0dvwhq 3dun - swbr · 2019-09-04 · plumbing first floor plan area b-removal plumbing first floor...

24

Upload: others

Post on 12-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 2: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 3: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 4: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical

SITE LEGEND:

2

3

4

5

6

7

8

1

1a

9

10

11

12

13

14

15

16

17

18

1

2a

3

4

5

6

2b

2c

1

18

172

3

4

9

2a

2b

2b

5

6

4

3

5

7

MAS

TEN

AVE

NU

E

BEST STREET

DODGE STREET

1a

15

10

10

13

16

13

14

1112

8

JEFF

ERSO

N A

VEN

UE

16

Page 5: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical

G-001

L-000L-001L-002L-101L-102

C-101C-102

A-101A-102A-103A-104A-105A-106A-107

PD-101P-101P-102

E-101E-102

Landscape

General

Civil

Architectural

Plumbing

Electrical

General Notes, Legends & Drawing List

Existing Conditions/ Survey (West)Existing Conditions/ Survey (East)Demolition Plan Site Layout Plan (West)Site Layout Plan (East)

Grading, Drainage & Utility (West) PlanGrading, Drainage & Utility (East) Plan

Service Building - First Floor Demolition PlanService Building - First Key Plan & Part CService Building - First Floor Plan - Part BService Building - Elevations - North & EastService Building - Elevations - South & WestNorth Tower - Demolition Plan and New Work PlanSouth Tower - Demolition Plan and New Work Plan

Plumbing First Floor Plan Area B-RemovalPlumbing First Floor Plan Area C & DPlumbing First Floor Plan Area B

Electrical Site PlanElectrical Site Plan

CMU SERIES PARTITIONS

8" CMU WITH HORIZONTAL REINFORCING AT 16" O.C. (VERT.)7 5/8"C8

6" CMU WITH HORIZONTAL REINFORCING AT 16" O.C. (VERT.)5 5/8"C6

12" CMU WITH HORIZONTAL REINFORCING AT 16" O.C. (VERT.)11 5/8"C12

These documents and all the ideas, arrangements, designs and plans indicated thereon or presented thereby are owned by and remain the property of SWBR and no part thereof shall be utilized by any person, firm, or corporation for any purpose whatsoever except with the specific written permission of SWBR. All rights reserved. ©

387 East Main Street Rochester NY 14604

585 232 8300 | [email protected]

FIL

E P

AT

H:

SWBR Project Number

Checked By:

Project Manager:

Drawn By:

Revisions

4/1

0/2

019

6:2

7:4

7 P

MC

:\1

-Lo

cal R

evit M

od

els

20

19\1

863

0.0

0 C

FG

B P

AR

KS

- J

ohn

nie

B.W

iley_C

entr

al_

lyn

ann

ew

.rvt

18630.00

Checker

General Notes,Legends & DrawingList

DP

Author

G-001

Design Development

Community Foundation for

Greater Buffalo

City of Buffalo Parks & Buffalo

Public School Facilities Survey &

Design Development

726 Exhange Street, Suite 52Buffalo, NY 14210

3.29.2019

AB Anchor boltA/C Air condition(ing) (ed)ACC AccessibleACCU Air cooled condensing unitACI American Concrete InstituteACT Acoustical ceiling tileACM Asbestos containing materialACOUS PNL Acoustical panelACS PNL Access panelADDL AdditionalADJ Adjustable, adjacentADH AdhesiveAFF Above finished floorAGGR AggregateAHU Air handling unitAISC American Institute of Steel ConstructionAISI American Iron and Steel InstituteALT AlternateALUM AluminumANOD AnodizedAPPROX ApproximateARCH Architect(ural)ARD Auxillary roof drainASD Allowable stress designASTM American Society for Testing and MaterialsAWP Acoustical wall panelAWS American Welding SocietyBAT BattenB/B Back to backB BD Base boardBCNYS Building Code of New York StateBITUM BituminousBD BoardBLDG BuildingBLKG BlockingBM Beam, BenchmarkBOT BottomBR BedroomBRG BearingBRZ BronzeBSMT BasementBTWN BetweenBUR Built up roofingBW Both waysCCTV Closed circuit televisionCAB CabinetCB Catch basin, Corner beadCH BD ChalkboardCEM CementCF Contractor furnishedCFMF Cold-formed metal framingCF/CI Contractor furnished/ Contractor installedCF/OI Contractor furnished/ Owner installedCG Corner guardCH Coat hookCI Cast ironCIP Cast in place, Cast iron pipeCJ Control jointCL CenterlineCLG CeilingCLO ClosetCLR Clear, ColorCMT Ceramic mosaic tileCMU Concrete masonry unitCNTR CounterCO Cleanout, Cased opening, CompanyCOL ColumnCONC ConcreteCONF ConferenceCONN Connect(ion)CONSTR ConstructionCONT Continue(ous)CONTR Contract(or)COORD CoordinateCPT CarpetCSJ Construction jointCSK Counter sunkCT Ceramic tile, Count, Current transformerCTR CenterCW Cold water piping, Casement windowCU CubicCUH Cabinet unit heaterCU YD Cubic yardD Deep, DepthD Penny (nail)db Bar diameterDBL DoubleDEFS Direct-applied exterior finish systemDEG DegreeDEMO DemolitionDEPT DepartmentDET DetailDF Drinking fountainDIA OR ø DiameterDIAG Diagonal, DiagramDIM DimensionDIFF DiffuserDIR DirectionDISP DispenserDIV DivisionDMPF Damp proofingDL Dead loadDN DownDO DittoDR Door, DriveDS DownspoutDW Dishwasher

DWV Drainage waste & ventDWG DrawingDWL DowelE EastEA EachEBCNYS Existing Building Code of New York StateEC Electrical contractorEF Each faceEIFS Exterior insulation and finish systemEJ Expansion jointELAS ElastomericEL ElevationELEC Electric(al)ELEV ElevatorEM Entry mat, Expanded metalEMER EmergencyENCL EnclosureENGR EngineerEOS Edge of slabEP Electric panelEQ EqualEQUIP EquipmentES Emergency showerETC Et ceteraETR Existing to remainEW Each wayEWC Electric water coolerEXIST ExistingEXC Excavation, ExcavateEXP Expand, ExpansionEXT Exterior, External, ExtinguisherF/F Face to faceFAAP Fire alarm annunciator panelFACP Fire alarm control panelFD Floor drainFDTN FoundationFE Fire extinguisherFEC Fire extinguisher cabinetFHC Fire hose cabinetFIN Finish(ed)FIXT FixtureFLASH FlashingFLEX FlexibleFLOUR FluorescentFLG Flooring, flangeFO Finished openingFP Fire protection, FireproofFRTW Fire retardant treated woodFT Foot, FeetFTG FootingFTR Finned tube radiationFURN Furnace, Furniture, FurnishFUT FutureFWC Fabric wall coveringGA GageGAL GallonGALV GalvanizedGB Grab barGC General contract(or)GFRC Glass fiber reinforced concreteGFRG Glass fiber reinforced gypsumGL Glass, Ground levelGL BLK Glass blockGLU LAM Glued laminated beamGR Grade, GrossGWT Glazed wall tileGYP GypsumGYP BD Gypsum boardGYP PLAS Gypsum plasterHB Hose bibbHC Hollow core, Hose cabinetHCP HandicappedHDW HardwareHDWD HardwoodHM Hollow metalHO Hold openHORIZ HorizontalHP High point, HorsepowerHR HourHSS Hollow structural sectionHT HeightHTG HeatingHTR HeaterHVAC Heating, ventilating and air conditioningHW Hot waterHYD HydrantID Inside diameterIN InchesINCL IncludedINCAND IncandescentINFO InformationINSUL InsulationINTERM IntermediateINT InteriorJAN JanitorJST JoistJT JointKIP 1000 PoundsKIT KitchenKO KnockoutKPL Kick plateL Liter, AngleLAM Laminate(d)LAU LaundryLAV LavatoryLB PoundLBL LabelLD LoadLF Linear feet (foot)

LH Left hand, Latent heatLIN LinearLKR LockerLL Live loadLLH Long leg horizontalLLV Long leg verticalLOC LocationLRFD Load & resistance factor designLT LightLTG LightingLWC Light-weight concreteMACH MachineMAINT MaintenanceMAS MasonryMATL MaterialMAX MaximumMC Mechanical contractorMCB Metal corner beadMDO Medium density overlayMDF Medium density fiberboardMECH MechanicalMEP Mechanical, electrical, plumbing and fire protectionMEZZ MezzanineMFR ManufacturerMH ManholeMM MillimeterMIFRC Mastic/intumescent fire-resistive coatingMIN MinimumMISC MiscellaneousMLWK MillworkMO Masonry openingMRK BD Marker boardMTD MountedMTL MetalMULL MullionN NorthNAT NaturalNCOMBL NoncombustibleNIC Not in contractNO OR # NumberNOM NominalNORM NormalNRC Noise reduction coefficientNTS Not to scaleNWC Normal weight concreteO/O Out to outOA Overall, Outside airOC On centerOD Outside diameterOF/CI Owner furnished, Contactor installedOF/OI Owner furnished, Owner installedOFD Overflow drainOFF OfficeOH Opposite handOH DR Overhead (coiling) doorOPNG OpeningOPP OppositeOPT Optional, OptimumOZ OuncePA Public addressPBD ParticleboardPC Plumbing contractor, Portland cementPCC Precast concretePCT Porcelain ceramic tilePED PedestalPEND PendantPER PeriodPERF PerforatedPGBD Peg boardPL Plate, Property linePLF Ponds per linear footPLAM Plastic laminatePLAS PlasterPLB PlumbingPLYWD PlywoodPNL PanelPOL PolishedPORC PorcelainPOS Positive, PositionPPT Pressure-preservative treatedPR PairPREFAB PrefabricatePREFIN PrefinishPREP PreparationPROJ ProjectPROJ SCRN Projection screenPSF Pounds per square footPSI Pounds per square inchPT Paint, Post tensionPTN PartitionPVC Polyvinyl chloride (plastic)PVG PavingQT Quarry tileQTR QuarterQTY QuantityR Riser, Radius, Thermal resistanceRB Rubber base, Resilient baseRCP Reinforced concrete pipe, Reflected ceiling planRD Roof drain, RoadREC RecessedREF RefrigeratorREFL ReflectREG Register, RegulationREINF ReinforcedREQD RequiredRESIL ResilientREV Revision

RF Resilient flooringRFG RoofingRH Right hand, Roof hatchRM RoomRO Rough openingROW Right of wayRTU Roof top unitRV Roof ventRWB Rubber wall baseS SouthSAB Sound attenuation battsSAN SanitarySC Solid core, Shading coefficientSCHED ScheduleSEAL Sealer on floor (finish)SECT SectionSF Square foot, Safety factorSFRM Sprayed fire-resistive

MaterialSGT Structural glazed tileSHT SheetSHR ShowerSIM SimilarSOG Slab on gradeSP Standpipe, Sump pitSPA SpacesSPKR SpeakerSPEC SpecificationSQ SquareSRD Secondary roof drainSS Service sinkSSM Solid surface materialSSP Stainless steel pipeSST Stainless steelST StainSTA StationSTC Sound transmission classSTD StandardSTIFF StiffenerSTL SteelSTOR StorageSTR Straight, StringersSTRUCT StructuralSUSP SuspendedSV Sheet vinylSY Square yardT TreadT/ Top ofT&B Top and bottomT&G Tongue and grooveTEL TelephoneTHRES ThresholdTEMP TemporaryTER TerrazzoTHK Thick(ness)TK BD Tack boardTMPD TemperedTOC Top of concreteTOM Top of masonryTOPO Topography, TopographicTOS Top of steelTOW Top of wallTPD Toilet paper dispenserTSTAT ThermostatTV TelevisionTYP TypicalU Heat transfer coefficientUC UndercutUCL Under cabinet lightingUGND UndergroundUH Unit heaterUL Underwriter's laboratoriesUNEX UnexcavatedUNFIN UnfinishedUON Unless otherwise notedUTIL UtilityUV Unit ventilatorVARN Varnish(ed)VB Vinyl baseVCT Vinyl composition tileVENT VentilationVERT VerticalVEST VestibuleVIF Verify in fieldVIN VinylVOL VolumeVR Vapor retarderVT Vinyl tileV SHT Vinyl sheetVWC Vinyl wall coveringW WestW/ WithWC Water closet, Wall coveringW/O WithoutWD WoodWDW WindowWF Wide flangeWD GD Wood guardWH Water heaterWI Wrought ironWM Wire meshWP Waterproofing, Working pointWR Water repellent, weather resistantW RECPT Waste receptacleWSCT WainscotWT Weight, Watertight, Water tableWWF Welded wire fabricX ByYD Yard

C12A

C12A-XXX

1

4

3

2

X SCALE: X"=1'-0"

Title

1

12

B

A

1

8'-0" AFF

1

Batt insulation

Rigid insulation

Wood blocking (intermittent) Stone

Gravel or crushed stone

Wood framing (continuous)

Finish wood

Steel - large scale

Steel - small scale

Plywood

Concrete

Concrete masonry unit

Brick

(Other metals as noted)

View title

Building / wall section cut

Detail - blow up

Exterior elevation

Interior elevations

101

1

Partition type

Room number

Door numbers

Window type

Revision

OR

OR

Undisturbed earth

001100

A

001

Structural grid

Viewing direction

Detail no.

Drawing no.

Detail no.

Drawing no.

Drawing no.

Elevation no.

Plan key note

Demolition key note

Ceiling type and height

Drawing symbols

(Other metals as noted)

A-XXX

X

A-XXX

X

Gypsum, sand, mortar

A-XXX

X

Drawing no.

Elevation no.

Detail no.

Detail section cut

Detail no.

DRAWING NO.

A-XXX

X

Viewing direction

Accessibility

Accessible unit

V/HAU

Visual / hearing accommodation unit

Material symbols

Architectural / Structural abbreviations

DRAWING LIST - JBW/MASTEN PARK

Page 6: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 7: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 8: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical

REPUTED OWNERCITY OF BUFFALO STADIUM

PARKS & RECREATION

ER LO

TLE

ER LO

TLE

ER &

RSON

ER

T LLC

R S ER

ALO

TLE

ER

ALO

TLE

ER

ER

NER

ALO

ITLE

NER

ALO

ITLE

NER

ALO

ITLE REPUTED OWNER

CITY OF BUFFALOPERFECTING TITLE

RECITY BUFFAL

MAK

REPUTED OWNER1200 JEFFERSON PROPERTIES LLC

REPUTE

CITY OF BUFFALO

REPUTE

1200 JEFFERSON

REPUTED

CITY OF

PERFECTI

REPUT

GERTRU

REPUT

EAST SIDE

REPUTED

EAST SIDE

REPUTE

CITY OF

PERFECT

REPUTE

NASIMA

REPUTE

AWA

REPUTE

AWA

REPUTE

LATOYA

REPUT

CITY OF BUFFALO

REPUTE

EAST SIDE

REPUTE

THELM

REPUTE

EAST SIDE

REPUTE

EAST SIDE

REPUT

CITY OF BUFFAL

REPUT

CITY OF BUFFAL

REPUTE

COLLETTE

REPUTE

CITY OF

PERFECT

REPUT

NANNY'S

HOM

INCOR

REPUTE

EAST SIDE

REPUTE

EAST SIDE

REPUTE

CITY OF

PERFECT

REPUTE

CREIGTON

REPUTE

TIFFANY

REP

D&H CAPITA

REPUTE

CITY OF

PERFECT

REPUT

NANNY'S

HOM

INCOR

REPUT

JAMES &

REPUT

JAMES & V

REPUT

VERON

REPU

EAST SIDREPUTED OWNER

CITY OF BUFFALOPERFECTING TITLE

REPUTED OWNER

RUSSOTTO

PROPERTI ES I NC.

NEROINC.

WNEROINC.

NERWN

ERN JR

NERON

NEROUPTION

NERNSON

EROR

ERNTLLC

ER

REPUTED OWNER

ANGELA N. SULLIVAN

301

505

PARKING

PARKING

PARKING

PARKING

GUY

GUYGUY

GATE

GATE

GATE

SHADOWSSHADOWS SHADOWS

SHADOWSSHADOWS

G/O

LINE

DENSETREES

DENSE

TREES

DENSETREES

DENSETREES G/

OLINE

SHADOWSG/OLINE

SHADOWS

G/O

LINE

G/O

LINE

G/OLINE

G/OLINE

G/OLINE

G/O

LINE

SHADOWS

G/O

LINE

ATHLETICCOURT

ATHLETICCOURT

ATHLETICFIELD

ATHLETICFIELD

ATHLETICFIELD

ATHLETICFIELD

ATHLETICFIELD

ATHLETICFIELD

ATHLETICFIELD

ATHLETICFIELD

PLAYGROUND

PLAYGROUND

POOLPOOL

POOL POOL

WALL

WALL

WALLS

WALL

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC

CONC CONC

CONC

CONC

CONC

CONC

670

665

660

655650

670

665

67066

5660

655

655

BRUSH

BRUSH BRUSH

BRUSH

BRUSH

SIGN

SIGN

SIGN

RWRWRWRW

RWRWRW

RW

RW

RW

RW

RW

RW

RW

RWRW

RW

RW

RW

RWRWRW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW RW

RWRW

RW

RW

RW

RW

BLEACHERS

PILLARS

PILLAR

BLEACHERS

BLEACHERS

BL EACHERS

PILLAR PILLAR

PILLARS

PILLARS

PILLARS

PILLARS

PILLAR

S

BLEAC

HERS

BLEACHERS

PILLARS

PILLARS

673.37

670.13

670.74

671.28

671.14

669.99

671.79

671.60

671.18

670.40

671.36

670.85

672.31

672.71

672.57

672.44

640.49

662.72662.68

670.80

671.61

671.07

670.78

671.01

671.19

668.81

670.92

671.09

674.60 674.72 674.08

674.65

676.60

675.70

666.07

665.86

669.30

669.66

654.04

660.35

666.15

656.65

656.07656.22

656.69

656.15656.39

656.58

656.09656.56

656.79

656.79

656.33

656.09

656.09

656.20

656.34

656.19

655.55

656.35

670.19

669.62670.34

656.35

656.31

656.32

652.01

653.49652.66

653.42

653.60

646.24647.61

648.26

644.12

652.66

653.14

652.77

653.28

653.78

652.71

653.43

654.42

664.97

665.11

665.11

668.33667.94

668.40

654.07

655.76

655.68

655.63

655.69

655.55

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB CB

CB

CB

CB

CBCB

CB

CB

PILLARS

PILLARS

PILLARS

PILLARS

MAPPINGLIMIT MAPPING

LIMIT

MAPPING

L IMIT

MAPPINGLIMIT

MAPPINGLIMIT

MAPPING

LIMIT

RIM = 643.26N INV =SE INV =S INV =SW INV =

RIM =643.68

RIM =643.88

RIM =644.05

RIM = 645.62INACCESSIBLE

RIM = 645.53INACCESSIBLE

RIM = 646.92INACCESSBLE

RIM = 651.55INACCESSIBLE

RIM = 654.10INACCESSIBLE

RIM = 649.34INACCESSIBLE

RIM = 644.02E INV = 634.72W INV = 634.72

M = 639.80INV = 632.60INV = 632.40

RIM = 640.24NW INV = 629.64NE INV = 637.04E INV = 629.44S INV = 629.64

9.86630.9632.26632.26

253.0585

M = 640.29ACCESSIBLE

RIM =675.35

RIM = 653.81INACCESSIBLE

RIM =651.18

RIM =658.82

9E

RIM =664.24

6" 6"

6"6"

6"

6"

6"

6"

6"

6"

36"

36"

36"

36"

36"

36"36"

36"

16"

16"

16"

16"

4"

10"10"

10"

10"10"

16"

8"

8"

8"

4"CPD

4"CPD

6"PVC

6"PVC

4"CPD

8"

12"

12"

8"PVC

8"PVC

8"PVC

8"PVC

8"PVC

8"PVC8"PVC

8"PVC

8"PVC

4"

12"

10"10"

10"

12"8"8"

12"

24"RCP

24"RCP

12"

10"

10"

12"

30"

12"

24"RCP

36"RCP

36"RCP

24"

12" 12"12"

TG = 643.58SUMP = 640.83

TG = 643.35SUMP = 640.35

TG = 643.46SUMP = 640.16

TG = 643.96SUMP = 640.96

TG = 644.17FILLED WITH DEBRIS

TG = 644.21FILLED WITH DEBRIS

TG =647.08

TG = 654.28INACCESSIBLE

TG = 654.02INACCESSIBLE TG

=

651.95

TG = 654.09INACCESSIBLE

TG = 654.92INACCESSIBLE

TG = 653.99INACCESSIBLE

TG = 654.06INACCESSIBLE

TG = 645.44INACCESSIBLE

TG = 646.32FILLED WITH DEBRISSUMP = 640.22

TG = 646.52FILLED WITH DEBRIS

TG = 669.54E INV = 666.54SUMP = 663.89

TG = 669.62NW INV =666.67SUMP = 663.92

TG = 669.53NW INV =SUMP =

TG =669.45

TG =656.02

TG =656.04

TG = 655.86FULL OF DEBRISSUMP = 650.01

TG = 666.77NW INV =663.54N INV = 663.02NE INV = 663.82SUMP = 662.57

TG = 667.69NW INV =664.14E INV = 663.44SUMP = 663.19

TG = 664.06INACCESSIBLESUMP = 661.06

G = 663.51NACCESSIBLEUMP = 660.46

G = 662.21NACCESSIBLESUMP = 659.51

TG = 655.67FULL OF DEBRIS

TG = 655.62E INV = 650.67SUMP = 649.52

TG = 660.17E INV = 656.47SUMP = 655.44

TG = 664.32NO VISIBLE PIPESSUMP = 658.82

TG = 655.62E INV = 650.87SUMP = 649.87

TG = 666.01E INV = 661.01SUMP = 660.21

TG = 655.61E INV = 650.71SUMP = 649.71

TG = 655.61E INV = 650.66SUMP = 649.71

TG = 665.99N INV = 661.14SUMP = 660.49

TG = 655.59E INV = 650.75SUMP = 649.69

TG = 666.12N INV = 661.42SUMP = 661.07

TG = 655.60E INV = 650.85SUMP = 649.80

TG =667.13

TG =667.08

TG = 639.48INACCESSIBLESUMP = 636.23

RIM = 640.02SUMP = 633.72

EBRIS25

= 651.10D WITH DEBRISP = 648.10

TG =668.11

TG =668.11 TG =

666.30

TG =666.42

TG =665.15

TG =665.18

TG = 645.43INACCESSIBLENO VISIBLE PIPESSUMP = 642.18

TG = 645.73E INV = 643.53INACCESSIBLESUMP = 642.63

TG = 657.92N INV = 650.72SE INV = 650.77SUMP = 655.09

TG = 664.35INACCESSIBLESUMP = 661.20

BESTSTREET

DODGESTREET

EDNALACE

MASTEN

AVENUE

CH ET

PE ET

JEFFERSON

AVENUE

ST

EHH

EHH

EHH

EHH

EHH

EHH

EHH

EHH

EHH

E

EE

E

E

G

COCO

CO

CO

CO

CO

CO

CO

TR

HH

TR

HH

TR

HH

TR

HH

TR

HH

TR

HH

TR

HH

TR

HH

TR

HHTR

HH

TR

HH

TR

HH

T

T

T

X

X

X

X

X

W

W

W

WV

WV

WV

WV

WV

WV

WV

WV

WV

WVWV

WV

WV

WV

WV

WV

WV

WV

WV

WV

WV

WV

WVWV

WV WV

WV

WV

WVWV

WV

WV

WV

WVWV

WV

WVWV

GV

W

W

WV

WVWV

WV

E

EE

TSP

SA

SA SA

SA SA SA SA SA

SA

SA

SA

SA

SA

SA

SA

SA

SA

W

SA

SA

ST

SA

SA

Page 9: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical

18,0

18,0

54,C,203801

54,C,203801

3,17670

4U39,1767

04

15,17670

4U51,176

704

39,1767

043,17670

4U

-.5,1477

22-4,0

-.5,147722

-4,0

15,0

51,176

707

21,0

57,1767

07

51,17670

715

,0

21,0

57,1767

07

10 .5625

,1772 10

10 .5625,0

10 .5625,0

10 .5625

,1772 10

51.5,2

03347

5 1.5, 2033 47

22.75, 0

22.75,0

22.75,0

22.7 5, 0

21.375,0

21.375,0

2 1.375, 0

21.3 75 ,0

25.5,1

76339

25.5,0

25.5,1763 39

25 .5,0

25.5,0

25.5,1763 39

25 .5,0

25.5,1

76339

63,176339

63,0

63,176339

63 ,0

63,0

63,176339

63 ,0

63,176339

63.5,203347

6 3.5 ,2

03 34 7

59,177210 28,177210

28,0 59,0

51.5,203347

GALV

ANIZED

GALV

ANIZED

GALV

ANIZED

GALV

ANIZED

17.31,0

1 7.31, 010.75,09.375, 0

10.75,0

9.375,0

10.75,0 9.375,0

10.75

,09.375,0

10.75,0 9.375,0

10.75,0

9.375,0

10. 75,0

9. 375, 0

10. 75,0

9. 375, 0

120

120

120

120

5.000 O. D.

5.000 O. D.

2.375 O. D.

2.375 O. D.

5.000 O.D.

5.000 O.D.

5.000 O.D.

5.000 O.D.

5.000 O.D.

5.000 O.D.

2.375

O.D.

1.315 O.D.

4 2,C ,203 801

4 2,C ,203 801

66,C,203801

66,C,203801

5 4,C ,203 801

5 4,C ,203 801

66,C,203801

66,C,203801

66,C,203801

66,C,203801

102,T,80

206

102,T,80

206

102,T,80

206

102,T,80

206

GUY

GUYGUY

WALL

CONC

BRUSH

BRUSH BRUSH

BRUSH

BRUSH

RWRW

RWRWRW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

RW

PILLARS

BLEACHERS

BLEACHERS

BL EACHERS

CB

CB

CB

CB

CB

CB

CB

CB

CB

RIM =664.24

EHH

E

EE

TR

HH

TR

HH

TR

HH

TR

HH

TR

HHTR

HH

TR

HH

TR

HH

TX

X

1'

2'

Page 10: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical

GUY

WALL

CONC

CONC

CONC

CONC

RW

RW

RW

RW

RW

RW

RW

RW RW

RWRW

RW

RW

RW

RW

BLEACHERS

BLEACHERS

BL EACHERS

PILLARS

PILLARS

PILLARS

PILLAR

S

BLEAC

HERS

BLEACHERS

PILLARS

PILLARS

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB CB

CB

CB

CBCB

CB

EHH

EHH

EHH

EHH

EHH

EHH

EHH

EHH

E

TR

HH

X

X

TR

HH

TR

HH

TR

HH

T

T

X

EE

TSP

Page 11: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 12: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 13: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 14: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 15: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 16: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 17: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 18: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 19: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 20: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 21: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 22: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 23: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical
Page 24: 0DVWHQ 3DUN - SWBR · 2019-09-04 · Plumbing First Floor Plan Area B-Removal Plumbing First Floor Plan Area C & D Plumbing First Floor Plan Area B Electrical Site Plan Electrical