-12
Process DesignProcess Design
Small lot sizes Setup time reduction Manufacturing cells Limited work in process Quality improvement Production flexibility Balanced system Little inventory storage
![Page 13: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/13.jpg)
13-13
Benefits of Small Lot SizesBenefits of Small Lot Sizes
Reduces inventory
Less storage space
Less rework
Problems are more apparent
Increases product flexibility
Easier to balance operations
![Page 14: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/14.jpg)
13-14
Single-Minute ExchangeSingle-Minute Exchange
Single-minute exchange of die (SMED): A system for reducing changeover time
Categorize changeover activities Internal – activities that can only be done while
machine is stopped External – activities that do not require stopping
the machine
![Page 15: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/15.jpg)
13-15
Production FlexibilityProduction Flexibility
Reduce downtime by reducing changeover time
Use preventive maintenance to reduce breakdowns
Cross-train workers to help clear bottlenecks
![Page 16: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/16.jpg)
13-16
Production Flexibility (cont’d)Production Flexibility (cont’d)
Use many small units of capacity Use off-line buffers Reserve capacity for important customers
![Page 17: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/17.jpg)
13-17
Quality ImprovementQuality Improvement
Autonomation
Automatic detection of defects during production
Jidoka
Japanese term for autonomation
![Page 18: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/18.jpg)
13-18
Production FlexibilityProduction Flexibility
Balance system: Distributing the workload evenly among work stations
Work assigned to each work station must be less than or equal to the cycle time
Cycle time is set equal to the takt time Takt time is the cycle time needed to match
customer demand for final product
![Page 19: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/19.jpg)
13-19
Personnel/Organizational Personnel/Organizational ElementsElements
Workers as assets
Cross-trained workers
Continuous improvement
Cost accounting
Leadership/project management
![Page 20: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/20.jpg)
13-20
Manufacturing Planning and Manufacturing Planning and ControlControl
Level loading
Pull systems
Visual systems
Close vendor relationships
Reduced transaction processing
Preventive maintenance
![Page 21: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/21.jpg)
13-21
Pull/Push SystemsPull/Push Systems
Pull system: System for moving work where a workstation pulls output from the preceding station as needed. (e.g. Kanban)
Push system: System for moving work where output is pushed to the next station as it is completed
![Page 22: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/22.jpg)
13-22
Kanban Production Control Kanban Production Control SystemSystem
Kanban: Card or other device that communicates demand for work or materials from the preceding station
Kanban is the Japanese word meaning “signal” or “visible record”
Paperless production control system
Authority to pull, or produce comes from a downstream process.
![Page 23: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/23.jpg)
13-23
Kanban FormulaKanban Formula
N = DT(1+X)C
N = Total number of containers
D = Planned usage rate of using work center
T = Average waiting time for replenishment of parts plus average production time for a container of parts
X = Policy variable set by management - possible inefficiency in the system
C = Capacity of a standard container
![Page 24: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/24.jpg)
13-24
Limited Work in ProcessLimited Work in Process
Benefits Lower carrying costs Increased flexibility Aids scheduling Saves cost of rework and scrap
Two general approaches Kanban – focuses on individual work stations Constant work in process (CONWIP) – focuses
on the system as a whole
![Page 25: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/25.jpg)
13-25
Traditional Supplier NetworkTraditional Supplier Network
BuyerBuyer
SupplierSupplierSupplierSupplier SupplierSupplier SupplierSupplier
SupplierSupplier
SupplierSupplierSupplierSupplier
Figure 13.4a
![Page 26: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/26.jpg)
13-26
Tiered Supplier NetworkTiered Supplier NetworkFigure 13.4b
SupplierSupplier
SupplierSupplier
SupplierSupplier
SupplierSupplierSupplierSupplier SupplierSupplier
BuyerBuyer
SupplierSupplierFirst Tier SupplierFirst Tier Supplier
Second Tier SupplierSecond Tier Supplier
Third Tier SupplierThird Tier Supplier
![Page 27: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/27.jpg)
13-27
Preventive Maintenance andPreventive Maintenance andHousekeepingHousekeeping
Preventative maintenance: Maintaining equipment in good condition and replacing parts that have a tendency to fail before they actually fail.
Housekeeping: Maintaining a workplace that is clean and free of unnecessary materials.
![Page 28: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/28.jpg)
13-28
Housekeeping Five S’sHousekeeping Five S’s
1. Sort
2. Straighten
3. Sweep
4. Standardize
5. Self-discipline
![Page 29: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/29.jpg)
13-29
Comparison of JIT and Comparison of JIT and TraditionalTraditional
Factor Traditional JIT
Inventory Much to offset forecast errors, late deliveries
Minimal necessary to operate
Deliveries Few, large Many, small
Lot sizes Large Small
Setup; runs Few, long runs Many, short runs
Vendors Long-term relationships are unusual
Partners
Workers Necessary to do the work Assets
Table 13.3
![Page 30: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/30.jpg)
13-30
Transitioning to a JIT SystemTransitioning to a JIT System
Get top management commitment
Decide which parts need most effort
Obtain support of workers
Start by trying to reduce setup times
Gradually convert operations
Convert suppliers to JIT
Prepare for obstacles
![Page 31: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/31.jpg)
13-31
Obstacles to ConversionObstacles to Conversion
Management may not be committed
Workers/management may not be cooperative
Difficult to change company culture
Suppliers may resist Why?
![Page 32: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/32.jpg)
13-32
Suppliers May Resist JITSuppliers May Resist JIT
Unwilling to commit resources Uneasy about long-term commitments Frequent, small deliveries may be difficult Burden of quality control shifts to supplier Frequent engineering changes may cause
JIT changes
![Page 33: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/33.jpg)
13-33
JIT in ServicesJIT in Services
The basic goal of the demand flow technology in the service organization is to provide optimum response to the customer with the highest quality service and lowest possible cost. Eliminate disruptions Make system flexible Reduce setup and lead times Eliminate waste Minimize WIP Simplify the process
![Page 34: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/34.jpg)
13-34
JIT II: a supplier representative works right in the company’s plant, making sure there is an appropriate supply on hand.
JIT IIJIT II
![Page 35: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/35.jpg)
13-35
Benefits of JIT SystemsBenefits of JIT Systems
Reduced inventory levels
High quality
Flexibility
Reduced lead times
Increased productivity
![Page 36: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/36.jpg)
13-36
Benefits of JIT Systems (cont’d)Benefits of JIT Systems (cont’d)
Increased equipment utilization
Reduced scrap and rework
Reduced space requirements
Pressure for good vendor relationships
Reduced need for indirect labor
![Page 37: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/37.jpg)
13-37
Smooth flow of work (the ultimate goal) Elimination of waste Continuous improvement Eliminating anything that does not add
value Simple systems that are easy to
manage Use of product layouts to minimize
moving materials and parts Quality at the source
Elements of JITElements of JITTable 13.4
![Page 38: 13-1 Learning Objectives Explain what is meant by the term lean operations system. List each of the goals of JIT and explain its importance. List](https://reader035.vdocuments.site/reader035/viewer/2022070413/5697bf9a1a28abf838c92653/html5/thumbnails/38.jpg)
13-38
Poka-yoke – fail safe tools and methods Preventative maintenance Good housekeeping Set-up time reduction
Cross-trained employees
A pull system
Elements of JIT (cont’d)Elements of JIT (cont’d)Table 13.4