Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
1 of 28
PROJECT REPORT
IRON ORE CRUSHING & SCREENING FACILITIES OF CAPACITY 14,00,000 TPA
WITHIN MINING LEASE AREA OF 138.96 HA AT ARI DONGRI
I N D E X
29
CHAPTERS PARTICULARSPAGE
NO.
I Introduction & Project Cost 2-3
II Company / Group Profile 4-9
III Proposed Project 10-11
IV Manufacturing Process 12-13
V Utilities 14
VI Site & Infrastructure 15-16
VII Civil & Structural Work 17-18
VIII Environment Management 19-20
IX Socio-Economic Development 21-26
X Project & Manpower 27
XI Project Implementation Schedule 28
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
2 of 28
CHAPTER - I
INTRODUCTION
A. PROJECT PARAMETERS & DETAILS:
Name of the Unit : GODAWARI POWER AND ISPAT
LIMITED
Certificate of Incorporation : 21/09/1999
Regd. Office : Plot No. 428/2, Phase I, Industrial Area,
Siltara - 493111, Dist. Raipur(Chhattisgarh)
Location of the project : Within the mining lease area of 138.96 ha in
Forest Compartment No. 139 (New 608)
Village : Kachche (Ari Dongri),
Tehsil : Bhanupratappur,
Dist. Uttar Bastar (Kanker), Chhattisgarh
Contact person : Shri T. Bose
Tel No. : 0091-771-4082736 / 4082000
Mobile No. : 09993000739
Fax No. : 0091-771-4057601
Project Activity : Iron Ore Crushing & Screening Unit -Capacity 14,00,000 TPA or 400 TPH
Land Area : 8000 Sq. Mtr. within the mining lease area of
138.96 ha
Water Requirement : 10 KLD
Power Requirement : 650 KW
Manpower : 55 Nos.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
3 of 28
B. PROJECT COST & FINANCING :
(Rs. in Crores )
SL.
NO.
PARTICULARS PROJECT
COST
COST OF PROJECT
1 SITE DEVELOPMENT 0.50
2 FACTORY SHED, BUILDING & CIVIL WORK 1.00
3 PLANT & MACHINERY 13.00
4 MISCELLENOUS 0.50
TOTAL 15.00
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
4 of 28
CHAPTER - II
COMPANY / GROUP PROFILE
Godawari Power & Ispat Limited (GPIL) was incorporated on 21/09/1999 with the
Registrar of Companies, Gwalior (M.P.). The promoters of the company are the Hira
Group of Industries, which is one of the largest groups in Central India. Hira Group,
integrating its operations by setting up facilities for forward and backward integration
and foraying into higher value added projects, has diversified into Sponge Iron,
Power, Steel, Rolled Products, Ferro Alloys, Mining, Cement, Crushing,
Beneficiation, Pelletization, Renewable Energy, Technology & Real Estate. Our
group turnover is about Rs. 2600 Crores (Net) in FY 2014-15 within which the
turnover (Net) of Godawari Power & Ispat Ltd. is Rs.1935 Crores. The Group is one
of the largest entities of the Chhattisgarh and also has a pronounced presence in other
states.
GPIL is the flagship company of Hira Group of Industries, incorporated in 1999. The
company’s integrated steel manufacturing unit having a dominant presence in the
long products segment of the steel industry, mainly into mild steel wires. Today,
GPIL is an end-to-end manufacturer of mild steel wires. In the process, the company
manufacturers sponge iron, billets, ferro-alloys, power, wire rods and steel wires.
Board of Directors
The Board of GPIL comprises following Directors:
1) Mr. Biswajit Choudhuri, Chairman Independent Director
2) Mr. Bajrang Lal Agrawal, Managing Director
3) Mr. Dinesh Agrawal, Executive Director
4) Mr. Abhishek Agrawal, Executive Director
5) Mr. Dinesh Kumar Gandhi, Non-Executive Director
6) Mr. Vinod Pillai, Executive Director
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
5 of 28
7) Mr. Shashi Kumar, Independent Director
8) Mr. B.N. Ojha, Independent Director
9) Mr. Harishankar Khandelwal, Independent Director
10) Ms. Bhavna G. Desai, Independent Director
Company at a glance
Godawari Power & Ispat Ltd was originally incorporated as Ispat Godawari Ltd in
1999 with an objective to set up facilities to manufacture sponge iron, billets, and
generate captive power at Industrial Area, Phase-I, Siltara, Dist. Raipur, Chhattisgarh.
Year Particulars2001 Beginning of commercial operations with
Sponge Iron Plant of capacity 1,05,000 TPA2003 Fully operational -
Sponge Iron Plant - 1,05,000 TPA with Steel Billets - 1,00,000TPA & Captive power generation - 18 MW
2003 Prospecting License for iron ore mining at Boria Tibbu inChhattisgarh
2004 1st Phase expansion -Sponge Iron - 2,35,000 TPA, Steel Billet - 2,00,000 TPA, Captivepower generation - 28 MW, Ferro Alloys - 16,500 TPA & HBWire - 1,00,000 TPA
2005 Name of the company changed from Ispat Godawari Ltd. toGodawari Power & Ispat Ltd.
2005 Allotment of captive iron ore mines at Ari Dongri, Dist. Kanker(106.60 ha) & Boria Tibbu, Dist. Rajnandgaon (110.0 ha) inChhattisgarh
2006 2nd Phase expansion -Sponge Iron - 2,60,000 TPA, Steel Billets - 2,00,000 TPA, Captivepower generation - 25 MW, Oxygen Gas Plant - 12,00,000Cu.Mtr., Nitrogen Gas Plant - 45,00,000 Cu.Mtr. & Fly Ash BrickPlant - 1,65,00,000 Nos.
2006 Successfully completed its initial public offering and its shares gotlisted on the BSE & NSE
2006 First WHRB captive power plant (7 MW) became the first one inthe world to be registered with CDM Executive Board forentitlement of carbon credits under the Kyoto Protocol.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
6 of 28
2008 Setting up of Iron Ore Crushing Plant at Gidhali of 12,00,000 TPAcapacity.
2009 Iron Ore mining operations started at Ari Dongri, Dist. Kanker.2009 Further expansion for installation of 20 MW Biomass Power Plant,
Iron Ore Beneficiation - 10,00,000 TPA, Rolling Mill - 3,00,000TPA & Arc Furnace - 5,000 TPA
2010 Commissioning of Iron Ore Pellet Plant of 6,00,000 TPA capacity2011 Merger of R.R. Ispat Limited (having a Rolling Mill of capacity of
1,00,000 TPA), a wholly owned subsidiary of the company withGodawari Power & Ispat Ltd.Subsequently, the name of R.R. Ispat Limited has been changed toR.R. Ispat (A Unit of Godawari Power & Ispat Ltd.).
2013 Commissioning of Iron Ore Pellet Plant of 15,00,000 TPAcapacity
2014 Mining operations started at Boria Tibbu Iron Ore Mines, Dist.Rajnandgaon.
The current installed capacity of Godawari Power and Ispat Limited is -
Sponge Iron : 4,95,000 TPA
Steel Billets : 4,00,000 TPA
Steel Rolled Products : 1,00,000 TPA
Power (Coal/WHRB/Biomass/Wind) : 73 MW
Ferro Alloys or Pig Iron : 15,450 TPA or 33,000 TPA
Oxygen Gas : 12,00,000 M3 per Annum
Nitrogen Gas : 45,00,000 M3 per Annum
Fly Ash Brick plant : 1,65,00,000 Nos. per Annum
Iron Ore Pelletizing Plant : 21,00,000 TPA
Iron Ore Crushing : 12,00,000 TPA
Iron Ore Beneficiation : 10,00,000 TPA (under Commissioning Stage)
Rolling Mill : 3,00,000 TPA (under implementation)
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
7 of 28
The following Environment Clearances were obtained from Ministry of Environment
& Forests, New Delhi for our current projects.
1) MoEF F. No. J-11011/326/2005-1A II (I) dated 02/03/2006
2) MoEF F. No J-11015/208/2006-IA II(M) dated 31/01/2007
3) MoEF F. No J-11015/339/2006-IA II(M) dated 25/06/2007
4) MoEF F. No. J-11011/179/2009-IA II(I) dated 25/08/2009
5) MoEF F. No. J-11015/384/2012-IA II(M) dated 12/12/2014
The compliance reports for all the existing manufacturing facilities and mining
operations are being submitted to the Regional Office, MoEF, Bhopal and
Chhattisgarh Pollution Control Board, Raipur.
Consistent with the vision, GPIL, continually endeavors in mastering the techniques
for improving the factors affecting their mission with environment, customers,
benefits to society, public Image, philosophy & values, profitability & growth;
pursuing innovation, Creativity, Diversity, environment excellence and change. We
believe in blue ocean technology i.e., a sound strategy model to put technology to use
in a commercial way inducting low cost process planning, preparing new technology
road map benchmarking of process with world’s best to ensure desired outputs from
the inputs.
Our Strategy
- To integrate the operation by setting up facilities for forward and backward value
chain and emerge as integrated and leading player in the steel wire segment in
organized sector with a complete value chain from Iron Ore to steel wire.
- To achieve economies of scale by setting up sizable manufacturing facilities.
- To gainfully utilize waste generated during the process of manufacturing and
maximize the return for shareholders.
- To foray into higher value added products such as alloy and stainless wires with
total integrated facility of producing finished wire from Iron ore.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
8 of 28
GPIL has become the first company in Chhattisgarh to be awarded the Integrated
Management System Certification by Accreditation bodies UKAS of UK and Swiss
Accreditation of Switzerland and certified by SGS India Pvt. Ltd., signify excellence
in different aspects of business.
ISO:9001:2008 FOR Quality Management System
ISO:14001:2004 for Environment Management System
OHSAS ISO:18001:2007 for Occupational Health & Safety
Group Companies
Hira Cements Limited (HCL):
Hira Cement Ltd. is a Cement Grinding Unit set up in 1988 with a current capacity of
42,500 tonnes per annum. The plant is located in Urla Industrial Area, Raipur and
has a good market.
Hira Ferro Alloys Limited (HFAL):
HFAL has set up the first unit in India to commercially manufacture Ferro alloys in
small electric arc furnaces. Our group was the first in India to break this monopoly
and develop in-house technology by own Research and Development to produce
Silico Manganese in a small furnace.
The first unit of HFAL came into production from October 1990 for a capacity of
Ferro Manganese of 8000 TPA. The plant has gone for expansion and the current
capacity is 10,500 MT per annum of Ferro Alloys. The second unit of HFAL has a
captive thermal power plant of capacity 20 MW, Biomass power of 8.5 MW, Ferro
Alloys of capacity 50,000 TPA and a Fly Ash Brick manufacturing facility of
capacity 3,00,000 MT per annum.
Alok Ferro Alloys Limited (AFAL):
AFAL is the second Ferro Alloys plant of the group. The plant went into production
in March, 1995 manufacturing Ferro chrome & Silico manganese with a capacity of
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
9 of 28
14,500 MT per annum. AFAL has also set up Captive Power Plant of 8 MW
capacity.
Hira Steels Limited (HSL):
The group made its first foray into Iron & Steel by setting up a state-of-the-art fully
automatic, high speed wire rod mill & wire drawing unit with an installed capacity to
produce 42500 MT of Wire rods & 20000 MT of wires. The current capacity of the
plant is 1,20,000 MT per annum of Wire Rods & 60,000 MT per annum of HB Wires.
Jagdamba Power & Alloys Ltd (JPAL):
JPAL located at Murethi, Siltara Industrial Area, Raipur is having a capacity of 25
MW Thermal Power plant. The unit was commissioned in March, 2007 and is selling
all its power to the Electricity Board Grid.
Ardent Steel Limited
ASL is the subsidiary of M/s. Godawari Power and Ispat Limited, a company
incorporated under the Companies Act in April, 2007. The company has established a
0.6 MTPA Iron Ore Pelletization Plant in Keonjhar District, Orissa, India. This was a
step towards value addition to the iron ore mines deposits with some soft ore in the
Gandhamardhan and other nearby deposits of Keonjhar district, Odisha.
Godawari Green Energy Limited
The company has recently commissioned the First Concentric Solar Power Project of
50 MW capacity under the Jawaharlal Nehru Solar Mission Phase-I at Village Nokh,
Tehsil- Pokhran, District Jaisalmer, Rajasthan.
The unit has successfully started injecting power to the National grid on World
Environment Day, the 5th June, 2013 and subsequently the commercial operations
were started from 19th June, 2013.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
10 of 28
CHAPTER - III
PROPOSED PROJECT
The company has obtained Environment Clearance vide No. J-11015/384/
2012.IA.II(M) for iron ore mining in the lease area of 138.96 ha with mining capacity
of 14,05,000 TPA situated at Village : Kachhe Ari Dongri, Tehsil : Bhanupratappur,
Dist. Kanker, Chhattisgarh.
Now the company proposes to set up an Iron Ore Crushing & Screening facilities of
14,00,000 TPA capacity in the area of 8000 Sq.Mtr. within the mining lease area of
138.96 ha in Forest Compartment No. 139 (New 608).
The Iron Ore Crushing & Screening plant has already been incorporated in the Approved
Amalgamated Mining Plan. The company now proposes to regularize the facility by
suitable amendment in the Environmental Clearance.
Location of the existing Iron Ore Mining Lease Area
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
11 of 28
Co-ordinates of the mining lease area of 138.96 ha:
Boundary pillars co-ordinate taken by D.G.P.S. (WGS/84) is as under:
BP No. Latitudes Longitudes
B N 200 24’ 42.73776” E 810 04’ 06.555288”
C N 200 24‘42.53773” E 810 04’ 13.16868”
D N 200 24’ 27.78048” E 810 04’ 13.28954”
E N 200 24’ 27.73987” E 810 04’ 06.57600”
F N 200 24’ 13.53910” E 810 04’ 06.63651”
G N 200 24’ 13.33339” E 810 03’ 47.34940”
H N 200 24’ 09.44879” E 810 03’ 47.33956”
I N 200 24’ 09.33642” E 810 03’ 34.20093”
J N 200 25’ 01.44269” E 810 03’ 33.73692”
K N 200 25’ 01.51454” E 810 03’ 47.18549”
The proposed iron ore crushing & screening with 400 TPH capacity will consist of
Vibrating Screens, Jaw Crusher system, cone crusher, roll crusher, conveyor systems and
pollution control equipments.
The reason behind for setting up the iron ore crushing and screening unit is that the
average grade of iron ore available in the ML area is around 60% Fe, whereas the iron ore
encountered within the BHQ/BMQ is having 52% Fe. The ROM ore will be crushed to
fines at mines itself and transported directly to our plant site situated at Siltara, Raipur
from the ML area.
The area is well connected through road network. Area is approachable from Rajahara by
State highway connecting Jagdalpur by covering a distance of about 20km. The nearest
Railway Station is Kusumkasa (Near Dalli Rajhara) located 30 km away from the mine.
The road distance from the mining site at Ari Dongri to our existing steel plant at
Siltara Industrial Area, Raipur is about 165 Kms.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
12 of 28
CHAPTER – IV
MANUFACTURING PROCESS
IRON ORE CRUSHER & SCREENING FACILITIES
Two Units of Iron Ore Crusher and Screening is proposed to be setup. The ROM from
captive mines will be received in dumping yard. The received ROM would be in the size
range upto 1000 mm. The ROM will be fed into the Ground Hopper in combination of
pay loader and dumpers/trucks.
Unit-1 – Crushing Unit
The material will be fed to Ground Hopper and then to Grizzly Feeder
From Grizzly Feeder material will flow in two ways;
One flow will pass from Grizzly Feeder of 400 TPH subjected to another Grizzly
Feeder of 250 TPH and goes to Jaw Crusher
After crushing in Jaw Crusher the material goes to Vibrating Screen where it will
separate to sizes 0-10 mm, 10-40 mm and 40-80 mm.
0-10 mm is the Product-1 which in turn goes to Loading Hopper.
10-40 mm is the Product-2 subject to smooth Roll Crusher to make the size to 0-10
mm as Product-3 and goes to Loading Hopper.
40-80 mm the oversize material goes to Cone Crusher for further crushing which after
crushing takes back to Vibrating Screen.
Another flow of material passes from Grizzly Feeder subject to Primary Jaw Crusher
and after crushing the material flows to Vibrating Screen where it will separate to
sizes 0-10 mm, 10-40 mm and 40-250 mm.
0-10 mm material is the Product-1 and 10-40 mm is the Product-2.
40-250 mm takes back to Primary Jaw Crusher for further crushing through Grizzly
Feeder.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
13 of 28
Unit-2 – Screening Unit
The material will be fed to Ground Hopper and then to Vibrating Screen.
After screening, the material will separate to 0-10 mm Product-1, 10-25 mm Product-
2 and 25-250 mm Product-3.
Product-3 of size 25-250 mm will pass to the Ground Hopper of Crushing Unit for
reducing the size of the material.
Besides all the production equipments, other equipments like Power supply, pollution
control, electrical motors etc. have been included. The capacity of the equipment has
been decided on the basis of experience of similar units.
Process Flow Chart of Iron Ore Crushing & Screening Unit
Based on the production capacity, analysis of the required raw materials and the facilities,
a process-cum-material flow has been worked out as under :
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
14 of 28
CHAPTER - V
UTILITIES
Water :
The water requirement will be 10 KLD for water sprinkling in the conveyors to
control the fugitive emission and the same will be procured from the nearby villages.
Power :
The iron ore crushing and screening unit will consume about 650 KW of power
including lighting load. The power will be sourced from State Electricity Board
(CSPDCL).
Raw Materials for Crushing & Screening Unit
The estimated annual requirement of Raw Materials:
Capacity of Iron Ore Crusher
TPA : 14,00,000
TPH : 400
Maximum Crushing capacity per day : 400 TPH x 14 Hrs = 5600 tonnes
Maximum Crushing capacity per annum : 5600 TPD x 250 days
= 14,00,000 Tonnes
Material Balance
In MT
S.NO INPOUT OUTPUT UTILIZATION1 Iron Ore Lumps 14,00,000 Sized Ore 8,40,000 For Sponge Iron
Plant at Siltara2 Iron Ore Fines 5,60,000 For Pellet Plant at
SiltaraTotal 14,00,000 14,00,000
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
15 of 28
CHAPTER - VI
SITE & INFRASTRUCTURE
The proposed Iron Ore Crushing & Screening unit will be within the mining lease area of
captive iron ore mines of 138.96 ha. This unit will be set up in an area of 8000 Sq. Mtr.
available at ground level of mines.
There is a provision of storage silo of 300 MT capacity for automatic truck loading which
will save time of loading of sized material.
Land and Site Development
The site will be accordingly developed as per site conditions.
There are no ecologically sensitive places like national park, sanctuary, biosphere reserve,
heritage sites, archeological monuments, defense installation, health resorts, scenic beauty
etc. around 10 Kms. radius of the site. There is no route of migratory animals within the
project site.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
16 of 28
Location of proposed Crushing & Screening facilities within
the Iron Ore Mining Lease Area -
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
17 of 28
CHAPTER - VII
CIVIL AND STRUCTURAL WORK
Civil work for Crushing & Screening facilities
Civil work comprises all crushing & screening units, its auxiliaries, site leveling, roads,
drainage, sewerage and all other infrastructure within the plant boundary. In general,
specifications/ details in respect of types of structures, grades of concrete, materials, etc.
for all major units have been considered as per standard practice of civil work.
Type of Civil Work
RCC foundations for steel structurals carrying over ground conveyor galleries.
In the ground RCC foundations for steel super structures has been considered
along with RCC floor slab and roof slabs supported on steel beams of steel super
structure.
Other miscellaneous buildings like electrical substation building, central room
building, etc. shall be mainly consisting of fully RCC framed structure with
isolated RCC foundations, RCC columns, beams, floor slab and roof slab, RCC
stair case wherever necessary with brick work, cladding. Floors shall be provided
with suitable floor finish and roof shall be provided with appropriate water
proofing treatment.
Brick / block masonry work
Brick will be of locally available best quality conforming to the architectural
requirements.
Technological Structures
Steel structural work will comprise of structures for various operating platforms, gallery
etc.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
18 of 28
Building Structures
Steel structural work will include column bracings, rafters, roof trusses, purlins, side
runners, roof bracings, stairs, ladders, handrails, columns, floor beams (both rolled and
built-up plated sections), chequered plate flooring and GCS sheets for side cladding and
GCS sheets for roof cladding.
Structural work
Structural steelwork will cover all steel structures required in buildings, including
platforms, walkways, stairs, sheeting, etc., conveyor galleries, junction houses, pipelines
with water sprinklers and all other steel structures and sheetings required for the project.
Other Miscellaneous Units
RCC foundations for A/C and ventilation equipment, electrical equipments
RCC framed buildings for stores, security posts, watch towers
RCC internal roads and weigh bridge
RCC stockyard
Boundary Wall
Roads and roadside drains, culverts etc.
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
19 of 28
CHAPTER - VIII
ENVIRONMENT MANAGEMENT
Godawari Power & Ispat Limited has a well defined Environmental Policy by which the
company is committed to conduct business with strong environmental conscience
towards community, customer & employees.
Control of Air Pollution :
The main source of fugitive emission is due to the crushing & screening plant, loading &
unloading point, vehicular movement and all transfer points and the same will be
controlled through extensive water sprinkling. The water sprinkling will also be done on
haul roads. Four air monitoring stations are established in core zone area.
The entire crushing & screening process will be done in a closed circuit to eliminate
fugitive emission. Adoption of technology like recovery of dust/ash for re-use as raw
material will fulfill the twin objectives of material conservation and pollution control.
The fines so generated is being separately stored & transported to our plant at Siltara for
use in our pelletization process.
Control of Water Pollution :
There is no effluent generation from the crushing & screening unit. Domestic Effluent
will be generated approx 01 KLD, the septic tank and soak pit is constructed for domestic
Effluent.
Green Belt Development
Adequate green belt has already been done in and around the existing mining lease area
of 106.60 ha. Locally available types of sufficient trees which are resistant to pollutants
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
20 of 28
will also further be planted in the expansion of mining lease area and around the crushing
unit. The main objective of the green belt is to provide a barrier between the source of
pollution and the surrounding areas.
The green area development will be as per the proposed programme as given for the
mining activities in 138.96 ha. The summary of which is as under :
Existing Plantation :
Years Within the lease area Outside the lease areaAlong the road side
(Nos.) Area (Ha) (Nos.) (Km)
2009-10 -- -- -- --
2010-11 7,000 2.83 3,300 3 km
2011-12 4,000 1.62 -- --
2012-13 1,900 0.77 15,000 16 km
2013-14 4,700 1.90 9,500 11 km
Total 8,400 7.12 27,800 30 km
Proposed Plantation Programme :
Year Nos. of saplings
2014-15 5,0002015-16 1,0002016-17 1,0002017-18 1,0002018-19 1,000
Total 9,000
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
21 of 28
CHAPTER - IX
SOCIO-ECONOMIC DEVELOPMENT
Godawari Power & Ispat Ltd. has been actively supporting social causes for a very long
time. The company strives to integrate social value within its daily business decision-
making process with an aim to achieve positive and sustainable outcomes towards
business, environment and the society at large. Apart from the various CSR activities, the
company has taken the social initiatives towards conservation of environment,
improvement of the social status of people in Chhattisgarh, contributions to relief funds,
etc.
Under Corporate Social Responsibility (CSR) the needs of the nearby villages and
surrounding area is being periodically addressed and GPIL is committed to further
identify and continue the same in future.
Godawari Power & Ispat Ltd. is already executing various CSR activities in the nearby
villages of Kacche Ari Dongri in the following fields.
Education Programme :
Assistance in construction and repairing of schools.
Promotion of education programmes and Vocational Training & Skill
development.
Promotion of Adult Education program
Free of cost computer education to children & youths of the adjacent villages.
Course is certified by IGNOU & 65 children were enrolled in 2012-2013
NICETEC Society is appointed as consultant for GPIL for providing Computer
Training Courses to the students of Village Kachhe, Parrekodo, Wyner, Hirge,
Tekadhora & Salhe
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
22 of 28
Health Programme :
Periodic medical check-up of nearby villagers
Preventive medical care and health services for rural population is already
promoted.
Awareness to improve health and hygiene standards.
Construction of First Aid Health Centre at Village Kachhe with following
Facilities:
a. Two Qualified Doctors
b. Free Medicines for the patients
c. 24x7 Ambulance facility
d. Contract with Jyoti Hospital, Dallirajhara for the referral cases
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
23 of 28
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
24 of 28
Water Conservation :
Digging & repairing of Ponds, wells and hand pumps.
Support for water harvesting schemes.
Awareness programmes on safe drinking water.
Cleaning of Ponds and save earth campaign with N.S.S. (National Service
Scheme) students of Govt. High School Bhanupratappur.
4 piyau have been established in and around the mines area in order to facilitate
the drinking need of nearby villagers and travelers on the road.
Plantation :
GPIL always believes in preserving the environment. It’s important for us to
preserve our environment to assure economic and social benefit for a longer
period of time.
Planting trees is one of the many ways of giving back the society, what we have
taken from it.
Road side plantation, block plantation and inside-outside of mines
Near about 24 km of Road Side plantation, 1.7 acre of Block plantation and
Inside-Outside of Mines was done in plantation drive
Sankalp 2013 :
In order to protect environment & create awareness, GPIL took initiative of
SANKALP’2013
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
25 of 28
SANKALP ‘2013 is a step towards creating awareness among the people in which
06 employees of GPIL, Mines started a journey from Kachhe Mines to New
Delhi by cycle with a purpose to carry & spread message “ Go Green, Save
Energy, Conserve Environment”
Plantation was done by the troupe throughout the journey it covers colleges 27-
28, schools 75-80 near about 1600 plants were planted though out the journey
Journey starts from 09.09.2013 to 02.10.2013
Covered a long distance of 1600 kms and travelled from Village Kacchee,
Chhattisgarh to Central Park, New Delhi.
GPIL has been awarded with Best CSR Practices Awards-2013 organized by
THINK MEDIA INC, Delhi for best project in GO GREEN & CONSERVE
ENVIRONMENT for our “SANKALP-2013 Environment Awareness Cycle
Tour” from Kachhe (Mines) to New Delhi
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
26 of 28
Other Activities :
Supplementing Govt. efforts in health monitoring camps, social welfare and
various awareness programmes among the rural population.
Assisting social forestry programme.
Improvement in livelihoods by rain water harvesting and land leveling.
As a respect to the cultural & religion values of Kachche, we have constructed a
Shitla Mata Temple in Kachche & Parrekodo.
CC Road of around 0.9 KM was constructed from Kachche Square to Mines.
An investment of Rs. 0.50 Crore has made towards construction CC Road.
Organised Mega Farmer’s Workshop at Gram Panchayat Kachhe near about 250
villagers from nearby Gram Panchayat Kachhe, Parrekodo, Wyner, Tekadhora,
Hingre & Salhe were participated.
PARTICULARS Expenditure incurredtill FY 2014-15 (in lacs)
Education 12.67
Health 48.87
Infrastructure Development 78.64
Community Development 10.07
Environment Conservation / Plantation 44.56
Sports 0.49
Total 195.30
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
27 of 28
CHAPTER - X
PROJECT AND MAN POWER
In order to operate and maintain the iron ore crushing and screening unit including its
technical and general administrative needs, the manpower requirement is estimated to be
55.
Sl.No CategoryMan Power
Requirement
1 Mechanic / Electrician 5
2 Skilled / Semi-skilled 20
3 Unskilled 30
Total 55
Godawari Power and Ispat Limited Iron Ore Crushing & Screening Unit
28 of 28
CHAPTER - XI
PROJECT IMPLEMENTATION SCHEDULE
The implementation of the proposed project will take about one year from the date of
statutory clearances including environmental clearance.