(07)006 level e ga floor plan - university of sheffield/file/... · 2012. 5. 17. · the church...
TRANSCRIPT
Level E GA Floor Plan
Level E GA Floor Plan
UNIVERSITY OF SHEFFIELD
job no (category) dwg no revision
FACULTY OF ENGINEERINGGRADUATE SCHOOLSHEFFIELD
This drawing is © Bond Bryan Architects Ltd. If in doubt ASK. Drawingmeasurements shall not be obtained by scaling. Verify all dimensionsprior to construction. Immediately report any discrepancies on thisdrawing to Architect. This drawing shall be read in conjunction withassociated specifications and related consultant's documents.
the church studio springvale road sheffield S10 1LP
+44 (0)114 266 2040+44 (0)114 268 7021
TF
E [email protected] www.bondbryan.com
11-003
11-003
(07)006 (07)006
scale date drawn checked
revisions
notesD
ESIGN
D
TD
C
- - -
--
--
designtenderconstruction
PLPR
planningpreliminaryrecord
PT pre-tender
5 6 7 8
102103
104105
97 98 99 100 101 102 103
12
34
5
56
7
123456
12
34
56
12
34
56 1
23
45
6
1 2 3 4
106
107
108
109
110
111
112
113
114
115
116
117
118119
120121
122123
124125
126127
128129
1 2 3 4 5 6
104105106107108109110111112113114115116117
118 119 120 121 122 123 124
1,390 7,250 2,895 4,670 1,600 3,2375
2,76
56,
320
6,00
06,
640
6,32
01,
730
4,59
55,
6875
2,02
5
CHEM ENG G
Disabled Refuge1400 x 900
2640 x 3390 Clear Shaft1700 x 2350 Lift Car2000KG max load
1300mm Door Width
Workroom Workroom
Workroom Workroom
TW
mov
able
par
titio
n
TW
waterfountain
Window to be temporarily changedto door for access to fire escapeduring construction
Position of Temporary External Fire EscapeDuring Construction Serving Floors D, E & F
TW
N E
W C
A S
T L
E
S T
R E
E T
B R O A D L A N E
Fire rated roller shutterconnected to fire alarmto lift door
NoteExisting door opening to be partiallyblocked up & replaced with windowto match existing adjacent.
Flexible TeachingRDS A2-10A: 159 m2Occupancy: 69E05
Flexible TeachingRDS A2-11A: 83 m2Occupancy: 36E06
Stair 1RDS N20-33A: 34 m2E20 Stair 1 Lobby
RDS N20-32A: 31 m2E18
Lift
Ele
c R
iser
RD
S N
21-2
8A
: 3 m
2E
19
Female ToiletRDS N19b-18A: 11 m2E21
Access WC incl BidetRDS N19b-17A: 3 m2E22
Sto
re/F
utur
e R
iser
RD
S N
14-1
6A
: 4 m
2E
03
Mech RiserRDS N21-25A: 8 m2E04
PGR/PDRARDS N12-27A: 56 m2Occupancy: 12E09
Heating RiserRDS N21-29A: 2 m2E10
CICS ITRDS N22-06A: 12 m2E27 AD Office
RDS N12-26A: 10 m2Occupancy: 1E28
CirculationRDS N20-31A: 46 m2E29
CirculationRDS N20-30A: 51 m2E30
Smoke ShaftE12
OfficeRDS N12-30A: 12 m2E13
OfficeRDS N12-28A: 7 m2E17
PGRRDS N12-29A: 34 m2E16
Break OutRDS A2-12A: 55 m2Occupancy: 25E08
CICS RiserRDS N21-27E26
Mech RiserRDS N21-26A: 8 m2E07
PGR/PDRARDS N12-25A: 62 m2Occupancy: 14E01
OfficeRDS N12-31A: 12 m2E14
CleanersRDS N19b-16A: 3 m2E23
StoreRDS N14-18A: 2 m2E11
CirculationRDS N20-34A: 25 m2E15
Mech RiserRDS N21-38E25
Break OutRDS A2-14A: 10 m2Occupancy: 5E02
Male ToiletRDS N19b-28A: 9 m2E24
A B DC CaAa Ab
7
6
5
4
3
2
1
1a
8
5a
Ris
er
TW
TW
Wall Type 1 - 140mm blockwork, plaster finisheither side
Wall Type 2 - 140mm blockwork, plaster finishto one side, fairface/painted finish to one side
Wall Type 3 - 140mm blockwork, fairface/paintedfinish to either side
Wall Type 4 - 250mm concrete shear wall,Fermacell metal frame drylining to either side
Wall Type 5 - 250mm concrete shear wall,Fermacell metal frame drylining to one side,fairface/painted to one side
Wall Type 5 - 250mm concrete shear wall,fairface/painted to either side
Wall Type 6 - Fermacell metal stud partition
Existing wall/structure
Internal Partition Legend
15.04.11
15.04.11SP KR
KR
Revised in accordance withend user comments. Structureupdated in accordance withlatest SE information
D0
SP
19.04.11SP KRRevised in accordance withend user comments.
D1
26.04.11SP SMRevised in accordance withend user comments.
D2
28.04.11SP SMRevised in accordance withend user comments.
D3
06.05.11SP KRRevised in accordance withend user comments. Stair 1reconfigured. RDS Numbers added.
D4
09.05.11SP KRStair 1 reconfigured to suitjunction detail to Broad LaneBuilding
D5
13.05.11CC KRGlazing to Atrium adjusted tosuit new roof configuration.Windows added to stair 1.
D6
1:100 & A0
24.05.11SP KRRevised in accordance withlatest end user comments.Planning alterations undertaken.
D7
31.05.11SP KRMissing RDS numbers added,occupancy numbers updated
D8
13
03.06.11SP KRStage D IssueToilet Cores revised to providemale & female facilities. Clientcomments incorporated. Sitecontext shown.
D9
21.06.11SP KRExisting locker room removedfrom Chem Eng and OfficesN12-30 & N12-31 enlarged.Male toilet N19b-28 rearranged.
D10
12.07.11SP KRExternal facades amended tosuit vent strategy. RiserN21-25 increased.
D11
22.07.11SP KRExisting building surveyinformation integrated ontoplan. External wall & gridposition adjusted.
D12
Existing connecting adjacent building layouts based on thirdparty survey information dated May 2011 supplied by METSurveys Ltd on behalf of Sheffield University. The accuracyof existing building layouts cannot be verified by Bond BryanArchitects Ltd. Site dimensions to be checked prior tocommencement of work.
16.08.11SP KRPlanning IssueLift shaft size adjusted. Roomsnumbers added.
D13