1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program • Approach to CIP discussion – Revenue Fund • Money collected through assessments and/or user fees – Equipment Reserve Fund • The designated fund to replace equipment • We have a regulation that states we must have $100,000 minimum in that fund • Replacement equipment must come from these funds – The summary sheet for each department is first, followed by the individual details for that department. – This is an initial discussion, no decision will be made today

Upload: zaria-yeatman

Post on 31-Mar-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

1

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

• Approach to CIP discussion – Revenue Fund

• Money collected through assessments and/or user fees

– Equipment Reserve Fund• The designated fund to replace equipment• We have a regulation that states we must have $100,000

minimum in that fund • Replacement equipment must come from these funds

– The summary sheet for each department is first, followed by the individual details for that department.

– This is an initial discussion, no decision will be made today

Page 2: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

2

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail ScheduleRevenue Fund Projects

Department Project 2013 2014 2015 2016 2017

Administration Accounting Software 15,000

Computer Hardware TBDExterior Power Wash/Seal 9,000 Replace/Repair Rotted Wood Backside of Office-Stone FrontCopy Machine Replacement 8,000

Carpet Replacement 15,000

Emergency Generator         20,000

17,850 9,000 8,000 15,000 20,000

Page 3: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

3

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements Program

PROJECT DETAIL

Project Cost2013 $ 15,0002014 201520162017 __________ Total Project Cost $ 15,000

Project Cost2013 $ 15,0002014 201520162017 __________ Total Project Cost $ 15,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Accounting Software General Ledger / Payroll

Department: Administration

Funding Source: Assessments

Project Category: Facility and Other Improvements

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:Current software was purchased approximately 8 years ago. It was a custom written program. Due to problems with the ledger portion of this package we would like to purchase a more “off the shelf” product. Currently payroll is being outsourced. The new software will have a module for in house payroll. The firm doing our audit has suggested the past 2 years that we find a different software provider. Project Status/Scheduling:A volunteer committee working on requirements now and reviewing potential vendors. Need for Hardware replacement unlikely, but not known for sure at this time.

Spring, 2013.Effect of Project on Annual Operations:Some cost savings should be realized by shortening the audit on site time and dispensing with the outsource payroll fee. Staff time currently spent on spreadsheets requested from other staff, BOC or FOIA for analysis should be reduced.

Page 4: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

4

Project Cost201320142015 $8,00020162017 _______ Total Project Cost $ 8,000

Project Cost201320142015 $8,00020162017 _______ Total Project Cost $ 8,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: District Office Copy Machine Replacement

Department: Administration

Funding Source: Assessments

Project Category: Facility and Other Improvements

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

District office copy machine was purchased in 2005; unit is currently under a maintenance agreement, but should be replaced after 10 years as obsolete and/or have reached its serviceable life.

Project Status/Scheduling:

Spring, 2015.

Effect of Project on Annual Operations:

None.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 5: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

5

Project Cost2013201420152016 $ 15,0002017 __________ Total Project Cost $ 15,000

Project Cost2013201420152016 $ 15,0002017 __________ Total Project Cost $ 15,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: District Office Carpet Replacement

Department: Administration

Funding Source: Assessments

Project Category: Facility and Other Improvements

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

Project will replace carpet in high-traffic areas at an estimated cost of $3.75/sq. ft.

Project Status/Scheduling:Spring, 2016

Effect of Project on Annual Operations:None.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 6: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

6

Department: AdministrationFunding Source: AssessmentsProject Category: Facility and Other Improvements

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Type: Replacement ___ Expansion _X_

Project Description, Justification:

Purchase and installation of a 35 Kw generator and concrete pad. Generator to be installed at the District Office to maintain telephone and computer systems in the event of an extended power outage.

Project Status/Scheduling:Spring, 2017.

Effect of Project on Annual Operations:

None.

Project Cost

20132014 201520162017 20,000

Total Project Cost $ 20,000

Project Cost

20132014 201520162017 20,000

Total Project Cost $ 20,000

Project Title: District Office Emergency Generator/Pad

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 7: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

7

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Water Leak Detection Program TBD TBD TBD TBD

PRV Rehabilitation Program 25,000 25,000 25,000 25,000 25,000

Fire Station #1 Tank Rehab/Paint 35,000

9-Hole Booster Tank Rehab/Paint TBD

Well # 2 Improvements     326,480    

25,000 25,000 386,480 25,000 25,000

Revenue Fund Projects

Department Project 2013 2014 2015 2016 2017

Page 8: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

8

Project Cost2013 $ 02014 TBD2015 2016 2017 Total Project Cost $ TBD

Project Cost2013 $ 02014 TBD2015 2016 2017 Total Project Cost $ TBD

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Leak Detection Program

Department: Water/Wastewater

Funding Source: User Rates, Assessments

Project Category: Water

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

Staff will be looking into this and I will follow up at a later date on recommendations for budget in 2014. Project includes contracted labor to isolate and locate water line breaks, leaks and service line separations in system to reduce overall water loss. Water distribution system to be divided into several mini-systems to conduct program over multiple years. This project is one of several recommended projects outlined in the 2006 water system master plan.

Project Status/Scheduling:

Completion projected by end of 3rd quarter each year.

Effect of Project on Annual Operations:

Effective program will ultimately result in gradual reduction in electrical consumption.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 9: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

9

Project Cost2013

$ 25,000 2014

25,0002015

25,0002016

25,0002017 ____25,000 Total Project Cost $ 125,000

Project Cost2013

$ 25,000 2014

25,0002015

25,0002016

25,0002017 ____25,000 Total Project Cost $ 125,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: PRV Rehabilitation Program

(pressure reducing valves) Department: Water/Wastewater

Funding Source: User Rates, Assessments

Project Category: Water System Improvements

Project Type: Replacement _X_ Expansion _X_

Project Description, Justification:

Project includes the rehabilitation and upgrade of 1-2 pressure reducing valves (PRVs) per year until entire system is upgraded. PRVs are 30+ years old, with many components obsolete and in need of replacement. Where needed, telemetry components will be added for critical/problem areas to monitor pressure fluctuations. This project is one of several recommended projects outlined in the 2006 water system master plan.

Project Status/Scheduling:

Completion by end of 3rd quarter each year.

Effect of Project on Annual Operations:

Rehabilitated PRVs will assist in reduction of pressure problems in water system, and ultimately reduce labor costs due to continual repairs.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 10: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

10

Project Cost

2013 $ 149,9382014201520162017 Total Project Cost $ 149,938

Project Cost

2013 $ 149,9382014201520162017 Total Project Cost $ 149,938

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: 9-Hole Booster Tank, Rehab and Paint – Quail Run Tank

Department: Water/Wastewater

Funding Source: User Rates, Assessments

Project Category: Water System Improvements

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:Project includes wet sand blasting, priming and painting water tank located at 9-Hole Maintenance Facility. Currently the tank is rusting above the water line. No additional work will be required to complete this project.By using Utility Service Company for this Project we can spread capital upfront renovation cost over multiple years.

Project Status/Scheduling:

Project to be bid in Spring, 2013, and completed in 2nd quarter, 2013.

Effect of Project on Annual Operations:The tank would not be in use while painting is done. If this is not done, rusting will continue, will begin to leak, and become unusable.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 11: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

11

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 12: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

12

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Revenue Fund Projects

Department Project 2013 2014 2015 2016 2017

WastewaterLift Station Rehabilitation Program 62,500 TBD TBD TBD TBD

Page 13: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

13

Project Cost2013 $ 62,5002014 TBD2015 TBD2016 TBD2017 ___ TBD Total Project Cost $ 62,500

Project Cost2013 $ 62,5002014 TBD2015 TBD2016 TBD2017 ___ TBD Total Project Cost $ 62,500

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Lift Station Rehabilitation Program

Department: Water/Wastewater

Funding Source: User Rates, Assessments

Project Category: Wastewater

Project Type: Replacement _X_ Expansion _X_Project Description, Justification:

The District’s wastewater collection system has a total of 27 lift stations – 11 above-ground, 15 below-ground, and 3 with submersible pumps. The controls for these lift stations are 20-30 years old and are prone to regular maintenance problems; controls for most below-ground stations are also located in the wet-well, and are damaged when power loss occurs and the well floods. Replacement components are often hard or impossible to obtain. Installing up-to-date controls and relocating above ground will make the units more energy efficient and help reduce labor and materials costs. Funding recommendations will allow the District to rehabilitate 1-2 lift stations per year (depending on size), beginning with the most critical stations completed first.

Project Status/Scheduling:

Installation of new equipment to replace Haddock Creek Lift Station with 3 submersible pumps and Controls this being one of the critical lift stations would begin 2nd quarter, 2013.

Effect of Project on Annual Operations:

Possible significant savings in labor; repair savings for pumps, motors, seals, as monitoring would detect problems much earlier.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 14: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

14

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Revenue Fund Projects

Department Project 2013 2014 2015 2016 2017

RoadsRoad Paving 300,000 315,000 330,750 347,288 364,652

Facilities

Maint Walking Trail Parking Lot 22,500

Handicap Fish Pier Parking Lot 23,100

District Office Overflow Parking 13,200

Barn Parking Lot       54,450  

322,500 338,100 343,950 401,738 364,652

Page 15: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

15

PRIORITY #

PROJECT TITLE: ROAD PAVING PROJECT COST

2013 230,000

DEPARTMENT: ROADS 2014 253,000

2015 278,300

FUNDING SOURCE: ASSESSMENTS-COUNTY 2016 306,130

2017 336,743

PROJECT CATEGORY: ROAD IMPROVEMENTS TOTAL PROJECT COST 1,404,173

PROJECT TYPE: REPLACEMENT X STATE OR FEDERALLY MANDATED

EXPANSION

YES NO X

PROJECT DESCRIPTION & JUSTIFICATION:

CONTINUATION OF THE FIVE YEAR PAVING PROGRAM OF SINGLE/DOUBLE CHIP AND SEAL AND ASPHALT OVERLAY OR BOTH. COSTS ARE INFLATED FROM 2012 ACTUAL COSTS.

PROJECT STATUS/SCHEDULING:AUGUST OF EACH YEAR.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

EFFECT OF PROJECT ON ANNUAL OPERATIONS:DURING ROAD PREPARATION TIME SOME OTHER SERVICES WILL BE DELAYED BECAUSE

OF LACK OF MANPOWER. SERVICES WILL BE RESTORED WHEN ROAD PAVING IS COMPLETED.

Page 16: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

16

PRIORITY # 1

PROJECT TITLE: ROAD PAVING PROJECT COST2013 230,000

DEPARTMENT: ROADS

FUNDING SOURCE: ASSESSMENTS-COUNTY

PROJECT CATEGORY: ROAD IMPROVEMENTS TOTAL PROJECT COST 230,000

PROJECT TYPE: REPLACEMENT X STATE OR FEDERALLY MANDATEDEXPANSION

YES NO X

PROJECT DESCRIPTION & JUSTIFICATION:CONTINUATION OF THE FIVE YEAR PAVING PROGRAM OF SINGLE/DOUBLE CHIP AND

SEAL AND ASPHALT OVERLAY OR BOTH. COSTS ARE INFLATED FROM 2012 ACTUAL COSTS.

PROJECT STATUS/SCHEDULING:

AUGUST OF EACH YEAR.

EFFECT OF PROJECT ON ANNUAL OPERATIONS:DURING ROAD PREPARATION TIME SOME OTHER SERVICES WILL BE DELAYED BECAUSE

OF LACK OF MANPOWER. SERVICES WILL BE RESTORED WHEN ROAD PAVING IS COMPLETED.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 17: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

17

PRIOROTY # 3PROJECT TITLE: WALKING TRAIL P/L PROJECT COST

2013 22,500DEPARTMENT: FACILITY MAINTENANCE 2014

2015 FUNDING SOURCE: ASSESSMENTS 2016

2017 PROJECT CATEGORY: P/L PAVING TOTAL PROJECT COST 22,500

PROJECT TYPE: REPLACEMENT X STATE OR FEDERALLY MANDATEDEXPANSION

YES NO XPROJECT DESCRIPTION & JUSTIFICATION:

CONDITION OF LOT IS DIRT AND ROCK AND NEEDS MAINTENANCE AT TIMES. INSTALLA 4" ASPHALT OVERLAY. THIS WOULD CONNECT THE ASPHALT AT THE HANDI-CAP PARKING AREATO BLUE WATER DRIVE. STAFF WOULD STRIPE LOT THROUGH REGULAR OPERATING BUDGETUNLESS BID COMES IN LOWER THAN EXPECTED.

PROJECT STATUS/SCHEDULING:PROJECT WOULD COINSIDE WITH THE ROAD PAVING PROGRAM UNLESS DIFFERENT

CONTRACTORS ARE AWARDED EACH PROJECT. IN THIS CASE PROJECT TO BE COMPLETED BYEND OF AUGUST 2013.

EFFECT OF PROJECT ON ANNUAL OPERATIONS:NONE

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 18: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

18

PROJECT TITLE: H/C FISHING P/LOT PROJECT COST2013

DEPARTMENT: FACILITY MAINTENANCE 2014 23,1002015

FUNDING SOURCE: ASSESSMENTS 2016 2017

PROJECT CATEGORY: P/LOT PAVING TOTAL PROJECT COST 23,100

PROJECT TYPE: REPLACEMENT X STATE OR FEDERALLY MANDATEDEXPANSION

YES NO XPROJECT DESCRIPTION & JUSTIFICATION:

CONDITION OF PARKING LOT IS COMPACTED GRAVEL. PARKING LOT HAS TO BE GRADED AFTER HEAVY RAINFALL DUE TO EROISION. VERY LITTLE BASE ROCK WOULD HAVE TOBE ADDED TO COMPLETE THE 4" ASPHALT PAVING.

PROJECT STATUS/SCHEDULING:PROJECT WOULD COINSIDE WITH THE ROAD PAVING PROGRAM UNLESS DIFFERENT

CONTRACTORS ARE AWARDED EACH PROJECT. IN THIS CASE PROJECT TO BE COMPLETED BYEND OF AUGUST 2013.

EFFECT OF PROJECT ON ANNUAL OPERATIONS:NONE

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 19: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

19

PROJECT TITLE: D.O. OVERFLOW PARKING PROJECT COST2013

DEPARTMENT: FACILITY MAINTENANCE 2014 2015 13,200

FUNDING SOURCE: ASSESSMENTS 2016 2017

PROJECT CATEGORY: P/LOT PAVING TOTAL PROJECT COST 13,200

PROJECT TYPE: REPLACEMENT X STATE OR FEDERALLY MANDATEDEXPANSION

YES NO X

PROJECT DESCRIPTION & JUSTIFICATION:CONDITION OF PARKING LOT IS COMPACTED GRAVEL. VERY LITTLE BASE ROCK WOULD

HAVE TO BE ADDED TO COMPLETE THE 4" ASPHALT PAVING. LOT IS USED A LOT FOR DISTRICT OFFICE MEETINGS.

PROJECT STATUS/SCHEDULING:PROJECT WOULD COINSIDE WITH THE ROAD PAVING PROGRAM UNLESS DIFFERENT

CONTRACTORS ARE AWARDED EACH PROJECT. IN THIS CASE PROJECT TO BE COMPLETED BYEND OF AUGUST 2013.

EFFECT OF PROJECT ON ANNUAL OPERATIONS:NONE

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 20: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

20

PROJECT TITLE:BARN PARKING LOT PROJECT COST

DEPARTMENT: FACILITY MAINTENANCE 2014 2015

FUNDING SOURCE: ASSESSMENTS 2016 54,450

PROJECT CATEGORY: P/LOT PAVING TOTAL PROJECT COST 54,450

PROJECT TYPE: REPLACEMENT X STATE OR FEDERALLY MANDATEDEXPANSION

YES NO X

PROJECT DESCRIPTION & JUSTIFICATION:CONDITION OF PARKING LOT IS COMPACTED GRAVEL. VERY LITTLE BASE ROCK WOULD

HAVE TO BE ADDED TO COMPLETE THE 4" ASPHALT PAVING. LOT HAS TO BE GRADED AFTER HEAVY RAINFALLS. GRAVEL ALSO WASHES OUT ONTO SHIELDS DRIVE AT BOTH ENTRANCES.

PROJECT STATUS/SCHEDULING:PROJECT WOULD COINSIDE WITH THE ROAD PAVING PROGRAM UNLESS DIFFERENT

CONTRACTORS ARE AWARDED EACH PROJECT. IN THIS CASE PROJECT TO BE COMPLETED BYEND OF AUGUST 2013.

EFFECT OF PROJECT ON ANNUAL OPERATIONS:NONE

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 21: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

21

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Revenue Fund Projects

Department Project 2013 2014 2015 2016 2017

Fire Satellite Fire Station 45,000 0 0 0 0

Page 22: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

22

2013 $ 45,000 201420152016 __________ Total Project Cost $ 45,000

2013 $ 45,000 201420152016 __________ Total Project Cost $ 45,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Satellite Fire Station, New Construction

Department: Fire Protection

Funding Source: Assessments, (1/3 of cost) Rural Dues, & Possibly Lady’s Auxiliary

Project Category: Facility and Other Improvements

Project Type: Replacement ___ Expansion _X_

Project Description, Justification:

Project calls for the construction of a two (2) bay fire station in the area of Stateline and Sun view. This station would mainly house tanker equipment, as these vehicles are historically the most dangerous to drive due to the weight and motion of the water. This area’s water supply is by 4 inch mains, which does not supply enough water for some structure fires. The only option to this problem is the use of tanker trucks. This station would also give better distribution of equipment, which will help with ISO ratings. The location would also help the Rural Department and would give the auxiliary some needed storage space.

Project Status/Scheduling:This project would hopefully be started in the spring of 2013 if funding can be arranged.

Effect of Project on Annual Operations:There would be a slight increase in utilities, but this could be offset by participation from the Rural Department and Lady’s Auxiliary.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 23: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

23

Recreation HVAC unit RC-Heat not working TBD

Resurface Both Pools TBD

2012 Budget WS Small Pool-Decking Rubaroc Surface 38,500

West Tennis Court Resurface 70,000

Playground Set Replacement/Addition       75,000

4,040 38,500 70,000 75,000

Holiday Island Suburban Improvement District2013-2017 Capital Improvements ProgramComprehensive Detail Schedule

Revenue Fund Projects

Department Project 2013 2014 2015 2016 2017

Page 24: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

24

Project Cost Total Project Cost $ Unknown

Project Cost Total Project Cost $ Unknown

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Heating / AC Unit

Department: Recreation Center

Funding Source: Assessments

Project Category: Facility and Other Improvements

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

The air condition part of the heat pump is working fine but when it has to heat the recreation center it will freeze up and not work properly. This was discovered during the winter when we were only open on a limited basis.

Project Status/Scheduling:

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Effect of Project on Annual Operations:

Page 25: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

25

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Project Cost201320142015 TO BE DETERMINED

Project Cost201320142015 TO BE DETERMINED

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Re-surface both Pools

Department: Recreation Center

Funding Source: Assessments

Project Category: Facility and Other Improvements

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

Upon opening the pools this season, it was noted that several places on the bottom are flaking and peeling more than normal. We have also had a couple of visitors scrap the bottom of their feet.

Project Status/Scheduling:

Pool needs to be drained to determine condition and cost. Can probably hold off for another year or two.

Effect of Project on Annual Operations:

Page 26: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

26

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Small Pool-Decking Rubaroc Surface

$ 38,500

Page 27: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

27

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

West Tennis Court Resurface

$ 70,000

Page 28: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

28

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Playground Equipment

$75,000

Page 29: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

29

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Revenue Fund Projects

Department Project 2013 2014 2015 2016 2017

Marina Floatation Replacement 11,025 11,575 12,200 12,810 13,450

24-Slip Addition, Dock #4 132,000

2012 Budget WS Dry Dock Storage Addition       125,000  

11,025 143,575 12,200 137,810 13,450

Page 30: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

30

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Project Cost2013 $11,0252014 11,5752015 12,200

Project Cost2013 $11,0252014 11,5752015 12,200

Is Project Mandated by the State or Federal Government?

Yes __X__ No ____

Is Project Mandated by the State or Federal Government?

Yes __X__ No ____

Project Title: Flotation Replacement

Department: Marina

Funding Source: Assessments and/or user fees

Project Category: Facility and Other Improvements

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

In February, 2008 the US Corps of Engineers issued flotation standards requiring all commercial marinas to replace all Styrofoam floatation with specified encapsulated floatation (1) when annual inspections reveal that the lowest part of the dock structure falls below a minimum of six inches above the waters surface; and (2) full compliance (complete replacement) by 2033. Flotation replacement at the Holiday Island Marina is currently estimated to be 40% complete. Priorities established each year based on condition and buoyancy.

Project Status/Scheduling:

Spring of each scheduled year

Effect of Project on Annual Operations:None

Page 31: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

31

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Slip addition

Page 32: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

32

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Dry Dock Storage Addition

$125,000

Page 33: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

33

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Revenue Fund Projects

Department Project 2013 2014 2015 2016 2017

Golf Maintenance Cart Path Improvements 10,500 11,025 11,580 12,200 12,810

Page 34: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

34

Project Cost2013 $ 10,5002014 201520162017 ________ Total Project Cost $ 10,500

Project Cost2013 $ 10,5002014 201520162017 ________ Total Project Cost $ 10,500

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Cart Path Improvements

Department: 18 Hole Golf Maintenance

Funding Source: Assessments

Project Category: Facility and OtherImprovements

Project Type: Replacement _X_ _Expansion ____

Project Description, Justification:

The District has not conducted a systematic repair/replacement of cart path surfaces at either course for 15+ years. Project will replace paths for 1-2 holes per year, prioritized based on condition. Staff will conduct an initial evaluation to determine the most cost effective surface between asphalt and concrete.

Project Status/Scheduling:

Spring, 2013.

Effect of Project on Annual Operations:

None.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 35: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

35

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Revenue Fund Projects

Department Project 2013 2014 2015 2016 2017

Pro ShopReplace Carpet in Entire Building 19,000

Clubhouse Paint Building Inside & Out 23,000

North Entrance-Patio Resurfacing     18,000    

42,000 0 18,000

Page 36: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

36

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT 2013-2017 Capital Improvements Program

PROJECT DETAIL

Project Title: Carpet Replacement Department: Pro Shop / Clubhouse Funding Source: Assessments Project Category: Facility and Other Improvements Project Type: Replacement _X_ Expansion ___ Project Description, Justification: Replace carpet in entire clubhouse building, includes installation. Project Status/Scheduling: Spring, 2013. Effect of Project on Annual Operations:

None.

Project Cost

2013 $ 19,000 2014 2015 2016 2017 ________ Total Project Cost $ 19,000

Is Project Mandated by the State or Federal Government?

Yes ____ No __X__

Page 37: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

37

Project Cost2013 $ 23,000 2014 201520162017 __________ Total Project Cost $ 23,000

Project Cost2013 $ 23,000 2014 201520162017 __________ Total Project Cost $ 23,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Painting – Inside and Out

Department: Pro Shop / Clubhouse

Funding Source: Assessments

Project Category: Facility and Other Improvements

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

Paint all inside walls at Clubhouse. Paint exterior of building.Project Status/Scheduling:

Spring, 2013.

Effect of Project on Annual Operations:

None.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 38: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

38

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Department Project 2013 2014 2015 2016 2017

CampgroundNo Capital Improvements for 2013

Normal Maintenance will be included in the operating budget.

Page 39: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

39

Equipment Reserve Fund

• The designated fund to replace equipment• We have a regulation that states we must have

$100,000 minimum in that fund • Replacement equipment must come from

these funds

Reminder

Page 40: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

40

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Equipment Reserve Fund Projects

Department Project 2013 2014 2015 2016 2017

Water Zero Turn Mower 8,500

Roads Zero Turn Mower

8,500Replace 2001 Graveley-U#29

Bucket Truck   30,000       Replace 1986 Ford

Fire Ladder Truck 90,000Replace 1976-Ladder #1

Engine # 1       80,000  Replace 1974 -Engine #1

Page 41: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

41

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Equipment Reserve Fund Projects

Department Project 2013 2014 2015 2016 2017 Comments

WaterZero Turn Mower 8,500

Replace 1991 Graveley-U#20

Page 42: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

42

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Department Project 2013 2014 2015 2016 2017

RoadsZero Turn Mower 8,500

Replace 2001 Graveley-U#29

Bucket Truck   30,000      Replace 1986 Ford

8,500 30,000

Equipment Reserve Fund Projects

Page 43: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

43

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Department Project 2013 2014 2015 2016 2017

Fire Ladder Truck 90,000Replace 1976-Ladder #1

Engine # 1       80,000  Replace 1974 -Engine #1

90,000 80,000

Equipment Reserve Fund Projects

Page 44: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

44

Project Cost20122013 20142015 $ 95,0002016 __________ Total Project Cost $ 95,000

Project Cost20122013 20142015 $ 95,0002016 __________ Total Project Cost $ 95,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Ladder Truck Replacement

Department: Fire Protection

Funding Source: Assessments

Project Category: Vehicles

Project Type: Replacement _X__ Expansion __

Project Description, Justification:

This project is to replace our existing Ladder Truck, which is a 1976 model. This vehicle was moved from our second out unit status to strictly high-rise fires and areas needing very large volumes of water. This move has relieved the necessity to replace the truck earlier, but the truck is experiencing a few problems here and there. All equipment will transfer to another truck, which will reduce some of the expense.

Project Status/Scheduling:

Project is only in the planning stage and hope to complete in the fall of 2015

Effect of Project on Annual Operations:

None, since it is a replacement project and a better unit, it should reduce the burden on OEM

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 45: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

45

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Department Project 2013 2014 2015 2016 2017Equipment Reserve Fund Projects

Golf Maintenance Greens Mower 19,000

Roughs Mower 37,000

2 Fairway Mowers 98,000

Sprayer 18,000

4 Maintenance/Utility Carts 32,000

Sand Trap Rake     13,000    

56,000 148,000 13,000

Page 46: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

46

Equipment Reserve Fund ProjectsProject Cost

2013 $ 19,000201420152016 2017 __________ Total Project Cost $ 19,000

Project Cost2013 $ 19,000201420152016 2017 __________ Total Project Cost $ 19,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Greens Mower

Department: 18 Hole Golf Maintenance

Funding Source: Equipment Reserve Fund

Project Category: Vehicles and Equipment

Project Type: Replacement _X _Expansion ___

Project Description, Justification:

Need to replace 3 mowers, put one in 2013 budget.

Project Status/Scheduling:

Spring, 2013

Effect of Project on Annual Operations:

None.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Page 47: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

47

Equipment Reserve Fund Projects

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Project Cost2013 $ 37,0002014 2015 20162017 __________ Total Project Cost $ 37,000

Project Cost2013 $ 37,0002014 2015 20162017 __________ Total Project Cost $ 37,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Roughs Mower Replacement – Unit # 1809

Department: 18 Hole Golf Maintenance

Funding Source: Equipment Reserve Fund

Project Category: Vehicles and Equipment

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

Need 3 - replace 1 in 2013. Unit # 1809 is a 2002 Toro 300D with 4,600 hours. The mowing deck is worn out, engine life is non-existent, and the transmission is in poor condition.

Project Status/Scheduling:

Spring, 2013.

Effect of Project on Annual Operations:

None.

Page 48: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

48

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

2 Fairway Mowers 98,000

Sprayer 18,000

4 Maintenance/Utility Carts 32,000

Sand Trap Rake     13,000

Page 49: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

49

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Equipment Reserve Fund projects

Department Project 2013 2014 2015 2016 2017

Golf Maintenance Greens Mower 19,000

Roughs Mower 37,000Replace Unit# 1809

2 Fairway Mowers 98,000Replace Unit# 1811

Sprayer 18,000

4 Maintenance/Utility Carts 32,000 Replace 4 Carts

Sand Trap Rake     13,000    

56,000 148,00 13,000

Page 50: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

50

Project Cost20132014 $ 98,000201520162017 __________ Total Project Cost $ 98,000

Project Cost20132014 $ 98,000201520162017 __________ Total Project Cost $ 98,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Fairway Mower 2@ $49,000/mower

Department: 18 Hole Golf Maintenance

Funding Source: Equipment Reserve Fund

Project Category: Vehicles and Equipment

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

Unit 1811 has 4,800 hours. Unit is beginning to wear out and is starting to experience hydraulic and engine problems. New unit to be used at 18-hole course and rotate older unit to 9-hole course.

Project Status/Scheduling:

Spring, 2014.

Effect of Project on Annual Operations:None.

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Equipment Reserve Fund Projects

Page 51: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

51

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Project Cost20132014 18,0002015 20162017 ________ Total Project Cost $ 18,000

Project Cost20132014 18,0002015 20162017 ________ Total Project Cost $ 18,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Sprayer

Department: 18 Hole Golf Maintenance

Funding Source: Equipment Reserve Fund Project Category: Vehicles and Equipment

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

Project Status/Scheduling:

Spring, 2014.

Effect of Project on Annual Operations:

None.

Equipment Reserve Fund Projects

Page 52: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

52

HOLIDAY ISLAND SUBURBAN IMPROVEMENT DISTRICT2013-2017 Capital Improvements ProgramPROJECT DETAIL

Equipment Reserve Fund Projects Project Cost2013 $ 2014 32,000 201520162017 __________ Total Project Cost $ 32,000

Project Cost2013 $ 2014 32,000 201520162017 __________ Total Project Cost $ 32,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: 4 Maintenance Carts @ $8,000/cart

Department: 18 Hole Golf Maintenance

Funding Source: Equipment Reserve

Project Category: Vehicles and Equipment

Project Type: Replacement _X_ Expansion ___

Project Description, Justification:

Current Maintenance/utility carts are in poor condition or not running at all. Current units have between 2,200 and 2,500 hours. Currently 3 out of 5 carts are down.

Project Status/Scheduling:

Spring, 2014.

Effect of Project on Annual Operations:

None.

Page 53: 1 Holiday Island Suburban Improvement District 2013-2017 Capital Improvements Program Approach to CIP discussion – Revenue Fund Money collected through

53

Holiday Island Suburban Improvement District2013-2017 Capital Improvements Program

Comprehensive Detail Schedule

Equipment Reserve Fund Projects

Project Cost20132014 2015 $ 13,00020162017 __________ Total Project Cost $ 13,000

Project Cost20132014 2015 $ 13,00020162017 __________ Total Project Cost $ 13,000

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Is Project Mandated by the State or Federal Government?Yes ____ No __X__

Project Title: Sand Trap Rake

Department: 18 Hole Golf Maintenance

Funding Source: Equipment Reserve Fund Project Category: Vehicles and Equipment

Project Type: Replacement _X_Expansion ___

Project Description, Justification:

Project Status/Scheduling:

Spring, 2015.

Effect of Project on Annual Operations:

None.