Page 1: 10/29/2008 - NRC MOX Fuel Qualification Program Update

VA7

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 2: 10/29/2008 - NRC MOX Fuel Qualification Program Update

NRC MOX Fuel Qualification ProgramUpdate Meeting

2 nd Cycle PIE Results

DRAFT

R o s e MontgomeryU.S. PIE Coordinator

--- IREVA NP INC. > NRC Update Meeting - October 29, 2008 - AREVA NP Inc 2

Page 3: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Exams completed

> Assembly Length

D Visuals

o Shoulder Gap

o Fuel Rod Growth

* Fuel Assembly Distortion

* Fuel Rod Distortion (Water Channel)

* Holddown Spring Rate

*Holddown Spring Free Height

o Peripheral Fuel Rod Oxide

o Transverse Grid Growth

> Internal Guide Tube Oxide

I AREVA NP INC. I> NRC Update Meeting - October 29, 2008- ARE VA NP Inc.

3> NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 3

Page 4: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Assembly growth

A f**

t Gap to CoreSupport Plate,

0.624"tt Gap to Core

Support Plate,0.051"

FuelAssemblyLength,159.850"

As-Built

FuelAssembly

Length,160.423"

AfterIrradiation

|

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc. 4WAREVA NIP INC. > NRC Update Meeting - October 29, 2006 - AREVA NP Inc. 4

Page 5: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Assembly growth

" Measured growth at end of 2nd cycle washigher than expected at the establishedburnup

" Dipstick measurements confirmed withmeasuring tape

" Fuel did not experience hard contact duringoperation

" Fuel was discharged pending disposition

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc 5

I AREVA NP INC. I > NRC Update Meeting - October 29, 2008 - AREVA NP Inc 5

Page 6: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Visuals

AREVA Ný INC. > NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 6

Page 7: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Preliminary Results - FuelAssembly Length

I AREVA N> NRC Update Meeting - October 29, 2008 - AREVA NP Inc 7

Page 8: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Shoulder gap

AREVA NP INC. > NRC Update Meeting - October 29, 2008 - AREVA NP Inc 8

Page 9: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Fuel Rod Growth

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc. 9

AREVA NP INC. > NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 9

Page 10: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Assembly distortion

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc. 10

AREVA NP INC. L > NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 10

Page 11: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Rod bow

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc. 11-AREVA NP INC. I > NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 11

Page 12: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results - Fuel Rod Distortion

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc. 12

i AREVA NP INC. -1> NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 12

Page 13: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Fuel rod images

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc 13

I AREVA NP INC. L > NRC Update Meeting - October 29, 2008 - AREVA NP Inc 13

Page 14: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Hoiddown spring rateand free height

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc. 14

AREVA NP INC. I > NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 14

Page 15: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Peripheral Fuel Rod Oxide

> NRC Update Meeting - October 29, 2008- AREVA NP Inc 15

AREVA NP INC. k > NRC Update Meeting - October 29, 2008 - AREVA NP Inc 15

Page 16: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Grid Transverse Width

mRV PIC> NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 16

Page 17: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Internal guide tube oxide

---IREVA NP INC. > NRC Update Meeting - October 29, 2008 - AREVA NP Inc 17

Page 18: 10/29/2008 - NRC MOX Fuel Qualification Program Update

MOX Results: Summary

> NRC Update Meeting - October 29, 2008- ARE VA NP Inc. 18I AREVA NP INC. I > NRC Update Meeting - October 29, 2008 - AREVA NP Inc. 18

Page 19: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Upcoming Hot Cell Exam

AREVA NP INC. > NRC Update Meeting - October 29, 2008- ARE VA NP Inc 19

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc 19

Page 20: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Dry R-ute DUO 2

29 October 2008

DRAFT

Page 20

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc

Page 21: 10/29/2008 - NRC MOX Fuel Qualification Program Update

WE BackgoundHCATION FACILIT

" MFFF needs 820 MT of DUO 2 powder from 2016to 2030 to produce MOX fuel.

* MOX Services baseline is Wet Route (WR)processed Uranium from depleted UF 6.

" But today, the standard route for producing U0 2

Powder is now Dry Route (from DUF 6 [gas] toU0 2 by pyrohydrolysis).

Page 21

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 22: 10/29/2008 - NRC MOX Fuel Qualification Program Update

_ Wet RouteiAINFACILITY

* Historical technology.

* Due to the dissolution process in nitric aciduranium conversion, the plants would have tohandle liquid effluents containing ammoniumnitrate.

° High number of chemical contaminated solidwaste (HEPA filters).

* Plants have or will shut down (PierrelateFrance).

Page 22

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc

Page 23: 10/29/2008 - NRC MOX Fuel Qualification Program Update

ICATION FACILITY_

* New reference technology worldwide.

* Generate much less effluents with typically farfewer chemical constituents.

* LEU fuel business has almost entirely switchedto Dry Route (DR).

Page 23

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc

Page 24: 10/29/2008 - NRC MOX Fuel Qualification Program Update

AREVA NP Dry Conversion Process

Page 24

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 25: 10/29/2008 - NRC MOX Fuel Qualification Program Update

AREVA V NP Dry Conversin History

U02.

1i981:-19831984-19861993-11-997

19931997-

Pilot plant operationDevelopment inprototype'systemr.Prototype in production, (100 MTU/yr)400 MTU/yr plant on-line in Germany

1200:MTUIyr-plant on-line in U.S.

First MOXkfuels in 900 MW, 3 .loopreactor

MOX203.

All UF6 Conversion in AREVA NPis Dry Route.

Page 25

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 26: 10/29/2008 - NRC MOX Fuel Qualification Program Update

ualiflcation of Dry-Process Uranium•BRICATIONf FACILITYm E u lin LEU f uels

U.S. Experience - early 1990's

- AREVA purchased pellets from Siemens (Richland)

Transition to dry-process UO 2 was qualified extensively

0 Physical examinations of pellets, including microstructure

0 Qualification was completely "internal" - between purchaserand supplier

* No changes relative to fuel design or performance

Page 26

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 27: 10/29/2008 - NRC MOX Fuel Qualification Program Update

FUEL FABRICATION FACILITYOuaiification of Dr -Process

Uranium for MOX

• At the beginning of 2009 MELOX ReferencePlant will use DR powder for producingMOX batches and to qualify the process.

" The completed switch to DR is expected inabout three years.

Page 27

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 28: 10/29/2008 - NRC MOX Fuel Qualification Program Update

DR PerformanceFUEL FABRICATION FACILITY

* MELOX produced MOX fuel with DR powderin 2003.

* The fuel was irradiated in a 3-loop 900 MWreactor.- Rods have been extracted after 3 cycles : 45 Gwd/MT

- Rods have been extracted after 4 cycles : 52 Gwd/MT

* Those rods will be shipped this year to "hotcells" and results will be available in mid-2009.

Page 28

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 29: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Use and Qualification of DR UO2

Powder for MOX

Page 29

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 30: 10/29/2008 - NRC MOX Fuel Qualification Program Update

FUEL FABRICATION% FACILITY

Use and Qualification of DR UO,Powder for MOX

W In 2009, the following PIEs are planned:

0 3-cycle: Non-destructive examinations on one DRand on one ADU, three punctures and gas analysis.

0 4-cycle: Non-destructive examinations on one DRand on one ADU, five punctures and gas analysis,destructive examinations (metallographies anddensity measurements) on one DR rod.

Those hot cell examinations are comparablewith Oak Ridge U.S. MOX examinationprogram.

Page 30

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 31: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Microstructure of the standardnon-irradiated MOX MIMAS

Page 31

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 32: 10/29/2008 - NRC MOX Fuel Qualification Program Update

X-Ray maps Frewitt sieved fuels

Page 32

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 33: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Cumulated Surface Fraction of PuRich Agglomerates

Page 33

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 34: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Effect on Fission Gas ReleaseICATIONt FACILITY

No MOX DR microstructure is characterized bylarger U0 2 spots, but it is a technical non-issueand the surface fraction occupied by these U0 2spots is similar to the reference fuels.

Po Similar distribution of the PuO 2 rich and coatingphase areas.

lo Fission product distribution simulation givessimilar results to the reference fuels (mainly dueto the fact that the size and distribution of the Purich agglomerates are similar).

[Same FGR behavior is expected] Page 34

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc

Page 35: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Dry Route Changes for MELOXICATION FACILITY

* DR will only affect the uranium feedinghoppers.

DR will not affect the Primary Blendcharacteristics which are determined by theperformances of the Ball Mill and SievingProcesses.

* Previous mixing results in MELOX are showingthat DR U does not affect the Pu rich particlessize.

Page 35

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 36: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Impact for MFFF?CILIT

Switch to DR is a natural evolution.The European database (i.e.,demonstration program with 'hot cells'results) will be large and comprehensive.MFFF changes would be consistent withexisting licensing basisMay be minor editorials in processdescriptionNot switching would make MFFF divergefrom future European fuel performancedatabase.

Page 36

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 37: 10/29/2008 - NRC MOX Fuel Qualification Program Update

II Qualification of Dry-Process UraniumRICATION FACILITY for IIOX

Expectations for MFFF and Fuel Designerin US

* Follow MELOX - adopt same type of Uranium

" Qualify product by comparison to MELOX product

w Physical examinations of pellets, including microstructureand resintering data

* Use hot cell PIE data from MELOX-produced lead rods tobenchmark Fuel Performance Code Models

Page 37

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc

Page 38: 10/29/2008 - NRC MOX Fuel Qualification Program Update

Potential Sch ewduleCATION FACILITYý

-Base Plan" Demonstration using existing and future data

- 2009: Hot Cell Results0 Benchmark Fuel Performance Codes

-2010: New reload in European Reactor

- Starting 2010: Operating experience

-2016: MFFF start-upPage 38

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 39: 10/29/2008 - NRC MOX Fuel Qualification Program Update

FACATO ILITYDcu e sli atd

" MOX Fuel Qualification Plan (informationdocument) will be revised to incorporate allchanges.

" MOX Fuel Design Report (BAW-10238)will be updated to identify all changesrelative to the MOX LTA design.

Page 39

> NRC Update Meeting - October 29, 2008 - AREVA NP Inc.

Page 40: 10/29/2008 - NRC MOX Fuel Qualification Program Update

9ConclusionICATION% FACILITY

* MFFF must be attentive to Ref-plantsand industry evolutions.

* Expectations that the fuel performancesare not affected by the conversion routechosen for uranium.

* Data to confirm this is expected mid2009.

Page 40