Route CR-115 Project Description BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION CREEK BIN# 12089 Type of Work BRIDGE REPLACEMENT Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100059617 ACBRZ59617 ATRP (007) CONSTRUCTION BRIDGE REPLACEMENT 2019 $938 $235 $1,173 TOTAL COST: $938 $235 $1,173 Route CR-124 Project Description BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK BIN# 14309 Type of Work BRIDGE REPLACEMENT Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100059618 ACBRZ59618 ATRP (010) CONSTRUCTION BRIDGE REPLACEMENT 2019 $383 $96 $479 TOTAL COST: $383 $96 $479 Route CR-124 Project Description BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER AN UNNAMED TRIBUTARY TO BINION CREEK BIN#12282 Type of Work BRIDGE REPLACEMENT Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100059619 ACBRZ59619 ATRP (010) CONSTRUCTION BRIDGE REPLACEMENT 2019 $241 $60 $302 TOTAL COST: $241 $60 $302 11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM STIP YEARS from 10/1/2014-9/30/2019 1 of 24 COUNTY HIGHWAY PROJECTS - TUSCALOOSA STIP PLAN: 2016 - Original

Upload: phamtuyen

Post on 08-Nov-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-115 ProjectDescription

BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION CREEK BIN# 12089

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059617 ACBRZ59617 ATRP (007)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $938 $235 $1,173

TOTAL COST: $938 $235 $1,173

Route CR-124 ProjectDescription

BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK BIN# 14309

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059618 ACBRZ59618 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $383 $96 $479

TOTAL COST: $383 $96 $479

Route CR-124 ProjectDescription

BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER AN UNNAMED TRIBUTARY TO BINION CREEK BIN#12282

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059619 ACBRZ59619 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $241 $60 $302

TOTAL COST: $241 $60 $302

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

1 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 2: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-1358 ProjectDescription

BRIDGE REPLACEMENT ON CR-1358 (HOLMAN CHURCH ROAD) OVER KANSAS CITY SOUTHERN RAILROAD

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059621 ACBRZ59621 ATRP (007)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $694 $173 $867

TOTAL COST: $694 $173 $867

Route CR-140 ProjectDescription

RESURFACING AND STRIPING ON CR-140 FROM PIKENS COUNTY LINE TO DOCKERY ROAD

Type of Work RESURFACING

Project Length in Miles 9.200 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059431 ACOA59431 ATRP (002) CONSTRUCTION

RESURFACING

2016 $1,573 $393 $1,966

TOTAL COST: $1,573 $393 $1,966

Route CR-140 ProjectDescription

RESURFACING AND STRIPING ON CR-140 FROM DOCKERY ROAD TO SR-6 (US-82)

Type of Work RESURFACING

Project Length in Miles 2.600 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061866 ACOA61866 ATRP (017) CONSTRUCTION

RESURFACING

2016 $431 $108 $539

TOTAL COST: $431 $108 $539

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

2 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 3: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-155 ProjectDescription

BRIDGE REPLACEMENT ON CR-155 (SANDY ROAD) OVER BIG SANDY CREEK BIN # 11878

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058501 ACBRZ58501 ATRP (015)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $449 $112 $561

TOTAL COST: $449 $112 $561

Route CR-59 ProjectDescription

RESURFACE CR-59 (LOCK 17 ROAD) FROM NORTH CITY LIMITS OF BROOKWOOD TO GROUNDHOG ROAD

Type of Work RESURFACING

Project Length in Miles 11.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059432 ACOA59432 ATRP (002) CONSTRUCTION

RESURFACING

2017 $3,328 $832 $4,160

TOTAL COST: $3,328 $832 $4,160

Route CR-826 ProjectDescription

BRIDGE REPLACEMENT ON CR-826 (MALONE CREEK ROAD) OVER MALONE MILL CREEK BIN# 13817

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059616 ACBRZ59616 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $404 $101 $505

TOTAL COST: $404 $101 $505

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

3 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 4: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-85 ProjectDescription

PATCHING, RESURFACING AND STRIPING ON DAFFRON ROAD (CR-85) FROM SR-6 (US-82) TO HARGROVE ROAD

Type of Work RESURFACING

Project Length in Miles 2.560 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061870 ACOA61870 ATRP (017) CONSTRUCTION

RESURFACING

2016 $446 $112 $558

TOTAL COST: $446 $112 $558

Route CR-NA ProjectDescription

ROADWAY IMPROVEMENTS ON HARGROVE ROAD FROM 10TH AVENUE TO HACKBERRY LANE IN THE CITY OF TUSCALOOSA

Type of Work RESURFACING

Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059443 ACOA59443 ATRP (017) CONSTRUCTION

RESURFACING

2018 $1,908 $587 $2,495

TOTAL COST: $1,908 $587 $2,495

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

4 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 5: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-NA ProjectDescription

ADDITIONAL LANE (GRADE, DRAIN, BASE AND PAVE) AND RESURFACING OF OLD BIRMINGHAM HIGHWAY FROM SOUTH OF R.O.W. LIMITS OF I-20/59 INTERCHANGE TO THE JEFFERSON COUNTY LINE

Type of Work RESURFACING

Project Length in Miles 0.565 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061869 ACOA61869 ATRP (016) CONSTRUCTION

RESURFACING

2017 $684 $171 $856

TOTAL COST: $684 $171 $856

Route CR-NA ProjectDescription

PATCHING, RESURFACING AND STRIPING ON CR-95 (OLD GREENSBORO ROAD) FROM H.B. JOHNSTON ROAD TO MAXWELL LOOP ROAD

Type of Work RESURFACING

Project Length in Miles 5.340 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061872 ACOA61872 ATRP (017) CONSTRUCTION

RESURFACING

2017 $724 $181 $904

TOTAL COST: $724 $181 $904

Route CR-NA ProjectDescription

WIDENING OF FOSTERS FERRY ROAD FROM JOE MALISHAM PARKWAY TO 29TH STREET

Type of Work RESURFACING

Project Length in Miles 1.365 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061873 ACOA61873 ATRP (017) CONSTRUCTION

RESURFACING

2019 $1,491 $373 $1,864

TOTAL COST: $1,491 $373 $1,864

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

5 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 6: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS ON WATERMELON ROAD AT THE INTERSECTION OF UNION CHAPEL ROAD - CITY OF TUSCALOOSA

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061875 ACOA61875 ATRP (017) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $642 $161 $803

TOTAL COST: $642 $161 $803

Route CR-NA ProjectDescription

MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK

Type of Work TURN LANES

Project Length in Miles 1.150 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100008464 STPOA 6317 (250) RIGHT OF WAY

TURN LANES 2019 $901 $225 $1,127

TOTAL COST: $901 $225 $1,127

Route CR-NA ProjectDescription

M-CLASS BOULEVARD EXTENSION WITH OVERPASS ACROSS SR-7 (US-11) AND NORFOLK SOUTHERN RR TO TINGLE TANGLE ROAD.

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061878 ACOA61878F ATRP (017)

CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2017 $7,116 $1,779 $8,895

TOTAL COST: $7,116 $1,779 $8,895

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

6 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 7: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-NA ProjectDescription

WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100008465 STPOA 6314 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2019 $451 $113 $563

TOTAL COST: $451 $113 $563

Route I -59 ProjectDescription

RESURFACING ON I-59 FROM NORTH OF BROOKWOOD INTERCHANGE (MP 86.63) TO SOUTH OF CR-9 (MP 91.76)

Type of Work RESURFACING

Project Length in Miles 10.260 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064217 IM I059 (391) PRELIMINARY ENGINEERING

RESURFACING

2016 $5 $1 $6

100064219 IM I059 (391) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2016 $4,335 $482 $4,817

TOTAL COST: $4,341 $482 $4,823

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

7 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 8: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route I -59 ProjectDescription

RESURFACING ON I-59 FROM SOUTH OF CR-9(MP 91.76) TO SOUTH OF SR-5 (US-11)INTERCHANGE (MP 96.00)

Type of Work RESURFACING

Project Length in Miles 8.480 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064220 IM I059 (389) PRELIMINARY ENGINEERING

RESURFACING

2016 $6 $1 $7

100064221 IM I059 (389) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2016 $8,682 $965 $9,647

TOTAL COST: $8,688 $965 $9,654

Route I -59 ProjectDescription

RESURFACING ON I-59 FROM SOUTH OF THE SR-5 (US-11) INTERCHANGE (MP 96.00) TO THE JEFFERSON COUNTY LINE (100.867)

Type of Work RESURFACING

Project Length in Miles 9.734 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064222 IM I059 (390) PRELIMINARY ENGINEERING

RESURFACING

2016 $8 $1 $9

100064223 IM I059 (390) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2016 $11,193 $1,244 $12,437

TOTAL COST: $11,201 $1,245 $12,446

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

8 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 9: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route I -59 ProjectDescription

RESURFACE I-59 FROM GREENE COUNTY LINE TO N. OF SR-300 (HOLLEY SPRINGS LN) (PRIORITY #14)

Type of Work RESURFACING

Project Length in Miles 7.014 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049354 IMF I059 (356) CONSTRUCTION

RESURFACING

2016 $13,239 $1,471 $14,710

TOTAL COST: $13,239 $1,471 $14,710

Route I -59 ProjectDescription

GUIDE RAIL INSTALLATION ON I-59 FROM TUSCALOOSA COUNTY LINE TO .25 MI SOUTH OF SR-6 (US-82)(MCFARLAND BLVD)

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 35.302 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064197 HSIPF I059 () PRELIMINARY ENGINEERING

SAFETY IMPROVEMENTS

2019 $224 $25 $249

100060977 HSIPF I059 () CONSTRUCTION

SAFETY IMPROVEMENTS

2019 $1,219 $135 $1,355

TOTAL COST: $1,443 $160 $1,604

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

9 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 10: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route I -59 ProjectDescription

ADD LANES AND BRIDGE REPLACEMENT ON I-59 FROM .25 MI SOUTH OF SR-6(MCFARLAND BOULEVARD) (US-82) TO .75 MILE SOUTH OF BUTTERMILK ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 6.414 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059709 RPF-IMF-NHF I059 (387) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2017 $550 $138 $688

100059708 RPF-IMF-NHF I059 (387) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2017 $75,637 $14,628

$90,265

TOTAL COST: $76,188 $14,765

$90,953

Route NA- ProjectDescription

WIDEN AND IMPROVE PEDESTRIAN ACCESS 10TH AVENUE FROM 31ST STREET TO 15TH STREET IN TUSCALOOSA TO BE FUNDED BY HOUSING AND URBAN DEVELOPMENT (HUD)

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059446 HUD FUNDS & LOCAL FUNDS ()

CONSTRUCTION

RESURFACING

2019 $5,440 $1,360 $6,800

TOTAL COST: $5,440 $1,360 $6,800

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

10 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 11: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route SR-215 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-215 AT SR-6 (US-82) AND CR-26 (BEAR CREEK CUT-OFF ROAD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.520 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057990 STPAA-STPOA 0215 (501)

UTILITIES

INTERSECTION IMPROVEMENTS

2016 $183 $46 $229

TOTAL COST: $183 $46 $229

Route SR-297 ProjectDescription

SR-297 ROW CORRIDOR PRESERVATION TUSCALOOSA EAST BYPASS

Type of Work UNCLASSIFIED

Project Length in Miles 19.962 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060575 DESTP-NCPD 0297 (907)

PRELIMINARY ENGINEERING

UNCLASSIFIED 2019 $6 $2 $8

TOTAL COST: $6 $2 $8

Route SR-5 ProjectDescription

SR-5 BRG REMOVAL 5-63-2.3 AANDB OVER L AND N RR (ABAND), BIN 005799 AND 005800

Type of Work OVERPASS REMOVAL

Project Length in Miles 0.880 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057835 BR 0005 (540) UTILITIES

OVERPASS REMOVAL

2019 $65 $16 $81

TOTAL COST: $65 $16 $81

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

11 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 12: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route SR-6 ProjectDescription

INSTALLATION OF ADAPTIVE SIGNALS AND REMOVAL OF UNWARRANTED SIGNALS ON SR-6 (US-82; MCFARLAND BLVD) FROM 0.10 MI E. OF 26TH AVE (MP 46.13) TO SR-7 (US-11; SKYLAND BLVD) (MP 53.420)

Type of Work SIGNALIZATION

Project Length in Miles 10.306 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064053 NHF MR15 (900) UTILITIES

SIGNALIZATION 2016 $1,610 $403 $2,013

100064019 NHF MR15 (900) CONSTRUCTION

SIGNALIZATION 2016 $6,764 $1,691 $8,455

TOTAL COST: $8,374 $2,094 $10,468

Route SR-6 ProjectDescription

ACCESS MANAGEMENT ALONG SR-6 (US-82; MCFARLAND BLVD) FROM W. OF ROSE BLVD (MP 42.500) TO JUST EAST OF JUG FACTORY RD (MP 53.700)

Type of Work SIGNALIZATION

Project Length in Miles 11.200 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062358 NHF 0006 (560) UTILITIES

SIGNALIZATION 2019 $5,656 $1,414 $7,070

TOTAL COST: $5,656 $1,414 $7,070

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

12 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 13: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route SR-69 ProjectDescription

REALIGNMENT OF INTERSECTION SR-69 AT CR-62 (UNION CHAPEL RD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.080 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100053649 STPOA 0069 (536) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2017 $577 $144 $722

100053650 STPOA 0069 (536) UTILITIES

INTERSECTION IMPROVEMENTS

2018 $610 $152 $762

100053651 TRC-ST-063-069-013 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2018 $0 $1,022 $1,022

TOTAL COST: $1,187 $1,319 $2,506

Route SR-7 ProjectDescription

REPLACE BRIDGE (BIN 005140) ON SR-7 (US-11) OVER NORFOLK SOUTHERN RAILROAD (SUFF =12.5, STAT= SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.048 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055889 BR 0007 (546) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2017 $360 $90 $450

100055891 BR 0007 (546) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $124 $31 $155

100055892 BR 0007 (546) UTILITIES

BRIDGE REPLACEMENT

2019 $140 $35 $174

100055893 BR 0007 (546) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,214 $304 $1,518

TOTAL COST: $1,837 $459 $2,297

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

13 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Original

Page 14: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-NA ProjectDescription

MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK

Type of Work TURN LANES

Project Length in Miles 1.150 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065002 STPOA 6317 (250) PRELIMINARY ENGINEERING

TURN LANES 2017 $245 $61 $306

TOTAL COST: $245 $61 $306

Route I -59 ProjectDescription

I-59 ADDITIONAL LANES FROM SOUTH OF CR-1900 (BLACK WARRIOR PARKWAY) INTERCHANGE TO SR-6 (US-82) INTERCHANGE (MCFARLAND BLVD) GDBP BR

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 4.840 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064910 RP-IM-NH I059 (399) PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2017 $838 $182 $1,020

TOTAL COST: $838 $182 $1,020

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

14 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 1

Page 15: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route SR-6 ProjectDescription

ACCESS MANAGEMENT AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/MCFARLAND BLVD.) FROM ROSE BLVD. TO SR-69

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 4.282 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065113 NH 0006 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2019 $330 $82 $412

TOTAL COST: $330 $82 $412

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

15 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 1

Page 16: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route SR-6 ProjectDescription

ADDITIONAL LANES, ACCESS MANAGEMENT, AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/ MCFARLAND BLVD.) FROM WEST OF SR-69 TO RICE MINE ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065936 NHF 0006 (564) PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2016 $644 $161 $805

TOTAL COST: $644 $161 $805

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

16 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 10

Page 17: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route SR-215 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-215 AT SR-6 (US-82) AND CR-26 (BEAR CREEK CUT-OFF ROAD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.520 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057991 TRIC-ST-063-215-002 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2016 $0 $3,383 $3,383

TOTAL COST: $0 $3,383 $3,383

Route SR-6 ProjectDescription

WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD

Type of Work INTERCHANGE

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065855 NH 0006 () RIGHT OF WAY

INTERCHANGE

2019 $364 $91 $455

100065854 NH 0006 () UTILITIES

INTERCHANGE

2019 $495 $124 $618

TOTAL COST: $858 $215 $1,073

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

17 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 11

Page 18: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-66 ProjectDescription

ADDITIONAL LANES ON BEAR CREEK ROAD AND BEAR CREEK CUTOFF ROAD FROM SR-69 TO SR-215

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066303 STPAA 6316 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2019 $989 $247 $1,236

100066304 STPAA 6316 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $330 $82 $412

100066305 STPAA 6316 () UTILITIES

ADDITIONAL ROADWAY LANES

2019 $2,555 $639 $3,194

TOTAL COST: $3,874 $968 $4,842

Route SR-6 ProjectDescription

WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD

Type of Work INTERCHANGE

Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064404 TRC-ACAA64404 ATRP (004)

CONSTRUCTION

INTERCHANGE

2019 $7,257 $1,814 $9,072

TOTAL COST: $7,257 $1,814 $9,072

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

18 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 13

Page 19: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route I -59 ProjectDescription

RESURFACING I-59 FROM EAST OF EXIT 79 (MP 80.882) TO EAST OF EXIT 86 (MP 86.912)

Type of Work RESURFACING

Project Length in Miles 11.604 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066479 IM I059 (406) PRELIMINARY ENGINEERING

RESURFACING

2017 $225 $25 $250

100066481 IM I059 (406) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2018 $9,394 $1,044 $10,438

TOTAL COST: $9,619 $1,069 $10,688

Route SR-215 ProjectDescription

ADD LANES ON SR-215 FROM SR-216 TO SR-7 (US-11) AND REALIGN INTERSECTION WITH SR-7 (US-11)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 4.200 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066567 NH 0215 (504) PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2017 $785 $196 $982

100066568 NH 0215 (504) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $916 $229 $1,145

100066569 NH 0215 (504) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $899 $225 $1,124

TOTAL COST: $2,600 $650 $3,250

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

19 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 19

Page 20: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route I -59 ProjectDescription

ADD LANES AND BRIDGE REPLACEMENT ON I-59 FROM .25 MI SOUTH OF SR-6 (MCFARLAND BOULEVARD) (US-82) TO .75 MILE SOUTH OF BUTTERMILK ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.210 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066910 RPF-IMF-NHF I059 (387) UTILITIES

ADDITIONAL ROADWAY LANES

2017 $2,818 $545 $3,363

TOTAL COST: $2,818 $545 $3,363

Route SR-13 ProjectDescription

SR-13 (US-43) RESURFACING AND PAVEMENT REHABILITATION FROM THE NORTH END OF THE I-359 BRIDGE TO THE HUGH THOMAS BRIDGE

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.679 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054473 NH-RP 0013 (568) CONSTRUCTION

PAVEMENT REHABILITATION

2018 $14,923 $10,928

$25,851

TOTAL COST: $14,923 $10,928

$25,851

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

20 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 21

Page 21: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route CR-NA ProjectDescription

WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067467 STPOA 6314 () PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2019 $162 $40 $202

TOTAL COST: $162 $40 $202

Route SR-6 ProjectDescription

ADDITIONAL LANES, ACCESS MANAGEMENT, AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/ MCFARLAND BLVD.) FROM WEST OF SR-69 TO RICE MINE ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.000 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067680 TRC-ST-063-006-016 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $0 $253 $253

TOTAL COST: $0 $253 $253

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

21 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 30

Page 22: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route I -59 ProjectDescription

I20/59 ADDITIONAL LANES FROM APPROXIMATELY 1300FT SOUTH OF THE 3RD AVENUE OVERPASS TO APPROXIMATELY 1650FT SOUTH OF THE SR-6(US-82) (MCFARLAND BLVD) INTERCHANGE GRADE, DRAIN, BASE, PAVE, AND SIGNING

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 2.500 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039473 IM-NH I059 (399) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $3,858 $923 $4,780

TOTAL COST: $3,858 $923 $4,780

Route SR-69 ProjectDescription

SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 2.860 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057985 STPAAF 0069 (540) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $3,798 $949 $4,747

100057986 STPAAF 0069 (540) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $1,648 $412 $2,061

TOTAL COST: $5,446 $1,362 $6,808

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

22 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 36

Page 23: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route SR-6 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-6 (US-82 / MCFARLAND BOULEVARD) AT SR-69

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.410 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068588 NH 0006 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2019 $121 $30 $152

TOTAL COST: $121 $30 $152

Route SR-69 ProjectDescription

SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.430 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057987 STPAAF 0069 (540) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $41,091 $10,273

$51,364

TOTAL COST: $41,091 $10,273

$51,364

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

23 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 38

Page 24: 10/18/2018 ALABAMA DEPARTMENT OF TRANSPORTATION 1 …cpmsapps.dot.state.al.us/OfficeEngineer/ProjectReports/... · 2018-10-18 · BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION

Route SR-7 ProjectDescription

ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION WITH SR-5

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 20.760 Urban Area TUSCALOOSA COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068754 STPAA 0007 (549) PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2018 $800 $200 $1,000

100068755 STPAA 0007 (549) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $4,848 $1,212 $6,060

100068756 STPAA 0007 (549) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $4,848 $1,212 $6,060

TOTAL COST: $10,496 $2,624 $13,120

11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

24 of 24

COUNTY HIGHWAY PROJECTS - TUSCALOOSA

STIP PLAN: 2016 - Amendment # 38