1 st brig
DESCRIPTION
4 TH BRIG. 5TH BRIG. 2 ND BRIG. = COMPANY STREET DIRECTION. = HQS. 1 ST BRIG. ART ANNEX. 3 RD BRIG. 1 ST BRIG. CAV. 243 FEET. 15. 150 FEET. 63 FEET. 30 FEET. 15 A-FRAMES. 30 FEET front. 15 A-FRAMES. - PowerPoint PPT PresentationTRANSCRIPT
1ST
BRIG
4 TH BRIG
1ST
BRIG
2ND
BRIG
3RD B
RIG
5TH BRIG
CAV
= COMPANY STREET DIRECTION
= HQS
15
150 FEET 63 FEET 30 FEET
30 FEET front
• Space calculated by taking number of registrants and dividing by 33 to yield numberOf company streets 30 foot frontage x 243 depth needed. Each street had 15 A-frame Tents per side with 10 foot street, 2 cooking area, space for 2 company commanderWall tents and 1 regimental/battalion level wall tent.
• Frontage calculation based on 30 feet x number of calculated company streets• Depth calculated using standard 243 feet.
243 FEET
15 A-FRAMES
15 A-FRAMES