3 Narrative “Cheat” Slide 1. Planning – This term should be used when discussing the transportation planning process, where through an analytical analysis, needs are identified and recommendations are made. Corridor studies can be done at this stage to investigate conceptual designs of alternatives and possible impacts to determine the feasibility of moving a recommendation to project development through the programming process. Data from these studies can be used in project development to supplement information required for that process. The planning activities are generally funded by federal funds that have been allocated specifically for planning and cannot be spent for project development.1. Planning – This term should be used when discussing the transportation planning process, where through an analytical analysis, needs are identified and recommendations are made. Corridor studies can be done at this stage to investigate conceptual designs of alternatives and possible impacts to determine the feasibility of moving a recommendation to project development through the programming process. Data from these studies can be used in project development to supplement information required for that process. The planning activities are generally funded by federal funds that have been allocated specifically for planning and cannot be spent for project development. 2. Programming – At this point is where a recommendation takes on a life as a project as appropriate funding (brick and mortar money) is allocated to move it through the next phases.2. Programming – At this point is where a recommendation takes on a life as a project as appropriate funding (brick and mortar money) is allocated to move it through the next phases. 3. Project development – This can include feasibility/corridor studies as the brick and mortar money is eligible for these type of studies. Generally, however, this is where preliminary engineering and environmental studies are conducted. For certain reasons, generally the lack money, projects that are programmed can sit in this phase for quite a while before sufficient funding is available for it to actually move forward. Those projects that have sufficient funding move on through the process, and R/W and final design plans are prepared. 1) Project Development where sufficient funds are not available to move it to final design, R/W and construction; 2) Project Implementation where funding is there to move the project through to construction in a timely fashion. A schedule can be reasonably set for all phases and an ad date determined.3. Project development – This can include feasibility/corridor studies as the brick and mortar money is eligible for these type of studies. Generally, however, this is where preliminary engineering and environmental studies are conducted. For certain reasons, generally the lack money, projects that are programmed can sit in this phase for quite a while before sufficient funding is available for it to actually move forward. Those projects that have sufficient funding move on through the process, and R/W and final design plans are prepared. 1) Project Development where sufficient funds are not available to move it to final design, R/W and construction; 2) Project Implementation where funding is there to move the project through to construction in a timely fashion. A schedule can be reasonably set for all phases and an ad date determined. 4. Construction and Implementation – This includes advertising, receiving and reviewing bids, awarding the contract and supervising the construction and/or implementation of projects.4. Construction and Implementation – This includes advertising, receiving and reviewing bids, awarding the contract and supervising the construction and/or implementation of projects.

TRANSCRIPT

Page 1: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

1

Six Year Improvement Six Year Improvement Program Public HearingsProgram Public Hearings

FY 2005 to FY 2010FY 2005 to FY 2010

Page 2: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

2

Project ImplementationProject Implementation

PLANNINGPLANNING

PROGRAMMINGPROGRAMMING

CONSTRUCTION and CONSTRUCTION and IMPLEMENTATIONIMPLEMENTATION

PROJECT DEVELOPMENTPROJECT DEVELOPMENT

Page 3: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

3

Narrative “Cheat” SlideNarrative “Cheat” Slide• 1.1.            PlanningPlanning – This term should be used when discussing the transportation planning process, – This term should be used when discussing the transportation planning process,

where through an analytical analysis, needs are identified and recommendations are made. Corridor where through an analytical analysis, needs are identified and recommendations are made. Corridor studies can be done at this stage to investigate conceptual designs of alternatives and possible studies can be done at this stage to investigate conceptual designs of alternatives and possible impacts to determine the feasibility of moving a recommendation to project development through the impacts to determine the feasibility of moving a recommendation to project development through the programming process. Data from these studies can be used in project development to supplement programming process. Data from these studies can be used in project development to supplement information required for that process. The planning activities are generally funded by federal funds information required for that process. The planning activities are generally funded by federal funds that have been allocated specifically for planning and cannot be spent for project development. that have been allocated specifically for planning and cannot be spent for project development.

  • 2.2.            ProgrammingProgramming – At this point is where a recommendation takes on a life as a project as – At this point is where a recommendation takes on a life as a project as

appropriate funding (brick and mortar money) is allocated to move it through the next phases.appropriate funding (brick and mortar money) is allocated to move it through the next phases.  • 3.3.            Project development Project development – This can include feasibility/corridor studies as the brick and mortar – This can include feasibility/corridor studies as the brick and mortar

money is eligible for these type of studies. Generally, however, this is where preliminary engineering money is eligible for these type of studies. Generally, however, this is where preliminary engineering and environmental studies are conducted. For certain reasons, generally the lack money, projects and environmental studies are conducted. For certain reasons, generally the lack money, projects that are programmed can sit in this phase for quite a while before sufficient funding is available for it that are programmed can sit in this phase for quite a while before sufficient funding is available for it to actually move forward. Those projects that have sufficient funding move on through the process, to actually move forward. Those projects that have sufficient funding move on through the process, and R/W and final design plans are prepared. 1) and R/W and final design plans are prepared. 1) Project DevelopmentProject Development where sufficient funds are where sufficient funds are not available to move it to final design, R/W and construction; 2) not available to move it to final design, R/W and construction; 2) Project ImplementationProject Implementation where where funding is there to move the project through to construction in a timely fashion. A schedule can be funding is there to move the project through to construction in a timely fashion. A schedule can be reasonably set for all phases and an ad date determined.reasonably set for all phases and an ad date determined.

• 4.4.            Construction and ImplementationConstruction and Implementation – This includes advertising, receiving and reviewing bids, – This includes advertising, receiving and reviewing bids,

awarding the contract and supervising the construction and/or implementation of projects. awarding the contract and supervising the construction and/or implementation of projects.   

Page 4: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

4

PlanningPlanning• VDOT and VDRPT work with regional and local planning VDOT and VDRPT work with regional and local planning

agencies to develop long range transportation plans agencies to develop long range transportation plans (with 20-25 year planning horizons)(with 20-25 year planning horizons)

• The long range transportation plans identify deficiencies, The long range transportation plans identify deficiencies, and provide recommendations to address these and provide recommendations to address these deficienciesdeficiencies

• The public is given numerous opportunities to review and The public is given numerous opportunities to review and comment on the transportation plans throughout the comment on the transportation plans throughout the plan development process, and prior to plan adoption by plan development process, and prior to plan adoption by the regional and local planning agenciesthe regional and local planning agencies

Page 5: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

5

Project ImplementationProject Implementation

PLANNINGPLANNING

PROGRAMMINGPROGRAMMING

CONSTRUCTION and CONSTRUCTION and IMPLEMENTATIONIMPLEMENTATION

PROJECT DEVELOPMENTPROJECT DEVELOPMENT

You are here

Page 6: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

6

ProgrammingProgramming• Once a long range transportation plan has been adopted Once a long range transportation plan has been adopted

by regional and local planning agencies as well as the by regional and local planning agencies as well as the local jurisdictions, the agencies and localities endorse local jurisdictions, the agencies and localities endorse which recommendations within the plan should be which recommendations within the plan should be considered at the Six Year Improvement Program Public considered at the Six Year Improvement Program Public HearingsHearings

• The Six Year Improvement Program Public Hearings are The Six Year Improvement Program Public Hearings are an opportunity for the public to provide comments and an opportunity for the public to provide comments and additional input to help the Commonwealth additional input to help the Commonwealth Transportation Board (CTB) identify priorities for Transportation Board (CTB) identify priorities for inclusion in the Six Year Improvement Programinclusion in the Six Year Improvement Program

Page 7: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

7

ProgrammingProgramming• The input gathered at the Six Year Improvement Program The input gathered at the Six Year Improvement Program

Public Hearings, as well as locally and regionally Public Hearings, as well as locally and regionally approved long range transportation plan approved long range transportation plan recommendations, is provided to the CTB for recommendations, is provided to the CTB for consideration prior to including projects in the Six Year consideration prior to including projects in the Six Year Improvement ProgramImprovement Program

• After reviewing all recommendations and comments, the After reviewing all recommendations and comments, the CTB adopts the Six Year Improvement ProgramCTB adopts the Six Year Improvement Program

Page 8: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

8

Project ImplementationProject Implementation

PLANNINGPLANNING

PROGRAMMINGPROGRAMMING

CONSTRUCTION and CONSTRUCTION and IMPLEMENTATIONIMPLEMENTATION

PROJECT DEVELOPMENTPROJECT DEVELOPMENT

Page 9: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

9

Project DevelopmentProject Development

• After a project has been programmed, After a project has been programmed, the project development process beginsthe project development process begins

• Project development has two phases:Project development has two phases:– Preliminary EngineeringPreliminary Engineering: includes : includes

environmental analysis and location environmental analysis and location and designand design

– Right of WayRight of Way: : Acquisition of land for future Acquisition of land for future constructionconstruction

Page 10: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

10

Project ImplementationProject Implementation

PLANNINGPLANNING

PROGRAMMINGPROGRAMMING

CONSTRUCTION and CONSTRUCTION and IMPLEMENTATIONIMPLEMENTATION

PROJECT DEVELOPMENTPROJECT DEVELOPMENT

Page 11: 1 Six Year Improvement Program Public Hearings FY 2005 to FY 2010

11

Construction and Construction and ImplementationImplementation

The final phase of the process is the actual The final phase of the process is the actual construction or implementation of the construction or implementation of the

programmed projectsprogrammed projects