1 keiichiro sakagami / jem payloads ([email protected]) notice : this technical data is...
TRANSCRIPT
1
Keiichiro Sakagami / JEM PAYLOADSKeiichiro Sakagami / JEM PAYLOADS ([email protected])([email protected])
Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors and sub contractors only for the purposes of fulfilling the cooperating agency’s responsibilities under the Space Station Intergovernmental Agreement (IGA) and Memorandum of Understanding (MOU). It shall not be used for any other purpose, nor disclosed or retransferred to any other entity or government without prior written permission of the Japan Aerospace Exploration Agency (JAXA).
JAXA Increment 19/20 JAXA Increment 19/20
OverviewOverview17A Crew/PL Ops Meeting17A Crew/PL Ops Meeting
March 26, 2009 March 26, 2009
“ “JJ”JJ”
2
CONTENTSCONTENTS
JAXA PL RACKS OVERVIEW
INCREMENT OVERVIEW
KEY MILESTONE
JAXA PL OPS STRUCTURE, ROLES & RESPONSIBILITIES
BACKUP CHARTS
JAXA PL RACKS OVERVIEW
INCREMENT OVERVIEW
KEY MILESTONE
JAXA PL OPS STRUCTURE, ROLES & RESPONSIBILITIES
BACKUP CHARTS
3
Saibo Rack JPM1A2 Starboard
PortAft Forward
JAXA PAYLOAD RACKS JAXA PAYLOAD RACKS ( (SaiboSaibo, , RyutaiRyutai))
Clean Bench (CB)
Cell Biology Experiment Facility
(CBEF)
Saibo Rack (for Life Science)
Fluid Physics Experiment Facility (FPEF)
Image Processing Unit
(IPU)
Solution Crystallization Observation Facility
(SCOF)
Protein Crystallization Research Facility
(PCRF)
Ryutai Rack (for Material Science)
ER 5 JPM1F1
ER 4 JPM1F5
MELFI JPM1D4Ryutai Rack
JPM1A3
4
Payload Power Distribution Box (PPDB)P-PDB receives main power from a Power Distribution Unit and distributes power to JAXA ISPR Components and Experiment Facilities.
AAA/SD
Utility Interface PanelUtility Interface Panel provides following communication interfaces: 1553B, Ethernet, FDDI, and video.
Maintenance Switch Panel (MSP)The MSP is used for redundant safety interlock. It is used to protect the crew during maintenance or installation activities.
Utility DC to DC Converter Unit (UDC)
UDC receives 120Vdc safing power from a Power Distribution Unit and provides 28V DC Power to experiment equipments such as Micro-gravity Measurement Apparatus.
Clean Bench (CB)CB provides a closed work space for aseptic operation in order to perform life science and biotechnology experiments.
Cell Biology Experiment Facility (CBEF)
CBEF provides a controlled environment for studying fundamental phenomena of life in the space environment, using cells, tissues, small animals, plants, or microorganisms.
PEF Access PortPEF Nozzle is penetrated into the PEF Access Port when the rack has fire.
PEF Access Port for CBEFPEF Nozzle is penetrated into the PEF Access Port when the CBEF has fire.
PEF Access Port for CBPEF Nozzle is penetrated
into the PEF Access Port when the CB has fire.
Saibo RackSaibo Rack
5
Protein Crystallization Research Facility (PCRF)
AAA/SD
Utility DC to DC Converter Unit (UDC)
UDC receives 120Vdc safing power from a Power Distribution Unit and provides 28V DC Power to experiment equipments such as Micro-gravity Measurement Apparatus.
Utility Interface PanelUtility Interface Panel provides following communication interfaces: 1553B, Ethernet, FDDI, and video.
Payload Power Distribution Box (PPDB)P-PDB receives main power from a Power Distribution Unit and distributes power to JAXA ISPR Components and Experiment Facilities.
Image Processing Unit (IPU)IPU receives video data from cameras monitoring various experiments and from the Video Control Unit .
IPU records, plays back, compresses, and outputs the data to the high rate
data link for transmission to the ground.
Solution Crystallization Observation Facility (SCOF)SCOF and PCRF provides opportunities for fundamental studies of crystal growth of various solutions and proteins.
Fluid Physics Experiment Facility (FPEF))
FPEF enables users to investigate the effects of the marangoni convection of the moderate temperature.
Maintenance Switch PanelThe MSP is used for redundant safety interlock during maintenance or installation activities.
PEF Access PortPEF Nozzle is penetrated into the PEF Access Port when the rack has fire.
Storage*Now FPEF silicon oil filter is installed on this position.
Ryutai RackRyutai Rack
6
INCREMENT 17 OVERVIEWINCREMENT 17 OVERVIEW
Inc 17 was the first increment to conduct experiments in Kibo.
Initial checkout for Saibo/Ryutai rack was completed and some Japanese experiments were successfully performed.
In addition to JAXA PL racks, MELFI and ERs were transferred from USlab to JPM.
Inc 17 was the first increment to conduct experiments in Kibo.
Initial checkout for Saibo/Ryutai rack was completed and some Japanese experiments were successfully performed.
In addition to JAXA PL racks, MELFI and ERs were transferred from USlab to JPM.
FPEF/Marangoni ExpFPEF/Marangoni Exp Saibo/CBEF CheckoutSaibo/CBEF Checkout
JAXA PL Racks Checkout with GregJAXA PL Racks Checkout with Greg
7
INCREMENT 18 OVERVIEWINCREMENT 18 OVERVIEW
Ice Crystal Experiments are going well.
From this increment, we are going to start Life Science Experiments (Rad Gene & LOH and Dome Gene).
A series of CGSE CO2 T/S was performed and now we think CGSE can supply CO2 to Saibo Rack.
In addition to JAXA PL racks, MELFI and ERs are in operations.
Ice Crystal Experiments are going well.
From this increment, we are going to start Life Science Experiments (Rad Gene & LOH and Dome Gene).
A series of CGSE CO2 T/S was performed and now we think CGSE can supply CO2 to Saibo Rack.
In addition to JAXA PL racks, MELFI and ERs are in operations.
SCOF/Ice Crystal SCOF/Ice Crystal
Rad Gene and LOH
Rad Gene and LOH
Dome Gene Dome Gene
8
INCREMENT 19/20 OVERVIEWINCREMENT 19/20 OVERVIEW More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks.
More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks.
Microbe-I Microbe-I Rad SilkRad Silk Space SeedSpace Seed JAXA PCGJAXA PCG
FACETFACET Marangoni Exp 3Marangoni Exp 3
SEDA-APSEDA-AP MAXIMAXI SMILESSMILES
More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks.
Moreover, from this increment, we will start the first operations on JEM External Payloads (both JAXA and NASA PLs).
More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks.
Moreover, from this increment, we will start the first operations on JEM External Payloads (both JAXA and NASA PLs).
More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks.
Moreover, from this increment, we will start the first operations on JEM External Payloads (both JAXA and NASA PLs).
In addition to JAXA PL racks, MELFI and ERs are getting into full swing.
There may be some simultaneous operations constraints based on the JEM stage analysis.
The number of crewmember will be increased.
More than 10 experiments are planned in the JPM using both Saibo/Ryutai Racks.
Moreover, from this increment, we will start the first operations on JEM External Payloads (both JAXA and NASA PLs).
In addition to JAXA PL racks, MELFI and ERs are getting into full swing.
There may be some simultaneous operations constraints based on the JEM stage analysis.
The number of crewmember will be increased.
9
2009 Apr May Jun Jul Aug Sep Oct
Biological Rhythms (FE2)
17S Undock (4/5)
32PUndock (4/20)
33PDock (4/26)
2J/A Dock (6/15)
2J/A Undock (6/26)
19S Dock (5/29)
FacetFacet
Cell Setup/MLT On Cell Rotation
UndockDock Crew Activity
EPO3/ Moon Score
Biological Rhythms (FE1)
EPO3
Biological Rhythms
CBEF/CB Maintenance
FPEF Experiment Cell Setup /MLT On
MarangoniMarangoni
CB/CBEF CL-UP
JAXA PCGJAXA PCG
Canister Attachment
34P dock (7/26)
Sanita
PADLES Removal
SaiboSaibo MaintenanceMaintenance
MicrobeMicrobe
Rad SilkRad Silk
17A Dock (8/8)17A Undock (8/17)
MEU Attachment / Detachment
Swab
FPEF Experiment Cell Setup
18S Undock (10/11)
Canister Detachment
HTV1 Berth (9/8) HTV1 Undock (10/7)
PADLES Setup
PEU Attachment
Short Exp
Watering / MELFI Sample Replacement ELT C/O
EPO3/Dewey’s Forest Setup
EPO3/ Moon ScoreEPO3/ Moon Score
JAXA-CM1/CM2
HDTV C/O
Ryutai Rack
Saibo Rack
Small PL
PADLES
CM
18S Relocate (7/20)
34PUndock (9/29)
33PUndock (7/17)
20S Dock (10/2)
Space SeedSpace Seed
MLT Off
VRU Exchange VRU Exchange
SEDA-AP
MAXISMILES
JAXA Utilization Overview (Based on Final OOS Input)
Increment 19/20
External PL
KEY MILESTONESKEY MILESTONES
10
JAXA Payload Ops Conductor (JPOC) JAXA Payload Ops Conductor (JPOC)
Rack Officer (BIO/FISICS)
<Pressurized>
Rack Officer (BIO/FISICS)
<Pressurized>
User Integrator (BIO/FISICS) User Integrator (BIO/FISICS)
J-FLIGHTJ-FLIGHT
JFCT (FLAT,CANSEI, J-PLAN, J-COM,
Tsukuba-GC, SENIN, ARIES, KIBOTT)
JFCT (FLAT,CANSEI, J-PLAN, J-COM,
Tsukuba-GC, SENIN, ARIES, KIBOTT)
POIC SSIPC/MCR SSIPC/UOA (Cadre)
Rack Operator (BIO/FISICS)
Rack Operator (BIO/FISICS)
Technical Support*
(BIO/FISICS)
Technical Support*
(BIO/FISICS)
JEM Pressurized Payload Operations
NASA/POIC CadrePOD
NASA/POIC CadrePOD
JAXA System/Payload
Safety *
JAXA System/Payload
Safety *
SSIPC/ESR
JEM Payload Officer
(JEM PAYLOADS)
JEM Payload Officer
(JEM PAYLOADS)
JAXA PL OPS STRUCTURE JAXA PL OPS STRUCTURE
(Inc 19/20)(Inc 19/20)
Payload Ground System Officer*
Payload Ground System Officer*
*IPU-G Operator*IPU-G Operator*On-call
New PL FCTs for JAXA Exposed Payload
Operations
JEM Exposed Payload Operations
Exposed Facility Payload Officer (ExPO)
<Exposed>
Exposed Facility Payload Officer (ExPO)
<Exposed>
MAXI Operator
MAXI Operator
SEDA-AP Operator
SEDA-AP Operator
SMILES
Operator (after Flt HTV1)
SMILES
Operator (after Flt HTV1)
Technical Support*
(SEDA-AP, MAXI, SMILES)
Technical Support*
(SEDA-AP, MAXI, SMILES)
11
11
JEM PAYLOADS (JEM Payload Officer)
JPOC (JAXA Payload Ops Conductor)
Makoto Furukawa
Kyoichi Arakane
BIO (BIology Ops Lead) FISICS (FluId ScIence and Crystalization Science Ops Lead)
Daisuke Masuda Waka Nishikawa Ryoichi Kumagai
Kensuke Teranishi
Satoshi “Gucci” Kawaguchi
Takuya Takami
Yuki Kawai
PL OPS MANAGER
Toru Mori
JAXA PL Inc Manager
JAXA Inc Scientist
Hideo UsuiTakahiro Sato
Keiji Murakami
<Off Console>
Takao Wakatsuki
Misako Nomura
Hideki Nagata
Aakane ImamuraKenji Noguchi
Kenta Kinoshita
Shusuke Ochiai
Takehiko IshikawaShimpei Takahashi Kunihiro “Kuni” Matsumoto Keiichiro “JJ” SakagamiRyoji Kobayashi
RO (Rack Officer)
OP (Operator)
RO (Rack Officer)
Chie Inoue
Yusuke Ohkawa
Kazue Ueyama
Chikara “Rickey” Harada
Kuniko “Nicky” Okada
Hideyuki Watanebe
Yuusuke WarashinaYuhei SuzukiHiroya KoikeMakoto WatanabeYuuta Iwahana
Go Hyakutake
Yukiko Abe
Exposed Payload
Lead
Position Lead for Inc. 19/20
Increment Lead
JEM Payload FCT Members (for Inc 19/20)JEM Payload FCT Members (for Inc 19/20) AAs of January, 2009s of January, 2009
Exposed Payload Ops Team
Masayuki Goto
12
12
JEM Payload FCT Members (for Inc 19/20)JEM Payload FCT Members (for Inc 19/20) AAs of January, 2009s of January, 2009
JEM PAYLOADS (JEM Payload Officer)
JPOC (JAXA Payload Ops Conductor)
Makoto Furukawa
Kyoichi Arakane Kensuke Teranishi
Takuya Takami
PL OPS MANAGER
Toru Mori
JAXA PL Inc Manager
JAXA Inc Scientist
Keiji Murakami
<Off Console>
Takao Wakatsuki
Kenji Noguchi
Takehiko IshikawaShimpei Takahashi Kunihiro “Kuni” Matsumoto Keiichiro “JJ” SakagamiRyoji Kobayashi
Chikara “Rickey” Harada
Kuniko “Nicky” Okada
Hideyuki Watanebe
Go Hyakutake
Exposed Payload
Lead
Position Lead for Inc. 19/20
Increment Lead
Pressurized Payload Ops Team
Masayuki Goto
MAXI SEDA-AP SMILES
ExPO (Exposed Payload Officer )
Daichi SAKOH
OP (Operator)
13
ROLES & RESPONSIBILITIESROLES & RESPONSIBILITIES
14
14
JAXA PAYLOAD OPERATIONS TEAMJAXA PAYLOAD OPERATIONS TEAM
User Operations Area (UOA)
User Operations Area (UOA)
15
BACKUP CHARTS
HOSC/SSIPC NEW GATEWAY
JAXA ACTIVITY OV (INC 19/20)
RACK TOPOLOGY IN THE JPM
BACKUP CHARTS
HOSC/SSIPC NEW GATEWAY
JAXA ACTIVITY OV (INC 19/20)
RACK TOPOLOGY IN THE JPM
16
HOSC/SSIPC NEW GATEWAHOSC/SSIPC NEW GATEWA YY
All Ku band150.0Mbps
IPU realtime video:43.0Mbps
PDH Data: 0.5Mbps
Mid Rate Data of Payload: 3.0Mbps
HDTV : 27.0Mbps
It is impossible to downlink realtimely.23.5Mbps
MSFC TKSC
Receive Capability:23.5MbpsTrans-Pacific
GW GWOCSPDSS
Present ICD
>43.0Mbps
23.5Mbps
BACKGROUND (1) It took too long time to complete Fluid Physics Experiment because the video to downlink from the IPU was more than we expected.
(2) The HDTV System has been developed.(3) Bandwidth of all Ku band became 150Mbps.
(4) Trans-Pacific goes down in price.
Demand
17
(1)To downlink the video of the IPU in realtime to SSIPC at the maximum rate (43 Mbps).
(2)To downlink the HDTV in realtime to SSIPC
Purposes for new Gateway are...
MSFC TKSC
Receive Capability:23.5MbpsTrans-Pacific
GW GWPDH & Mid
Rate
>43.0Mbps
IPU or HDTVnewGW
newGW
PDSS OCS
HOSC/SSIPC NEW GATEWAY HOSC/SSIPC NEW GATEWAY
18
OCS@TKSC
APS
PLAN OF NEW GATEWAYPLAN OF NEW GATEWAYJEM
IPUBitstream
MPCBitstream
PDH
MAXI
SMILES
US LAB
MPCBitstream
PEHG
HCOR
Ch.2
Ch.6APID
1200,1201
APIDXXXX
APIDYYYY
Ch.8
HRFM
APID121
0
Ch.2
FDS@WSTF
PDSS@MSTF
JSC
VCID26
VCID18
Pkt
b/sb/s
b/s IPU-G@TKSC HDTV
User
IPUUser
PLUser
MAXIUser
SMILESUser
VCID18
VCID26
VCID26?
VCID26?
APID1210
APID1200, 1201,XXXX,YYYY
New Gateway
APID1210
In March 2009, the New Gateway will be installed and tested for communication interface.
In April 2009, the New Gateway will start to be operated for JAXA payload.
NoteFor JAXA Commercial in March, the HDTV will reach JSC.
19
JAXA Maintenance
JAXA Payload hours:Red:<=1hrs
Yellow:1–4hrs
Green:>=5hrs
WEEKS(beginning
)
8/8 8/175/17 5/28
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Wk 75/18
Wk 85/25
Wk 96/1
Wk 106/8
Wk 157/13
Wk 177/27
18Sdock3/27
17Sundock
4/5
20Sdock10/2
18Sundock10/11
RS EVA
Shuttle/Soyuz Dock/Undock
ProgressDock/Undock
JEMRMS Ops
Marangoni EXP
HTV Ops
Rad Silk
Area PADLES
PROX C/O
JAXA PCGHoliday
ICS C/O
Holter ECG
2524232221201
CGSE OPS
33Pdock4/26
33Pundock
7/10(TBD)
RSEVA#226/5
34Pundock
9/29
FACET
CommercialEPO2 MELFI
ISS CDR (Gennady Padalka)
FE-1 (Mike Barratt)
JEMRMS
THC A HEPA R&R
ATCS Sample
MELFI Dewar 1, 2, 3 @ -95C and Dewar 4 @ +2 OPS in JPM
ATCS Sample
CGSE(Ar)
Hatch Seal Inspect
JPM/JLP MESHCVR/IMV GRILL/DIFFUSER CLN (Weekly)
32Pundock
4/21
34Pdock7/26
26
PEPS Audit PEPS QDMA PEPS PEPS Hatch Seal Inspect
Area Dosimeter
Wk 65/11
Wk 116/15
Wk 126/22
Gas Trap Ops
ELPS Check
Space SeedMicrobe
Wk 167/20
PROXC/O#4
PROXC/O#3
CBEF/CB Maintenance
Commercial
EPO3
ATCS Refill
JAXA Activity OV (as of JAN 21, 2009)
JAXA PCG
Wk 188/3
Wk 208/17
27
Wk 269/28
Wk 2710/5
HTV
9/8
19Sdock5/29
Exp18 FE-2 (Tim Kopra)Exp18 FE-2 (K. Wakata) FE-2 (Nicole Stott)
FE-5 (Frank DeWinne)
FE-4 (Robert Thirsk)
FE-3 (Roman Romanenko)
18Sreloc7/20
RSEVA #236/10
THC B HEPA R&R
Windows Inspect Fire Alarm Indct C/OGas Trap Ops
PEPS QDMA
CBEF/CB Cleanup
Rad Silk
SAIBO
RYUTAI
Others
SYSTEM
PAYLOAD
JAXA P/L Maintenance
10/8
Microbe
2J/A 17AHTV
Road to 2J/A
HTVOps
Maintenance
US P/Lin JEM SDRM @ER5 HREP [Ground]
SDRAMSAMS USOS Maintenance
Biological Rhythms(FE-2)
HDTV
Road To 2J/A
Ext P/L
ICS Voice Func C/O
ICS C/O [Ground]
SEDA-AP and MAXI C/O & Ops [Ground]
P/L Stowage Rcn
P/L Stowage Rcn
Biological Rhythms(FE-1)
P/L Stowage Recon
SMILES C/O & Ops [Ground]
Wk 14/6
Wk 249/14
Wk 259/21
Wk 24/13
Wk 34/20
Wk 44/27
Wk 55/4
Wk 136/29
Wk 147/6
Wk 198/10
Wk 228/31
Wk 218/24
Wk 239/7
FACET
Space Seed
HDTV C/O
MarangoniEXP
SAMS @ER4
X2R8:7/6-9
20
Hatch
Airlock
DMS2 (O1)
Sys. Stow1 (O2)
User Stow1 (O3)
ICS (O4)
DMS1 (O5)
ISPR (A1)
ISPR (A2)
ISPR (A3)
ISPR (A4)
ISPR (A5)
RMS (A6)
ECLSS/TCS1(D1) EPS1 (D2)
Sys. Stow2 (D3)
User (Refrig) (D4)
EPS2 (D5) ECLSS/TCS2(D6)
ISPR (F1)
ISPR (F2)
ISPR (F3)
ISPR (F5)
ISPR (F6)
WS (F4)
Fo
rwar
d D
eck
O
verh
ead
A
ft
PFE/ PBA JRSR
(Overhead Forward standoff)
SAIBO RYUTAI
(Overhead Aft standoff)
(Aft Deck standoff)
(Forward Deck standoff) (CHeCS) (PLT) (SLT, PCS)
EXPR#5 EXPR#4
UOP b1 Aft Deck2
(PLT, PCS for P/L) (SLT, PCS) (CheCS, SSC)
(OA0)
(O0)
(A0)
(AD0)
(D0)
(FD0)
(F0)
(OF0)
PFE/ PBA
ELS
SRCA
Hat
ch
SRCA
Camera
ELS
ELPS
ZSR
(Material Science)
(Material Science) (Life Science)
MELFI
C&W ATU
C&W ATU
Stow
Stow
Stow Stow
Stow Stow Stow
Stow
(Life Science) (Material Science)
ARS (TBD)
ZSR (TBD) EXPR#8 (TBD)
(Life Science) (Material Science)
Crew Qtrs (TBD)
(Life Science) (Material Science)
Stow Stow Stow
Stow
Stow
Stow
UOP b2 Aft Deck5
UOP b3 Aft Deck6
UOP a1 Fwd Deck2
UOP a2 Fwd Deck4
UOP a3 Fwd Deck6
RACK TOPOLOGY IN THE JPMRACK TOPOLOGY IN THE JPM
NASA allocation
Hard / Soft Dummy panel
System Rack
Stowage location
*This rack is configured according to Inc19,20 IDRD (draft).