5120 s king drive landmark 3 story elevator building...plumbing p-1 basement plumbing plan p-2 first...

6
If your property is listed with a real estate broker, please disregard. It is not our intention to solicit the offerings of other real estate brokers. We are happy to work with them and cooperate fully. ©2017 Coldwell Banker Residential Real Estate LLC. All Rights Reserved. Coldwell Banker Residential Brokerage fully supports the principles of the Fair Housing Act and the Equal Opportunity Act. Operated by a subsidiary of NRT LLC. Coldwell Banker and the Coldwell Banker Logo are registered service marks owned by Coldwell Banker Real Estate LLC. Real estate agents affiliated with Coldwell Banker Residential Brokerage are independent contractor sales associates and are not employees of Coldwell Banker Residential Brokerage. SITE PLAN INDEX OF DRAWINGS ARCHITECTURAL A-1 SITE PLAN A-2 BASEMENT FLOOR PLAN A-3 FIRST FLOOR PLAN A-4 SECOND FLOOR PLAN A-5 THIRD FLOOR PLAN A-6 ELEVATOR SHAFT MODIFICATIONS A-7 EAST ELEVATION A-8 DOOR AND ROOM FINISH SCHEDULES PLUMBING P-1 BASEMENT PLUMBING PLAN P-2 FIRST FLOOR PLUMBING PLAN P-3 SECOND FLOOR PLUMBING PLAN P-4 THIRD FLOOR PLUMBING PLAN P-5 PLUMBING RISER DIAGRAM (WATER) P-6 PLUMBING RISER DIAGRAM (SOIL AND WASTE) MECHANICAL M-1 BASEMENT MECHANICAL PLAN M-2 SECOND FLOOR MECHANICAL PLAN M-3 THIRD FLOOR MECHANICAL PLAN M-4 VENTILATION. REFRIGERATION & FURNACE M-5 REMOTE REFRIGERATION PIPING TO DIAGRAM ELECTRICAL E-1 BASEMENT LIGHTING PLAN E-2 SECOND FLOOR LIGHTING PLAN E-3 THIRD FLOOR LIGHTING PLAN E-4 BASEMENT POWER PLAN E-5 SECOND FLOOR POWER PLAN E-6 THIRD FLOOR POWER PLAN E-7 ELECTRICAL RISER DIAGRAMS E-8 ELECTRICAL PANEL SCHEDULES 5120 S King Drive Landmark 3 Story Elevator Building

Upload: others

Post on 26-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5120 S King Drive Landmark 3 Story Elevator Building...plumbing p-1 basement plumbing plan p-2 first floor plumbing plan p-3 second floor plumbing plan p-4 third floor plumbing plan

If your property is listed with a real estate broker, please disregard. It is not our intention to solicit the offerings of other real estate brokers. We are happy to work with them and cooperate fully. ©2017 Coldwell Banker Residential Real Estate LLC. All Rights Reserved. Coldwell Banker Residential Brokerage fully supports the principles of the Fair Housing Act and the Equal Opportunity Act. Operated by a subsidiary of NRT LLC. Coldwell Banker and the Coldwell Banker Logo are registered service marks owned by Coldwell

Banker Real Estate LLC. Real estate agents affiliated with Coldwell Banker Residential Brokerage are independent contractor sales associates and are not employees of Coldwell Banker Residential Brokerage.

SITE PLAN

INDEX OF DRAWINGS

ARCHITECTURAL

A-1 SITE PLANA-2 BASEMENT FLOOR PLANA-3 FIRST FLOOR PLANA-4 SECOND FLOOR PLANA-5 THIRD FLOOR PLANA-6 ELEVATOR SHAFT MODIFICATIONSA-7 EAST ELEVATIONA-8 DOOR AND ROOM FINISH SCHEDULES

PLUMBING

P-1 BASEMENT PLUMBING PLANP-2 FIRST FLOOR PLUMBING PLANP-3 SECOND FLOOR PLUMBING PLANP-4 THIRD FLOOR PLUMBING PLANP-5 PLUMBING RISER DIAGRAM (WATER)P-6 PLUMBING RISER DIAGRAM (SOIL AND WASTE)

MECHANICAL

M-1 BASEMENT MECHANICAL PLANM-2 SECOND FLOOR MECHANICAL PLANM-3 THIRD FLOOR MECHANICAL PLANM-4 VENTILATION. REFRIGERATION & FURNACEM-5 REMOTE REFRIGERATION PIPING TO DIAGRAM

ELECTRICALE-1 BASEMENT LIGHTING PLANE-2 SECOND FLOOR LIGHTING PLANE-3 THIRD FLOOR LIGHTING PLANE-4 BASEMENT POWER PLANE-5 SECOND FLOOR POWER PLANE-6 THIRD FLOOR POWER PLANE-7 ELECTRICAL RISER DIAGRAMSE-8 ELECTRICAL PANEL SCHEDULES

5120 S King DriveLandmark 3 Story Elevator Building

Page 2: 5120 S King Drive Landmark 3 Story Elevator Building...plumbing p-1 basement plumbing plan p-2 first floor plumbing plan p-3 second floor plumbing plan p-4 third floor plumbing plan

If your property is listed with a real estate broker, please disregard. It is not our intention to solicit the offerings of other real estate brokers. We are happy to work with them and cooperate fully. ©2017 Coldwell Banker Residential Real Estate LLC. All Rights Reserved. Coldwell Banker Residential Brokerage fully supports the principles of the Fair Housing Act and the Equal Opportunity Act. Operated by a subsidiary of NRT LLC. Coldwell Banker and the Coldwell Banker Logo are registered service marks owned by Coldwell

Banker Real Estate LLC. Real estate agents affiliated with Coldwell Banker Residential Brokerage are independent contractor sales associates and are not employees of Coldwell Banker Residential Brokerage.

NEW 8” CONCRETE RETAINING WALL

MEN’S TOILET

WOMEN’S TOILET

ELEVATOR

ELEVATOR EQUIPMENT

UTILITYROOM

ACTIVE STORAGE

INACTIVE STORAGEELECTRICAL

ROOM

BASEMENT FLOOR PLAN

5120 S King DriveLandmark 3 Story Elevator Building

Page 3: 5120 S King Drive Landmark 3 Story Elevator Building...plumbing p-1 basement plumbing plan p-2 first floor plumbing plan p-3 second floor plumbing plan p-4 third floor plumbing plan

If your property is listed with a real estate broker, please disregard. It is not our intention to solicit the offerings of other real estate brokers. We are happy to work with them and cooperate fully. ©2017 Coldwell Banker Residential Real Estate LLC. All Rights Reserved. Coldwell Banker Residential Brokerage fully supports the principles of the Fair Housing Act and the Equal Opportunity Act. Operated by a subsidiary of NRT LLC. Coldwell Banker and the Coldwell Banker Logo are registered service marks owned by Coldwell

Banker Real Estate LLC. Real estate agents affiliated with Coldwell Banker Residential Brokerage are independent contractor sales associates and are not employees of Coldwell Banker Residential Brokerage.

BUILDING EXITING SCHEDULE

FIRST FLOOR MAX. OCCUPANCY SECOND FLOOR MAX. OCCUPANCY THIRD FLOOR MAX. OCCUPANCY TOTAL BUILDING MAX. OCCUPANCY

EXIT CAPACITYEXIT #1 = 172 PERSONSEXIT #2 = 172 PERSONSEXIT #3 = 172 PERSONSTOTAL EXITING CAPACITY 516 PERSONS

= 37 PERSONS= 224= 180= 441

EXISTING CORRIDOR

EXISTING FURNACE ROOMEXISTING FURNACE

ROOM

EXISTING CORRIDOREXISTING CORRIDOR

NEW CONCRETE SLAB

EXISTING OFFICE206 SF

2 PEOPLE

EXISTING OFFICE248 SF

3 PEOPLE

EXISTING OFFICE264 SF

3 PEOPLE

EXISTING OFFICE264 SF

2 PEOPLE

EXISTING OFFICE370 SF

4 PEOPLE

EXISTING OFFICE311 SF

3 PEOPLE

EXISTINGLOBBY

EXISTING MEN’S TOILET EXISTING

WOMEN’S TOILET

EXISTING OFFICE318 SF

3 PEOPLE

EXISTING OFFICE247 SF

3 PEOPLE

EXISTING OFFICE194 SF

2 PEOPLE

EXISTING OFFICE173 SF

2 PEOPLE

EXISTING OFFICE191 SF

2 PEOPLE

EXISTING OFFICE522 SF

5 PEOPLE

EXISTING CONFERENCE 311 SF

3 PEOPLE

FIRST FLOOR PLAN

5120 S King DriveLandmark 3 Story Elevator Building

Page 4: 5120 S King Drive Landmark 3 Story Elevator Building...plumbing p-1 basement plumbing plan p-2 first floor plumbing plan p-3 second floor plumbing plan p-4 third floor plumbing plan

If your property is listed with a real estate broker, please disregard. It is not our intention to solicit the offerings of other real estate brokers. We are happy to work with them and cooperate fully. ©2017 Coldwell Banker Residential Real Estate LLC. All Rights Reserved. Coldwell Banker Residential Brokerage fully supports the principles of the Fair Housing Act and the Equal Opportunity Act. Operated by a subsidiary of NRT LLC. Coldwell Banker and the Coldwell Banker Logo are registered service marks owned by Coldwell

Banker Real Estate LLC. Real estate agents affiliated with Coldwell Banker Residential Brokerage are independent contractor sales associates and are not employees of Coldwell Banker Residential Brokerage.

CLASSROOM

926 SF 46 PEOPLE

CLASSROOM

566 SF 28 PEOPLE

CLASSROOM

567 SF 28 PEOPLE

CLASSROOM

455 SF 22 PEOPLE

CLASSROOM

464 SF 23 PEOPLE

JANITOR

CLASSROOM

435 SF 21 PEOPLE

CLASSROOM

571 SF28 PERSONS

CORRIDOR

ELEVATOR

STORAGECLASSROOM

TYP. ALL CLASSROOMS

JANITOR

LOW ROOFLOW ROOF

MEN

WOMEN

UTILITY

WOMEN

UTILITY

SECOND FLOOR PLAN

5120 S King DriveLandmark 3 Story Elevator Building

Page 5: 5120 S King Drive Landmark 3 Story Elevator Building...plumbing p-1 basement plumbing plan p-2 first floor plumbing plan p-3 second floor plumbing plan p-4 third floor plumbing plan

If your property is listed with a real estate broker, please disregard. It is not our intention to solicit the offerings of other real estate brokers. We are happy to work with them and cooperate fully. ©2017 Coldwell Banker Residential Real Estate LLC. All Rights Reserved. Coldwell Banker Residential Brokerage fully supports the principles of the Fair Housing Act and the Equal Opportunity Act. Operated by a subsidiary of NRT LLC. Coldwell Banker and the Coldwell Banker Logo are registered service marks owned by Coldwell

Banker Real Estate LLC. Real estate agents affiliated with Coldwell Banker Residential Brokerage are independent contractor sales associates and are not employees of Coldwell Banker Residential Brokerage.

CLASSROOM

1622 SF 81 PEOPLE

UTILITY

UTILITY

JANITORELEVATOR

STORAGE

CLASSROOM

CLASSROOM

CLASSROOM

499 SF 24 PEOPLE

CLASSROOM

432 SF 21 PEOPLE

CLASSROOM

462 SF 23 PEOPLE

THIRD FLOOR PLAN

5120 S King DriveLandmark 3 Story Elevator Building

Page 6: 5120 S King Drive Landmark 3 Story Elevator Building...plumbing p-1 basement plumbing plan p-2 first floor plumbing plan p-3 second floor plumbing plan p-4 third floor plumbing plan

If your property is listed with a real estate broker, please disregard. It is not our intention to solicit the offerings of other real estate brokers. We are happy to work with them and cooperate fully. ©2017 Coldwell Banker Residential Real Estate LLC. All Rights Reserved. Coldwell Banker Residential Brokerage fully supports the principles of the Fair Housing Act and the Equal Opportunity Act. Operated by a subsidiary of NRT LLC. Coldwell Banker and the Coldwell Banker Logo are registered service marks owned by Coldwell

Banker Real Estate LLC. Real estate agents affiliated with Coldwell Banker Residential Brokerage are independent contractor sales associates and are not employees of Coldwell Banker Residential Brokerage.

3” DEEP PIT

PLEXIGLASS DOME

NEW WHEEL CHAIR LIFT MODEL : GENESIS CVL-EN-57 BY GARVENTA

TIE BACK BRACE ANCHORED TO CB SECURED TO CONCRETE DECK & MASONRY WALL

CUT BACK PROJECTING DECK & REMOVE RAILING AS REQUIRED TO INSTALL LIFT

NEW BRONZE ENTRANCE DOORS

EXIST. RAILING

EAST ELEVATION PLAN