1 mitigation program summary insures compliance with mpwmd water allocation program eir measures to...
TRANSCRIPT
![Page 1: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/1.jpg)
1
Mitigation Program Summary
• Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to meet municipal demand on the Monterey Peninsula
• Includes both direct and indirect measures to protect and manage natural resources
Monterey Peninsula
Water Management District
![Page 2: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/2.jpg)
2
Prior Programs Incorporated into the Mitigation Program in 1991
• Carmel River Management Program• Irrigation Program• Interim Relief Program• Emergency Irrigation Program• Hydrologic monitoring and reporting
(stream gaging, groundwater levels and quality, water use by water distribution systems and private wells)
• Carmel River lagoon habitat monitoring
![Page 3: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/3.jpg)
3
Direct Measures
• Fish rescue, rearing, habitat improvement
• Streambank and channel restoration
• Irrigation of Carmel River riparian corridor
• Vegetation management/modification and augmentation
• Seaside basin injection/recovery
![Page 4: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/4.jpg)
4
Indirect Measures
• Conservation - e.g. property inspection/retrofits, studies for Pebble Beach reclamation project
• Enforcement of Ordinances/Rules and Regulations for water use and activities along the Carmel River
•Management of limited water supplies
•Monitoring programs (fishery, wildlife, vegetation, water quality and quantity)
![Page 5: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/5.jpg)
5
Total = $5,677,400
Capital Projects Fund$2,882,300(51%)
Mitigation Fund
$2,068,800(36%)
Conservation Fund $726,300(13%)
FY 2003-04 Budget - Revenues by Fund
![Page 6: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/6.jpg)
6
Mitigation Program Revenues 1992-2004
![Page 7: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/7.jpg)
7
Mitigation Program Expenditures 1992 to 2004
![Page 8: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/8.jpg)
8
Mitigation Program Revenues and Expenditures 1992-2004
![Page 9: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/9.jpg)
9
Comparison of Planned and Actual Mitigation Program Expenditures 1992-2004
![Page 10: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/10.jpg)
10
SUMMER/FALL PUMPING in the CARMEL VALLEY ALLUVIAL AQUIFER
Above Robinson Canyon Bridge
Sept. 1984
Dec. 1989
![Page 11: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/11.jpg)
11
FISHERIES PROJECTS
Approximately $1.55 million between 1993 and 2003
![Page 12: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/12.jpg)
12
EROSION PREVENTION
Approximately $1.04 million between 1993 and 2003
![Page 13: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/13.jpg)
13
Degradation in Perennial Areas Appears to be Halted for Now
Above Robinson Canyon Bridge
May 2002
![Page 14: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/14.jpg)
14
Degradation in theLower Carmel River Continues
March 2003
See Next Slide
![Page 15: 1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to](https://reader035.vdocuments.site/reader035/viewer/2022081518/5515a233550346486b8b5e81/html5/thumbnails/15.jpg)
15
2004 Bank ErosionLower Carmel River
April 12, 2004