Page 1: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

1

Workshop I - Introduction:

“Monitoring and evaluation (“M+E”) financial engineering instruments for SMEs”

5th Plenary Meeting JEREMIE Networking Platform

Brussels, 20 May 2011

DG REGIO D3 - Financial engineering, major projects

Joanna Mouliou

Page 2: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

2

• Because of the specific nature of financial engineering instruments,

• Because MS and regions are gathering more experience with JEREMIE financial instruments and they come up with more specific demands,

• Because certain issues discussed in COCOF meetings require a specific follow up,

• Because you asked for it.

Why a New Structure of the JEREMIE Networking Platform

meeting?

Page 3: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

3

What to achieve with

the New Structure of the JEREMIE

N.P. meeting?

To built up a strong collaboration with you

To adapt a tailor made structure

according to your needs

(agree with you the subjects for the meetings –

tailor made meetings)

To increase the number of subjects

to be discussed with two or more

workshops running in parallel.

Page 4: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

4

What to achieve with

the New Structure of the JEREMIE

N.P. meeting?

To increase the added value of the meetings as you can form the composition of the

groups of participants (workshops with

mixed participants from Managing

Authorities, Holding Funds and/or other

Financial Intermediaries, upon

your request)

To encourage your active

participation in round table

discussions (you will be the main

actors of meetings with presentations

and exchange of ideas with your

peers)

Page 5: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

5

Why "M+E" as the main topic of this meeting?

• Fifth Report on economic, social & territorial cohesion & EU Budget review / Growing emphasis on performance orientation of Cohesion Policy / through: "M+E" tools

• Council Regulation (EC) No 1083/2006:– Annual Implementation Report (AIR) for each

programme– National Strategic Reports (NSR)s in 2009 & 2012 – ECs Strategic Reports in 2010-2013

• COCOF – Monitoring Template:EC: to consolidate aggregate monitoring information provided by M.As for: global assessment of the performance of FEIs supported under Structural Funds supported Programmes.

Page 6: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

6

Monitoring & Evaluation are two different processes

• Monitoring observes and reports on whether the desired outputs are occurring and whether implementation is on track

• It is an observation of the current situation (achieved outputs, progress towards intended results).

Example: I want to know how many SMEs are now financed through JEREMIE in HU with the aim to support innovation.

Page 7: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

7

Monitoring & Evaluation are two different processes

MONITORING:• OPs under Cohesion Policy are

implemented under multilevel governance (different actors in the system).

• The Commission needs to aggregate information about Financial Engineering Instruments. Reason for “Monitoring Templates report”.

• Need to establish common indicators to facilitate dialogue and transparency.

Page 8: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

8

Monitoring & Evaluation are two different processes

EVALUATION (an issue to discuss and explore at the next meeting):

- is an inquiry into the non observable.- it answers the following two questions:- Does it work? (results occurred

because of a public intervention, or because of external factors?)

- If it does / doesn’t work, why?

Page 9: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

9

“MONITORING TEMPLATE REPORT”

• The specific nature of financial engineering instruments requires a specific "M+E" process,

• In the absence of formal reporting obligations, MAs have been requested to report annually on FEI implementation on a voluntary basis (Annex II, COCOF 10-0014-04-EN),

– Submission of reports by MS by 31 May 2011,

– Analysis of submitted reports in June/July 2011,

– Dissemination of key findings to MS/MAs around September 2011.

Page 10: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

10

“MONITORING TEMPLATE REPORT”

• Provide MAs with a standard tool for the monitoring of FEIs at various levels

• Report on – Financial progress– Outputs delivered (achievements

against output indicators)– Progress towards desired results

(changes in result indicators)

Page 11: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

11

Unit Name

Number Number of SMEs receiving financial support in a form of loans / venture capital

Number Number of SMEs receiving non-financial support

Number Number of new SMEs supported

EUR Private / Public investment matching EU support for SMEs (loans, venture capital)

Number Number of reported jobs created in assisted SMEs

A clear definition for each Indicator is needed

Examples of output Financial Indicators for Productive

Investment in SMEs

Page 12: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

12

Speakers

Krisztina SZABO

EDOP MA, NDA Hungary – M.A.

Pascal VOULTON SOFIMAC Partners –

Auvergne – F.I.

Álvaro NAVARRO

IDEA de Andalusia, Spain – H.F.

Workshop "M+E"

FEIs for SMEs

Jurgita KARCIAUSKAITE,

Ministry of Finance

Lithuania – M.A.

Page 13: 1 Workshop I - Introduction: Monitoring and evaluation (M+E) financial engineering instruments for SMEs 5 th Plenary Meeting JEREMIE Networking Platform

13

Thank you for your attention

For further information:

Website:

http://jeremie.europa.eu

Email:

[email protected]

DG REGIO – Unit D3 – Financial engineering, major projects