1 performance management report service group: provide support services to security, fire, police,...
TRANSCRIPT
1
Performance Management Report
Service Group: Provide support services to security, fire, police, and emergency management
Team Leader:
Major Bill Alford
Team Members:
Dispatch Supervisor Guy Borden
Sergeant Mike McGraw
Corporal Bill Dougherty
ORS
National Institutes of Health
Date: 14 January 2005
2
Table of Contents
Main Presentation
PM Template ……………………………….……………………… 3
Customer Perspective……………………….…………………… 5
Internal Business Process Perspective……………………………………… 18
Learning and Growth Perspective…………………………………………… 24
Financial Perspective……………………………………… 33
Conclusions and Recommendations………………………………………….. 42
3
Value Proposition : Ensure the safety of staff and visitors by providing reliable and timely emergency communications, preliminary background checks, and community policing. We tailor these services to accommodate the unique culture and diversity of NIH.
:
Customer
InternalProcesses
Financial
Learning & Growth
IB1
L1
F1
Provide an environment that is safe and secure for personnel and others while at NIH facilities
C1
Increase the quality of service Minimize unit cost of
ECC, conducting background checks, & of community policing
Use innovative technology to enhance skills and improve performance
High Impact Objectives-Provide Support Services
4
Value Proposition
Team Members
Maj. Billy Alford
We will deliver coordinated and unified services by ensuring that internal/external lines of communications are open, working together, increasing cost effectiveness, reliability and timelines in providing emergency communications. This is done by providing highly trained staff, and a state of the art emergency communications system.
Strategy Description
To ensure the safety and security of NIH staff, patients, visitors, and property, we provide a reliable and timely emergency communications services, personal security checks on new employees and contractors, and community policing services. We tailor these services to accomodate the unique culture, history, intellectual assets and diversity of the Nation's leading biomedical research complex while adhering to federal guidelines, policies, and regulations.
Team Leader
Date: 5 Oct 2004
Service Strategy
Guy Borden, Mike McGraw, Bill Dougherty
DS3: Provide community policing
Provide support services to security, fire, police and emergency management
Service Group
Performance Management Plan (PMP)
DS2: Conduct personal security checks (change to personnel security)
DS1: Operate Emergency Communications Center
Discrete Services
Division Approval/Date: Associate Director Approval/Date:
Operational Excellence
Customer Intimacy
Product Leadership
Growth
Sustain
Harvest
5
Customer Perspective
6
Objective MeasureFY 04 Target
FY05 Target
FY06 Target
Initiative Owner
C1a: # of requests for ECC Service
N/AEstablish/Implement
comprehensirve management plan for ECC
Guy Borden
C1b: % of calls resulting in dispatch of fire/ EMS N/A Mike McGraw
C1c: % of calls resulting in dispatch of police officer
N/A Mike McGraw
C1d: Number of personnel clearances N/A Bill Dougherty
C1e: Number of persons fingerprinted for employment/security clearences
N/A Mike McGraw
C1f. # of intelligenc items disseminated N/A Mike McGraw
C1g. # of community policing contacts, events. Articles N/A Bill Dougherty
Cust
om
er
C1: Provide an environment that is safe and secure for personnel and others while at NIH facilities.
Customer Perspective
7
Customer Measures
For ECC
8
NIH ECC Requests for Service per Week by Type
1,1801,250 1,265 1,267 1,235
1,1321,198
1,285 1,262
1,029
1,199
1,326
895839
786863 821 858 869
944901 866
915 913
215 238 231
85132 104
165 188 178 188125
218
117170 186
91
192113 115
73 82 9098 122
2,380
2,192
2,345
2,532
2,414
2,165
2,361
2,547
2,306
2,4682,4972,407
-
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
July-10-04 July-17-04 July-24-04 July-31-04 Aug-7-04 Aug-14-04 Aug-21-04 Aug-28-04 Sep-4-04 Sep-11-04 Sep-18-04 Sep-25-04
Phone Calls Radio Calls (Entered in CODY) Radio Calls (Non-CODY)
Incidental / Drop-in Total
C1a. Requests for Service July –Sept 04
9
Comparisons to prior years• C1. Provide an environment that is safe and
secure for personnel and others while at NIH facilities.
• C1a.Number of requests for ECC service
• Monthly Average for FY 03 • 5,550 (1)
• Monthly Average for FY 04 Quarterly Average• 9,500 - 28,500
(1) Note: Complete Data for FY 03 is was not available due to system problem
10
FY 03 FY 04 FY 04 (as a percent of total)
Q1 not available 1,209 4.2 %
Q2 1,238 1,003 3.5 %
Q3 1,290 939 3.3 %
Q4 1,241 1,219 4.3 %
* Note: Average total calls per quarter = 28,500
C1b. Percent of calls dispatching fire/EMS
11
FY 03 FY 04 FY 04 (as a percent of total)
Q1 not available 6,566 23 %
Q2 5,663 7,132 25 %
Q3 5,176 7,291 26 %
Q4 5,954 7,119 25 %
*Note: Average total calls per quarter = 28,500
C1b. Percent of calls dispatching police
12
Customer Measures (cont.)
For other support services
13
C1d. Number of Personnel Security ChecksOct - Dec 02: 788 Jan-March 04: 1871
Jan-March 03: 930 April- June 04: 1,571
April-June 03: 1,086 June-Sept 04: 1,985
July-Sept 03: 1845 Oct- Dec 04: 1,456 total for yr 4,679 Total for yr: 6,883
C1e. Number of persons fingerprintedOct- Dec 02: Not available Jan-March 04:
447Jan-March 03: Not available April-June 04:
630April-June 03: 110 June - Sep 04:
833* July-Sept 03: 239 Oct-Sept 04: 930
Total for yr: 349 Total for yr: 2872
*(started fingerprinting all new employees)
14
C1f. # of intelligence items
(Data not collected in FY03)Avg. Analyzed per day FY04: 35
Avg. Analyzed per month FY04: 770Avg. Analyzed per year FY04: 2310Avg. Analyzed per year FY04: 9240Avg. # Distributed to staff FY 04: 3 per day Mon- Fri.Avg. # of intel meetings attended per month=3
C1g. # of community policing contacts, events, articles
Oct-Dec 02: Not available Oct-Dec 03: 116
Jan-May 03: 25 Jan-Feb 04: April- June 03: 21 March –
May 04: 58July- Sept 03: 34 June –
August 04: 51
15
IB1a: Timeliness of dispatch Guy Borden
IB1b: # of calls by location and type
Mike McGraw
IB1c: # of Cody entries requiring correction
IB1d. % of ECC shifts where asigned personnel are not present
IB1e. % of trainees registrations cancelled 24 hrs or less prior to training date
IB1f. # of intelligence items analyzed
IB1g. Average turnaround time for preliminary background check
Bill Dougherty
IB1: Improve quality of service
Inte
rnal
Bus
ines
s
Internal Process Perspective
16
Internal Business Process Measures
For ECC
17
• IB1. Improve Quality of Service• IB1a. Timeliness of dispatch
• FY 03 27,331 calls at 2.9 minutes average time to dispatch• Oct-Dec 03 7,773 calls at 3.4 minutes average time to dispatch• Jan – March 8,155 calls at 2.7 minutes average time to dispatch• April – June 8,261 calls at 2.6 minutes average time to dispatch• July – Sept 8,364 calls at 3.5 minutes average time to dispatch
-Total Calls FY04: 32,553* at 3.05 minutes average time to dispatch*(reflects of 5,222 or increase in volume of 19% from FY03 with a 5%
increase in average time to dispatch)-
• IB1b. # of calls by location and type* (This measure was moved to Police Operations)
• IB1c. # of Cody entry corrections – 225 in 9 months per 25, 053 CODY dispatches
• IB1d. % of ECC shifts where assigned personnel are not present*
• % of ECC shift hours using Overtime ………… 3.5% • Avg. # of ECC hours per week …………………. 437 • Avg # of OT hours per week……………………….16
18
Internal Business Process Measures
For Other Support Services
19
• IB1. Improve Quality of Service
• IB1e. % of trainees registrations cancelled inside 24hrs (TBD)
• IB1f. # of intelligence items analyzed• Average 35 per day
• IB1g. Avg. turnaround time for personnel clearance
• 192 per week (9,984 per year) at 1.5 days average turnaround time
20
Learning and Growth Perspective
Objective MeasureFY 04 Target
FY05 Target
FY06 Target
Initiative Owner
L & GLG1: Increase knowledge, skills and abilities of staff
LG1a: Percent of Employees qualified in soft skills (i.e. medical, EEO, Ethics)
LG1b: % of Sworn Police (SSB) completing mandated in-service training
LG1c: % of officers qualified at range with issued weapons
21
Learning and Growth Measures
For ECC
22
• LG1. Increase Knowledge Skills and Abilities of employees
• LG1a. % employees qualified in “soft skills” (i.e. medical, EEO, Ethics)
• 25% Emergency Police Dispatch (EPD)• 25% Emergency Fire Dispatch (EFD)• 0% for all others:
• Communications ( no training in 04)• Call Processing• Dispatch Procedures• Stress Management• Disaster and major incident training• TTY training
23
Learning and Growth Measures
For other support services
24
• LG1. Increase Knowledge Skills and Abilities of employees
• LG1b. % of Sworn Police (SSB) completing mandated in-service training
• 100% completed except for:• 0% for Defense tactics training - EEO is not available• 0% for EMT
• LG1c. % of officers qualified at range with issued weapon• of all officers enrolled, 100% completed for all types of issued
weapons
25
Financial MeasuresF1: Minimize unit cost of
operating the ECCF1a: Number ofrequests
for ECC ECC service (via phone, radio, drop-in) -includes emergency and non-emergency requests
Guy Bordon
F2: Minimize unit cost of conducting preliminary background checks
F2a: Number of preliminary background checks
Mike McGraw
F3: Minimize unit cost of community policing
F3a: Number of community policing contacts
F3b: Number of community policing events
Bill Dougherty
26
Financial Measures
• F1. Minimize unit costs of operating ECC, conducting preliminary background checks, and community policing.• F1a. Cost per ECC call/contact/request……
$10.82
• F1.b. Cost per preliminary background checks…. $30.30
• F1c. Cost community policing event …….. $2,333.33
27
Conclusions / Initiatives
28
What changes have we made based on monitoring our data?
Different staffing configurations for ECC to reduce Overtime problems
Coordinate patrolling activities with community policing opportunities
Introducing K-9 teams to visitors and staff for community policing opportunity
Ramp up for new fingerprinting work load increase of 3 x previous workload
Focused distribution of daily intelligence reports
29
How do we plan to contribute in the future?
New ECC with advance remote monitoring equipment
Redundant systems hardware to protect against dispatching failure
Emphasize new technology and best practices training for all Support Service and ECC personnel
Study and compare against similar type operations to develop new methods for providing Emergency Communications Services
Expand community policing program to develop community eyes and ears for threat detection and advanced warning
Sharpen our incident response procedures and develop up to date contingency plans for dealing with personnel shortages and overload emergencies
30
AppendicesAppendix
Page 2 of template………………………….……………………………….32
Customer Perspective
C1a: Total Number of Service Requests handled by ECC……..37
C1b: Number Telephone Calls for Police, Fire, General Support Received in ECC …………………………………………………………37
C1c: Number of Personal Security checks for Access (Oct 03 – Dec 2004)
…………………………………………………37
C1d: Number of Personnel Fingerprinted for Employment and Security Clearances (Oct 03– Dec 2004)…………………………….37
C1e: Number of persons fingerprinted………………………….37
C1f: Number of Community Awareness Events………………….37
C1g: Number of Community Policing Contacts…………………….37
C2, C3: NIH Security Survey Ratings…………………………………..37
Page 3 of template……………………………………………………………33
Internal Business Process Perspective
IB1a: Timeliness of Dispatch………………………………………….38
31
Appendix (con’t)
Page 4 of Template…………………………………………………………………………34
Learning and Growth Perspective
LG1: Percent of Individual Development Plans (IDP) Tasks Completed……….39
LG2a: Number of new training technology acquired…………………………….39
LG2b: Dollars spent for new training technology…………………………………39
Page 5 of Template…………………………………………………………………………35
Financial Perspective
F1a: Number and Identification of New Systems/Technologies that Reduce Man-hours………………………………………………………………………………………..39
F1b: Total Dispatcher Overtime……………………………………………………39
F2: Number and Identification of New Systems/Technologies that Reduce Error Rate and Duplication of Effort, Resulting in Additional Lost Time for Customers…39
Table of Contents (con’t)
32
Objective MeasureFY 04 Target
FY05 Target
FY06 Target
Initiative Owner
C1a: # of requests for ECC Service
Establish/Implement comprehensirve management
plan for ECCGuy Borden
C1b: % of calls resulting in dispatch of fire/ EMS Mike McGraw
C1c: % of calls resulting in dispatch of police officer
Mike McGraw
C1d: Number of personnel clearances Bill Dougherty
C1e: Number of persons fingerprinted for employment/security clearences
Mike McGraw
C1f. # of intelligenc items disseminated Mike McGraw
C1g. # of community policing contacts, events. Articles Bill Dougherty
Cust
om
er
C1: Provide an environment that is safe and secure for personnel and others while at NIH facilities.
Customer Perspective
33
Objective MeasureFY 04 Target
FY05 Target
FY06 Target
Initiative Owner
C2a. # of meetings attended with internal/external customers
C2b. # of participants in ride-a-long program
C2c. # of people touring the mobile command center
C2d. Ratings on competence on Customer Scorecard (orchastrate survey so that customers are not bombarded)
C2e. Ratings on professionalism on customer scorecard (maybe ask safety question here)
C3a: # and type of customer complaints
Develop Trail Audit process and survey with OQM
Guy Borden
C3b. Customer Scorecard to Fire Dept for ECC
Develop questions with OQM for 2004 Survey
Billy Alford
C2c. Customer scorecard to Police Officers for ECC
Develop questions with OQM for 2004 Survey
Billy Alford
C2d. Customer scorecard to Police Officers and ECC for training
Develop questions with OQM for 2004 Survey
Billy Alford
C2e. Customer scorecard of Aos/ Project Officers for preliminary screeening/cleareances
Develop questions with OQM for 2004 Survey
Billy Alford
C2f: Customer Scorecard of DSER Division Heads, Facility Managers, NLM, CC for community policing
Develop questions with OQM for 2004 Survey
Billy Alford
C2. Project an Image of knowledge and competence while ensuring a professional and respectful relationtionship with our customers/stakeholders
Custo
mer
C3: Increase customer satisfaction with police support activities
Surveys on Hold
34
Objective MeasureFY 04 Target
FY05 Target
FY06 Target
Initiative Owner
IB1a: Timeliness of dispatch Guy Borden
IB1b: # of calls by location and type
Mike McGraw
IB1c: # of Cody entries requiring correction
IB1d. % of ECC shifts where asigned personnel are not present
IB1e. % of trainees registrations cancelled 24 hrs or less prior to training date
IB1f. # of intelligence items analyzed
IB1g. Average turnaround time for preliminary background check
Bill Dougherty
IB2a: # of meetings with emails communicating content
Establish QA program for entries in Cody System
Guy Borden
IB2b: Inventory communicated to Sr. Managemetn (Required to Authorized) for police
Develop Support Services Survey with OQM
Billy Alford
IB2c. # Of intelligence items communicated
IB2d. # of Montgomery Co. Police Dept Bulletins disseminated
IB2e. # of actions taken to improve facilities and improve security from facility manager meetings
IB2f: % of NIH buildings with active community policing contact
Bill Dougherty
IB1: Improve quality of service
IB2: Improve communication and coordination among ourselves and with other NIH service providers
Inte
rnal
Bu
sin
ess
35
Objective MeasureFY 04 Target
FY05 Target
FY06 Target
Initiative Owner
IB3a. # of communocations via MILES
IB3b. # of communocations via HARS
IB3c. # of communocations via NAWAS
IB3d. # of intellegence meetings attended with outside intellegence organizations
IB3e. # of community policing events attended outside NIH
LG1a: Hours of skill enhancement by technology type (classroom training per staff member; Web training per staff member, On the job training per staff member
LG1b: % of ECC personnel with current certification
LG1c: % compliance with all ECC mandatory training
LG1c: % compliance with all ECC mandatory training
LG1d: % of Division of Police budget spent on training
LG1d: % of IDP tasks completed
Tom Scott
Lea
rnin
g a
nd G
row
th
IB3. Maximize collaberation with relevant Federal, State, and local agencies
LG1: Increase knowledge, skills and abilities of staff
36
Objective MeasureFY 04 Target
FY05 Target
FY06 Target
Initiative Owner
LG2a: # of specilized law enforcement equipment acquired
LG2b: Web-based uptime
LG1c: # of cars added to fleet
LG1d: % of training achieved on web-based technologies
Tom Scott
F1: Minimize unit cost of operating the ECC
F1a: Number ofrequests for ECC ECC service (via phone, radio, drop-in) -includes emergency and non-emergency requests
Guy Bordon
F2: Minimize unit cost of conducting preliminary background checks
F2a: Number of preliminary background checks
Mike McGraw
F3a: Number of community policing contacts
F3b: Number of community policing events
Bill Dougherty
Fina
ncia
l
LG2: Use innovative technology to enhance skills
F3: Minimize unit cost of community policing
37
Measures – Support Services• C1a.Number of requests for ECC service
• July 04: 9,678• August 04: 9,499• Sept 04: 9,487
• C1b. % of calls dispatching fire/EMS per Quarter• Oct- Dec 03: 1,209• Jan – March 04: 1003• April - June 04: 939• July - Sept 04: 1,219
• C1c. % of calls dispatching police officer per Quarter• Oct- Dec 03: 6,566• Jan - March 04: 7,132• April - June 04: 7,291• July – Sept 04: 7,119
• C1d. Number of personal security checks• Jan-Mar 04: 1,871• April-June 04: 1,571• June-August 04: 1,985• Oct- Dec 04: 1,456 Total for 04= 6,883
• C1e. Number of persons fingerprinted• March - May 04: 319• June - August 04: 996* (started fingerprinting all new employees)
• C1f. # of intelligence items• Avg. Analyzed per day: 35• Avg. # Distributed to staff: 3 per day Mon- Fri.
• C1g. # of community policing contacts, events, articles• Oct- Dec 03: 116• Jan-Feb 04: • March – May 04: 58• June – August 04: 51
• C2 Survey Results: not available• C3 Survey Results-not available
38
Measures – Support Services• IB1a. Timeliness of dispatch
• Jan – March 8,155 calls at 2.7 minutes • April – June 8,261 calls at 2.6 minutes • July – Sept 8,364 calls at 3.5 minutes
• IB1b. # of calls by location and type* (This measure is moved to Police Operations)
• IB1c. # of Cody entry corrections – 225 in 9 months per 25, 053 CODY dispatches
• IB1d. % of ECC shifts where assigned personnel are not present*• % of ECC shift hours using Overtime …… 3.5% • Avg. # of ECC hours per week ……………. 437 • Avg # of OT hours per week………………….16
• IB1e. % of trainees registrations cancelled inside 24hrs (TBD)
• IB1f. # of intelligence items analyzed• 35 per day
• IB1g. Avg. turnaround time for preliminary background check• 192 per week at 1.5 days average turnaround time
39
Measures – Support Services
• LG1a. % employees qualified in “soft skills” (i.e. medical, EEO, Ethics)
• 25% Emergency Police Dispatch (EPD)• 25% Emergency Fire Dispatch (EFD)• 0% for all others:
• Communications ( no training in 04)• Call Processing• Dispatch Procedures• Stress Management• Disaster and major incident training• TTY training
• LG1b. % of Sworn Police (SSB) completing mandated in-service training
• 100% completed except for:• 0% for Defense tactics training -
EEO is not available• 0% for EMT
• LG1c. % of officers qualified at range with issued weapon
• 100% completed for all types of issued weapons
• F1a. Cost per ECC call/contact/request…… $10.82
• F1.b. Cost per preliminary background checks $30.30
• F1c. Cost community policing event ..$2,333.33