Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

Upload: denis-wheeler

Post on 12-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

1

Natural Resource Program Center

GIS Projects: 2009 Priorities

Collective efforts of NRPC I&MGIS Team

Page 2: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

2

Natural Resource Program Center

First, a brief review…

• In the event of questions or concerns who do you contact?

Before

Page 3: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

3

Natural Resource Program Center

What’s on tap?• Analysis of inventory products• NPScape (major focus of

presentation)• VSIMS core functionality• Support of IRMA functional

requirements and use case analysis (not addressed here)

Page 4: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

4

Natural Resource Program Center

Analysis of Inventory Products

Subtitle…

FANCY

Page 5: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

5

Natural Resource Program Center

“Back to the Future” in the sense

• Over the years, the I&M program has invested millions of dollar$ in Inventory Products

• True value of inventory data is realized when:– Used as a baseline for future efforts– Applied in park decision making

Page 6: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

6

Natural Resource Program Center

Initial Inventory Projects• Focus on “standard” inventory

products generated by soils, geology, base cartography, and other core inventories

• Work in concert with local (park) staff to identify management questions that can be addressed with available inventory data

Page 7: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

7

Natural Resource Program Center

Navajo National Monument (NAVA)

• Park status: small resource staff, limited GIS expertise and resources, units managed in context of surrounding tribal lands

• Project goals are to : – Produce a baseline GIS library in an easy to use

format (Theme Manager). – Generate summary statistics for data layers (PMIS

input)– Utilizing existing I&M inventory products to

develop an analysis of erosion risk within the landscape context of the monument.

– Provide training and documentation to NAVA for project products  

Page 8: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

8

Natural Resource Program Center

NAVA Adjacent Land Use• Use base cartography (imagery) to

document change• Alteration to drainage patterns• Affects access to and stability of ruin

sites

1952 2007

Page 9: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

9

Natural Resource Program Center

NAVA Erosion Modeling

Using Revised Universal Soil Loss v2 (RUSLE2) parameters

Frames:

•Elevation•Slope•Flow Accumulation•Slope-Length•Erosivity•Soil Erodibility•Land Cover•NDVI•Cropping Factor•Erosion Risk

Page 10: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

10

Natural Resource Program Center

Organ Pipe Cactus National Monument (ORPI)

• Park status: resource staff dealing with significant impact to resources due to border activities, history of monitoring in the park, need to inform park management and work with law enforcement on interdiction efforts

• Project goals are to : – Using  good science, staff experience and existing

geospatial datasets, identify information gaps and vulnerable areas.

– Identify temporal (historic) and spatial disturbance regimes related to cross-border traffic. Use outputs to help focus inventory & monitoring, law enforcement efforts and research on the environmental impact of border-related disturbances.

Page 11: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

11

Natural Resource Program Center

Organ Pipe Cactus National Monument (ORPI)

• Cost-surface modeling of border crossing:

Basic model Include pedestrian fence

Page 12: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

12

Natural Resource Program Center

NPScape Project

Objects near parks are closer and largerthan they appear

Page 13: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

13

Natural Resource Program Center

NPScape Project Overview•Project is intended to provide a view of parks in their larger ecological context•Focus is on a consistent, servicewide approach that still has relevance at park level•Utilizing geospatial data available on a nationwide scale•Careful attention to developing procedures that can be replicated•SOPs and tools are being developed that can be customized for local applications (acknowledging our “one size” might not “fit all”)

Page 14: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

14

Natural Resource Program Center

Suite of products for each metric

• Measure Development Summary (MDS)

• Data products• Standard Operating Procedures• Cartographic and other graphic

outputs• Tables and other summaries• Interpretation/summary by park

Page 15: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

15

Natural Resource Program Center

Project SOPs• Documentation ensures consistency and

adherence to project standards…• Hopefully dodge the “hit by the bus”

situation

Page 16: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

16

Natural Resource Program Center

Initial focus on four metrics

• Population• Land Cover• Conservation Status• Roads

Page 17: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

17

Natural Resource Program Center

Population Measures

• Recent change in population density (1990 – 2000)

• Historic change in population density (1790 – 1990)

• Recent population change• Etc.

Page 18: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

18

Natural Resource Program Center

Population and Housing MDS• Each MDS covers the following

topics:– Background (what are the monitoring

questions and ecological inferences)– Data sources and dimensions

(spatial, temporal, and thematic)– Derived metrics– Issues and assumptions considered in

the metrics

Page 19: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

19

Natural Resource Program Center

Population Data Sources• 1990 Census Block Groups

(geography and STF1 content)• 2000 Census Block Groups

(geography and STF1 content)• Waisanen & Bliss Historic

Population (1790 – 1990, county-based)

• Etc.

Page 20: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

20

Natural Resource Program Center

Population Processing SOPs• Perhaps the most important

project deliverable…• SOPs allow you to replicate or

customize process for local needs

Page 21: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

21

Natural Resource Program Center

SOP Content• GIS Components developed in ArcGIS Model

Builder (leverage standard geospatial tools)• Documentation consists of: how to run existing

models, data requirements, model logic and assumptions, quality checks, and how to customize models

Page 22: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

22

Natural Resource Program Center

Sample products: Historic Population Density

Different ways of representing content…depends on medium, e.g. print or web.

Page 23: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

23

Natural Resource Program Center

Ability to look at individual county-level detail

Average U.S. Population Density (2000) = 30.7 people/km2

Page 24: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

24

Natural Resource Program Center

Sample Products: Recent Population Density Change

Park1990 Population Density

(Persons/km2)2000 Population Density

(Persons/km2)BUFF 10 11GRSM 45 54KIMO 89 100MABI 24 26MISS 266 308PIPE 7 6SEKI 4 4WHIS 32 36

1990

2000

Page 25: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

25

Natural Resource Program Center

Land Cover Measures

• Percent Natural/Percent Converted• Change in percent natural/percent

converted• Area in impervious cover• Etc.

Page 26: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

26

Natural Resource Program Center

Land Cover Data Sources

• National Land Cover Data (NLCD)

• LANDFIRE• Gap Analysis Program (GAP)• NatureServe Ecological Systems• Etc.

Page 27: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

27

Natural Resource Program Center

Sample Output: Percent Converted

Park %ConvertedBUFF 24%GRSM 20%KIMO 40%MABI 14%MISS 65%PIPE 87%SEKI 3%WHIS 9% Green = Natural NLCD Land Cover Classes

Yellow = Converted NLCD Land Cover Classes

Page 28: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

28

Natural Resource Program Center

Sample Output: Land Cover Change (1992 – 2001)

Park Natural-to-Converted (%) Converted-to-Natural (%)BUFF 1.8 0.5GRSM 0.7 0.3KIMO 3.4 1.5MABI 1.4 0.2MISS 0.4 0.9PIPE 0.0 0.1SEKI <0.1 <0.1WHIS 0.2 <0.1

Page 29: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

29

Natural Resource Program Center

Conservation Status Measures

• Percent protected land• Conservation Risk Index (CRI)• Etc.

Page 30: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

30

Natural Resource Program Center

Conservation Status Data Sources

• Gap Analysis Program (GAP)• Protected Areas Database

(PAD-US)• Etc.

Page 31: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

31

Natural Resource Program Center

Sample Output: Percent Protected Land

Park %ProtectedBUFF 6%GRSM 19%KIMO <1%MABI 2%MISS 2%PIPE <1%SEKI 49%WHIS 13%

Page 32: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

32

Natural Resource Program Center

Sample Output: Conservation Risk Index (CRI)

• Utilizes input from Land Cover measure and a different Conservation Status measure

Converted land (%)CRI = --------------------------

Protected Land (%)

Unit % of Area Converted % of Area Protected CRIBUFF 24.2 6.6 3.67GRSM 19.9 19.2 1.04KIMO 40.1 0.8 50.13MABI 14.6 2.0 7.30MISS 65.8 2.1 31.33PIPE 87.5 0.7 125.00SEKI 2.9 49.9 0.06WHIS 9.4 13.5 0.70

Page 33: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

33

Natural Resource Program Center

Transportation Measures

• Distance to roads• Road density• Etc.

Page 34: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

34

Natural Resource Program Center

Transportation Data Sources

• ESRI StreetMap• TIGER Line Files• TeleAtlas• Etc.

Page 35: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

35

Natural Resource Program Center

ParkInterstates(km/km2)

Major Roads(km/km2)

Streets(km/km2)

BUFF 0.00 0.17 0.98GRSM 0.03 0.20 1.56KIMO 0.04 0.37 2.20MABI 0.08 0.20 1.20MISS 0.09 0.70 2.68PIPE 0.00 0.20 1.11SEKI 0.00 0.06 0.43WHIS 0.03 0.21 1.14

Sample Output: Road Density• Not all roads are created equal: treat

local streets, major roads, and interstates differently

• Calculate density for each road “classification”

Can add gridded densitiesfor each layer to obtain totalroad density.

Page 36: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

36

Natural Resource Program Center

Sample Output: Distance to Roads

• Surrogate for “road less” areas

Distance to major roads Distance to streets

Buffalo National River – 30km Buffer

Page 37: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

37

Natural Resource Program Center

Project Updates and Links to Data/Products

http://www1.nrintra.nps.gov/im/monitor/npscape/index.cfm

http://nrinfo

Page 38: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

38

Natural Resource Program Center

Vital Signs Internet Map Services (VSIMS)

• FY2009 Activities:– NRDT upload and map display functions

plus integration with IRMA– Development staff opening

• Demo during Weds Show and Tell session

Page 39: 1 Natural Resource Program Center GIS Projects: 2009 Priorities Collective efforts of NRPC I&M GIS Team

39

Natural Resource Program Center

Questions or Comments?

• Swap Meet• Happy Hour (Meet Brent in

back corner of bar, he’s buying!)

• Ad Hoc