1. water treatment plant termoenergo inŽenjering · 2015. 4. 16. · plant “visnjicka banja” -...
TRANSCRIPT
1. WATER TREATMENT PLANT
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (year 2003 – 2007.)
TECHNICAL STUDY WITH ECONOMIC ELEMENTS FOR
WATER TREATMENT PLANT (REVERSE OSMOSIS)
TENDER DOCUMENTATION FOR NEW WATER
TREATMENT PLANT AND MIXED BED EXCHANGERS
WTP – DETAILED DESIGN FOR PUMS AND
CONCOMITANT INSTALATIONS REPLACEMENT
WTP – BASIC DESIGN FOR NEW WATER TREATMENT
PLANT BASED ON REVERSE OSMOIS
WTP – AS BUILT DESIGN OF WATER TREATMENT
PLANT
DETAILED DESIGN OF MIXED BED EXCHANGERS
INSTALATION FOR DEMI WATER POLISHING
- WTP IN HEATING PLANT “DUNAV”
CHEMICAL INDUSTRY PANČEVO- “PETROHEMIJA PANČEVO” (year 1995, 2008.)
WATER TREATMENT PLANT - DETAILED DESIGN OF
EXPANSION AND RECONSTRUCTION
2. CITY DISTRICT HEATING
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
BELGRADE DISTRICT HEATING SYSTEM (year 2006 – 2009.)
- BASIC AND DETAILED DESIGN OF RECONSTRUCTION
OF HEATING PLANT “KONJARNIK”
- BASIC DESIGN AND FEASIBILITY STUDY OF HEATING
PLANT “VISNJICKA BANJA”
- DETAILED DESIGN OF PUMPING STATION IN
MILESEVSKA NO 38 STREET
- BASIC DESIGN WITH FEASIBILITY STUDY FOR
RECONSTRUCTION OF HEATING PLANT “ZEMUN”
- DETAILED AND BASIC DESIGN OF PUMPING STATION
PPS1 IN BLOCK 38
- DETAILED AND BASIC DESIGN OF PUMPING STATION
PPS2 IN BLOCK 28
DISTRICT HEATING OF ZAJECAR CITY (year 2007 – 2008.)
- CONCEPT DESIGN OF THE WHOLE ZAJECAR
- GENERAL DESIGN OF THE WHOLE ZAJECAR
- DETAILED DESIGN OF THE WHOLE ZAJECAR
- HEATING PLANT 3 X 16 MW (ENGINEERING)
- HEATING PLANT 3 X 10 MW
- STRATEGIC DEVELOPMENT PLAN
VRANJE - DISTRICT HEATING IN BLOCK 47 (year 2006.)
- BOILERHOUSE WITH STACK AND HEAVY FUEL OIL TANK
FARM
- DISTRIBUTION NETWORK FOR BLOCK 47
LOZNICA – DISTRICT HEATING FROM VISCOSE PLANT (year 2005.)
- TECHNICAL STUDY ON TUNING OF PRIMARY NETWORK
AND SUBSTATIONS
- TECHNICAL REVISION OF DESIGNS FOR
RECONSTRUCTION AND MODERNIZATION OF BOILERS
NO.1,2,3 IN POWERPLANT "VISKOZA"
- DETAILED DESIGNS FOR ERRECTION AND
CONNECTION OF BOILER NO.1
DISTRICT HEATING OF SREMSKA MITROVICA CITY (year 2000, 2009.)
DETAILED DESIGN OF DISTRICT HEATING SYSTEM,
MAIN HOTWATER PIPELINE AND BRANCH SECTIONS
TECHNICAL INVESTMENT DOCUMENTATION FOR MAIN
HOTWATER PIPELINE AND BLOCK NETWORK
DETAILED DESIGN PROJECT FOR RECONSTRUCTION
OF PUMPING/HEAT EXCHANGE STATION
OBRENOVAC-ZABREŽJE DISTRICT HEATING (year 1998.)
- BASIC DESIGNS FOR OBRENOVAC-ZABREŽJE HEATING
- DETAILED DESIGNS FOR OBRENOVAC-ZABREŽJE
HEATING
PLJEVLJA DISTRICT HEATING FROM POWERPLANT PLJEVLJA (year 1996.)
- BASIC CONCEPT SOLUTION FOR PLJEVLJA HEATING
- DETAILED DESIGNS FOR PLJEVLJA DISTRICT HEATING
- DETAILED DESIGNS FOR DISTRIBUTION NETWORK
- DETAILED MECHANICAL DESIGN OF PUMP STATION
(REV.A)
- DETAILED DESIGN FOR MEASURING AND CONTROL OF
PUMP AND EXCHANGER STATION
ŽUPSKI ALEKSANDROVAC – DISTRICT HEATING (year 1994.)
- BASIC DESIGN EXPANSION OF EXISTING BOILERHOUSE
"VINO ŽUPA" WITH 2 STEAM BOILERS (41 t/h) AND
PUMP/EXCHANGER STATION 34,7 MW
- PRIMARY HOTWATER NETWORK DESIGNS
- INVESTMENT PROGRAM
BEOGRAD DISTRICT HEATING FROM POWERPLANT “NIKOLA TESLA” (year 1994 – 1995.)
- BASIC TECHNOLOGICAL DESIGN FOR COUPLING OF
HEATING SYSTEMS OBRENOVAC AND BEOGRAD
(CONNECTION OF POWERPLANT UNITS I AND II WITH
UNITS III,IV,V,VI)
SMEDEREVO DISTRICT HEATING (year 1994 – 1997.)
- MAINS AND DISTRIBUTION NETWORK FROM PUMP
STATION TO SUBSTATIONS APPR. 32 KM AWAY
- CENTRAL PUMPING STATION
- TECHNICAL INVESTMENT PROGRAM FOR SMEDEREVO
DISTRICT HEATING
IRON & STEEL CONCERN – “SARTID 1913” (year 1994 – 1997.)
- TECHNICAL DOCUMENTATION - PRELIMINARY
INVESTMENT PROGRAM FOR SMEDEREVO DISTRICT
HEATING FROM METALWORKS SMEDEREVO
- FEASIBILITY STUDY FOR SMEDEREVO DISTRICT
HEATING WITH WASTE HEAT FROM STEELWORKS
“SARTID 1913”
2.COMPRESSOR STATIONS
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com
ZASTAVA AUTOMOBILI
- DETAIL DESIGN OF COMRESSOR
STATIONKS1
CAPACITY 1 x 4680 + 1 x 2635 + 1 x 3050
Q=10 365 m3/h
- DETAIL DESIGN OF COMRESSOR
STATIONKS2 FOR MECHANICAL AND
PRESSING WORKSCAPACITY
1 x 4680 + 2 x 2635 + 1 x 3050 = Q=13 000
m3/h
- MECHANICAL DETAIL DESIGN OF
PRIMARY INSTALLATIONS FOR
COMPRESSED AIR AND I RECIRCULATION
SYSTEM AT PRODUCTION ZONE FOR
ZASTAVA 10
ZASTAVA KOVAČNICA
- DETAIL DESIGN OF COMPRESS STATION
CAPACITY 4 x 4230 + 1 x 3050 = m3/h
Q=20 000 m3/h
JP “SRBIJAGAS
- UNDERGROUND STORAGE OF FGAS FUEL –
BANATSKI DVOR – PRODUCTION LINE FOR
GAS FUEL
NIS SRBIJE – RAFINERIJA NAFTE PANČEVO
- DETAIL DESIGN OF COMPRESS STATION FOR
RECIRCULATION OF GAS (HYDROGEN)
PRESSURE 42 BAR, PEL=1,7 MW
- DETAIL DESIGN OF BLOWER INSTALLATION
GB-2541S AT PLANT S-2450
- DETAIL DESIGN OF COMPRESS STATION FOR
INDUSTRIAL AIR
CAPACITY 2 x 5260, Q=10500 m3/h
“British American Tobacco” – Duvanska industrija Vranje
- DETAIL DESIGN OF COMPRESS STATION
- DETAIL DESIGN OF BURNER INSTALLATION
GB-2541S AT PLANT S-2450
- DETAIL DESIGN OF VACUUM STATION
DIN “FABRIKA DUVANA” A.D. – NIŠ u sastavu Philip Morris Srbija
- DETAIL DESIGN OF COMPRESSOR STATION
SANATIONPROJEKAT SANACIJE
KOMPRESORSKE STANICE
TE “NIKOLA TESLA” A - OBRENOVAC
- DETAIL DESIGN OF COMPRESSOR STATION NEEDED FOR
VISUALISATION OF BURNING PROCESS AT BLOCKS A3-A6,
CAPACITY1670 m3/h, p= 8 barG
3. MEDICAL CENTERS
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
Hospital “Milenko Marin” – Loznica (year 2007.)
- GENERAL DESIGN FOR HEAT ENERGY UTILITY
Institute for oncology and radiology – Serbia (year 2000.)
- DETAILED DESIGN FOR RECONSTRUCTION AND
EXPANSION OF EXISTING INSTALLATIONS
(DEPARTMENT OF CHEMATOLOGY – CHILDREN WARD)
Medical center – Podgorica (year 1999 – 2000.)
- GENERAL DESIGN FOR HEAT ENERGY UTILITY
- GENERAL DESIGN OF VENTILATION AND
AIR-CONDITIONING SYSTEM
- TENDER DOCUMENTATION FOR EQUIPMENT DELIVERY
Public hospital “Danilo I” – Cetinje (year 1999 – 2000.)
- DETAILED MECHANICAL, ELECTRICAL AND
INSTRUMENTATION DESIGN
City hospital “Dr. Miloš Pantić” – Valjevo (year 1998.)
- CONCEPT DESIGN FOR HOSPITAL COMPLEX
- DETAILED MECHANICAL DESIGN OF TECHNICAL
INSTALLATIONS
- DETAILED ELECTRICAL DESIGN
- DETAILED REGULATION AND CONTROL DESIGN
Public hospital “Đorđe Jovanović” – Zrenjanin (year 1990.)
- DESIGN DOCUMENTATION CONTROL
3. POWER PLANTS
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
THERMAL POWER PLANT KOSTOLAC B 2 X 350 MW (year 2007 – 2008.)
- DETAILED DESIGN OF ASH DISPOSAL SYSTEM
- TEHNICAL REVIEW OF TECHNOLOGICAL AND
MECHANICAL DESIGN PROJECTS OF ASH DISPOSTAL
SYSTEM
NEOPLANTA – NOVI SAD (year 1995.)
- DETAILED DESIGN OF EXISTING POWER PLANT
EXPANSION
MILL “BOROVO” – BOROVO (year 1994.)
- DETAILED POWER PLANT DESIGN – ANALYSIS OF
PIPELINE RECONSTRUCTION (pressure 12 bar and 13
bar)
- STUDY WITH BASIC DESIGN FOR STABILITY AND
SAVING ENERGY FOR DP “PROIZVODNJA AUTO
GUMA “ BOROVO
- PROGRAM FOR REHABILITATION OF ENERGETIC
SYSTEM IN MILL “BOROVO”
“OHIS “ – SKOPLJE (year 1990.)
- DETAILED MECHANICAL DESIGN OF EXISTING POWER
PLANT EXPANSION
(existing boiler replacement by new boiler with capacity of 80 t/h
superheated steam, pressure 64 bar, temperature 500oC)
MILAN BLAGOJEVIĆ LUČANI
- DETAIL DESIGN OF PIPE RING GLAVNI PROJEKAT
CEVNOG PRSTENA VISOKOG PRSTENA ZA
POSTOJEĆU ENERGANU SA KOMPJUTERSKIM
PRORAČUNOM DOZVOLJENIH NAPONA
ŠEĆERANA “4 NOEMBRI” – BITOLJ (year 1990.)
- TECHNICAL DOCUMENTATION CONTROL FOR
EXISTING POWER PLANT EXPANSION AND OUTSIDE
INSTALATIONS
OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (year 1991 – 2007.)
- BASIC DESIGN OF POWER PLANT EXPANSION
- TENDER DOCUMENTATION FOR EQUIPMENT
DELIVERY FOR POWER PLANT EXPANSION
- DETAILED DESIGN OF POWER PLANT
EXPANSION BY BOILER WITH CAPACITY OF
110 t/h, PRESSURE 45,6 bar, TEMPERATURE
412OC AND BY TURBOGENERATOR (POWER
12MW)
- DETAILED DESIGN OF POWER PLANT
EXPANSION (BOILER 1 AND BOILER 2)
- TENDER DOCUMENTATION FOR DELIVERY
OF NEW BOILER WITH CAPACITY OF 120 t/h
SUPERHEATED STEAM
- TENDER DOCUMENTATION FOR DELIVERY
OF TURBOGENERATOR
- TECHNICAL ANALYSIS OF NEW
BACKPRESSURE TURBOAGREGATE
CHARACTERISTICS
- DETAILED DESIGNS FOR NEW
TURBOAGREGATE T3 INSTALATION
- DETAILED DESIGNS FOR BOILER K2 (BF 9601)
INSTALATION
- STUDY FOR CHOICE OF NEW
TURBOAGREGATE CHARACTERISTICS IN THE
OLD PART OF POWER PLANT
- POWER PLANT – MECHANICAL AS BUILT
DESIGN OF THE BOILER BF-9602 AND
CONCOMITANT EQUIPMENT
BLACK METALLURGY CONCERN - “US Steel” (Former “SARTID 1913”) (year 1990 – 1993., 2008 – 2009.)
- DOCUMENTATION NOSTRIFICATION FOR
BOILER 220 t/h, SUPERHEATED STEAM FOR
POWER PLANT No. 2
- DETAILED DESIGN PROJECT FOR
RECONSTRUCTION OF AGLOMERATION UNIT
“NATRON” - MAGLAJ
DETAIL DESIGN OF NEW PUMP STATION FOR BLOCK 1
OF EXISTING POWER PLANT
DETAIL DESIGN OF CONDENSATE COLLECTION
DETAIL DESIGN OF COMPRESSOR STATION
TE “NIKOLA TESLA” A - OBRENOVAC
DETAIL DESIGN OF CONNECTING TENT A AND TS 380/220
KV
DETAIL ELECTRICAL DESIGN OF RECONSTRUCTION
FOR THE MEASUREMENTS AND SIGNALISATION FOR
EXCAVATOR STATION FOR BLOCKS A1, A2 I A3
B.A.T. CIGARETTE FACTORY, IBADAN, NIGERIA
STEAM PLANT
OIL SUPP FOR BOILERS & GENSET
LPG INSTALLATION
COMPRESSED AIR INSTALLATION
VACUM INSTALLATION
EXTERNAL PIPEWORK
ICN GALENIKA d.d. - ZEMUN
BASIC MECHANICAL DESIGN OF RECONSTRUCTION
FOR CONDENSATE SYSTEM – ENERGY SAVE
TECHNICAL REPORT ABOUT BOILER ROOM AND STEAM
CONDENSATE SYSTEM
BOILER ROOM –STUDY ABOUT RECONSTRUCTION OF
EXITING BOILER ROOM CONDITIONED BY
BRAKEDOWNS BOILER TPK BKG - 150
STUDY FOR CONSTRUCION OF BOILER CAPACITY 25
T/H OF STEAM
DETAIL DESIGN OF RECONSTRUCTION FOR BOILER
ROOM, INSTALLATION OF BOILER S - 2500 INSTEAD OF
BRAKEDOWND BOLIER
GENERAL DESIGN OF BOILER ROOM
RECONSTRUCTION
DETAIL DESIGN OF MEASURMENT AND REGULATION
FOR FEEDER TANK
DETAIL DESIGN OF BOILER INSTALLATION S - 2500
(MANUF. NO. 237) FOR PHASE I OF BOILER ROOM
ANALAYSIS OF POSSIBILITIES OF SUPPLY BOILER
ROOM WITH TOBACCO WATER
DETAIL MECHANICAL DESIGN OF NEW PIPELINE AND
GAS SPLITTER INSTALLATION
STUDY FOR NEW PIPELINE AND GAS SLITTER
INSTALLATION MANUF. NO. 156/97
DETAIL DESIGN OF BIOLER INSTALLATION NO. 2, S -
2500 OPTIMAL (MANUF. NO 214) FOR PHASE I OF
BOILER ROOM
DETAIL DESIGN OF BOILER INSTALLATION S - 2500
OPTIMAL (MANUF. NO 237) FOR PHASE I OF BOILER
ROOM
DETAIL MECHANICAL AND ELECTRICAL DESIG OF NEW
LOADING STATION FOR OIL
4. ENERGY SAVING
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
NIS SRBIJE – OIL REFINERY PANČEVO (year 1997 – 2007.)
- DETAILED DESIGN OF RAW WATER PREHEATING AND
CONDENSATE UTILIZATION
- BASIC DESIGNS FOR CONDENSATE RECOVERY FROM TANK
FARM SECTION AND BLOCKS V, VI, XXI
- DETAILED DESIGN FOR PROCESS CONDENSATE RETURN
FROM BLOCK 6 TO POWERPLANT
- DETAILED DESIGN OF RECONSTRUCTION AND OVERHAUL
OF STEAM TRACER SYSTEM IN SECTIONS S-2100 AND S-2200
- AS BUILT DESIGN MECHANICAL DOCUMENTATION OF STEAM
TRACER SYSTEM IN BLOCK V SECTIONS S-100, S-600, S-750,
S-850
- AS BUILT DESIGN MECHANICAL DOCUMENTATION OF STEAM
TRACER SYSTEM IN BLOCK V SECTIONS S-200, S-900, S-1500
- DETAILED DESIGN OF TANK FARM CONDENSATE
COLLECTING AND RECOVERY
- DETAILED CIVIL ENGINEERING DESIGN OF CONDENSATE
COLLECTING STATIONS IN TANK FARM BLOCK 12
- DETAILED CIVIL ENGINEERING DESIGN OF CONDENSATE
COLLECTING STATIONS IN TANK FARM BLOCK 8
PHARMACEUTICAL FACTORY ZORKA PHARMA (year 2004.)
- TECHNICAL DOCUMENTATION ON RATIONAL HEAT ENERGY
UTILIZATION
NIS – OIL REFINERY NOVI SAD (year 2000.)
- DETAILED DESIGN OF CONDENSATE RECOVERY FROM
LUBEOIL PLANT I
METHANOL–ACETIC ACID COMPLEX MSK – KIKINDA (year 1998.)
- CONCEPTUAL DESIGN OF HEAT ENERGY UTILIZATION IN MSK
KIKINDA
ICN GALENIKA d.d. – ZEMUN (year 1998.)
- ENERGY SAVING - BASIC MECHANICAL DESIGN OF
CONDENSATE SYSTEM RECONSTRUCTION
NIS SRBIJE – OIL REFINERY BEOGRAD (year 1998.)
- BASIC DESIGN OF RATIONAL STEAM UTILIZATION AND
CONDENSATE RECOVERY IN REFINERY BEOGRAD
- DETAILED DESIGN OF CONDENSATE RECOVERY FROM
PROCESS PLANTS
CHEMICAL INDUSTRY HIP - AZOTARA PANČEVO (year 1995.)
- CONCEPTUAL DESIGN OF HEAT ENERGY UTILIZATION
- DETAILED AUTOMATIC CONTROL DESIGN OF "BABCOCK &
WILCOX" BOILER
IRON & STEEL CONCERN - “SARTID 1913” (year 1994 – 1997.)
- DETAILED DESIGNS OF THE WASTE HEAT RECOVERY
SYSTEMS
PETROCHEMICAL INDUSTRY HIP PETROHEMIJA – PANČEVO (year 1994 – 1996.)
- DETAILED DESIGNS FOR RECONSTRUCTION, RECOVERY
AND UTILIZATION OF CONDENSATE
- CONDENSATE SYSTEM OF LDPE PLANT
- RECONSTRUCTION AND EXTENSION OF CONDENSATE
SYSTEM IN LDPE PLANT
PAPER MILL BEOGRAD (year 1992.)
- TECHNICAL ANALYSIS OF THE EXISTING STEAM AND
CONDENSATE SYSTEM
“NATRON” – MAGLAJ (year 1991.)
- DETAILED DESIGN OF CONDENSATE RECOVERY SYSTEM
PAINT & LACQUER INDUSTRY DUGA – BEOGRAD (year 1990 – 1994.)
- BASIC MECHANICAL DESIGN OF CONDENSATE SYSTEM
RECONSTRUCTION AND EXTENSION
- FEASIBILITY STUDY FOR ENERGY PRODUCTION,
DISTRIBUTION AND UTILIZATION SYSTEM RECONSTRUCTION
2a. HEATING PLANTS
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
JKP “BEOGRADSKE ELEKTRANE”, BEOGRAD (year 2006 – 2009.)
- DETAILED DESIGN OF HEATING PLANT „Konjarnik“
- DETAILED DESIGN OF HEATING PLANT „Višnjička banja“
- TECHNICAL REVISION OF DCS AND BMS SYSTEMS FOR
HEATING PLANTS „Konjarnik“, „Dunav“, and „Voždovac“
- BASIC DESIGN OF HEATING PLANT „ZEMUN“
- DETAILED DESIGN OF PUMPING STATIONS PPS1 AND
PPS2
- DETAILED DESIGN OF PUMPING STATION IN
MILESEVSKA STREET
- DETAILED DESIGN OF INSTALAIONS FOR OIL
TRANSFER ON PIERS FOR BARGES AT RIVER SAVA IN
TO „NOVI BEOGRAD“
- DETAILED DESIGN OF RECONSTRUCTION FOR
EXISTING TS 10/0,4 AT LOCATION TO „KANAREVO
BRDO“
- DETAILED DESIGN OF RECONSTRUCTION AND
MODERNIZATION SECTION FOR TECHICAL WATER AND
WATER FOR FIRE PROTECTION
JKP “BEOGRADSKE ELEKTRANE”, BEOGRAD
- DETAIL DESIGN OF PUMPING STATION PPS3 – M4
AT TO MILJAKOVAC
- DETAIL DESIGN OF RECONSTRUCTION AND
MODERNIZATION FOR CIRCULATION SYSTEM AT
TO "MIRIJEVO" 116 MW (2 x 58 MW)
- DETAIL DESIGN OF RECONSTRUCTION FOR PUMP
STATION AND EXCHANGER STATION AT TO
”DUNAV” 348MW (2x58 MW AND 2 x 116MW)
- DETAIL DESIGN OF RECONSTRUCION AND REPAIR
FOR FUNNELAT TO NOVI BEOGRAD
NIS SRBIJE - RAFINERIJA NAFTE PANČEVO
- DETAILED DESIGN FOR EXPANSION OF POWER PLANT WITH BOILER CAPACITY 110 T/H, PRESSURE 45,6 BAR, TEMPERATURE 412 OC
- DETAILED DESIGN OF BOILER INSTALATION BF-9602 CAPACITY 120 T/H PRESSURE OF STEAM 45,6 BAR I TEMPERATURE 412OC
- DETAILED DESIGN OF INSTRUMETATION FOR BOILER BF 9602 - DOCUMENTATION DONE FOR FOXBORO
ICN GALENIKA d.d. – ZEMUN
- DETAIL DESIGN OF BOILER S – 2500
(MANUFACTURER NO. 237) INSTALLATION IN FIRST
PHASE OF HEATING PLANT
- DETAIL DESIGN OF BOILER NO. 2 S – 2500 OPTIMAL
(MANUFACTURER NO. 214) INSTALLATION IN
SECOND PHASE OF HEATING PLANT
„CRVENA ZASTAVA“ KRAGUJEVAC (year 2006 – 2007.)
- DETAILED DESIGN OF HEATING PLANT
- AS BUILT DESIGN OF HEATING PLANT
JAPAN TOBACCO INTERNATIONAL “SENTA” (year 2006.)
- DETAILED DESIGN OF HEATING PLANT
DIN “FABRIKA DUVANA” A.D. NIŠ - PHILIP MORRIS SRBIJA
- BASIC DESIGN FOR INSTALATION OF NEW STEAM
BOILER CAPACITY 5 T/H, 8 BAR
CITY OF ČAČAK (year 2005.)
- DETAILED DESIGN OF HEATING PLANT
CITY OF LOZNICA (year 2005.)
- DETAILED DESIGN OF HEATING PLANT
JP “NOVI DOM” VRANJE –BLOCK 47
DETAIL DESIGN OF HEATING PLANT CAPACITY 2 x 5 MW
WITH OIL FUEL STORAGE
HOTEL INTERKONTINENTAL CG, D.P. BEOGRAD
BASIC DESIGN OF HOT WATER STEAM HEATING PLANT
CAPACITY 2 X 4 MW AND PRODUCTIONOF STEAM 6 T/H,
12 BAR
Zastava automobili a.d. -Kragujevac
BASIC AND DETAIL DESIGN OF HOT WATER HEATING
PLANT CAPACITY 2 4 MW AND PRODUCTION OF STEAM
8 T/H, 12 BAR
Toplifikacija Moravija – Zaječar a.d.
BASIC AND DETAIL DESIGN OF HEATING PLANT
CAPACITY 3 x 16 MW AND OIL FUEL STORAGE
JP “Srbija Gas”, Podzemno skladište gasa – Banatski dvor
BASIC AND DETAIL DESIGN OF HETING PLANT AT
ENERGY SECTOR CAPACITY 2 MW
JP PTT “Srbija”, Printing office and paper warehose at Ada Huji
BASIC AND DETAIL DESIGN OF HEATING PLANT AND
OBJECTS SUPPLY WITH HEAT ENERGY
PKB “IMES”, PADINSKA SKELA
DETAIL DESIGN OF HEATING PLANT, TWO BOILERS
INSTALLATION OF 1,5 T/H, PRESSURE 8 BAR
DETAIL DESIGN OF BONE BURNING PLANT WITH STEAM
BOILER CAPACITY 1,5 T/H, PRESKA 8 BAR
D.M.D. IBP “BEOGRAD“ – ZEMUN (year 2000.)
DETAILED DESIGN OF THE HEATING PLANT, CAPACITY
2x10 t/h
(WITH COMPANY “TEHNOCAD” – BELGRADE)
“Milan Blagojević – Namenska” Lučani
DETAIL DESIGN OF RECONSTRUCTION FOR HEATING
PLANT, STEAM BOILER TE-111, MAXIMAL PRODUCTION 16
T/H, PRESSURE 12,5 BAR
PD RB “Kolubara” - Lazarevac
DETAIL DESIGN OF HEATING PLANT FOR OIL FUEL,
CAPACITY 2 MW
Cementara “TITAN” – Kosjerić
DETAIL DESIGN OF OIL FUEL CHANGE WITH WOOD FUEL
Q=1 MW
HOSPITAL “DANILO I” – CETINJE (year 1999 – 2000.)
DETAILED DESIGN OF THE HEATING PLANT IN
HOSPITAL “DANILO I” CETINJE
HOSPITAL CENTER “PODGORICA” (year 1999 – 2000.)
TENDER DOCUMENTATION FOR EQUIPMENT DELIVERY
AND WORKS IN HEATING PLANT AND CONCOMITANT
INSTALATIONS
ICN GALENIKA d.d. – ZEMUN (year 1997 – 2007.)
- HEATING PLANT – RECONSTRUCTION OF THE EXISTING
HEATING PALNT, CAUSED BY BOILER (TPK BKG – 150)
DAMAGE
- DETAILED DESIGN OF HEATING PLANT
RECONSTRUCTION, BOILER S-2500 INSTALATION
INSTEAD OF DAMAGED BOILER
- GENERAL DESIGN OF HEATING PLANT
RECONSTRUCTION
- DETAILED DESIGN OF BOILER “S – 2500“ INSTALATION
(Manufact. No. 214) IN THE FIRST STEP OF HEATING
PLANT RECONSTRUCTION
- DETAILED DESIGN OF BOILER No. 2 INSTALATION (S-
2500 OPTIMAL) IN THE FIRST STEP OF HEATING PLANT
RECONSTRUCTION
DETAILED DESIGN OF HEATING PLANT
„STRAGARI“ COMPANY – STRAGARI (year 1992.)
STUDY OF RECONSTRUCTION FOR THE HEATING
PLANT WITH CAPACITY OF 25 t/h
PD RB “KOLUBARA” - LAZAREVAC
DETAILED DESIGN OF HEATING PLANT FOR SOLID
FUEL, CAPACITY 2 MW
4a. PUBLIC COMPANY
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
PUBLIC COMPANY – AIRPORT „NIKOLA TESLA“ BELGRADE (year 2003 – 2004.)
BASIC AND DETAILED DESIGNS – ADAPTION AND
REHABILITATION OF AIRPORT “BEOGRAD”, TERMINAL
T2 – CONNECTING PART AND VIP PARLOUR
- ELECTRICAL DESIGNS
- INFORMATION SYSTEMS
SYSTEMS OF DEVICES AND EQUIPMENT MONITORING
AND CONTROL AT THE AIRPORT
5. PETROCHEMICAL COMPLEX
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
OIL INDUSTRY OF SERBIA – OIL REFINERY “PANČEVO” (oil production: 5 million tons per year) (year 1990 – 2007.)
- DETAILED DESIGN PLANT FOR STORAGE,
PREPARATION AND DOSING ADDITIVES IN DIESEL
FUEL
- HEATING OF SEDIMENTATION BASIN FOR HEAVY
FRACTION STORAGE
- DETAILED DESIGN BUILT SYSTEM FOR SUPPLY,
STORAGE AND IMPORT RAW MATERIAL IN SPLIT
SECTION OF PLANT FOR PRODUCING AROMATIC
MATERIALS IN S-3600
- DETAILED DESIGN OF RECONSTRUCTION SEAL OIL
SYSTEM - VACUUM DISTILLATION S-2200
- DETAILED DESIGN OF CENTRAL CONTROL FOR
TEMPERATURE REGULATION IN TANKS FARM
- DETAILED DESIGN OF POWER PLANT EXPANSION
WITH STEAM BOILER CAPACITY 110t/h , PRESSURE
45,6 bar, TEMPERATURE 412 oC, AND BACK PRESSURE
TURBINE WITH GENERATOR POWER 12MW
- DESIGN OF MEASURING AND CONTROL EQUIPMENT
RECONSTRUCTION FOR MEASURING AND BALANSING
OF ENERGY PRODUCTION AND CONSUMPTION IN
RNP
- DETAILED DESIGN OF POLYMER BITUMEN PLANT S-
0290
- DETAILED DESIGN OF COMPRESSOR HOUSE FOR
HYDROGEN
- DESIGN OF WASTE GAS BURNING SYSTEM
RECONSTRUCTION, FROM RAW MATERIAL TANKS
FOR BITUMENA
- FCC –DESIGN OF OPERATING SYSTEM IN HDS PLANT
- LOW PRESSURE STEAM SYSTEM IN RNP-FLOW
CALCULATE
- PLANT S-2700 FLARE BURNER PA-2701 – DETAILED
DESIGN RECONSTRUCTION OF FLARE AND STEAM
DISTRIBUTION TO PA-2701
- TANK FARM – DETAILED MECHANICAL DESIGN FOR
RECONSTRUCTION OF BENZENE AND TOULENA
SYSTEMS IN RAILWAY FILLING STATION
- DESIGN OF ANALYZER SYSTEM FOR MONITORING
GAS EMISION FROM FLUE DUCT IN OIL REFINERY
PANCEVO - DOCUMENTATION BASED ON CONTRACT
WITH ABB
- DESIGN OF ANALYZER SYSTEM FOR PROCESS
CONTROL ON PLANT BITUMEN,HDS AND FCC IN OIL
REFINERY PANCEVO - DOCUMENTATION BASED ON
CONTRACT WITH ABB
- DETAILED DESIGN OF MONITORING SYSTEM FOR
STEAM BOILER BF 9602 – DOCUMENTATION BASED
ON CONTRACT WITH FOXBORO
- DETAILED DESIGN OF COMPRESSOR HOUSE FOR
INSTRUMENT AIR
- DETAILED DESIGN FOR INSTALLATION OF STEAM
BOILER BF-9602 CAPACITY 120 t/h PARE, PRESSURE
45,6 bar AND TEMPERATURE 412OC
- DETAILED DESIGN OF LOW PRESSURE STEAM PIPES
IN OIL REFINERY PANCEVO.
- DETAILED DESIGN FOR RECONSTRUCTION OF STEAM
TRACING SYSTEM IN OIL REFINERY PANCEVO.
- DETAILED DESIGN FOR RECONSTRUCTION PIPES OF
HIGH PRESSURE STEAM IN OIL REFINERY PANCEVO
- DETAILED DESIGN OF TRUCK FILLING STATION
(PROJECT IS DESIGN FOR COMPANY ENERECO –
ITALIJA)
- DETAILED DESIGN OF TANKER FILLING STATION
(PROJECT IS DESIGN FOR COMPANY ENERECO –
ITALIJA)
- DETAIL DESIGN HIGH PRESSURE STEAM
CONNECTION PIPE BETWEEN OIL REFINERY AND
PETROCHEMICAL IN PANCEVO
- DETAIL DESIGN OF RECONSTRUCTION AND
SUPERSTRUCTURE TANK FB-9300 (VOLUME 1.000 m3)
I FB-9320 (VOLUME 1.500 m3) FOR DEMINERALISED
WATER.
- DETAIL MECHANICAL DESIGN OF TANK FB-0810
(VOLUME 6.750 m3) HEAVY SLOP.
- DETAIL MECHANICAL DESIGN FOR RECONSTRUCTION
OF TANK FB-0707 FOR PYROLITIC BENZINE
- DETAIL MECHANICAL DESIGN FOR RECONSTRUCTION
OF TANK FB-2001 (VOLUME 4.600 m3) FOR CATALYTIC
BENZINE
- DETAIL MECHANICAL DESIGN OF RECONSTRUCTION
TANK FB-0706 FOR BENZENE
- DETAIL MECHANICAL DESIGN OF TANK FB-0810
(VOLUME 10.000 m3) FOR HEAVY SLOP.
- DETAIL MECHANICAL DESIGN OF TANK FB-0706 FOR
ADDITIVES IN FUEL.
NIS SRBIJE – OIL REFINERY NOVI SAD (oil production: 2,5 million tons per year) (year 2000 – 2007.)
- DETAIL DESIGN CONDENSATE RETURN
FROM PLANT "ULJARA I"
- DETAIL MECHANICAL DESIGN FOR
RESTITUTION TANK STORAGE FOR OIL
PRODUCTS
- DETAIL DESIGN PLANT FOR ISOMERATION
(PROJECT IS DESIGNING FOR FIRM PETROL
INVEST – SARAJEVO)
CHEMICAL INDUSTRY HIP - AZOTARA PANČEVO (year 1998 – 2000.)
- BASIC DESIGN FOR USING HEAT ENERGY
- DETAIL DESIGN BOILER AUTOMATION
“BABCOCK & WILCOX ”
NIS SRBIJE – OIL REFINERY BEOGRAD (year 1997 – 2002.)
- DETAIL DESIGN RECONSTRUCTION ENERGY
SYSTEM.
- DETAIL DESIGN FOR CONDENSATE
RECOVERY AND RETURN FROM PLANT.
CHEMICAL INDUSTRY HIP PETROHEMIJA – PANČEVO (year 1994 – 2007.)
- RECONSTRUCTION SYSTEM FOR
IGNITION,MAINTENANCE AND CONTROL
FLAME START-UP BURNERS IN POWER
PLANT HIP PETROHEMIJA
- FUEL OIL STATION IN POWER PLANT
- DETAIL DESIGN RECONSTRUCTION
,RECOVERY, AND RETURNING CONDENSATE.
- DETAIL DESIGN FOR TRANSPORT MIXTURE
PARAFFIN FLUENT SOLVENT AND USED
COMPRESSOR OIL FROM COLLECT
RESERVOIR IN PENG PLANT TO FUEL OIL
HEADER PIPE.
- DETAIL DESIGN RECONSTRUCTION SYSTEM
FOR DOSING CHEMICALS IN PLANT FOR
PRIMARI FRACTION IN PLANT ETILEN
05REKONSTRUKCIJA REZERVOARA I TANKVANA
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com
NIS SRBIJE - RAFINERIJA NAFTE PANČEVO
2004
- RECONSTRUCTION OF RESERVOIR FB-9320
Vn=1000 m3
- DESIGN OF VERTICAL RESERVOIR FB-9300
Vn=1000 m3
- DESIGN OF VERTICAL RESERVOIR FB-0810
Vn=6700 m3
2005
- RECONSTRUCTION OF RESERVOIR FB-0707
Vn=540 m3
- DESIGN OF VERTICAL RESERVOIR FB-0706
Vn=85 m3
- RECONSTRUCTION OF RESERVOIR FB-2001,
Vn=5000 m3
- DESIGN OF VERTICAL RESERVOIR FB-0810
Vn=10000 m3
2006
- RECONSTRUCTION OF RESERVOIR FB-2002,
Vn=5000m3,
- RECONSTRUCTION OF RESERVOIR FB-1405,
Vn=21700 m3,
- RECONSTRUCTION OF RESERVOIR FB-2007
i FB-2008, Vn=1000 m3
(alkilat),
- DESIGN OF VERTICAL RESERVOIR WITH
STEEL EMERGENCY CONTAINERFB-0812
Vn=5000 m3
- SANATION OF RESERVOIR FB-1505,
Vn=21700 m3,
2007
- SANATION OF RESERVOIR FB-1204 AND
FIRE PROTECTION SYSTEM, Vn=21700 m3
- SANATION OF RESERVOIR FB-1501 Vn=5460
m3
- SANATION OF RESERVOIR FB-
1303/1304/1307 AND FIRE PROTECTION
SYSTEMVn=5000 m3
- SANATION OF RESERVOIR FB-1906 AND
FIRE PROTECTION SYSTEMVn=13000 m3
- SANATION OF RESERVOIR FB-1403 AND
FIRE PROTECTION SYSTEMVn=5460 m3
- SANATION OF RESERVOIR FB-1401 AND
FIRE PROTECTION SYSTEMVn=13040 m3
- SANATION OF RESERVOIR FB-1702 AND
FIRE PROTECTION SYSTEMVn=13000 m3
2008
- SANATION OF RESERVOIR FB-0403/0404 AND
FIRE PROTECTION SYSTEMVn=4500
- SANATION OF RESERVOIR FB-0401/0402 AND
FIRE PROTECTION SYSTEMVn=540 m3
- RECONSTRUCTION OF RESERVOIR R29,
Vn=60000 m3,
- SANATION OF RESERVOIR FB-1022 AND FIRE
PROTECTION SYSTEM, Vn=13000 m3
NIS SRBIJE - RAFINERIJA NOVI SAD
2007
- RECONSTRUCTION OF RESERVOIR,Vn=30000m3,
2008
- RECONSTRUCTION OF RESERVOIR N11, Vn=15000
m3,
- RECONSTRUCTION OF RESERVOIR, Vn=30000 m3,
- SANATION OF RESERVOIR B6, B11, B14, B16, (benzin),
Vn=5000 m3,
- SANATION OF RESERVOIR B7 i B8, Vn=3000 m3,
- SANATION OF RESERVOIR B5, Vn=2000 m3,
- ADAPTATION OF RESERVOIR B2 i B3, Vn=1000 m3,
- ADAPTATION OF RESERVOIR G1, Vn=3000 m3,
DIREKCIJA ZA ROBNE REZERVE REPUBLIKE SRBIJE
2006/7
- DESIGN OF RESERVOIR D13, Vn=5000 m3,
- DESIGN OF RESERVOIR G8, Vn=5000 m3,
NIS SRBIJE A.D. Novi Sad, NIS - PETROL BEOGRAD, JUGOPETROL
2008
- RECONSTRUCTION OF RESERVOIR R29, Vn=60000
m3,
- SANATION OF EMERGENCY CONTAINER
- DELIVERY AND INSTALLATION OF GEAR
6. PHARMACEUTICAL INDUSTRY
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
HEMOFARM CONCERN – HEMOMONT d.o.o. (year 2005.)
- RECONSTRUCTION OF COMPLETE FACILITY IN ORDER TO
MEET GMP REQUIREMENTS
- HVAC SYSTEMS (11 AHU’S)
- CLEAN ROOMS – MECHANICAL, CIVIL, ELECTRICAL,
INSTRUMENTATION AND CONTROL DESIGNS
“Zorka pharma” (year 2004.)
- DOCUMENTATION FOR ENERGY SAVING – TECHNICAL
UTILITIES
ICN Galenika d.d. – Zemun (year 1997 – 2007.)
- MECHANICAL DESIGN OF SYSTEM RECONSTRUCTION –
ENERGY SAVING – TECHNICAL UTILITIES
- TECHNICAL REPORT ON CLEAN STEAM SUPPLY AND
CONDENSATE SYSTEM
- DETAIL MECHANICAL, CIVIL, ELECTRICAL AND
INSTRUMENTATION DESIGN FOR HEATING PLANT
RECONSTRUCTION
- DETAIL INSTRUMENTATION AND CONTROL DESIGN FOR FEED
WATER SYSTEM
- DETAIL DESIGN OF GAS DISTRIBUTION SYSTEM IN ICN
- DETAIL DESIGN FOR STEAM BOILER INSTALLATION
- AS-BUILT DOCUMENTATION FOR STEAM BOILER
INSTALLATION
- DETAIL PROCESS-MECHANICAL AND ELECTRICAL DESIGN FOR
FUEL OIL STATION
7. FOOD INDUSTRY
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Belgrade Serbia Tel: +381 11 3806 172 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: [email protected]
Agricultural plant “Godomin” (year 2002.)
PROCESS – MECHANICAL, ELECTRICAL AND CIVIL
DESIGN OF SUPPLYING SYSTEM
Agricultural complex “Plantaže” – Podgorica (year 2002.)
DETAIL PROCESS-MECHANICAL AND ELECTRICAL
DESIGN FOR COOLING STATION
Sugar factory “4 noembri” – Bitolj (year 1991.)
DESIGN REVISION FOR POWER PLANT
RECONSTRUCTION
08TRANSPORTATION OF ASH AND DROSS
TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 11 000 Beograd Serbia Tel: +381 11 3806 172 Fax: +381 11 3806 251 E-mail: [email protected] www.termoenergo.com
TE KOSTOLAC
- TRANSPORTATION OF ASH AND DROSS:
- PUMP STATION
- EXTERNAL DISTRIBUTION FROMPUMP STATION TO DUMP