100g data center interconnects - ethernet alliance · lightcounting market research on high-speed...
TRANSCRIPT
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
100G Data Center Interconnects
Brad SmithVP & Chief Analyst
Data Center Interconnects
[email protected](408) 813-4345
3/12/2012 1
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
Waiting for New ServersWaiting for 10GBASE-T
Preparing for the Exa Flood of Data
3/12/2012 2
State of the Data Center Business
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
State of the Industry• Data centers are largely very cost sensitive; governs all
decision making– Decision algorithm (Cost of new product) / Server cost– Buy 100G LR4 transceiver OR 8 servers?
• Average and large data center needs 4-5G, not 10G yet• Getting ready for 10G and 40G QSFP• Most popular optical transceiver = 1G SFP+ & 10G SFP+
• Top-of-rack & End-of-row switches are 10G SFP+ & 40G QSFPready but ….
• Entire industry is “Waiting for new Romley servers”• And 10GBASE-T low-power 28-nm parts
3/12/2012 3
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
.
Intel’s Tick-Tock ModelSets the Clock for Data Center Upgrades
Tick= Architecture upgrade ; Tock= Silicon Shrink
3/12/2012 4
Delayed by ~8 months (Leap year effect?)Data center spending delayed by 8 months
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
MPUs – Key Data center Driver
• 8cores, 16 threads (AMD 16 Cores)• Increase DRAM support 128G to 768G+• PCI Express 3.0 faster I/O• Energy efficient• Bottom line: 80 percent more performance than the
previous generation Xeon 5600 MPUs
3/12/2012 5
X540 Lan-on-motherboard (LOM) comes in at only 25% ofthe cost of an SFP+ fiber per port deployment.
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
Microprocessors
3/12/2012 6
2-4 Cores 10-16 Cores 40-50 Cores
2 MPUs/Server128GBytes DRAMPCIe Gen2 (8 lanes @5G/lane
? MPUs/Server1T+ Bytes DRAMPCIe Gen3 (8G/lane)ARM, INTEL, AMD
4 MPUs/Server768G Bytes DRAMPCIe Gen3 (8/16 lanes @8G/lane
?Data centerin a server
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
I/O for Interconnects• Virtualization software
– Sends jobs to non busy MPUs– Increases utilization from 20% to 90%
• I/O increases: Data Direct I/0 - transfer of data directly to from thenetwork interface and cache, bypassing main memory
• PCI Express Gen 2 5G 8b/10b and 8 lanes• PCI Express Gen 3 8G 128/132 and 8-16 lanes• “66 GB/s in tested I/O bandwidth”
• Bottom line: ~300 % faster I/O bandwidth!
3/12/2012 7
20% 90%
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
3/12/2012 8
Traditional Data Center Reality
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
The Yellow Wall
3/12/2012 9
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
Most High-Speed InterconnectsApproaching the “10G” Speed Barrier
Most High-Speed InterconnectsApproaching the “10G” Speed Barrier
One of the biggest technical transitions in the communicationsindustry and huge opportunities for photonic interconnects
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
Major Data Center ProtocolsAll Hit 10Gbps barrier
• Direct Attach: 10G = 7m; 14G=3m; 25G will need active DAC?• 10GBASE-T needs microprocessor sized PHY to hit 10G
• InfiniBand: 10G moving to 14G FDR & 28G EDR• Ethernet: 10G moving to 25G• Fibre Channel: 8G moving to 14G & 28G• SAS: 6G moving to 12G and 24G• PCI Express: Gen2 5G moving to Gen3 8G & Gen4 16G
• All pass ~10Gbps where copper has issues• Reaches are becoming longer
• Optical value proposition = high data rate + long reach• Many data center protocols transitioning fro Copper-to-Optical
3/12/2012 11
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
.3/12/2012 12
.primecaretech.com
Mega Data Center
Link this rack
To this rack
400-600 metes
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
Data center Optics
• Pluggable transceivers
• Active Optical Cables
• Embedded Optical Modules
• FTTChip– Mez cards– Chip/Optical
3/12/2012 13
Finisar
Reflex/Fulcrum
Avago
More high-speed opticswithin and between racks
will push more traffic to 40G/100Guplinks
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
100G
• Lots of discussion and excitement• Google & 10x10MSA woke everyone up to the
coming exa-flood of data
• What customers want: inexpensive, QSFPsolutions (or CFP/4), dual and parallel fibers
• Waiting for 25G VCSELS for short reach• Waiting for LR4 prices to come down
3/12/2012 14
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
Why 100G Needed in Data Centers100G Driving Forces
• 48 – 60 Servers/ rack• 10Gbps server uplinks
• 480G -600G problem!
• Will demand 100G uplinks
• Timing: Romley Q2/2012 : Volume 2H/2012
• ~ 2H/ 2013 need for 100G transceivers climb rapidly
3/12/2012 15
.
LIGHTCOUNTINGMarket Research on High-Speed InterconnectsDatacom, Telecom, CATV, FTTX, Consumer markets © Copyright 2012 LightCounting LLC All material proprietary and confidential.
3/12/2012 16
Our Website:www.lightcounting.com
Headquarters Location:
858 West Park StreetEugene, OR 97401Tel: 408.962.4851Email: [email protected]
.