1 presentation to sec chairman on heavy electrical complex august 16, 2013 presentation on heavy...
TRANSCRIPT
1
Presentation to
SEC Chairmanon
Heavy Electrical Complex
August 16, 2013
Presentation on
Heavy Electrical Complex
January 31, 2014
2
Contents
• Introduction
• Products and Facilities
• Performance
• Planned Activities and Investors Attractions
333
Introduction
4
HEAVY ELECTRICAL COMPLEX
5
Commercial Operations 1997
Machinery Source China (62%), Germany, Switzerland, Local
Cost Rs. 1,158 Million
Area 72 Acres (Factory 43 Acres)
Human Resource 222 NOS
Product Power Transformers 6.3 t0 40 MVA
Transformers Supplied New 276 Nos. (Rs. 7.01 Billion)Repair 104 Nos. (Rs. 574 Million)
Capacity Utilization Maximum up-to 30 %
Quality Certification ISO-9001
Customers DISCOs, KESC and other organizations (Pakistan Steel, CDA, Railway, Private Industries)
Competitors PEL, Siemens, Foreign Suppliers
Profile
Share Ownership
-
* Benazir Employees Stock Option Scheme
6
Shareholding
Number % age
GOP through SEC
14,100,012 96.6
BESOS* 495,835 3.4
3 Directors 03 _
Total 14,595,850 100.0
Manpower (As on 31.12.2014)
S# Categories Regular Through Labour
Contractor Total
1. Officers
Engineers
Diploma Holders
Professional
20
02
04
03
03
04
23
05
08
2. Supervisors 02 08 10
3. Workers - 176 176
Total 28 194 222
888
Products
Sub-Assemblies
Manufacturing Facilities
99 Repair/Rehabilitation of Power Transformers
Voltage rating upto 500 KV and with capacity rating upto 250 MVA
New Power Transformers – Acquired Technology
S# Rating Nos MVA
1 31.5/40 MVA, 132/66/11.5 KV 3 120.0
2 31.5/40 MVA, 132/12/11 KV (KESC system) 8 320.0
3 20/26 MVA, 132/11.5 KV 59 1,534.0
4 10/13 MVA, 132/11.5 KV 59 767.0
5 6.3 MVA, 132/34.5 KV 5 31.5
6 10/13 MVA, 66/11.5 KV 10 130.0
7 6.3 MVA, 66/11.5 KV 4 25.2
Total 148 2,927.7
In - House Developed/Modified8 31.5/40 MVA, 132/11.5 KV (WAPDA system)9 20/26 MVA, 132/6.6 KV (Cement Sector)10 10/13 MVA, 66/11.5 KV (HESCO system)11 7.5 MVA, 132/6.6 KV (CDA )
Product-Mix
1,5,6,7 phased out from of WAPDA system
1010
HEC DESIGNED POWER TRANSFORMER - RATING 31.5/40 MVA, 132/11.5 KV – WEIGHS 78 TONS INCLUDING OIL 22.8 TONS, RADIATORS 18 NOS
Power Transformer – 40MVA
111111
RATING 20/26 MVA, 132/11.5 KV, WEIGHS 72 TONS INCLUDING OIL 28 TONS, RADIATORS 10 NOS ←
Power Transformer – 20/26MVA
Sub-Assemblies
Manufacturing Facilities
141414
Performance
15
40 MVA26 Nos
Rs. 966 Million
20/26 MVA186 Nos
Rs. 4,804 Million
10/13 MVA64 Nos
Rs. 1,240 Million
Repair / Rehabilitation
104 NosRs. 574 Million
Total (276+104) Power Transformers- RS. 7,584 Million
Sales Summary – Upto Dec 2013
Operational and Financial position for last 5 years
16
Description 2008-09 2009-10 2010-11 2011-12 2012-13
PT Supplied (No's)
30 28 23 14 17
Capacity Utilization
19.4% 24.6% 20.9% 8.6% 16%
Sales 797 965 828 539 704
Gross (Pr/Loss) (4) 94 73 68 78
Pre tax Profit/(Loss)
(42) 32 (26) 8.5 (6.9)
Total Assets 1,433 1,774 1,714 1,378 1,694
Total Liabilities 236 552 527 188 486
Accumulated Profit/(Loss)
(263) (238) (273) (270) (280)
Net Equity 1,197 1,222 1,187 1,190 1,180
Value in Rs Million
17
Order Position FY 2013-14 (Rs. In Million)
SN Client Description Qty. Value
1 PESCO 20/26MVA 1 38.000
2 ALSTOM 20/26MVA 2 79.000
3 USAID/PESCO Fan Motors, CBs ETC 12.530
4 FESCO 31.5.40 MVA 1 47.600
4 177.130
1 Colony Mill Multan 20/26 MVA 1 38.0001 38.000
1 ALSTOM 20/26 MVA 1 6.6202 PESCO/USAID 20/26 MVA 1 14.3903 Pak. Steel 4000KVA 1 3.850
3 24.8604 62.860
1 SEPCO/19.11.2012 10/13 & 20/26 MVA 6 237.00020/26 MVA 131.5/40 MVA 2
3 LESCO/30.10.2013 31.5/40 MVA 13 598.00022 968.000
1 IESCO 30/37MVA, SAVIGLIANO/Wah 1 16.5842 IESCO 20/26MVA, Minal/Wah 1
3 GEPCO 20/26MVA, Siemens/Bhimber 1 4.655
4 GEPCO 10/13MVA, Ganz/K.Sheikhan 1
4 21.23926 989.239
NEW P/TFs
TOTAL; C
SUB TOTAL
SUB TOTAL
C. EXPECTED ORDERS
NEW P/TFs
NEW P/TFs
TOTAL; A
B. ORDERS IN HAND
A. ORDERS EXECUTED
TOTAL; B
Repair of TFs
SUB TOTAL
2 MEPCO/06.11.2013 133.000
SUB TOTALRepair of TFs
181818
Planned Goals
and
Attractions for Investors
Future Goals
Plan Target
Short Term Plan (2 Year)
Business Enhancement Gradually enhancing annual sales turnover to Rs. 1. 2 billion in next two years
Design Optimization Finalizing improved design 20/26 MVA prototype during FY 2013-14
Mobile GSM System Launching New GSM System for Smart Grids during 2014
Systems Improvement Phase-wise Introduction of Enterprise Resource Planning in the company during 2013-14 and 2014-15
Enhancing In-house Testing Facilities Procurement of Impulse Generator by 2015
Long Term Plan
Diversification for manufacturing higher module step down power transformers (160 MVA and 250 MVA) as well as step up generator transformers
02 years after seeking government clearance to line-up suitable foreign investor and technology partner
20
Comprehensive, Integrated and Largest Power Transformer manufacturing facility in the Country
Abundant Land/Shop space and Infrastructure available for product diversification with less investment and short time frame
ISO 9001 Certified Company Easy access to Road and Railway network
Vast and growing market due to planned expansion of power sector
Conducive National investment policies moving towards open economy
Attractive incentives for local manufacturing
Availability of skilled manpower at reasonable wages
Ample Export opportunities being located geographically close to potential
markets of Afghanistan and Central Asian States
Investors Attractions
212121
Thank You