Page 1: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

1

Industry Shipperless & Industry Shipperless & Unregistered Working GroupUnregistered Working Group

Wednesday 3rd November 10.00amWednesday 3rd November 10.00amat xoserveat xoserve

Page 2: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

2

Agenda

Introduction: (10 minutes) (Alison Jennings & Mark Woodward)• Previous minutes

Statistical Information: (10 minutes) (Mark Woodward)• Overall industry position with unregistered and shipperless meter points

Legal framework for shipperless and unregistered sites (Andrew Wallace)

Disconnection Process: (David Watson)

Root Cause: (2 hours) (ALL)• Root Cause Schedule• MNC Queries – Conclusions from meeting in September• Existing Services set to DE – Conclusions from meeting in September• Existing services set to DE in error or legitimately - Conclusions from meeting in September• Address Clarity - Conclusions from meeting in September

ACTION: To provide updates to the list of root causes discussed so far in order to feed into the report being produced first quarter of next year

10 Legitimately Unregistered Sites

11 Meters fitted on site but not confirmed on UK-link

12 MPRN Allocation

13 No response to shipper activity,MAM & UIP reports

Page 3: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

3

Statistical Information

Page 4: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

4

Overall Industry unregistered and Shipperless Sites meter points

Sep-09 Nov-09 Jan-10 Mar-10 May-10 Jul-10 Sep-10 Description

643 578 670 646 658 664 724

These reports are sent out shipper specific and include sites where shippers have provided an activity which suggests intention to confirm i.e., Confirmation rejection, Meter asset update to the C&D store, Conquest raised to create the M Number, End User. They are for created sites > 12 months

TOTAL 15,672 15,524 15,839 16,403 16,959 14,755

With Meter

5118 (32.66%)

5276 (33.99%)

5387 (34.01)

5668 (33.42%)

6036 (35.59%)

6,129 (41.54%)

667 658 655 845 985 938 1,036

2,294 2,254 2,232 3,441 3,205 3,590 4,016

28,275 23,771 24,947 21,682 5,878 1,037 1,159These contain meter points created on UK Link where no shipper activity has been recorded and that remain unconfirmed. No Activity Table Between Target Months

5,987 6,572 6,841 9,271 24,136 28,960 29,386These contain sites which can represent one of the following reasons: Vacant sites No Gas meter but live service Service still in planning stage

31,058 26,032 26,484 26,049 27,067 29,092 25,598

These figures provide details of meter points that have a created date < than 12 months that remain unconfirmed - If not confirmed they will gradually feed into some of the above reports going out to industry (TMP_UnRegistered_Under_365_Days e.g. for March stats search as less (>) than 01/03/2010)

83,546 75,537 77,353 77,773 78,332 81,240 76,674TOTAL

Shipperless Sites - Shipper (PTS)

Shipperless Sites - Industry (SSP)

Shipper Activity

Legitimately Unregistered

Meter Point created less than 12 months

Orphaned

No Activity

Industry Unregistered and Shipperless Sites (Produced on a Bi-Monthly Basis)

These contain sites which have previously been confirmed and withdrawn with meter removed. Information provided suggests either the existing meter still on site or a new meter has been fitted e.g. Gas Safety Regulations (GSR)

14,622

This report is sent out to the whole industry either following a shippers response to the shipper activity report, that they have no further interest in the M Number or that no response is received

within the period of production of the next Bi monthly report. They also include sites where a service has been completed and in some instances a meter already installed. They are for created sites >

12 months

Unregistered Sites

Page 5: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

5

Root cause

Page 6: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

6

Root Cause Schedule

Ref Root Cause Title Meeting Date

1 Timescales for MPRN Request

2 xoserve is not informed of new service job cancellation or deferment.

3 Service laid but no MPRN is requested.

5 MPRNs Created for IGT / LPG Sites

6 MNC Queries

7 Existing Services not set to DE

8 Existing Services set to DE in error

10 Legitimately Unregistered Sites

11 Meters fitted on site but not confirmed on UK-link

12 MPRN Allocation

13 No response to shipper activity,MAM & UIP reports

14 Shipperless Sites (PTS and SSP Reports)

15 End Solution

16 Next Steps & Review Report

17 Possible final sweep up 6th April 2011

2nd February 2011

5th May 2010

4 Inaccurate tagging of services 7th July 2010

8th September 2010

9 Address Clarity

3rd November 2010

Page 7: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

7

Action: To provide updates to the list of root causes discussed so far in order to feed into the report being produced.

To Conclude:

• MNC Queries

• Existing Services set to DE

• Existing services set to DE in error or legitimately

• Address Clarity

Root Cause Topics – To conclude

Page 8: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

8

Root Cause Topics

10. Legitimately Unregistered

Currently the volume of legitimately unregistered categorised sites account for 29,386 MPRN’s

This represents:• Around 0.13% of the population of sites on UK Link.• The 29k go back over 10 yrs, if we take the last 5 yrs (which account for approx 92% of the volume) and the approx volume created over 5 yrs 414,000 this would represent 7.10%

xoserve currently defines legitimately unregistered sites as either:1. Live service with no meter2. Deferred service 3. Vacant4. Capped service/capped meter

Page 9: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

9

Root Cause Topics

As part of the our current process for Unregistered sites >12months a series of checks are carried out :

• They are checked against the Connections & Disconnections register to determine any meter activity (if meter activity identified it confirms there is service in the ground) – if identified moved to orphaned table.

• Send out MPRN reports to MAM’s (Meter Asset Managers). Again if identified a meter attached suggests that service in the ground – again if identified moved to orphaned table.

• Where no meter activity is confirmed from carrying out both steps 1 & 2 the remaining portfolio is sent out to the UIP’s, who originally requested for an MPRN to be created for the property. We ask that they confirm if either one of the following: a) Job completed - If job completed it becomes legitimately unregistered b) Job Cancelled - If job cancelled MPRN is set to “EX” c) Job Deferred - If job deferred site becomes legitimately unregistered (as deferred status) d) IGT/LPG site - If job IGT/LPG MPRN is set to “EX”

• On a bi-monthly basis the table is refreshed when a site is confirmed or the MP status changes (e.g. EX or DE) or meter activity is recorded on C&D

• Periodic checks with UIP’s on the deferred sites

• Periodic checks with the MAM’s & C&D store to see if meters fitted

• Desk top clean up exercises conducted

Page 10: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

10

Root Cause Topics

Problems/issues:

• Not all MAM’s are signed onto providing information about meters fitted

• Not all UIP’s are signed onto providing information on whether a site should not have been created – largely a manual process as some unable to link into their systems. (Good response so far, figures later)

• Too costly to visit all properties

• Notification from UIP’s is not currently sent when jobs change from deferred status

• Historically M Numbers were created at service and meter fit, with them now being created at possible service fit we will inevitably end up with some properties just having the service.

• The number of M Numbers being requested to create each month would suggest that that we may historically had a lot of service only sites without meters

• On new developments it may be simply more cost effective to lay services to all properties with the intension that at some time in the future the service will be utilised

• Vacant properties - No effective way to confirm if site comes on-line as no registered user

Page 11: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

11

Problems/issues: continued

• Letter process proved ineffective in ensuring site information

• Legal challenges for Networks disconnecting services after an agreed period

Discussions points:

• Are there additional categories that determine a legitimately unregistered site that xoserve may not have considered?

• Are there additional checks or systems xoserve could utilise to determine if site has meter attached and a Shipper associated to it?

• Are there any obligations that can be placed upon MAM’s or UIP’s to provide certain information?

• Do we accept that there are and will always be a certain volume of legitimately unregistered sites with live services but no meters attached?

• What else can the industry do to investigate if these sites are legitimately unregistered?

Root Cause Topics

Page 12: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

12

11. Meters fitted on site but not confirmed on UK-link

Extracts from shipper requests to create an M Number

• Please generate a new MPRN for the address XXXXXX There is a live service to this property laid post August 2002. Previous MPRN XXXXXXX showing as dead status. MSN XXXXXXX on site.

Please create an MPRN for the address and meter listed, as they are currently live, but MPRN XXXXXX is showing as DEAD on UK Link. The meter details are: MSN XXXXXXX, MAKE: SCH, MODEL: MD16, Dials 6, Year of Manufacture: 2001, Metric with an opening index of 061689, current index of 010843, taken on 06/07/09 and a fix date of 01/10/04.We have been supplying this site since 01/10/04 but I do not know why this MPRN was made DEAD. Please investigate.

The End User has confirmed that MSN XXXXX is on site with no MPR.Please create an MPR for this meter as it is consuming gas and needs to be billed as soon as possible.

Root Cause Topics

Page 13: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

13

Root Cause Topics

Problems/issues:

• No ongoing commitment to provide updates to shipper activity reports

• Meter Asset Managers providing meter fitted details which are not being confirmed

• Confirmation rejections and RGMA rejections for new sites not being re-worked

• Meters being fitted at supplier request then unable to secure contract

• Lack of governance surrounding developers and independent meter workers

• MNC’s being raised with or without meters fitted on site not being followed through to confirmation

• Duplicates – Meter exchanges against old MPRN when new MPRN remains unconfirmed

• M Numbers created where existing M Number has been set to Dead that remain unregistered due to Dead M Number remaining confirmed

Page 14: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

14

Root Cause Topics

Discussions points:

• Is there any governance around the Connections and Disconnection store, if not should there be?

• Do UIP’s fit both meters and services at the same time? Even prior to a shipper being associated to the site

• Do MAM’s fit meters prior to shipper/ supplier being associated to the site

• Is there any set of circumstances which would allow for a meter being fitted without being associated to a shipper?

• If confirmation/RGMA rejects what procedure should follow?

• What are the incentives to confirm a site?

Page 15: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

15

Root Cause Topics

12. MPRN Allocation

Problems/issues:

Ineffective management of MPRN allocations (UIP’s)

Data labelling firms are distributing MPRN’s

Batches of MPRN’s were issued upon request whilst making no reference to the previous batch

Historically large batches of MPRN’s have been allocated to individual UIP’s

Developers & UIP’s allocating MPRN’s to different sites within the same development

Random MPRN’s are unable to generate thus meaning another MPRN will be required (very small numbers)

Page 16: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

16

Discussions points:

What controls./ measures are taken by UIP’s to ensure MPRN batch is utilised effectively

xoserve introduced the following controls Requested that all UIP’s check previous allocations going back to 2008 Upon request of new MPR’s previous batch investigated to establish previous batch utilised

(internal & external) Communicated that UIP’s to ensure that the previous batch of MPRN’s have not ran out prior

to submitting a new request xoserve allocate a maximum of six months worth of MPRN’s per batch Record one customer per batch and store information of what MPRN’s were allocated and

when they were issued and to whom.

Are there other controls xoserve could employ?

How do UIP’s allocate MPRN’s to labelling firms (in bulk/ per job?)

Do UIP’s & Networks have a way of checking previous batches using a system approach?

In all circumstances do the UIP’s attach the label to the service, or are there instances where they are issued to the developer?

Should the label be more fixed rather than have the potential of being moved from one property to the next?

Root Cause Topics

Page 17: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

17

Root Cause Topics

13. No Response to Shipper Activity, MAM & UIP Reports

Shipper Activity reports

January March May July September

Number of shippers 4 2 5 1 3

Number of sites 81 37 127 469 35

UIP Reports

Jan/Feb 09 Mar/Apr 09 May/June 09 July/Aug 09

Number of sites issued   1,185 1005 1,145

Number of sites responded to 540 958 (80.84%) 1005 (100%) 11

Page 18: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

18

Root Cause Topics

Problems/issues:

Supplier information is required from all MAM’s in order to identify who originally requested for meter to be fitted. The MAM’s however, require shippers consent prior to releasing this information

UIP’s are not obliged to provide details on (Job completions, cancellations, deferments & IGT indicators)

Recipients of Shipper activity reports not cross referencing the “dead portfolio”

Shippers carry out exchanges against the old MPRN prior it being set to DE status instead of confirming the new MPRN.

Are the current recipients of the Shipper Activity Reports ensuring the reports are responded to. No obligation/ governance in place to support this process

No distinct targets and incentives in place to tackle the orphaned sites. In order for the process to work at a reduced cost we need to have Shippers, MAM’s & UIP’s signed onto providing updates

Page 19: 1 Industry Shipperless & Unregistered Working Group Wednesday 3rd November 10.00am at xoserve

19

Discussions points:

Upon receipt of the Shipper Activity report what is the current procedure

Are the current recipients of the Shipper Activity reports cross referencing the “dead portfolio”

Is it possible for all Shippers to give their consent to all MAM’s to release Supplier information to xoserve

Are their any ideas other than Shippers cross-referencing their portfolio in order to reduce the number of sites contained within the orphaned reports

Are there any reasons why positive confirmations should not follow confirmation rejections and C&D updates

Would Shippers benefit from xoserve meeting with them on a 121 basis with the aim of reducing the numbers of unregistered sites

Root Cause Topics