1GISFI_GICT_201112160 GISIF#7, 20 - 22., 2011
Agenda
• GICT_201112158, Standardization of Global Green Mobile Charger, Prof. Pandey, IIIT-A
• ITU Climate Change Activity, Malcolm Johnson, ITU-T• FICCI (Federation of Indian Chambers of Commerce and Industry) g
reen activity, Prashant Mathur• New version of TRs:
– GISFI_GICT_201112156, TR GICT.102 – (making ICT green), Yani, NEC
– GISFI_GICT_201112155, TR GICT.103 – (using ICT to make other sectors green), Yani, NEC
• GICT_201112158, ECR-VLI measurement procedure, Sanaka Peda Yanaiah, NEC
• Measurement:– WID– GICT_201112158, GSM Voice Models for EE Measurements – An Upd
ate, Mini Vasudevan, Ericsson• GISFI_GICT_201112162, Greening the Agriculture sector by ICT, S
anaka Peda Yanaiah, NEC
GISFI_GICT_201112160 GISIF#7, 20 - 22., 2011 2
Green ICT: Agenda and Decisions
Company: NEC CorporationAuthor(s): GISFI Green ICT chairContact information: [email protected]: Discussion and Approval
3GISFI_GICT_201112160 GISIF#7, 20 - 22., 2011
Few Points of GISFI#6 Report 1/2• All members are requested to provide comments on new input (MS Word
Track Changes) to TR GICT.102 (GISFI_GICT_201109122 TR-GICT.102v080 Study on Potential enhancements of ICT) and TR GICT.103 (GISFI_GICT_201109123 TR-GICT.103v080 Study on usage of ICT to make other sectors green) with the following deadlines:
– Comments: Mon., November 14, 2011– Modification based on comment: Wed., November 16, 2011– Comments on modification: Mon., November 21, 2011– Final version: Tue., November 22, 2011– Comment will be accepted only on new changes. If comments are not resolved
then that part will be removed and rest of the changes will be accepted in a new version of the TR.
• Action 1: Ericsson will provide comments on energy efficiency measurement metrics WID (GISFI_GICT_201109110) with the deadline as given above.
• Ericsson volunteered to be a rapporteur for metrics and measurement methods for RAN
4GISFI_GICT_201112160 GISIF#7, 20 - 22., 2011
Few Points of GISFI#6 Report 2/2
• GISFI_GICT_201109124 TR GICT.105v100 Study on Measurements and Metrics of Green ICT was made available for comments until the next meeting
• GISFI_GICT_201109108 OPEX calculation based on energy efficiency of Telecom equipment in Indian Scenario, NEC
– Action 2: GISFI provide input to TEC regarding ECR calculation methods for Green Passport program.
• Support is needed. VNL has volunteered
• GISFI_GICT_201109121 Global Green Energy Mobile Charger, IIIT-A– Product design or specification cannot be standardized– GISFI can look at standardization of charger interface.– IIIT-A should refer GSMA / ETSI work on universal charger– Standardization could be done on universal green charger where the interface to
the green energy sources could be standardized by GISFI– Action 3: IIIT-A is requested to discuss the topic for standardization with other m
embers and come with a work item description in the next GISFI meeting• GISFI_GICT_201109126 LS on “Thanking ATIS for Sharing ATIS Document
s”
5GISFI_GICT_201112160 GISIF#7, 20 - 22., 2011
Decisions based on GISFI#6
• Following 3 TRs can be published:– TR GICT.102: GISFI_GICT_201109122 TR-GICT.102
v080 Study on Potential enhancements of ICT– TR GICT.103: GISFI_GICT_201109123 TR-GICT.103
v080 Study on usage of ICT to make other sectors green
– TR GICT.105: GISFI_GICT_201109124 TR GICT.105v100 Study on Measurements and Metrics of Green ICT was made available for comments until the next meeting New version GISFI_GICT_201112157 with all figures re-drawn
6GISFI_GICT_201112160 GISIF#7, 20 - 22., 2011
Other Actions
• Create liaison with other bodies– ITU-T SG5 on measurement activities: Inform what w
e are doing and request for exchange of information– FICCI (Federation of Indian Chambers of Commerce
and Industry) green activity– Telecommunications Regulatory Authority of India (T
RAI)– Telecommunication Engineering Centre (TEC) Depart
ment of Telecommunications (DoT)
7GISFI_GICT_201112160 GISIF#7, 20 - 22., 2011
New Version of TRs
• GICT.102 -- GISFI_GICT_201112156 (making ICT green) • GICT.103 -- GISFI_GICT_201112155 (using ICT to make other sect
ors green)• Changes in the above 2 documents:
– Some new text based on literature survey and – Editorial modification
• Action: Members are requested to review and give comments on the above 2 TRs. Schedule is given below:– Comments: Mon., January 23, 2012– Modification based on comment: Wed., February 1, 2012– Comments on modification: Mon., February 13, 2012– Final version: Wed., February 15, 2012– Comment will be accepted only on new changes. If comments are not re
solved then that part will be removed and rest of the changes will be accepted in a new version of the TR