Route CR-115 ProjectDescription
BRIDGE REPLACEMENT CR-115 (TRAWEEK ROAD) OVER BINION CREEK BIN# 12089
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059617 ACBRZ59617 ATRP (007)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $938 $235 $1,173
TOTAL COST: $938 $235 $1,173
Route CR-124 ProjectDescription
BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK BIN# 14309
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059618 ACBRZ59618 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $383 $96 $479
TOTAL COST: $383 $96 $479
Route CR-124 ProjectDescription
BRIDGE REPLACEMENT CR-124 (OLD FAYETTE ROAD) OVER AN UNNAMED TRIBUTARY TO BINION CREEK BIN#12282
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059619 ACBRZ59619 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $241 $60 $302
TOTAL COST: $241 $60 $302
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
1 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route CR-1358 ProjectDescription
BRIDGE REPLACEMENT ON CR-1358 (HOLMAN CHURCH ROAD) OVER KANSAS CITY SOUTHERN RAILROAD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059621 ACBRZ59621 ATRP (007)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $694 $173 $867
TOTAL COST: $694 $173 $867
Route CR-140 ProjectDescription
RESURFACING AND STRIPING ON CR-140 FROM PIKENS COUNTY LINE TO DOCKERY ROAD
Type of Work RESURFACING
Project Length in Miles 9.200 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059431 ACOA59431 ATRP (002) CONSTRUCTION
RESURFACING
2016 $1,573 $393 $1,966
TOTAL COST: $1,573 $393 $1,966
Route CR-140 ProjectDescription
RESURFACING AND STRIPING ON CR-140 FROM DOCKERY ROAD TO SR-6 (US-82)
Type of Work RESURFACING
Project Length in Miles 2.600 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061866 ACOA61866 ATRP (017) CONSTRUCTION
RESURFACING
2016 $431 $108 $539
TOTAL COST: $431 $108 $539
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
2 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route CR-155 ProjectDescription
BRIDGE REPLACEMENT ON CR-155 (SANDY ROAD) OVER BIG SANDY CREEK BIN # 11878
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058501 ACBRZ58501 ATRP (015)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $449 $112 $561
TOTAL COST: $449 $112 $561
Route CR-59 ProjectDescription
RESURFACE CR-59 (LOCK 17 ROAD) FROM NORTH CITY LIMITS OF BROOKWOOD TO GROUNDHOG ROAD
Type of Work RESURFACING
Project Length in Miles 11.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059432 ACOA59432 ATRP (002) CONSTRUCTION
RESURFACING
2017 $3,328 $832 $4,160
TOTAL COST: $3,328 $832 $4,160
Route CR-826 ProjectDescription
BRIDGE REPLACEMENT ON CR-826 (MALONE CREEK ROAD) OVER MALONE MILL CREEK BIN# 13817
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059616 ACBRZ59616 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $404 $101 $505
TOTAL COST: $404 $101 $505
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
3 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route CR-85 ProjectDescription
PATCHING, RESURFACING AND STRIPING ON DAFFRON ROAD (CR-85) FROM SR-6 (US-82) TO HARGROVE ROAD
Type of Work RESURFACING
Project Length in Miles 2.560 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061870 ACOA61870 ATRP (017) CONSTRUCTION
RESURFACING
2016 $446 $112 $558
TOTAL COST: $446 $112 $558
Route CR-NA ProjectDescription
ROADWAY IMPROVEMENTS ON HARGROVE ROAD FROM 10TH AVENUE TO HACKBERRY LANE IN THE CITY OF TUSCALOOSA
Type of Work RESURFACING
Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059443 ACOA59443 ATRP (017) CONSTRUCTION
RESURFACING
2018 $1,908 $587 $2,495
TOTAL COST: $1,908 $587 $2,495
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
4 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
ADDITIONAL LANE (GRADE, DRAIN, BASE AND PAVE) AND RESURFACING OF OLD BIRMINGHAM HIGHWAY FROM SOUTH OF R.O.W. LIMITS OF I-20/59 INTERCHANGE TO THE JEFFERSON COUNTY LINE
Type of Work RESURFACING
Project Length in Miles 0.565 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061869 ACOA61869 ATRP (016) CONSTRUCTION
RESURFACING
2017 $684 $171 $856
TOTAL COST: $684 $171 $856
Route CR-NA ProjectDescription
PATCHING, RESURFACING AND STRIPING ON CR-95 (OLD GREENSBORO ROAD) FROM H.B. JOHNSTON ROAD TO MAXWELL LOOP ROAD
Type of Work RESURFACING
Project Length in Miles 5.340 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061872 ACOA61872 ATRP (017) CONSTRUCTION
RESURFACING
2017 $724 $181 $904
TOTAL COST: $724 $181 $904
Route CR-NA ProjectDescription
WIDENING OF FOSTERS FERRY ROAD FROM JOE MALISHAM PARKWAY TO 29TH STREET
Type of Work RESURFACING
Project Length in Miles 1.365 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061873 ACOA61873 ATRP (017) CONSTRUCTION
RESURFACING
2019 $1,491 $373 $1,864
TOTAL COST: $1,491 $373 $1,864
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
5 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS ON WATERMELON ROAD AT THE INTERSECTION OF UNION CHAPEL ROAD - CITY OF TUSCALOOSA
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061875 ACOA61875 ATRP (017) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $642 $161 $803
TOTAL COST: $642 $161 $803
Route CR-NA ProjectDescription
MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK
Type of Work TURN LANES
Project Length in Miles 1.150 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100008464 STPOA 6317 (250) RIGHT OF WAY
TURN LANES 2019 $901 $225 $1,127
TOTAL COST: $901 $225 $1,127
Route CR-NA ProjectDescription
M-CLASS BOULEVARD EXTENSION WITH OVERPASS ACROSS SR-7 (US-11) AND NORFOLK SOUTHERN RR TO TINGLE TANGLE ROAD.
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061878 ACOA61878F ATRP (017)
CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2017 $7,116 $1,779 $8,895
TOTAL COST: $7,116 $1,779 $8,895
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
6 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100008465 STPOA 6314 () RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2019 $451 $113 $563
TOTAL COST: $451 $113 $563
Route I -59 ProjectDescription
RESURFACING ON I-59 FROM NORTH OF BROOKWOOD INTERCHANGE (MP 86.63) TO SOUTH OF CR-9 (MP 91.76)
Type of Work RESURFACING
Project Length in Miles 10.260 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064217 IM I059 (391) PRELIMINARY ENGINEERING
RESURFACING
2016 $5 $1 $6
100064219 IM I059 (391) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2016 $4,335 $482 $4,817
TOTAL COST: $4,341 $482 $4,823
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
7 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
RESURFACING ON I-59 FROM SOUTH OF CR-9(MP 91.76) TO SOUTH OF SR-5 (US-11)INTERCHANGE (MP 96.00)
Type of Work RESURFACING
Project Length in Miles 8.480 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064220 IM I059 (389) PRELIMINARY ENGINEERING
RESURFACING
2016 $6 $1 $7
100064221 IM I059 (389) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2016 $8,682 $965 $9,647
TOTAL COST: $8,688 $965 $9,654
Route I -59 ProjectDescription
RESURFACING ON I-59 FROM SOUTH OF THE SR-5 (US-11) INTERCHANGE (MP 96.00) TO THE JEFFERSON COUNTY LINE (100.867)
Type of Work RESURFACING
Project Length in Miles 9.734 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064222 IM I059 (390) PRELIMINARY ENGINEERING
RESURFACING
2016 $8 $1 $9
100064223 IM I059 (390) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2016 $11,193 $1,244 $12,437
TOTAL COST: $11,201 $1,245 $12,446
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
8 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
RESURFACE I-59 FROM GREENE COUNTY LINE TO N. OF SR-300 (HOLLEY SPRINGS LN) (PRIORITY #14)
Type of Work RESURFACING
Project Length in Miles 7.014 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049354 IMF I059 (356) CONSTRUCTION
RESURFACING
2016 $13,239 $1,471 $14,710
TOTAL COST: $13,239 $1,471 $14,710
Route I -59 ProjectDescription
GUIDE RAIL INSTALLATION ON I-59 FROM TUSCALOOSA COUNTY LINE TO .25 MI SOUTH OF SR-6 (US-82)(MCFARLAND BLVD)
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 35.302 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064197 HSIPF I059 () PRELIMINARY ENGINEERING
SAFETY IMPROVEMENTS
2019 $224 $25 $249
100060977 HSIPF I059 () CONSTRUCTION
SAFETY IMPROVEMENTS
2019 $1,219 $135 $1,355
TOTAL COST: $1,443 $160 $1,604
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
9 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
ADD LANES AND BRIDGE REPLACEMENT ON I-59 FROM .25 MI SOUTH OF SR-6(MCFARLAND BOULEVARD) (US-82) TO .75 MILE SOUTH OF BUTTERMILK ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 6.414 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059709 RPF-IMF-NHF I059 (387) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2017 $550 $138 $688
100059708 RPF-IMF-NHF I059 (387) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2017 $75,637 $14,628
$90,265
TOTAL COST: $76,188 $14,765
$90,953
Route NA- ProjectDescription
WIDEN AND IMPROVE PEDESTRIAN ACCESS 10TH AVENUE FROM 31ST STREET TO 15TH STREET IN TUSCALOOSA TO BE FUNDED BY HOUSING AND URBAN DEVELOPMENT (HUD)
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059446 HUD FUNDS & LOCAL FUNDS ()
CONSTRUCTION
RESURFACING
2019 $5,440 $1,360 $6,800
TOTAL COST: $5,440 $1,360 $6,800
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
10 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route SR-215 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-215 AT SR-6 (US-82) AND CR-26 (BEAR CREEK CUT-OFF ROAD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.520 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057990 STPAA-STPOA 0215 (501)
UTILITIES
INTERSECTION IMPROVEMENTS
2016 $183 $46 $229
TOTAL COST: $183 $46 $229
Route SR-297 ProjectDescription
SR-297 ROW CORRIDOR PRESERVATION TUSCALOOSA EAST BYPASS
Type of Work UNCLASSIFIED
Project Length in Miles 19.962 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060575 DESTP-NCPD 0297 (907)
PRELIMINARY ENGINEERING
UNCLASSIFIED 2019 $6 $2 $8
TOTAL COST: $6 $2 $8
Route SR-5 ProjectDescription
SR-5 BRG REMOVAL 5-63-2.3 AANDB OVER L AND N RR (ABAND), BIN 005799 AND 005800
Type of Work OVERPASS REMOVAL
Project Length in Miles 0.880 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057835 BR 0005 (540) UTILITIES
OVERPASS REMOVAL
2019 $65 $16 $81
TOTAL COST: $65 $16 $81
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
11 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route SR-6 ProjectDescription
INSTALLATION OF ADAPTIVE SIGNALS AND REMOVAL OF UNWARRANTED SIGNALS ON SR-6 (US-82; MCFARLAND BLVD) FROM 0.10 MI E. OF 26TH AVE (MP 46.13) TO SR-7 (US-11; SKYLAND BLVD) (MP 53.420)
Type of Work SIGNALIZATION
Project Length in Miles 10.306 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064053 NHF MR15 (900) UTILITIES
SIGNALIZATION 2016 $1,610 $403 $2,013
100064019 NHF MR15 (900) CONSTRUCTION
SIGNALIZATION 2016 $6,764 $1,691 $8,455
TOTAL COST: $8,374 $2,094 $10,468
Route SR-6 ProjectDescription
ACCESS MANAGEMENT ALONG SR-6 (US-82; MCFARLAND BLVD) FROM W. OF ROSE BLVD (MP 42.500) TO JUST EAST OF JUG FACTORY RD (MP 53.700)
Type of Work SIGNALIZATION
Project Length in Miles 11.200 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062358 NHF 0006 (560) UTILITIES
SIGNALIZATION 2019 $5,656 $1,414 $7,070
TOTAL COST: $5,656 $1,414 $7,070
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
12 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route SR-69 ProjectDescription
REALIGNMENT OF INTERSECTION SR-69 AT CR-62 (UNION CHAPEL RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.080 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053649 STPOA 0069 (536) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2017 $577 $144 $722
100053650 STPOA 0069 (536) UTILITIES
INTERSECTION IMPROVEMENTS
2018 $610 $152 $762
100053651 TRC-ST-063-069-013 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2018 $0 $1,022 $1,022
TOTAL COST: $1,187 $1,319 $2,506
Route SR-7 ProjectDescription
REPLACE BRIDGE (BIN 005140) ON SR-7 (US-11) OVER NORFOLK SOUTHERN RAILROAD (SUFF =12.5, STAT= SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.048 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055889 BR 0007 (546) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2017 $360 $90 $450
100055891 BR 0007 (546) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $124 $31 $155
100055892 BR 0007 (546) UTILITIES
BRIDGE REPLACEMENT
2019 $140 $35 $174
100055893 BR 0007 (546) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,214 $304 $1,518
TOTAL COST: $1,837 $459 $2,297
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
13 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
MARTIN LUTHER KING BOULEVARD FROM SNOWS MILL AVENUE TO SR-69, ADD TURN LANES, REALIGNMENT OF INTERSECTIONS, SIDEWALKS, LIGHTING, AND BRIDGE REPLACEMENT OVER TWO MILE CREEK
Type of Work TURN LANES
Project Length in Miles 1.150 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065002 STPOA 6317 (250) PRELIMINARY ENGINEERING
TURN LANES 2017 $245 $61 $306
TOTAL COST: $245 $61 $306
Route I -59 ProjectDescription
I-59 ADDITIONAL LANES FROM SOUTH OF CR-1900 (BLACK WARRIOR PARKWAY) INTERCHANGE TO SR-6 (US-82) INTERCHANGE (MCFARLAND BLVD) GDBP BR
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 4.840 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064910 RP-IM-NH I059 (399) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2017 $838 $182 $1,020
TOTAL COST: $838 $182 $1,020
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
14 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 1
Route SR-6 ProjectDescription
ACCESS MANAGEMENT AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/MCFARLAND BLVD.) FROM ROSE BLVD. TO SR-69
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 4.282 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065113 NH 0006 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2019 $330 $82 $412
TOTAL COST: $330 $82 $412
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
15 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 1
Route SR-6 ProjectDescription
ADDITIONAL LANES, ACCESS MANAGEMENT, AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/ MCFARLAND BLVD.) FROM WEST OF SR-69 TO RICE MINE ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065936 NHF 0006 (564) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2016 $644 $161 $805
TOTAL COST: $644 $161 $805
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
16 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 10
Route SR-215 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-215 AT SR-6 (US-82) AND CR-26 (BEAR CREEK CUT-OFF ROAD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.520 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057991 TRIC-ST-063-215-002 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2016 $0 $3,383 $3,383
TOTAL COST: $0 $3,383 $3,383
Route SR-6 ProjectDescription
WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD
Type of Work INTERCHANGE
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065855 NH 0006 () RIGHT OF WAY
INTERCHANGE
2019 $364 $91 $455
100065854 NH 0006 () UTILITIES
INTERCHANGE
2019 $495 $124 $618
TOTAL COST: $858 $215 $1,073
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
17 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 11
Route CR-66 ProjectDescription
ADDITIONAL LANES ON BEAR CREEK ROAD AND BEAR CREEK CUTOFF ROAD FROM SR-69 TO SR-215
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066303 STPAA 6316 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2019 $989 $247 $1,236
100066304 STPAA 6316 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $330 $82 $412
100066305 STPAA 6316 () UTILITIES
ADDITIONAL ROADWAY LANES
2019 $2,555 $639 $3,194
TOTAL COST: $3,874 $968 $4,842
Route SR-6 ProjectDescription
WIDENING AND INTERCHANGE IMPROVEMENTS ON SR-6 (US-82; MCFARLAND BOULEVARD) AT UNIVERSITY BOULEVARD
Type of Work INTERCHANGE
Project Length in Miles 0.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064404 TRC-ACAA64404 ATRP (004)
CONSTRUCTION
INTERCHANGE
2019 $7,257 $1,814 $9,072
TOTAL COST: $7,257 $1,814 $9,072
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
18 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 13
Route I -59 ProjectDescription
RESURFACING I-59 FROM EAST OF EXIT 79 (MP 80.882) TO EAST OF EXIT 86 (MP 86.912)
Type of Work RESURFACING
Project Length in Miles 11.604 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066479 IM I059 (406) PRELIMINARY ENGINEERING
RESURFACING
2017 $225 $25 $250
100066481 IM I059 (406) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2018 $9,394 $1,044 $10,438
TOTAL COST: $9,619 $1,069 $10,688
Route SR-215 ProjectDescription
ADD LANES ON SR-215 FROM SR-216 TO SR-7 (US-11) AND REALIGN INTERSECTION WITH SR-7 (US-11)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 4.200 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066567 NH 0215 (504) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2017 $785 $196 $982
100066568 NH 0215 (504) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $916 $229 $1,145
100066569 NH 0215 (504) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $899 $225 $1,124
TOTAL COST: $2,600 $650 $3,250
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
19 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 19
Route I -59 ProjectDescription
ADD LANES AND BRIDGE REPLACEMENT ON I-59 FROM .25 MI SOUTH OF SR-6 (MCFARLAND BOULEVARD) (US-82) TO .75 MILE SOUTH OF BUTTERMILK ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.210 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066910 RPF-IMF-NHF I059 (387) UTILITIES
ADDITIONAL ROADWAY LANES
2017 $2,818 $545 $3,363
TOTAL COST: $2,818 $545 $3,363
Route SR-13 ProjectDescription
SR-13 (US-43) RESURFACING AND PAVEMENT REHABILITATION FROM THE NORTH END OF THE I-359 BRIDGE TO THE HUGH THOMAS BRIDGE
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.679 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054473 NH-RP 0013 (568) CONSTRUCTION
PAVEMENT REHABILITATION
2018 $14,923 $10,928
$25,851
TOTAL COST: $14,923 $10,928
$25,851
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
20 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 21
Route CR-NA ProjectDescription
WIDENING, STRIPING AND OTHER IMPROVEMENTS ON WATERMELON ROAD FROM SR-6 (US-82) TO SNOWS MILL AVENUE SPONSOR: CITY OF TUSCALOOSA
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.500 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067467 STPOA 6314 () PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2019 $162 $40 $202
TOTAL COST: $162 $40 $202
Route SR-6 ProjectDescription
ADDITIONAL LANES, ACCESS MANAGEMENT, AND BICYCLE/PEDESTRIAN IMPROVEMENTS ALONG SR-6 (US-82/ MCFARLAND BLVD.) FROM WEST OF SR-69 TO RICE MINE ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.000 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067680 TRC-ST-063-006-016 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $0 $253 $253
TOTAL COST: $0 $253 $253
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
21 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 30
Route I -59 ProjectDescription
I20/59 ADDITIONAL LANES FROM APPROXIMATELY 1300FT SOUTH OF THE 3RD AVENUE OVERPASS TO APPROXIMATELY 1650FT SOUTH OF THE SR-6(US-82) (MCFARLAND BLVD) INTERCHANGE GRADE, DRAIN, BASE, PAVE, AND SIGNING
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 2.500 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039473 IM-NH I059 (399) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2019 $3,858 $923 $4,780
TOTAL COST: $3,858 $923 $4,780
Route SR-69 ProjectDescription
SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 2.860 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057985 STPAAF 0069 (540) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $3,798 $949 $4,747
100057986 STPAAF 0069 (540) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $1,648 $412 $2,061
TOTAL COST: $5,446 $1,362 $6,808
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
22 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 36
Route SR-6 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-6 (US-82 / MCFARLAND BOULEVARD) AT SR-69
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.410 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068588 NH 0006 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2019 $121 $30 $152
TOTAL COST: $121 $30 $152
Route SR-69 ProjectDescription
SR-69 INTERSECTION IMPROVEMENTS FROM PLANTATION ROAD TO THE I-59 OVERPASS (INCLUDING THE ALABAMA SOUTHERN RAILROAD OVERPASS)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.430 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057987 STPAAF 0069 (540) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $41,091 $10,273
$51,364
TOTAL COST: $41,091 $10,273
$51,364
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
23 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 38
Route SR-7 ProjectDescription
ADD LANES ON SR-7 (US-11) FROM DAIMLER BENZ BOULEVARD TO THE INTERSECTION WITH SR-5
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 20.760 Urban Area TUSCALOOSA COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068754 STPAA 0007 (549) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2018 $800 $200 $1,000
100068755 STPAA 0007 (549) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $4,848 $1,212 $6,060
100068756 STPAA 0007 (549) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $4,848 $1,212 $6,060
TOTAL COST: $10,496 $2,624 $13,120
11/8/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
24 of 24
COUNTY HIGHWAY PROJECTS - TUSCALOOSA
STIP PLAN: 2016 - Amendment # 38