  • Project: WORLD TRADE CENTER DOHA QATAR

    Title of the Document

    Method Statement for the Installation of Alarm Check

    ValveReference No. Revision No Date Page No.QC-MS-FF-006 00 08 OCT 2010 2 of 7

    Table of Contents

    Sr. No. Contents Page

    01 Scope of work 3

    02 References 3

    03 Definitions 3

    04 Responsibilities/ Supervision 3

    05 Description of Work 4

    06 Plant Requirement 5

    07 Manpower Requirement 6

    08 Temporary works to be designed and Installed 6

    09 Health and Safety Requirements 6

    10 Environment requirements 6

    11 Security arrangements 6

    12 Special Contractual Arrangements7

    13 Records to be produced 7

    14 Attachments 7

  • Project: WORLD TRADE CENTER DOHA QATAR

    Title of the Document

    Method Statement for the Installation of Alarm Check

    ValveReference No. Revision No Date Page No.QC-MS-FF-006 00 08 OCT 2010 3 of 7

    1.0. Scope & ObjectiveThis method statement covers the detailed procedure for installation of Breeching Inlets & Cabinet. This procedure defines the method used to ensure that the installation of Breeching Inlet is carried as per the contract specification requirements and the approved drawings of Qatar World Trade Center

    2.0. ReferencesContract Documents:

    Specification : 15310, 2.08 (A)

    NFPA 13, 2007 Edition Standard for the Installation of Sprinkler System

    The Local Fire Authority, Qatar Civil Defence Directorate

    Shop Drawings: Marked ISSUED FOR CONSTRUCTION

    3.0. DefinitionsFire Protection System. Any fire alarm device or system or fire extinguishing device or system, or their combination, that is designed and installed for detecting, controlling, or extinguishing a fire or otherwise alerting occupants, or the fire department, or both, that a fire has occurredAutomatic Sprinkler. A fire suppression or control device that operates automatically when its heat-activated element is heated to its thermal rating or above, allowing water to discharge over a specified area.

    4.0. Responsibilities/ Supervision4.1 Project Manager shall have the overall responsibility of the project for execution, quality

    and safety. He shall maintain the planning progress and co-ordination of works with main contractor.

    4.2 Project/ Site Mechanical Engineer(s) shall be responsible for monitoring of the day-to-day activities on site, for materials, drawings, allocation of resources to work areas on site and testing & commissioning. He shall report to the Project Manager.4.3 Supervisor/ Charge Hand shall be directly responsible for the day-to-day job at site, for coordinating of work with Technicians or any other staff assigned his area.

    4.4 QA/QC Department will be overseeing the quality requirements and quality control measures for the project in coordination with Project/Site Engineer(s).

    4.5 Safety Officer shall be responsible for the health & safety aspects on site as per the ARABTEC/EFECO safety Manual.

  • Project: WORLD TRADE CENTER DOHA QATAR

    Title of the Document

    Method Statement for the Installation of Alarm Check

    ValveReference No. Revision No Date Page No.QC-MS-FF-006 00 08 OCT 2010 4 of 7

    5.0 Description of works5.1 Pre Installation Check

    5.1.1 Ensure that all safety requirements are in place in accordance with project safety plan5.1.2 Ensure that the latest revision of the approved working drawing is being used.5.1.3 On receipt of material on site, QA/QC engineer/ Site Engineer shall inspect the material internally and inspection shall be offered to the engineer for approval in MIR ( Material inspection request form)5.1.4 Ensure that the all materials used have passed receiving inspection in accordance with QA procedures and are not damaged or defective. Any non-conforming materials must be labeled by store keeper and returned to quarantine area in accordance with procedure.5.1.5 Ensure that all the pipe fitters and helpers are aware of the correct materials handling and installation procedure to ensure that best quality of workmanship. Training shall be provided by site engineers / Supervisor as and when required.5.1.6 Ensure space & access for installation is available and at correct location as per the approved drawing and site conditions.5.1.7 Check the tools required to install the Alarm Check valve.5.1.8 Supervisor shall ensure that correct tools and Alarm check valve with trim kit are available for installation and to achieve compliance with contract requirement.

    5.2 INSTALLATION OF ALARM CHECK VALVE5.2.1 The Alarm Check Valve must be installed in an area not subject to freezing temperatures or physical damage. The Alarm Check Valve may be installed in the vertical position with direction of flow up, or in the horizontal position with the access cover up.5.2.2 Verify that the appropriate trim chart and technical data for the Alarm Check Valve and associated equipment are available.

    5.2.3 Remove all plastic thread protectors from the openings of the Alarm Check Valve.

    5.2.4 Apply a small amount of pipe-joint compound or tape to the external threads of all pipe connections required. Take care not to allow any compound, tape, or other foreign matter inside any nipples or openings of the valve or trim components. Trim the Alarm Check Valve in accordance trim chart provided along with the alarm check valve

    5.2.5 Install the Alarm Check Valve and trim according to current Trim Charts for the valve used. Trim charts are provided with trim package and available with the project engineer or Technical Engineer. After installing the alarm check valve, please unpack the water motor gong and follow the instructions below to install as per the requirement.

  • Project: WORLD TRADE CENTER DOHA QATAR

    Title of the Document

    Method Statement for the Installation of Alarm Check

    ValveReference No. Revision No Date Page No.QC-MS-FF-006 00 08 OCT 2010 5 of 7

    5.2.6 For installation of water motor gong mark the through-wall locations for the centerlines of the Sleeve and Drain Outlet. The Drain Outlet must be located at least 10 inches (250mm)

    5.2.7 Make 1-1/2 inch (38 mm) diameter holes straight through the wall at both locations.

    5.2.8 Cut the non-threaded end of the Sleeve to a length equal to that of the wall thickness plus 0 to 1/8 inch (0 to 3 mm). Thread the cut end to inch NPT per ANSI B1.20.1.

    5.2.9 Install the alarm line piping up to and including the union half. Use thread sealant sparingly on male threads only.

    5.2.10 Prior to initiating installation of the Water Motor Alarm, mount the Drain Trim (less the Wall Plate and 45 Elbow), as well as the balance of alarm line piping (including other union half) to the Water Motor.

    5.2.11 Tighten the NPT threaded end of the Sleeve into the Body hand tight plus 1/8 turn.

    5.2.12 Slip the Support Washer over the Sleeve and place the assembly in position against the wall.

    5.2.13 Tighten the 3/4 inch Union. Install the Wall Plate and tighten the 45 Elbow.

    5.2.14 Apply pressure against the outside edge of the Water Motor Body and verify that the Body and Support

    5.2.15 Washer sit square against the wall. If not, adjust the alarm line and/or drain piping to suit.

    5.2.16 From the outside wall, insert the Drive Shaft through the Sleeve and fully insert it into the Impeller. (When fully inserted, the Shaft should protrude beyond the face of the wall by approximately 20" minus 2" minus wall thickness.) Mark the Drive Shaft at a point of approximately 1/8 to 1/4 inch inside the face of the wall; remove the Shaft; cut the Shaft where previously marked; file off burrs from the cut end of the Drive Shaft; and, re-insert the Drive Shaft through the Sleeve and fully insert it into the Impeller.

    5.2.17 Hold the Gong Mount in position against the wall, engage the Coupling with the Drive Shaft and then carefully thread the Striker Shaft Bearing onto the Sleeve. Securely tighten the Striker Shaft Bearing using a pair of channel locks on the 1-1/2 inch (38 mm) hex end.

  • Project: WORLD TRADE CENTER DOHA QATAR

    Title of the Document

    Method Statement for the Installation of Alarm Check

    ValveReference No. Revision No Date Page No.QC-MS-FF-006 00 08 OCT 2010 6 of 7

    5.2.18 Spin the Striker by hand and verify that it spins freely (without any sign of binding). If not, make the necessary adjustments.

    5.2.19 Install the gong and securely tighten the Cap Nut. The identification sign lettering must be orientated horizontally.

    5.2.20 After installation, the alarm check valve must be tested in accordance with the recognized installation standards. If a thread leak occurs or the groove joints leak, normally the unit must be removed and the joints should be done again. This is due to the fact that when the joint seal leaks, the sealing compound or tape is washed out of the joint or the groove of the pipe might more or the groove fittings gasket might be damaged.

    5.2.21 Ensure the alarm check valve is installed as per the procedure and the trim connections are installed as per the trim chart.

    5.2.22 Verify that all system components are rated for the water working pressure of the system.

    5.2.23 Final touch up of painting is to be done if required

    6.0 PLANT REQUIREMENT

    Special Wrench Wrench

    General toolsProtective clothing / equipment

    Engaged personnel on site will wear or use the following safety equipment as appropriate:

    Hard hats, safety boots, overalls / work wear, high visibility clothing, safety goggles, gloves and Masks.

    7.0 MANPOWER REQUIREMENTManpower requirement like Site Engineer, Supervisor/ Foreman, and pipe fitters depends upon the planning organization chart and site progress of works.

    8.0. TEMPORARY WORKS TO BE DESIGNED & INSTALLTEDAll the Safe Working Scaffolding Platforms will be installed in compliance to safety standard requirements.

  • Project: WORLD TRADE CENTER DOHA QATAR

    Title of the Document

    Method Statement for the Installation of Alarm Check

    ValveReference No. Revision No Date Page No.QC-MS-FF-006 00 08 OCT 2010 7 of 7

    9.0. HEALTH AND SAFET REQUIREMENTSImplementation of Health & Safety mechanisms and checks shall be done as

    per contract agreement and the approved EFECO safety manual. The safety officer shall carryout the necessary routine inspections.

    Safety Lighting : Safety lights will be used in case of power failure ensuring good illumination for the personnel. Green color safety jacket shall be worn on site for all personnel who are in site.

    Task Lighting : Adequate lighting will be provided ensuring the good illumination of the working area. Task Lighting will be connected to the nearest site distribution board which is RCD protected.

    Emergency Arrangements : Site general safety procedure will be followed. In case of emergency, the safety officer will stop the work. He will put in to action the emergency arrangements as described in EFECO safety Manual.

    Risk Control : Risk Assessment and their controls are carried out for the following activity / hazard and enclosed with this method statement.

    Using Hand Tools Disposal of Waste Material Temporary Site Electrical Supply

    The safety officer has the right to stop all the fire fighting works activity, if he is not satisfied with the safety arrangement on site during installation and testing process.

    10.0 ENVIRONMENTAL REQUIREMENTS All remedial measures to control all the operations within the environmental legal limits

    for Information and record.

    11.0 SECURITY ARRANGEMENTS No additional security arrangements over and above those already in place at the site,

    restricted access to the job site and the maintaining of the boundary fence security guards will be posted on all entrance points being used by vehicles during the camping out of this item of work to control and coordinate traffic movements.

    12.0 SPECIFIC CONTRACTUAL OBLIGATIONS We are executing all the works by following the Project Specifications Section No. 15310

    and the related issued For Construction drawings.

    13. RECORDS TO BE PRODUCED

  • Project: WORLD TRADE CENTER DOHA QATAR

    Title of the Document

    Method Statement for the Installation of Alarm Check

    ValveReference No. Revision No Date Page No.QC-MS-FF-006 00 08 OCT 2010 8 of 7

    The following Form(s) / Checklist(s) shall be prepared and raised to verify the above activity to ensure that the activity is carried out as per the contract requirements.

    Inspection Request (IRs) Revision 0 shall be raised along with QC checklist for alarm check valve installations QC Checklist for Installation of Alarm check valve

    14. ATTACHMENTS The following documents are enclosed with this method statement:

    Form ITPF-03-Inspection and Test plan for Installation of Fire Alarm check Valve

    QC Checklist for Installation of Alarm check valve Risk Assessment Form Using Hand Tools ( QC-RAF-01 )

    Risk assessment Form Disposal of Waste Materials ( QC-RAF-02 ) Risk assessment Form Temporary Site Electrical Supply ( QC-RAF-03 )

    ******************************

    Method Statement for the Installation of Alarm Check ValveProtective clothing / equipment