Addendum WATSON TATE SAVORY, Inc. 1316 Washington Street, Suite 100, Columbia, SC 29201 | 803.799.5181 1307 W. Morehead Street, Suite 101, Charlotte, NC 28208 | 704.749.5181 watsontatesavory.com 1 Date: 05 May 2020 Addendum No. THREE Project: ARTIFICIAL INTELLIGENCE LAB UPFIT University of South Carolina Columbia, South Carolina WTS # 1919 OSE # H27-Z408 From: Regina R. Floyd, AIA LEED AP BD+C To: Prospective Bidders / Plan Holders Addenda are issued prior to execution of Contract. All instructions contained herein shall be reflected in the Contract Sum and this Addendum will be made a part of the Contract Documents, if, as, and when a Construction Contract is awarded. This Addendum forms a part of the Contract Documents and modifies the original documents dated 05 April 2019, as noted below. Acknowledge receipt of this Addendum in this space provided on the Bid Form. Failure to do so will subject the Bidder to disqualification. This Addendum consists of 7 pages and the following attachments: Section 08 8719 – DECORATIVE WINDOW FILM ................................................................................... 4 Pages Drawing A1.1 – WEST TOWER LEVEL 5 – FLOOR PLAN .......................................................................... 1 Sheet Drawing A3.2 – INTERIOR ELEVATIONS ................................................................................................. 1 Sheet Drawing A5.1 – DOOR SCHEDULE AND DETAILS .................................................................................... 1 Sheet Drawing A1.14A – WEST TOWER - LEVEL 4 – AREA PLAN (For information only) ................................. 1 Sheet Drawing A2.14A – WEST TOWER - LEVEL 4 – RCP (For information only) ............................................. 1 Sheet A. GENERAL INFORMATION: 1. DOOR, FRAMES AND DOOR HARDWARE previously noted to have materials provided by Owner and installed by Contractor have been revised through this Addendum to be both PROVIDED AND INSTALLED BY CONTRACTOR. 2. Floor and Reflected Ceiling Plans for the existing spaces at Level 4 below are attached and provided for General Information due to work occurring below slab: 1) Drawing A1.14A – WEST TOWER - LEVEL 4 – AREA PLAN (for information only) 2) Drawing A2.14A – WEST TOWER - LEVEL 4 – RCP (for information only) 06

Upload: others

Post on 03-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

Addendum

WATSON TATE SAVORY, Inc.

1316 Washington Street, Suite 100, Columbia, SC 29201 | 803.799.5181 1307 W. Morehead Street, Suite 101, Charlotte, NC 28208 | 704.749.5181

watsontatesavory.com 1

Date: 05 May 2020

Addendum No. THREE

Project: ARTIFICIAL INTELLIGENCE LAB UPFIT

University of South Carolina

Columbia, South Carolina

WTS # 1919

OSE # H27-Z408

From: Regina R. Floyd, AIA LEED AP BD+C

To: Prospective Bidders / Plan Holders

Addenda are issued prior to execution of Contract. All instructions contained herein shall be reflected in

the Contract Sum and this Addendum will be made a part of the Contract Documents, if, as, and when a

Construction Contract is awarded.

This Addendum forms a part of the Contract Documents and modifies the original documents dated 05

April 2019, as noted below. Acknowledge receipt of this Addendum in this space provided on the Bid Form.

Failure to do so will subject the Bidder to disqualification.

This Addendum consists of 7 pages and the following attachments:

Section 08 8719 – DECORATIVE WINDOW FILM ................................................................................... 4 Pages

Drawing A1.1 – WEST TOWER LEVEL 5 – FLOOR PLAN .......................................................................... 1 Sheet

Drawing A3.2 – INTERIOR ELEVATIONS ................................................................................................. 1 Sheet

Drawing A5.1 – DOOR SCHEDULE AND DETAILS .................................................................................... 1 Sheet

Drawing A1.14A – WEST TOWER - LEVEL 4 – AREA PLAN (For information only) ................................. 1 Sheet

Drawing A2.14A – WEST TOWER - LEVEL 4 – RCP (For information only) ............................................. 1 Sheet

A. GENERAL INFORMATION:

1. DOOR, FRAMES AND DOOR HARDWARE previously noted to have materials provided by Owner

and installed by Contractor have been revised through this Addendum to be both PROVIDED

AND INSTALLED BY CONTRACTOR.

2. Floor and Reflected Ceiling Plans for the existing spaces at Level 4 below are attached and

provided for General Information due to work occurring below slab:

1) Drawing A1.14A – WEST TOWER - LEVEL 4 – AREA PLAN (for information only)

2) Drawing A2.14A – WEST TOWER - LEVEL 4 – RCP (for information only)

06

Page 2: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

ARTIFICIAL INTELLIGENCE LAB UPFIT ADDENDUM 03

University of South Carolina May 5, 2020

2

B. REVISIONS TO THE PROJECT MANUAL:

1. TABLE OF CONTENTS:

a. Add the following section:

“08 8719 – DECORATIVE WINDOW FILM .................................................................... 4 Pages

2. SECTION 01 1100 – SUMMARY:

a. Article 1.5 – Material Provided by the Owner: Delete Paragraph B. Doors, Hollow Metal

Frames and Door Hardware will NOT be provided by Owner. Both materials and

installation shall be by Contractor.

3. SECTION 05 1200 – STRUCTURAL STEEL:

a. Article 1.4: Delete Paragraph E “LEED Credit Related Submittals”.

4. SECTION 07 8413 – PENETRATION FIRESTOPPING:

a. Article 1.3: Delete Paragraph B “LEED Submittals”.

5. SECTION 08 1113 – HOLLOW METAL DOORS AND FRAMES:

a. Hollow Metal Doors and Frames Material is ADDED to the contract by this addendum.

Revise note at top of page 1 to read as follows:

“NOTE: ALL HOLLOW METAL DOORS AND FRAMES MATERIAL AND INSTALLATION IS BY

GENERAL CONTRACTOR”.

b. Article 2.3: Revise Item 2.3.B.1.b to read as follows:

“b. Construction: Full profile welded, unless otherwise. Knock down frames may be used

at Shell space doors where noted at Door Schedule.”

6. SECTION 08 1416 – FLUSH WOOD DOORS:

a. Flush Wood Door Material is ADDED to the contract by this addendum. Revise note at top

of page 1 to read as follows:

“NOTE: ALL FLUSH WOOD DOORS MATERIAL AND INSTALLATION IS BY GENERAL

CONTRACTOR”.

7. SECTION 08 4113 – ALUMINUM FRAMED ENTRANCES AND STOREFRONTS:

a. Article 2.1.C: Add the following approved substitution:

“3. Old Castle, Series 3000.”

8. SECTION 08 7100 – DOOR HARDWARE:

b. Door Hardware Material is ADDED to the contract by this addendum. Revise note at top of

page 1 to read as follows:

“NOTE: ALL DOOR HARDWARE MATERIAL AND INSTALLATION IS BY GENERAL

CONTRACTOR”.

9. SECTION 08 8719 – DECORATIVE WINDOW FILM:

a. Add the attached Section 08 8719 to the Project Manual (4 pages).

6,

Page 3: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

ARTIFICIAL INTELLIGENCE LAB UPFIT ADDENDUM 03

University of South Carolina May 5, 2020

3

10. SECTION 09 7713 – STRETCHED-FABRIC WALL SYSTEMS:

a. Article 2.3, Paragraph A: Delete reference to FWP-2 & FWP-3. All panels this project will

be FWP-1.

11. SECTION 11 5213 – PROJECTION SCREENS:

a. Page 1 – Add the following note:

“NOTE: PROJECTION SCREENS TO BE PROVIDED BY OWNER AND INSTALLED BY GENERAL

CONTRACTOR.”

C. REVISIONS TO THE DRAWINGS:

1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS:

a. OWNER PROVIDED MATERIAL Note (lower right of page): Delete Item 2 – Doors, Hollow

Metal Frames & Door Hardware. These items will NOT be provided by Owner, and shall be

furnished and installed by Contractor.

2. DRAWING S0.1 – GENERAL NOTES, PLANS AND DETAILS:

“APPLIED FIREPROOFING:

1. Steel Beams added for Alternate No. 01 skylight to have spray-applied fireproofing

installed per Section 07 8100 “Applied Fireproofing”. “

3. DRAWING A1.1 – WEST TOWER LEVEL 5 – FLOOR PLAN:

a. Replace with the attached Drawing A1.1, which has been revised as follows:

1) Noted existing metal framed walls to receive 5/8” gypsum wallboard at both sides:

- South wall of Glycol 500A

- South wall of Corridor H501

2) Noted locations for installation of Corner Guard as specified at Section 10 2600

(marked with “CG”).

4. DRAWING A2.1 – WEST TOWER – LEVEL 5 - RCP:

a. Reflected Ceiling Plan: Revise the notation “MP2” at the ceiling above the Tenant entry

(northwest corner of Corridor H501) to read “MP1”.

b. Reflected Ceiling Plan Legend: Revise the notation “MP2” at the ceiling type legend (lower

right of sheet) to read “MP1”.

5. DRAWING A3.2 – INTERIOR ELEVATIONS:

a. Elevation 3 / North Hallway – North Elevation:

- Removed incorrect door numbers that refer to former numbering at Building Shell.

b. Elevation 5 / East Hallway – East Elevation:

- Removed incorrect door numbers that refer to former numbering at Building Shell.

- Corrected door elevation at Door 501 into Quiet Room.

6. DRAWING A5.1 – DOOR SCHEDULE AND DETAILS:

a. Replace with the attached Drawing A5.1, which has been revised as follows:

1) Revised notes below Door Schedule to indicate that Doors, Frames and Hardware are

to be both Furnished and Installed by Contractor.

6,

Page 4: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

ARTIFICIAL INTELLIGENCE LAB UPFIT ADDENDUM 03

University of South Carolina May 5, 2020

4

2) Door Schedule:

- Noted doors to receive knock-down frames.

- Noted doors which will have access control.

- Revised door 505 to be type P02.

- Revised door 528 to be type P05.

- Revised door 529A to be type P04.

3) Panel Type Elevations:

- Added Type P04 (wood/glass double door – similar to P03)

- Revised Type P05 from double to single panel.

D. QUESTIONS & CLARIFICATIONS:

1. Question: Please indicate a location for dumpster.

Answer: Space for dumpster will be provided at the south side of the building along Devine

Street.

2. Question: Is there a location for material storage?

Answer: In addition to Level 5 shell areas, the Contractor may store items at Level 1 of the

building (one floor above the Loading Dock area).

3. Question: Will parking be provided?

Answer: Parking is not provided for the project. Previous contractors at site have leased

parking spaces along Devine Street from the City of Columbia parking. For availability of USC

Parking for lease contact Allen Broadus at USC Parking Services, Email:

[email protected] Phone: (803) 777-4316.

4. Question: Will contractors be able to use an elevator?

Answer: Contractor may use existing elevator (+/- 63” x 84”). Elevator finishes must be

covered and protected by Contractor.

5. Question: What is anticipated start date for this project?

Answer: Notice to Proceed is expected to be issued in the 3rd or 4th week of June.

6. Question: Are Contractors allowed to utilize Restrooms at Level 5 for employee use?

Answer: Finished Restroom spaces at the floor under construction may be used by employee

forces. Contractor is responsible for keeping restrooms cleaned and returning to Owner at end

of the project in the same condition.

7. Question: Please indicate the thickness of the concrete at the roof deck where the skylight is

scheduled to go.

Answer: Existing concrete roof slab is +/- 6” thick.

8. Question: At door H501B that wall is currently just metal studs onsite. Based on the wall

legend that is an existing wall assembly. Please indicate if we are supposed to provide

insulation, sheetrock, and finishing of that wall.

6,

Page 5: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

ARTIFICIAL INTELLIGENCE LAB UPFIT ADDENDUM 03

University of South Carolina May 5, 2020

5

Answer: Walls at Doors H501B and 500A were framed without gypsum wallboard to allow for

installation of welded frames. 5/8” gypsum wallboard to be provided at both sides of these

walls as added by this addendum at Drawing A1.1.

9. Question: P0-1 indicates for the tie in of the sanitary piping to be done on the 4th floor. What

is the room below this tie in location?

Answer: A Conference Room is located at Level 4 below this area. Existing floor and reflected

ceiling plans (Drawings A1.14A and A2.14A) from the Building Construction are included in this

addendum for information.

10. Question: Are there any subcontractors we are required to use?

Answer: Any roofing work to accommodate the skylight must be done by Aquaseal Roofing as

noted in the documents, due to the existing warranty. There are no other required

subcontractors.

11. Question: There is currently an office framed near the new director’s office 512 but it doesn’t

line up with the wall locations on the drawing. Please indicate if we are to demo those walls

that are existing.

Answer: This wall is to be removed. See previously issued Addendum 02.

12. Question: How do we send in bid bond and turn in bid form on a conference call?

Answer: As noted in the Bid Advertisement, hand deliver or mail Bid, with Bid Bond included,

to the address on the bid invitation (and noted below) before the listed bid opening time of

10:00 a.m. on May 14, 2020. Make sure the “Bid Enclosed H27-A408” note is on the outside of

the envelope. If bid is mailed, make sure bid is in a separate sealed envelope inside the mailed

package.

Kristen Moss (Bid Enclosed H27-Z408)

925 Gadsden Street

Columbia, SC 29208

13. Question: Reference Spec Section 10-2600. Corner guards/Door Protection are included in the

specifications; however, there are no corner guards shown in drawings. Please confirm if corner

guards/door protection is required. If required, please provide locations.

Answer: Corner Guards are required at all outside corners of the finished spaces. These has

been noted with “CG” at the revised Drawing A1.1 issued as part of this addendum.

14. Question: Reference Drawing F0.1. Please confirm the shell space to the south of the AI Lab is

to be included in the fire sprinkler design for the AI Renovation Lab?

Answer: The shell space to the south of the AI Lab is to be included in the fire sprinkler design

for the AI Renovation lab. The contractor must provide a compliant sprinkler design for the

entire floor. See Drawing F0-1 in the Construction Documents.

15. Question: Reference S0.1 and Spec 078100, please confirm the steel shown for the Add

Alternate 01- Skylight will require applied fireproofing.

Answer: Added steel will require fireproofing. See note added to Drawing S0.1 by this

addendum.

6,

Page 6: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

ARTIFICIAL INTELLIGENCE LAB UPFIT ADDENDUM 03

University of South Carolina May 5, 2020

6

16. Question: Please Provide locations for the corner guards.

Answer: Corner Guards are required at all outside corners of the finished spaces. These has

been noted with “CG” at the revised Drawing A1.1 issued as part of this addendum.

17. Question: Is Old Castle storefront an acceptable alternate manufacturer for the storefront

system?

Answer: Old Castle has been added as an acceptable manufacturer per this addendum.

18. Question: There are LEED submittal requirements in certain spec sections. Please confirm this

isn’t a LEED job.

Answer: This project is not pursuing LEED certification, and there are no requirements for LEED

submittals.

19. Question: On A2.1, it calls out metal panels as MP-2. On the finish schedule A7.1, it

only list MP-1. Please clarify. Answer: The designation of “MP-2” has been revised to read “MP-1” per this addendum.

20. Question: On A7.1 it calls out a FWP-1 for fabric wall panels. The specification

section 097713 notes FWP-1, FWP-22 and FWP-3. Please clarify where & what size

these panels are to be located or installed. Answer: Only FWP-1 will be used. See Interior Elevations 4/A3.2, 5/A3.2 and 8/A3.2 for the

three locations where these panels are located, and sizes needed.

21. Question: Please clarify locations of any Corner Guards.

Answer: Corner Guards are required at all outside corners of the finished spaces. These has

been noted with “CG” at the revised Drawing A1.1 issued as part of this addendum.

22. Question: Please clarify locations for the window shades.

Answer: Window shades are shown at exterior windows of all finished rooms. Drawing A2.1

“West Tower – Level 5 – RCP”. See Reflected Ceiling Legend and “WS” noted at window

locations.

23. Question: Are existing walls at Corridor H501 to be finished?

Answer: Yes, Corridor H501 is a finished space. See Drawing A7.1 where paint, flooring and

other finishes are shown at all spaces to receive finishes as part of this work.

24. Question: Please indicate if the owner furnished door and hardware package

includes any glass or is the GC to provide all glass Answer: Per this addendum, the doors and hardware will be furnished by the General

Contractor. All glass is to be provided by GC.

25. Question: A5.1 indicates for door 529A to be type P06 but this doesn’t match the

SF1L elevation shown on A6.1. Please confirm 529A should be type P05. Answer: 529A shall be a double wood door with glass lites as shown at the Elevation on A6.1.

Door Type P04 (double door – matching single door P03) is added by this addendum.

6,

Page 7: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

ARTIFICIAL INTELLIGENCE LAB UPFIT ADDENDUM 03

University of South Carolina May 5, 2020

7

26. Question: Door 501 on A5.1 indicates type P01 but wood and glass. Elevation on

A3.2 shows a solid door, please confirm there is no glass in this door

Answer: Door 501 is to be wood and glass door type P03. This change is made in this

addendum 03. Note the door numbers shown on interior elevations A3.2 were the former

door numbers and do not correlate with the door schedule. They are also removed by this

addendum.

27. Question: Door 505 on the door schedule is called out to be P04 but there is no P04

panel type elevation. Please provide an elevation for this door. Answer: Door 505 is to be panel type P02 (double solid flush door). This change has been

made by this addendum.

28. Question: A6.1 bottom right corner indicates double row glass film pattern for all GL-01

locations. Can you please clarify what this means? If a glass film is required at GL-01 please

provide a spec on the film.

Answer: All glass designated as GL-01 will have a double row of film “tick” marks as detailed to

help avoid persons walking into a clear pane of glass. See Section 08 8719- Decorative Window

Film, added to project manual by this addendum for the material.

29. Question: Section 230900 – Building Automation and Temperature Control System

Page 7 Section 1.9.A.4 – Please clarify the requirement for a 5 year warranty is desired.

Suggestion, USC standard warranty is one year.

Answer: Warranty period shall be one year from date of Substantial Completion

30. Question: Section 230900 – Building Automation and Temperature Control System

Page 21 Sect 3.4 – Is there training required specifically for this space, no amount of hours is

stipulated.

Answer: JCI shall provide owner field training during a customer turnover walk through.

31. Question: Section 230900 – Building Automation and Temperature Control System

Page 22, Commissioning, Testing, Acceptance – This is a very comprehensive and stringent

requirement for the VAV boxes. It will be expensive to cover this time consuming requirement.

Item F. Is it expected we provide the testing devices as indicated to be turned over to the

Owner. Suggestion JEC will typically perform point to point check out and functional test, and

submit report to the owner’s agent.

Answer: Commissioning and testing shall comply with specifications.

END OF ADDENDUM THREE

6,

Page 8: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

DECORATIVE WINDOW FILM 08 8719 - 1

ARTIFICIAL INTELLIGENCE LAB RENOVATION

Level 5 – 1112 Greene Street

University of South Carolina

Project: H27-Z408

Addendum 03

05 May 2020

SECTION 08 8719 - DECORATIVE WINDOW FILM

PART 1 - GENERAL

RELATED DOCUMENTS

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

SUMMARY

Section Includes:

1. Decorative Window Film.

PREINSTALLATION

MEETINGS

Preinstallation Conference: Conduct conference at Project site.

ACTION SUBMITTALS

Product Data: Manufacturer's data sheets on each product to be used, including:

1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations.

3. Installation methods.

Samples for Verification: For each finish product specified, two samples representing actual product, color, and patterns.

QUALITY ASSURANCE

Manufacturer Qualifications: All primary products specified in this section will be supplied by a single manufacturer with a minimum of ten (10) years experience.

Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.

Provide documentation that the installer is authorized by the Manufacturer to perform

Work specified in this section.

1. Provide a commercial building reference list of properties where the installer has

applied window film. This list will include the following information:

a. Name of building. b. The name and telephone number of a management contact.

06

Page 9: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

PACKAGE 4: BUILDING CONSTRUCTION Classroom/Laboratory Redevelopment University of South Carolina

Project: H27-6118-FW-D Construction Documents

26 February 2018

DECORATIVE WINDOW FILM 08 8719 - 2

c. Type of glass.

d. Type of film. e. Amount of film installed. f. Date of completion.

2. Provide a Glass Stress Analysis of the existing glass and proposed glass/film

combination as recommended by the film manufacturer.

Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship.

1. Finish areas designated by Architect. 2. Do not proceed with remaining work until workmanship, color, and sheen are

approved by Architect. 3. Refinish mock-up area as required to produce acceptable work.

CLOSEOUT SUBMITTALS

Maintenance Data: For window film to include in maintenance manuals

DELIVERY, STORAGE, AND HANDLING

A. Store products in manufacturer's unopened packaging until ready for installation.

Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having jurisdiction.

PROJECT CONDITIONS

Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

WARRANTY

At project closeout, provide to Owner or Owners Representative an executed current copy of the manufacturer’s standard limited warranty against manufacturing defect, outlining its terms, conditions, and exclusions from coverage.

PART 2 - PRODUCTS

MANUFACTURERS

Basis-of-Design Product: 3M Scotchcal, color “Frosted Crystal,” No. 7725-314.

Page 10: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

DECORATIVE WINDOW FILM 08 8719 - 3

ARTIFICIAL INTELLIGENCE LAB RENOVATION

Level 5 – 1112 Greene Street

University of South Carolina

Project: H27-Z408

Addendum 03

05 May 2020

2.2 PERFORMANCE REQUIREMENTS

Fire Performance: Surface burning characteristics when tested in accordance ASTM E 84:

1. Flame Spread: 25, maximum. 2. Smoke Developed: 450, maximum

PART 3 - EXECUTION

EXAMINATION

Do not begin installation until substrates have been properly prepared.

If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

PREPARATION

Clean surfaces thoroughly prior to installation.

Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

INSTALLATION

Install in accordance with manufacturer's instructions.

Cut film edges neatly and square at a uniform distance of 1/8 inch (3 mm) to 1/16 inch (1.5 mm) of window sealant. Use new blade tips after 3 to 4 cuts.

Spray the slip solution, composed of one capful of baby shampoo or dishwashing liquid

to 1 gallon of water, on window glass and adhesive to facilitate proper positioning of film.

Apply film to glass and lightly spray film with slip solution.

Squeegee from top to bottom of window. Spray slip solution to film and squeegee a second time.

Bump film edge with lint-free towel wrapped around edge of a 5-way tool.

Upon completion of film application, allow 30 days for moisture from film installation to dry thoroughly, and to allow film to dry flat with no moisture dimples when viewed under normal viewing conditions.

Page 11: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

PACKAGE 4: BUILDING CONSTRUCTION Classroom/Laboratory Redevelopment University of South Carolina

Project: H27-6118-FW-D Construction Documents

26 February 2018

DECORATIVE WINDOW FILM 08 8719 - 4

CLEANING AND PROTECTION

Remove left over material and debris from Work area. Use necessary means to protect film before, during, and after installation.

Touch-up, repair or replace damaged products before Substantial Completion.

After application of film, wash film using common window cleaning solutions, including ammonia solutions, 30 days after application. Do not use abrasive type cleaning agents and bristle brushes to avoid scratching film. Use synthetic sponges or soft cloths.

END OF SECTION 08 8719

Page 12: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

EX-1 EX-2 EX-3 EX-4 EX-5 EX-6

EX-D

EX-E

EX-F

EX-G

EX-H

EX-B

EX-BB

EX-BC

EX-GH

EX-HH

A

B

C

D

E

F

EX-C

A3.1 1

4

2

3

A3.1 5

8

7

6

A3.1

9

12 10

11

A3.113 15

14

16

A3.1 17

A3.1

18

19

A3.22 1

A3.28

A3.2 56

7

A3.2

3

4

523

524

527

525

528

H501A

505

512

16' - 2 1/8" 9' - 8 3/4" 1' - 0"

V.I.F.

26' - 3 3/4"

CLEAR

6' - 0" 19' - 2 7/8" 22' - 8 3/8" 2' - 0" 11"

20' -

10

7/8"

14' -

10

1/2"

14' -

10

1/2"

26' -

6"

61' -

10

3/8"

CLE

AR

6' -

0"

10' -

1 5

/8"

V.I.

F.

11' -

8 3

/4"

11' -

10

3/4"

43' -

8 7

/8"

8' -

9"

ALI

GN

25' - 9" 9' - 7 7/8"

V.I.F.

15' - 1 1/8" 1' - 0" 1' - 0" 21' - 9" 3' - 0"

1' - 0"

7' - 11" 14' - 5 1/2" 2' - 11"16' - 7 5/8"

V.I.F.

8' - 7 7/8" 1' - 0"

14' -

1 1

/4"

11' -

9 1

/2"

12' -

10

1/2"

12' -

10

1/2"

12' -

10

1/2"

12' -

10

7/8"

4' -

7 1

/2"

CLE

AR

6' -

0"

6' -

5 7

/8"

11' -

10

1/2"

12' -

8 1

/8"

12' -

10

1/2"

12' -

10"

SF1G

SF1H

SF1F

SF1E

SF1K

SF1M

A6-aS 00 y

A3-aS 00

A3-aS 00

A3-aS 00

A3-aS 00

10' - 6 3/8"

CLEAR

6' - 0" ±87' - 10 5/8"

CLEAR

8' - 0"

3' - 0" EQ. EQ.

VIF

+/- 3' - 0"

11" VIF

11" VIF

1' - 0" 11" VIF

1' - 0" 1' - 0"

1' -

0"

1' -

0"

1' - 0" 1' - 0"EQ. EQ.

9' -

8"

1' - 6"

ALI

GN

2' - 0"

11"

4' - 8" 3' - 4"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

1' - 0"

1' - 0" 1' - 0"

11" VIF

1' - 0"

1' - 0" 1' - 6 3/4"1' - 0"

1' -

4"

1' -

0"

CLE

AR

3' -

9"

1' -

0"

1' -

0"

1' -

0"

1' -

0"

ALIGNALIGN

A6-aS 00

A6-aS 00 y

A6-aS 00 y

A6-aS 00

A6-aS 00

A6-aS 00

D3-aS 00 y

D3-aS 00

A6-aS 00 y

D3-aS 00 y

D6-aS 00 y

A3-aS 00 y

D3-bS 00

D3-bS 00

D3-aS 00

D3-bS 00 y

D3-bS 00 y

D3-bS 00 y

D6-aS 00

D3-a00

D3-a00

D3-a00

D3-a00

D3-a00

A6-aS 00

A6-aS 00

D6-aS 00

D3-b00

A6-b00

D3-a00

D3-a00

D3-a00

D3-a00

D3-a00

D3-a00

H504

500B 500A.2

500E

H501B

500A.1

500G

501

SF1P

A6-aS 00

D6-a00

A3-aS 00

A6-aS 00

A6-aS 00

D3-aS 00

A3-aS 00

A3-aS 00

A3-aS 00

A3-aS 00

D3-aS 00

D3-a00

D3-a00

D3-aS 00

D3-aS 00

D3-aS 00

D3-aS 00

D3-aS 00

D3-b00

D3-b00

D3-b00

D3-b00

D3-b00

D3-b00

D3-aS 00

D3-aS 00

D3-aS 00

D3-aS 00

D3-a00

D6-aS 00

D3-bS 00 y

D3-bS 00 y

D3-b00 y

A6-a00

D3-aS 00

D3-aS 00D3-aS 00

D3-aS 00

D3-aS 00

D3-aS 00

D3-aS 00D3-aS 00

D3-aS 00D3-aS 00

D3-aS 00 y

A6-aS 00 y

D3-b00 y

A6-aS 00

A6-aS 00

D3-b00

D3-b00

D3-b00

D3-b00

D3-b00

D3-bS 00 yD3-a

S 00 yD3-aS 00

D3-bS 00 y D3-b

S 00 y

D3-b00 y

D3-b00 y

A3-b00 y

A6-aS 00

A6-aS 00

D3-a00

D3-a00

D3-a00

D3-b00

D3-b00

D3-aS 00

D3-aS 00

D3-aS 00

D3-aS 00

D3-a00

D3-b00

D6-aS 00

A6-aS 00 A6-a

S 00

EXTERIOR EXTERIOR WALL ASSEMBLY EW-03:AIR BARRIER AND RIGID INSULATION HAS BEEN PROVIDED AT EXTERIOR WALLS. METAL STUD FRAMING & GWB TO BE ADDED AT UPFIT LOCATIONS AS SHOWN AT THIS SHEET,

ALI

GN

SF1N

SF1N

OFFICE517

OFFICE518

OFFICE519

OFFICE520

SHELL500

CORRIDORH505

SHELL500B

SHELL500E

SHELL500G

CORRIDOR

H501

QUIET ROOM501

SEMINAR529

AI LAB524

POST DOC526

INFORMALSTUDY

528

POST DOC527

CONFERENCE523

DIRECTOR512

INFORMALSTUDY

508

COFFEE/BREAK507

STORAGE505

STORAGE525

GLYCOL500A

OFFICE521

OFFICE514

WORKROOM522

INFORMALSTUDY

511

CORRIDORH502

WOMENS504

FAMILY RR503

JANITOR502

MENS500H

ELEC500D

DATA500F

STAIRST03

ROOF EQUIP.ACCESS

500C

STAIRST02

ELEC510

TEAM ROOM509

ELEC (ROOFTOP EQUIP.)

506

SF1L

SF1J

A6-aS 00 y

MTR

MTR

MTR

MB MBMB MB

MBMB

MB

MB

MB

509

521

520

519

518

529A

529B

CORRIDORH503

500A

CORRIDORH506

SF1D

SF1B

SF1A

SF1B

11" VIF

CLEAR

8' - 0"

CENTER WALL ON EXISTING MULLION

ALI

GN

EXTERIOR EXTERIOR WALL ASSEMBLY EW-03:AIR BARRIER AND RIGID INSULATION HAS BEEN PROVIDED AT EXTERIOR WALLS. METAL STUD FRAMING & GWB TO BE ADDED AT UPFIT LOCATIONS AS SHOWN AT THIS SHEET,

D6-aS 00

A6-aS 00

A3-b00 y

(ABOVE)D6-aS 00

(ABOVE)D6-aS 00

(ABOVE)D6-aS 00

OFFICE515

OFFICE516

513

514

515

ADMIN513

SF1C

SF1B

SF1A

516

517

SF1B

SF1A

D3-aS 00 y

ALI

GN

6"

A6-aS 00

A6-aS 00

D3-aS 00 y

A4.1

6

5

A4.1

526

MB MB

1. PROTECT EXISTING BUILDING FINISHES AND FIXTURES ALREADY IN PLACE.

2. DIMENSIONS ARE TO FINISHED FACE OF GYPSUM WALLBOARD OR CENTER OF WALL AS INDICATED

AT PLAN.

3. PROVIDE BLOCKING IN WALLS AS REQUIRED FOR ALL WALL-MOUNTED CASEWORK, HANDRAILS,

EQUIPMENT, TOILET ACCESSORIES, MONITORS, MARKERBOARDS, ETC.

4. OWNER PROVIDED MATERIALS STORED ON FLOOR TO BE UTILIZED BY CONTRACTOR ON PROJECT:

- 650 PIECES 4' X 10' - 5/8" GYPSUM WALLBOARD

- 115 PIECES 4' X 12' - 5/8" GYPSUM WALLBOARD

- 1000 PIECES OF 3 5/8" X 15' STUDS

- 120 PIECES OF 3 5/8" REGULAR TRACK

- 96 PIECES OF 3 5/8" SLIP TRACK

5. OWNER FURNISHED/CONTRACTOR INSTALLED ITEMS:

- PROJECTION SCREEN AND PROJECTOR

GENERAL NOTES

MB

2 HR FIRE RATED WALL ASSEMBLY

1 HR FIRE RATED WALL ASSEMBLY

EXISTING WALL ASSEMBLY

MARKERBOARD (4'-0" WIDE X 7'-10" TALL - MOUNTED 4" A.F.F.)

LEGEND

Th

ese d

raw

ing

s a

re t

he p

rop

ert

y o

f W

ats

on T

ate

Savo

ry,

Inc.

and

may n

ot

be u

se

d in w

ho

le o

r in

part

with

ou

t w

ritt

en c

onsent

of

the a

rch

itects

and

any

infr

ing

em

en

t is

su

bje

ct

to leg

al actio

n.

Project Number:

Date:

Revisions:

NO. ISSUED FOR DATE

AR

TIFI

CIA

L IN

TELL

IGEN

CE

INTE

RIO

R U

PFI

T

Leve

l 5 -

1112

Gre

ene

Str

eet

H27-Z408

27 MARCH 2020

BIM

360

://U

SC

CT

L B

uild

ing

/US

C C

lassro

om

an

d L

ab

Ren

ova

tion

A18

.rvt

4/1

5/2

020

11:1

4:1

4 A

M A1.1

WEST TOWER

LEVEL 5 - FLOOR

PLAN

CO

LUM

BIA

, SC

UN

IVER

SIT

Y O

F S

OU

TH C

AR

OLI

NA

CONSTRUCTION DOCUMENTS

1/8" = 1'-0"A1.1

1 LEVEL 5 - WEST TOWER BUILDOUT - FLOOR PLAN N

4'0' 8' 16' 32'

CG

CG

CG

CG

CG CG

CG

CG

CG

CG

CG CG

CG

CG

CG

CG

CG

CG

CG

CG

CGCG CG

CG CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CGCG

CGCG

CGCGCG

CGCGCGCG

CG

CG

CG

CG

PROVIDE 5/8" GWB AT BOTHSIDES OF EXISTING 6" METALSTUD FRAMING AT SOUTHWALL OF GLYCOL ROOM 500A

PROVIDE 5/8" GWB AT BOTHSIDES OF EXISTING 6" METALSTUD FRAMING AT SOUTHWALL OF CORRIDOR H501

ADDENDUM 03 REVISIONS05.06.20

Page 13: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

HALLWAY

CJ CJ

GL-01 GL-02 GL-02 GL-02 GL-02 GL-02 GL-02 GL-02 GL-02GL-02 GL-02 GL-02

PT-1

RB-2

GL-02

8' -

2"

CJ CJ

GL-02 GL-02 GL-02 GL-02 GL-02GL-02 GL-02 GL-02 GL-02 GL-02 GL-02GL-02 GL-02GL-02

RB-2

PT-1

GL-02

PT-1

PT-1

FEC

2

A4.2

GL-01 GL-01 GL-01 GL-01GL-01 GL-01

WD-1

PT-1PT-1 PT-2 PT-2

WD-1

PT-1

RECESSED WINDOW SHADE POCKET AT EXTERIOR CURTAINWALL

EXISTING FIRE EXTINGUISHER & CABINET

RB-2RB-2RB-2 RB-2 WD-1

4

A4.1PT-2

EXISTING EXTERIOR ALUM. STOREFRONT

EXISTING EXTERIOR ALUM. STOREFRONT

EXISTING DOORS & WALLS SHOWN UNSHADED (TYP.)

9

A4.1

3

A4.2

41

C6-aS 02

41

HALLWAY

HALLWAY

HALLWAYINFORMAL STUDY/PRESENTATION

2

A4.2

GL-01 GL-01 GL-01 GL-01 GL-01 GL-01 GL-01 GL-01 GL-01

WD-1

PT-1

7

A4.2

PT-1

FWP-1 FWP-1 FWP-1

EQ.10' - 6"EQ.

3' -

2"

5' -

0"

1' -

4"

RB-1 RB-2 RB-2 RB-2

7

A4.1 5

A4.23

A4.2

GL-03 GL-03

CJCJ CJCJ CJCJ CJCJ

WD-1WD-1

6

A4.2

PT-1PT-1 PT-1 PT-1

EXISTING FIRE EXTINGUISHER & CABINET

RB-1 RB-1

EXISTING DOORS & WALLS SHOWN UNSHADED (TYP.) EXISTING WATER COOLER EXISTING WATER COOLER

EXISTING ELEVATOR DOORS

EQ. EQ. RECYCLING/TRASH CABINET

FWP-1 FWP-1

5

A4.1

7

A4.1

1

A4.2

41

41 41 41 41 41 41

HALLWAY

CJ CJ

GL-01 GL-04

CJ CJ

GL-01 GL-01

WD-1 WD-1

4

A4.2

GL-04GL-04

RB-1RB-1RB-1

PT-1 PT-2PT-1PT-1

11' - 10" 19' - 11 3/8" 26' - 3 1/4"

GL-01

METAL PANEL TRIM (MP-1) AT SOFFIT & WALLS OF ENTRY

MP-1

HALLWAY

CJ CJ

PT-1

PT-1 PT-1

RB-1

HALLWAYGL-02 GL-02 GL-02 GL-02

CJ CJ

RB-1

PT-1

PT-1

RB-1

FWP-1 FWP-1 FWP-1

EQ. 3' - 6" 3' - 6" 3' - 6" EQ.

3' -

2"

5' -

0"

1' -

4"

7

A4.1

Th

ese d

raw

ing

s a

re t

he p

rop

ert

y o

f W

ats

on T

ate

Savo

ry,

Inc.

and

may n

ot

be u

se

d in w

ho

le o

r in

part

with

ou

t w

ritt

en c

onsent

of

the a

rch

itects

and

any

infr

ing

em

en

t is

su

bje

ct

to leg

al actio

n.

Project Number:

Date:

Revisions:

NO. ISSUED FOR DATE

AR

TIFI

CIA

L IN

TELL

IGEN

CE

INTE

RIO

R U

PFI

T

Leve

l 5 -

1112

Gre

ene

Str

eet

H27-Z408

27 MARCH 2020

BIM

360

://U

SC

CT

L B

uild

ing

/US

C C

lassro

om

an

d L

ab

Ren

ova

tion

A18

.rvt

5/6

/20

20 1

:27

:02

PM

A3.2

INTERIOR

ELEVATIONS

CO

LUM

BIA

, SC

UN

IVER

SIT

Y O

F S

OU

TH C

AR

OLI

NA

CONSTRUCTION DOCUMENTS

1/4" = 1'-0"A3.2

1 WEST HALLWAY - EAST ELEVATION1/4" = 1'-0"A3.2

2 WEST HALLWAY - WEST ELEVATION

1/4" = 1'-0"A3.2

3 NORTH HALLWAY - NORTH ELEVATION

1/4" = 1'-0"A3.2

4 NORTH HALLWAY - SOUTH ELEVATION

1/4" = 1'-0"A3.2

5 EAST HALLWAY - EAST ELEVATION

1/4" = 1'-0"A3.2

6 EAST HALLWAY - WEST ELEVATION

1/4" = 1'-0"A3.2

7 CENTRAL HALLWAY - EAST ELEVATION1/4" = 1'-0"A3.2

8 CENTRAL HALLWAY - WEST ELEVATION

41 Addendum 02 05/01/20202 Addendum 03 05.06.2020

2 2

2

2

22222

Page 14: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

2"

1/2"

1/2"

SEE

PLA

N

SC

HED

PA

RTI

TIO

N

SEALANT, TYP. (BOTH SIDES)07 9200.C

SCHED HM FRAME08 1113.A3

SCHED HM DOOR08 1113.A2

5/8" GWB09 2900.A1

SCHED SOUND ATTEN BLANKET07 2100.B1

SCHED MTL STUD FRAMING09 2216.A0

SCHED SOUND ATTEN BLANKET07 2100.B1

HM FRAME ANCHOR08 1113.B1

GWB NOT INSTALLED AT ONE SIDE OF WALL AT SHELL SPACES - BUT FRAMES SIZED TO ACCOMODATE FUTURE GWB

GYPSUM WALLBOARD 1 SIDE ONLY AT JAMB J1A

2"

1/2" 1/2"

SEE PLAN

SCHED PARTITION

SEALANT, TYP. (BOTH SIDES)07 9200.C

SCHED HM FRAME08 1113.A3

SCHED HM DOOR08 1113.A2

5/8" GWB09 2900.A1

SCHED SOUND ATTEN BLANKET07 2100.B1

SCHED MTL STUD FRAMING09 2216.A0

SCHED SOUND ATTEN BLANKET07 2100.B1

SCHED MTL STUD BOX HEADER09 2216.A13

GWB NOT INSTALLED AT ONE SIDE OF WALL AT SHELL SPACES - BUT FRAMES SIZED TO ACCOMODATE FUTURE GWB

GYPSUM WALLBOARD 1 SIDE ONLY AT JAMB J1A

ABBREVIATIONS:

ALUM ALUMINUM

ANOD ANODIZED

EXT SF EXTERIOR STOREFRONT

GL GLASS

HM HOLLOW METAL

INT SF INTERIOR STOREFRONT

PREFIN PREFINISHED

PT PAINT

ST STAIN

WD WOOD

DOOR & FRAME TYPE LEGEND:

AL ALUMINUMGL GLASSHM HOLLOW METALST STEELWD WOOD

MATERIAL

PANELS:

P01.WD

TYPE NUMBERSEE DOOR SCHEDULE & DOOR/FRAME ELEVATIONS

AL ALUMINUMCW INTEGRATED INTO CURTAIN WALL SYSTEMHM HOLLOW METALST STEELWD WOOD

MATERIAL

FRAMES:

F02.HM

TYPE NUMBERSEE DOOR SCHEDULE & DOOR/FRAME ELEVATIONS

X

Y

X= 18" MIN. (24" PREFERRED)Y= 60" MIN.

PULL SIDE

FRONT APPROACH

Y

X= 12" IF DOOR HAS BOTH CLOSER & LATCHY= 48" MIN.

PUSH SIDE

X

NOTES:

ERECT ALL DOOR FRAMES & ADJACENT WALLS TO CONFORM TO THE APPLICABLE PLAN CONFIGURATION. NOTIFY ARCHITECT OF AN CONFLICTS PRIOR TO INSTALLATION.

ALL DOORS SHALL COMPLY WITH THE CLEARANCES FOR APPROACHES INDICATED.

X

Y

X= 36" MIN. (IF Y= 60")X= 42" MIN. (IF Y= 54")

PULL SIDE

HINGE SIDE APPROACH

Y

X= 12" IF DOOR HAS BOTH CLOSER & LATCHY= 48" MIN.

PUSH SIDE

X

DOOR CONFIGURATION PLANS:

X

Y

X= 24" MIN.Y= 48" MIN. (54" MIN. IF DOOR HAS CLOSER)

PULL SIDE

LATCH SIDE APPROACH

Y

X= 24" MIN.Y= 42" MIN.

PUSH SIDE

X

SCHED HM DOOR FRAME, BEYOND

SCHED DOOR

CONCRETE SLAB, SEE STRUCTURAL

SCHED RESILIENT FLOORING SYSTEM/BBT/EPOXY

SCHED CARPET OR CARPET TILE

METAL EDGE STRIP

SCHED HM DOOR FRAME, BEYOND

SCHED DOOR

CONCRETE SLAB, SEE STRUCTURAL

SCHED CARPET OR CARPET TILE

TRANSITION CARPET TYPE AT CENTERLINE OF DOOR

SCHED HM DOOR FRAME, BEYOND

SCHED DOOR

CONCRETE SLAB, SEE STRUCTURAL

SCHED RESILIENT FLOORING SYSTEM

SCHED CONCRETE OR SIMILAR

METAL EDGE STRIP

SCHED HM DOOR FRAME, BEYOND

SCHED DOOR

CONCRETE SLAB, SEE STRUCTURAL

SCHED CARPET OR CARPET TILE

METAL EDGE STRIP

SCHED CONCRETE OR SIMILAR

P01 P06

PANEL TYPE ELEVATIONS:

P02 P05

SC

HE

D. H

EIG

HT

WIDTH

SCHED.

5"10

"

WIDTH

SCHED.

SC

HED

. HEI

GH

T

4" 8"

2' -

0"

3' -

10"SC

HED

. HEI

GH

T

WIDTH

SCHED.

WIDTH

SCHED.

SC

HED

. HEI

GH

T

FLUSH PANEL

SCHED. MATERIAL & FINISH

SCHED. MATERIAL & FINISH

SCHED. MATERIAL & FINISH ALUMINUM

STOREFRONT DOOR

P03

8" 1' - 8" 8"

8"1'

- 8

"

SC

HED

. HEI

GH

T

WIDTH

SCHED.SCHED. MATERIAL & FINISH

GLASS TYPE GL-05

GLASS TYPE GL-05

5"5"

GLASS TYPE GL-05

P04

8" 1' - 8" 8"

8"1'

- 8

"

SC

HED

. HEI

GH

T

WIDTH

SCHED.

SCHED. MATERIAL & FINISH

GLASS TYPE GL-05

8" 1' - 8" 8"

41

F01

2"

WIDTH

SCHED. 2"

FRAME TYPE ELEVATIONS:

2"

SC

HE

D. H

EIG

HT

HOLLOW METAL

F02

ALUMINUM

2"

WIDTH

SCHED. 2"

2"S

CH

ED. H

EIG

HT

F03

DOUBLE EGRESS

2"

WIDTH

SCHED. 2"

2 5/

8"S

CH

ED. H

EIG

HT

GLAZING SCHEDULE:

GL-01: 1/2" CLEAR INTERIOR GLAZING / FULLY TEMPERED (Interior Storefront Clear)

GL-04: 1/2" ETCHED GLAZING / FULLY TEMPERED (Main Entry at Suite)

GL-02: 1/2" LAMINATED / FULLY TEMPERED (Interior Storefront with Opaque Strip from 2'-8" to 5'-4" a.f.f.)

GL-03: 1/2" LAMINATED TRANSLUCENT / FULLY TEMPERED (Interior Storefront Translucent)

GL-05: 1/4" CLEAR INTERIOR / FULLY TEMPERED (Non-Rated Doors)

SEE PLAN

SCHED PARTITION

SEALANT, TYP. (BOTH SIDES)07 9200.C

ALUM STOREFRONT HEAD08 4113.E

5/8" GWB09 2900.A1

SCHED SOUND ATTEN BLANKET07 2100.B1

SCHED MTL STUD FRAMING09 2216.A0

SCHED MTL STUD BOX HEADER09 2216.A13

FRAME FLUSH WITH FACE OF GWB AT CORRIDOR SIDE

SCHEDULED DOOR

SEE

PLA

N

SC

HED

PA

RTI

TIO

N

SEALANT, TYP. (BOTH SIDES)07 9200.C

ALUM STOREFRONT JAMB08 4113.B

5/8" GWB09 2900.A1

SCHED SOUND ATTEN BLANKET07 2100.B1

SCHED MTL STUD FRAMING09 2216.A0

FRAME FLUSH WITH FACE OF GWB AT CORRIDOR SIDE

SCHEDULED DOOR

Th

ese d

raw

ing

s a

re t

he p

rop

ert

y o

f W

ats

on T

ate

Savo

ry,

Inc.

and

may n

ot

be u

se

d in w

ho

le o

r in

part

with

ou

t w

ritt

en c

onsent

of

the a

rch

itects

and

any

infr

ing

em

en

t is

su

bje

ct

to leg

al actio

n.

Project Number:

Date:

Revisions:

NO. ISSUED FOR DATE

AR

TIFI

CIA

L IN

TELL

IGEN

CE

INTE

RIO

R U

PFI

T

Leve

l 5 -

1112

Gre

ene

Str

eet

H27-Z408

27 MARCH 2020

BIM

360

://U

SC

CT

L B

uild

ing

/US

C C

lassro

om

an

d L

ab

Ren

ova

tion

A18

.rvt

5/6

/20

20 1

:27

:05

PM

A5.1

DOOR SCHEDULEAND DETAILS

CO

LUM

BIA

, SC

UN

IVER

SIT

Y O

F S

OU

TH C

AR

OLI

NA

CONSTRUCTION DOCUMENTS

DOOR SCHEDULE - LEVEL 5

MARK

DIMENSIONS

RATING

PANEL FRAME DETAILS HDWR

SET REMARKSWIDTH HEIGHT THICKNESS TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL

Level 5 Upfit

500A 3' - 0" 7' - 0" 0' - 1 3/4" -- P01 WD PAINT F01 HM PAINT H1A J1A --- INT-04

500A.1 3' - 0" 7' - 0" 0' - 1 3/4" -- P01 WD PAINT F01 HM PAINT H1A J1A --- INT-04 KNOCK-DOWN FRAME

500A.2 3' - 0" 7' - 0" 0' - 1 3/4" -- P01 WD PAINT F01 HM PAINT H1A J1A --- INT-04 KNOCK-DOWN FRAME

500B 3' - 0" 7' - 0" 0' - 1 3/4" -- P01 WD PAINT F01 HM PAINT H1A J1A --- INT-04 KNOCK-DOWN FRAME

500E 3' - 0" 7' - 0" 0' - 1 3/4" -- P01 WD PAINT F01 HM PAINT H1A J1A --- INT-04 KNOCK-DOWN FRAME

500G 3' - 0" 7' - 0" 0' - 1 3/4" -- P01 WD PAINT F01 HM PAINT H1A J1A --- INT-04 KNOCK-DOWN FRAME

501 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

505 6' - 0" 8' - 0" 0' - 1 3/4" -- P02 WD STAIN F01 HM PAINT H1 J1 --- INT-07

509 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S3 INT-06

512 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 --- INT-05

513 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

514 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

515 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

516 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

517 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

518 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

519 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

520 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

521 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 --- INT-05

523 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S3 INT-06

524 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-06

525 3' - 0" 7' - 0" 0' - 1 3/4" -- P01 WD STAIN F01 HM PAINT H1 J1 --- INT-08

526 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL ST F02 ALUM PREFIN H2 J2 S4 INT-04

527 3' - 0" 8' - 0" 0' - 1 3/4" -- P03 WD/GL STAIN F02 ALUM PREFIN H2 J2 S4 INT-05

528 3' - 0" 8' - 0" 0' - 1 3/4" -- P05 ALUM/GL PREFIN F02 ALUM PREFIN -- -- S4 INT-09 CARD READER

529A 6' - 0" 8' - 0" 0' - 1 3/4" -- P04 WD/GL STAIN EXT. STF. ALUM PREFIN H2 J2 S3 INT-10

529B 3' - 0" 8' - 0" 0' - 1 3/4" -- P06 WD STAIN F01 HM PAINT H1 J1 S4 INT-11

H501A 6' - 0" 8' - 0" 0' - 1 3/4" -- P02 WD STAIN F03 HM PAINT H1 SIM. J1 SIM. --- INT-01

H501B 6' - 0" 8' - 0" 0' - 1 3/4" -- P02 WD STAIN F03 HM PAINT H1 SIM. J1 SIM. S2 INT-02

H504 3' - 0" 8' - 0" 0' - 1 3/4" -- P01 WD STAIN F01 HM PAINT H1 J1 S1 INT-03

3" = 1'-0"A5.1

J1 JAMB DETAIL

3" = 1'-0"A5.1

H1 HEAD DETAIL

6" = 1'-0"A5.1

S4 CARPET TILE TO RESILIENT FLOOR6" = 1'-0"A5.1

S3 CARPET TILE TO CARPET TILE6" = 1'-0"A5.1

S2 RESILIENT FLOOR TO CONCRETE6" = 1'-0"A5.1

1 CARPET TILE TO CONCRETE FLOOR

3" = 1'-0"A5.1

H2 HEAD DETAIL

3" = 1'-0"A5.1

J2 JAMB DETAIL

41 Addendum 02 05/01/2020

DOORS, HOLLOW METAL FRAMES & DOOR HARDWARE - CONTRACTOR PROVIDED AND INSTALLED:

- HOLLOW METAL FRAMES (PER SECTION 08 1113 "HOLLOW METAL DOORS AND FRAMES" AND DOOR SCHEDULE AT DWG. A5.1)

- WOOD DOORS (PER SECTION 08 1416 "FLUSH DOORS" AND DOOR SCHEDULE AT DWG. A5.1)

- DOOR HARDWARE PER SECTION 08 7100 "DOOR HARDWARE"

NOTE THAT ALUMINUM DOORS AND FRAMES TO BE PROVIDED BY CONTRACTOR PER SECTION 08 4113.

41

41

41

41

2 Addendum 03 05.06.2020

2

2

2

2

2

Page 15: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

UPUP

UPUP

SS

S

S

S

H

H

H

H

ARC

PP

PP

H

H

PP

PP

FS

TS

FS

TS

ARC

ARC

ARC

ARC

S

S

EX-1 EX-2 EX-3 EX-4 EX-5 EX-6

EX-8 EX-9

EX-D

EX-E

EX-F

EX-G

EX-H

EX-B

1

A3.21

A

A3.20

EX-BB

EX-BC

EX-GH

EX-HH

A

B

C

D

E

1 2

F

EX-C

A3.10

1

ORGANICCHEMISTRYTEACHING

LAB411

VESTIBULE411B

HONORS/MAJORSORGANIC

CHEMISTRYTEACHING

LAB414

SUPPORTLAB415

ORGANICCHEMISTRYTEACHING

LAB

416

VESTIBULE416B

ELEV. 2EV02

MENS427

STAIRST02

INFORMALSTUDY

410

TEAMMEETING

407

INFORMALSTUDY

406

CONFERENCE

405

STAIRST03

SENIORORGANIC

INSTRUCTOROFFICE

421

INFORMALSTUDY

423

INFORMALSTUDY

419

VESTIBULE414B

INFORMALSTUDY

401

ELEC408

ELEC420

CLASSROOM417

ORGANICCHEMISTRYTEACHING

LAB418

VESTIBULE418B

SS-1

ESE-1

SS-1 SS-1

ESE-1

SS-1

ESE-1

WOMENS404

JANITOR402

FAMILY RR403

ORGANICLAB

MANAGEROFFICE

424

ORGANICINSTRUCTOR

OFFICE425

CU

BB

IES

1

A4.10

2

A4.10

3

A4.10

1

A4.11

TELECOM422

ELEV. 1EV01

CORRIDORH401

402

404

H401A

408S402

413

B412B

411B414B

418B 416B

417C 417D

415

42

2

420S403

A6.31

3

A8.23

1

A8.23 23

A8.23

4

A8.22

1

A8.22

5

/1

A1

.14B

EX-7

NOTE: INTUMESCENT PAINT ON ALL EXPOSED STEEL COLS. AND FRAMING, TYP. SFRM ON ALL CONCEALED STEEL COLS. AND FRAMING, TYP.

OPEN TO BELOW

405

416A

2

A4.11

CLASSROOM412

CLASSROOM413

S406

C6-aS 02D3-b

00

D3-b00

D3-b00

C6-aS 02

C6-aS 02

D3-b00

A6-aS 00

A6-b00

D6-b00

A6-aS 00

A6-b00

D3-b00

D3-b00

D3-b00

A6-b00A6-a

S 00 D3-b00

A6-aS 00

D3-b00 y D3-

00

A6-aS 01

A6-aS 00

A6-aS 00

D3-b00

A6-b00

H6-aS 02

H6-aS 02

H6-aS 02

A6-b00

A6-b00

D3-b00

A6-aS 00

A6-aS 00

A6-aS 00

A6-aS 00

A6-aS 00

A6-aS 00

A6-aS 00

A6-aS 00

D3-b00

C6-aS 00

C6-aS 00

D3-b00

D3-b00

D6-b00

D3-b00

C6-aS 02

D3-b00

D3-b00

C6-aS 02

A6-b00

D3-b00

A6-b00

A6-b00

C6-aS 00

C6-aS 00

C6-aS 00

C6-aS 00

D3-b00

C6-aS 00

D3-b00

D3-b00

D6-b00

A6-aS 00

A6-aS 00

D3-b00

D3-00

D3-b00

D3-b00

D6-b00

C6-aS 00

C6-aS 02

D3-b00

D3-b00

D6-b00 D3-b

00

D3-b00

D3-b00

D3-b00

D3-b00

A6-b00

A6-aS 00

D3-b00

D3-b00

D6-b00

A6-b00

A6-b00

D3-b00

A6-b00

D3-b00

D6-b00

D3-b00

D3-b00

C6-aS 00

D3-b00

XEJC-01

XEJC-01

XEJC-01

XEJC-01

EJC-01

EJC-01

EJC-01EJC-01

D6-aS 00

D6-aS 00

C6-aS 02

C6-aS 02

C6-aS 02

H6-aS 02

H6-a02H6-a

S 02

H6-aS 02

A6-aS 00

A6-aS 00

A6-aS 00

C6-aS 00

C6-aS 00

C6-aS 00

C6-a02

C6-a02

C6-a02

H6-aS 02

H6-aS 02

D3-b00

A6-a01

C6-aS 00

A6-aS 00

A3.102

A6.10

4

A6.11

5

A6.20

5

A3.151

EW-03

D3-b00 y

D3-b00 y

H4-a02

H4-a01

D3-b00 y

OPEN TO BELOW

2 HR FIRE RATED MOTORIZED SHUTTER RECESSED IN CEILING

400A

4

A4.15

ORGANIC TAOFFICE

426

A10.41A E3

424

425

A10.42

2

A10.42

3

A10.42

6

417B

414A

426

A3.12 1

418A 417A

411A 412A

A6.31

5

SF103

SF103

SF103

SF102

SF1

13

SF101

SF114SF115

SF115 SF114 SF114 SF115

SF115SF114

413A

SF116

SF116SF116

SF116

SF120

SF120

SF1

21B

A6-aS 00

A6-aS 00

C6-aS 02

C6-aS 02

C6-aS 02

C6-aS 02

SIM.

SIM.D3-b00

D3-b00

4 3/4" 24' - 11 3/4" 3' - 0" 22' - 9" 6 3/4" 1' - 3 1/4" 20' - 0"

2' - 0 1/2"

3' - 8 1/2" 22' - 8 1/8"

2' - 7 1/4"

8' - 5 3/4" 2' - 10 7/8" 13' - 4 3/4" 1' - 0 7/8"

4 3/4"

24' - 11 3/4" 3' - 0"

11 1/4"

3' - 4" 4' - 4" 14' - 2 3/4"

1' - 9"

13' - 5 1/4" 5' - 0 1/2" 3' - 4"

2 3/4"

3' - 8 1/2" 25' - 3 3/8" 8' - 5 3/4" 8' - 2 1/8"

11 1/8" 3' - 8 1/8"

3' - 6 1/8"

1' - 0 7/8"

C6-aS 00

C6-aS 02

4 3/4"

24' - 11 3/4"

1' - 10"

20' - 9"

8' - 2"

20' - 9"

1' - 10"

20' - 10 3/4"

4' - 7 3/8"

1' - 2 3/4" 24' - 9" 3' - 4"1' - 9 3/4" 2"

5' - 7 3/8" 14' - 9 3/8" 15' - 2 1/4" 5' - 11"2"

1' - 9 3/4"

3' - 4" 24' - 9" 1' - 8 7/8" 7' - 10 1/2" 17' - 4 1/2"

A6-aS 00

D3-b00

4

A4.11

2

A4.15

1

A4.16

2

A4.16

1

A4.15

3

A4.16

4

A4.16

1

A4.13

A6.34B

7

8

EX-6CEX-6B

EW-05

EW-05

EW-05

EW-05

A3.10A

1

EW-03

EW-03EW-03EW-03

EW-03

EW-03

EW-03

EW-03

EW-03

EW-03EW-03

EW-03

EW-03

3

A4.15

4'x8' LOUVER SET IN EXISTING STOREFRONT FRAME. BOTTOM OF LOUVER 6" ABOVE SLAB.

A5.12 4 A5.105

A5.10

2

A5.10

3

A5.12 6

A5.11

13

A5.11

14

D3-00

C6-aS 00

D3-b00

D3-b00

C6-aS 02

C6-aS 02

D6-aS 00

D6-aS 00

D6-aS 00

A6-b00

A6-a00

A6-a00

D3-b00

H6-aS 02

H4-aS 02

A6-aS 00

D6-b00

HVAC EQUIPMENT, SEE MECHANICAL DRAWINGS

403

H4-a02

H4-a02

H4-a02

A6.37

5

A1.17A

2

A5.12

8

A5.12 9

1

A4.14

9

A6.35

24

A7.23

10

A5.12

10

O.H.

O.H.

O.H.

O.H.

O.H.

4

A5.12

14

421

407

CORRIDORH403

CORRIDORH402

O.H.

DECORATIVE METAL RAILING

6

9

A6.35SIM.

TV

TV

TV

6

6

SIM6

SIM

6

A8.243

1

A6.33

8

8

SF121A

SF1

19

SF121A

MB48.92

MB48.92

MB48.92

MB 4892

MB 4892

MB 4892

MB 4892MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MBP-4848

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

MB 4892

EX-6D

9' -

9 3

/8"

6' -

5 1

/2"

8' -

8 7

/8"

11"

11"

23' -

11"

11"

1' -

2"

15' -

1"

3' -

8 1

/2"

11' -

7"

3' -

8 1

/2"

15' -

1 3

/8"

1' -

1 5

/8"

10 1

/8"

24' -

2 7

/8"

8"11"

5' -

1 5

/8"

3' -

7 1

/4"

6' -

5 1

/2"

9' -

9 3

/8"

12

9' -

9 3

/8"

9' -

5 1

/2"

5' -

8 7

/8"

11"

11"

23' -

11"

3' -

7 1

/4"

46' -

1 1

/2"

3' -

7 1

/4"

31' -

5 7

/8"

9' -

5 1

/2"

9' -

9 3

/8"

12

1' - 5 3/8" 11"

16' -

2 7

/8"

8' -

8 7

/8"

11"

11"

24' -

0"

10"

1' -

1 3

/4"

15' -

1 1

/4"

3' -

8 1

/2"

11' -

7"

3' -

8 1

/2"

15' -

1 1

/4"

1' -

1 3

/4"

11"

24' -

0 1

/2"

9 1/

2"11

"5'

- 1

5/8

"3'

- 7

1/4

"6'

- 5

1/2

"9'

- 9

3/8

"

12

1' -

0 1

/4"

15' -

2 5

/8"

3' -

7 1

/4"

5' -

1 5

/8"

4' -

5"

4' -

7 1

/4"

16' -

8 3

/4"

3' -

8"

4' -

7 1

/4"

8' -

3"

8' -

3 3

/4"

2' -

8"

8' -

3 1

/2"

9' -

3 1

/4"

4' -

7 1

/4"

3' -

8"

16' -

8 3

/4"

4' -

7 1

/4"

4' -

5"

5' -

1 5

/8"

3' -

7 1

/4"

15' -

2"

1' -

0 7

/8"

3' -

7 1

/4"

3' -

6 3

/4"

1' -

0 7

/8"

11"

11"

3' -

10

3/8"

3' -

10

3/8"

TYP. AT COLUMNS,THIS ELEVATION

12

12

12

7' -

9 7

/8"

8' -

7"

8' -

8 3

/4"

1' -

0 7

/8"

1212

1' -

3 1

/2"

5' -

8 1

/2"

17' -

6"

12

1' -

0 7

/8"

11' -

8 1

/2"

12

7' - 10 7/16"

6' -

5 1

/2"

A3.10C

1

A3.10B

1

2

A6.33

1' -

10"

CENTER MARKERBOARDS ON WALL, TYP.

MB48.92 MB48.92

MB48.92 MB48.92

20

20

20

10' -

9 1

/4"

MB

.W.2

4.40

.24

6'-0" WIDE BY 14" DEEP X 24" TALL MAILBOX UNIT BY LAB CASEWORK CONTRACTOR, MOUNTED AT 3'-6" ABOVE FINISH FLOOR (PREVIOUSLY SHOWN AT SOUTH WALL OF SUPPORT LAB 415)

23

23

23

1' - 0 1/8"

TV LOCATION OF TELEVISION MONITOR TO BE PROVIDED AND INSTALLED BY OWNER. PROVIDE BLOCKING AT INTERIOR FRAMING. SIZE AND LOCATION TO BE PER THE A/V DRAWINGS ISSUED BY USC.

Th

ese d

raw

ing

s a

re t

he p

rop

ert

y o

f W

ats

on T

ate

Savo

ry,

Inc.

and

may n

ot

be u

se

d in w

ho

le o

r in

part

with

ou

t w

ritt

en c

onsent

of

the a

rch

itects

and

any

infr

ing

em

en

t is

su

bje

ct

to leg

al actio

n.

Project Number:

Date:

Revisions:

NO. ISSUED FOR DATE

CLA

SS

RO

OM

/LA

BO

RA

TOR

Y R

EDEV

ELO

PM

ENT

PA

CK

AG

E 4:

BU

ILD

ING

CO

NS

TRU

CTI

ON

H27-6118-FW-D

30 APRIL 2018

BIM

360

://U

SC

CT

L B

uild

ing

/US

C C

lassro

om

an

d L

ab

Ren

ova

tion

A18

.rvt

5/5

/20

20 6

:22

:18

PM

A1.14A

WEST TOWER -

LEVEL 4 - AREA

PLAN

CO

LUM

BIA

, SC

UN

IVER

SIT

Y O

F S

OU

TH C

AR

OLI

NA

CONSTRUCTION DOCUMENTS

1/8" = 1'-0"A1.14A

1 LEVEL 4 - AREA PLAN - WEST TOWERN

4'0' 8' 16' 32'

4

4

6

6

6

8

8

8

8

86

8

8

8

20

4 Addendum 02 02/01/18

6 OSE/Coordination 02/26/18

8 Conformed Set 04/30/18

12 Const. Bulletin 4.04 07/13/18

20 Const. Bulletin 4.15 02/06/19

23 Const. Bulletin 4.18 03/08/19

FOR INFORMATION ONLYADDENDUM 03 - 05.06.20

Page 16: 05 May 2020 THREE ARTIFICIAL INTELLIGENCE LAB UPFITpurchasing.sc.edu/solicitations/Addendum Three... · 1. DRAWING T0.1 – TITLE SHEET & INDEX OF DRAWINGS: a. OWNER PROVIDED MATERIAL

PDPC

WN

PDPC

WN

PDPC

WN

PDPC

WN

PP

PP

PDN

PCWV

PD

PCWN

P PCW

P D CW

N

P DC

W N

P D CW

N

P DC

W N

P D CW

N

P DC

W N

P D CW

N

P DC

W N

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PDCWN

PD

PCWN

PD

PCWN

PD

PCWN

PP

PP

PD

PCWN

PP

PP

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PP

PP

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

P DP

CW N

P DP

CW N

P DP

CW N

P DP

CW N

PD

PCWN

PD

PCWN

PD

PCWN

PD

PCWN

PDPC

WN

PDPC

WN

PDPC

WN

PDPC

WN

OS OS

OS OS

OS

OS

OS

OS

OS OS

OS

OS

OS

OS

OS

OS

OS

OSOS

OS

OS

S

S

S S

S S

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S SSF F

S

S

SS SF F

S

F

F

F

F

P P

EP

EP

S

SPP

SS

S

S

SS

P

P P

S S

S

J

J J

SC

SCS

S

S

EX-1 EX-2 EX-3 EX-4 EX-5 EX-6

EX-8 EX-9

EX-D

EX-E

EX-F

EX-G

EX-H

EX-B

EX-BB

EX-BC

EX-GH

EX-HH

A

B

C

D

E

1 2

F

EX-C

GYP-18' - 2"

GYP-18' - 2"

GYP-18' - 2"

GYP-18' - 2"

GYP-110' - 0"

ACP-X9' - 0"

ACP-110' - 0"

ACP-X10' - 0"

ACP-X10' - 0"

6' -

0"

ACP-X10' - 0"

ACP-19' - 6"

ACP-19' - 6"

ALIGN-TYP

EX-7

ACP-X10' - 0"

ACP-X10' - 6"

ACP-X10' - 0"

ACP-X10' - 0"

ACP-X10' - 0"

ACP-X10' - 0"

ACP-X10' - 0"

ACP-X10' - 0"

ACP-19' - 6"

ACP-19' - 6"

ACP-19' - 6"

ACP-X10' - 0"

GYP-110' - 0"

GYP-110' - 0"

GYP-110' - 0"

9' - 0"

9' - 0"

STAIRST06

ORGANICCHEMISTRYTEACHING

LAB411

CLASSROOM412

VESTIBULE411B

HONORS/MAJORSORGANIC

CHEMISTRYTEACHING

LAB414

SUPPORTLAB

415

ORGANICCHEMISTRYTEACHING

LAB416

CLASSROOM417

VESTIBULE416B

ORGANICCHEMISTRYTEACHING

LAB418

ELEV. 2EV02

MENS427

STAIRST02

INFORMALSTUDY

410

INFORMALSTUDY

406TEAMMEETING

407

CONFERENCE405

STAIRST03

INFORMALSTUDY

419INFORMAL

STUDY423

SENIORORGANIC

INSTRUCTOROFFICE

421

VESTIBULE414B

INFORMALSTUDY

401

ELEC

408

ELEC420

VESTIBULE418B

EM. GEN.EXHAUST

-

WOMENS404

SUPPLY-

ORGANICLAB

MANAGEROFFICE

424

ORGANICINSTRUCTOR

OFFICE

425

TELECOM422

ELEV. 1EV01

CORRIDORH401

CORRIDORH403

CORRIDORH402

CORRIDORH405

ORGANIC TAOFFICE

426

EJC-11

EJC-11

EJC-11

8

A2.20

2 HR FIRE RATED MOTOIZED SHUTTER RECESSED IN CEILING

SEE SHEET ATRIUM PLAN SHEET A6.30

1

A2.21

EQ 11 FULL TILES EQ

EQ21

FU

LL T

ILES

EQ

GYP-110' - 0"

EQ 10 FULL TILES EQ

EQ14

FU

LL T

ILES

EQ

EQ 10 FULL TILES EQ

EQ9

FULL

TIL

ESEQ

EQ2 FULL TILESEQ

EQ22

FU

LL T

ILES

EQ

EQ 49 FULL TILESEQ

ACP-X10' - 0"

CLASSROOM413

2

A2.21

EQ9

FULL

TIL

ESEQEQ 2 FULL TILES EQ

ACP-X10' - 0"

EQ14

FU

LL T

ILES

EQ

EQ 22 FULL TILES EQ

EQ21

FU

LL T

ILES

EQ

EQ 11 FULL TILES EQ

EQ 7 FULL TILES EQ

EQ3

FULL

TIL

ESEQ

EQ 6 FULL TILES EQ

EQ3

FULL

TIL

ESEQ

EQ 7 FULL TILES EQ

EQ7

FULL

TIL

ESEQ

EQ 7 FULL TILES EQ

EQ3

FULL

TIL

ESEQ EQ EQ

9' -

2 1

/8"

EQ5'

- 0

"EQ

EQ 7' - 0" 7' - 0" EQ

EQ5'

- 0

"EQ

EQ 8' - 0" 8' - 0" EQ

EQ 7' - 6" 7' - 6" EQ

EQ5'

- 0

"EQ

EQ 7' - 6" 7' - 6" EQ

EQ5'

- 0

"EQ

GYP-110' - 6"

GYP-110' - 6"

GYP-110' - 6"

GYP-110' - 0"

GYP-110' - 6"

GYP-110' - 6"

GYP-110' - 6"

EQ EQ

EQEQ

EQ EQ

EQEQ

EQ EQ

EQEQ

EQ EQ

EQEQ

EX-6CEX-6B

MANUAL WINDOW SHADE, RECESS MOUNT12 2413.B

MANUAL WINDOW SHADE, RECESS MOUNT12 2413.B

A4.51

4

A6.30A

2

9

A6.35

8

A0.03

8

A0.03

SIM.

7

A2.21SIM.

7

A2.21SIM.

5

A2.20

SIM.

8

A2.21

SIM.

3

A2.21

SIM.

1

A2.21

SIM.

6

A0.03

6

A0.03

SIM. O.H.9

A6.35 SIM

6

PROVIDE AT ALL EXTERIOR OPENINGS (WINDOW, CURTAINWALL, AND STOREFRONT) AT THE WEST TOWER, EXCLUDING LEVELS 1 AND 5 SHELL SPACES.

PROVIDE AT ALL EXTERIOR OPENINGS (WINDOW, CURTAINWALL, AND STOREFRONT) AT THE WEST TOWER, EXCLUDING LEVELS 1 AND 5 SHELL SPACES.

6

6

8

8

8

EX-6D

GYP-110' - 0"

8' -

8 7

/8" 16

' - 8

3/4

"16

' - 8

3/4

"

8' -

9"

18

18

18

18

18

18

PT-1 GYP CEILING,EGGSHELL FINISH

PT-13 GYP CEILING

PT7 GYP CEILING,EGGSHELL FINISH

PT-13 GYP CEILINGPT-1 GYP CEILING,EGGSHELL FINISH

PT-1 GYP SOFFIT

PT-1 GYP CEILING

PT-1 GYP CEILING

PT-13 GYP AT ROOF VENT OPENINGS, TYP.

PT-3 AT GYP. CEILINGS IN LABS, TYP.

PT-3

PT-3

PT-3 GYP. CEILINGS

PT-1

PT-3

PT-3

PT-1

PT-1

PT-1

PT-3

PT-3 PT-3 GYP. CEILINGS

PT-3

PT-3 GYP CEILINGS

PT-3 GYP CEILINGS

PT-13 GYP CEILING

REFLECTED CEILING PLAN - GENERAL NOTES

3. LIGHTS, FIXTURES, EXIT SIGNS AND OTHER CEILING ACCESSORIES ARE SHOWN FOR FIXTURE TYPE AND LOCATION ONLY. REFER TO ENGINEERING DRAWINGS FOR INFORMATION ON POWER REQUIREMENTS, CIRCUITING SWITCHING, FIXTURE SPECIFICATIONS AND EMERGENCY LIGHTING. 4. REFER TO ENGINEER'S DRAWINGS FOR LOCATIONS OF EXHAUST FANS, STROBES, EXIT LIGHTS, GRILLS, EMERGENCY LIGHTS, SMOKE DETECTORS, ETC. 5. IF DISCREPANCY EXISTS BETWEEN DRAWINGS AND FIELD OR ARCHITECTURAL AND ENGINEERING DRAWINGS, NOTIFY ARCHITECT IMMEDIATELY.6. CENTER CEILING GRID OR TILE IN ROOM, UNLESS OTHERWISE NOTED.7. GRID START POINTS IN ROOMS WHERE CEILINGS ARE NOT CENTERED ARE INDICATED WITH X.8. GANG MULTIPLE SWITCHES WITH SINGLE COVER PLATE MOUNT. SPEC WILL LIST COLOR AND DEVICE TYPE.9. SPRINKLER HEADS AND SPRINKLER LINES ARE TO BE LOCATED SO THAT THEY WILL NOT COME IN CONFLICT WITH THE LIGHTS AS SHOWN ON THE PLAN.10. SPRINKLER HEADS INSTALLED IN WOOD CEILING SHALL BE FULLY-RECESSED AND BRONZE COLOR TO MATCH ARCHITECT

CONTROL SAMPLE; SPRINKLER HEADS INSTALLED IN GWB CEILINGS SHALL BE FULLY RECESSED; COVER PLATES SHALL BE WHITE. 11. CUT ACT TILE OR EXPOSED EDGES SHALL BE TREATED WITH AN ARMSTRONG OR EQUAL CEILING PANEL TOUCH-UP PAINT.12. EXIT SIGNS TO BE CENTERED ON HALLWAY OR OPENING AND IN CENTER OF APC IF APPLICABLE, UOI13. PAINT EXPOSED DUCTS, CABLES, J-BOXES, SPRINKLER PIPES, AND OTHER EQUIPMENT TO MATCH CEILING.14. ACOUSTICAL CEILING PANELS (EXCEPT AT ANGLED FACES) TO BE CENTERED IN ROOM, UOI15. CEILING AT CURTAINWALL OR STOREFRONT LOCATIONS TO BE ALIGNED TO BOTTOM OF MULLION, UNLESS OTHERWISE .16. PROVIDE MANUALLY OPERATED ROLLER SHADES AT ALL EXTERIOR OPENINGS (WINDOW, CURTAINWALL, AND STOREFRONT) AT WEST TOWER, WITH THE EXCEPTION OF THE LEVEL 01 AND LEVEL 05 SHELL SPACES.17. CEILING SOFFITS TO BE PAINTED PT-13 UNLESS OTHERWISE NOTED18. CEILING SOFFITS NOTED TO BE PAINTED PT-1 TO HAVE EGGSHELL FINISH19. PAINT FINISH FOR GWB CEILINGS TO BE FLAT UNLESS OTHERWISE NOTED.

1. CEILING HEIGHTS TO BE AT 9' - 11 3/8" AFF, UOI SEE NOTE 15

2. CEILING TYPE TO BE APC-1, UOI

9' - 11 3/8"

APC-1

RCP - KEY NOTES:

1 FULL TILE AT THIS LOCATION.

2 CENTER FIXTURE QUANTITY IN GWB SOFFIT. 5'-0" SPACING, TYP.

3 PENDANT PLACEMENT TO BE COORDINATED W/ FURNITURE AT A LATER DATE

R3 NO CEILING

R4 MTL PANEL CLAD SOFFIT

R5 18" GLASS DRAFT STOP

R10 EXHAUST HOOD, REF MECH DWGS

R15 ACCESS PANEL

R17 RATED ACCESS PANEL

LAY IN FIXTURE

RECESSED DOWNLIGHT

WALL WASHER

REFLECTED CEILING PLAN SYMBOLS LEGEND

9'-0" CEILING HEIGHT TAG

2'x2' SUPPLY DIFFUSER

2'x2' EXHAUST2'x4'

CEILING MOUNTED PROJECTOR (NIC),REFER TO AV DRAWINGS

LIGHTING MECHANICAL

AUDIO/VISUAL

CEILING CAMERA

FIRE PROTECTION

SPRINKLER HEAD

OCCUPANCY SENSOR

MISC

SPRINKLER

SMOKE DETECTOR

HEAT DETECTOR

EXIT FIXTURES, REFER TO ELEC DWGS

2'x2'

CABLE TRAY

253542 PENDANT LIGHTING FIXTURE

CEILING MIC

ACCESS PANEL

LAY IN FIXTURE

PENDANT LIGHTING FIXTURE

RECESSED LIGHTING FIXTURE

PENDANT LIGHTING FIXTURE

LINEAR DIFFUSER IN SOFFIT WALL

EXHAUST DUCT ABOVE SHALL BE ENCLOSED IN A HORIZONTAL FIRE RATED ASSEMBLY AFTER EXITING FIRE CONTROL AREA

FUTURE PROJECTION SCREEN

PROJECTION SCREEN6

REFLECTED CEILING PLAN - LEGEND

SYMBOL CEILING

TYPE NOTES

REFER TO FINISH LEGEND / SHEET A8.00 BACK OF HOUSE, UTILITY.

CEILINGS AND SOFFITS PT-13 UNLESS OTHERWISE NOTED.

REFER TO FINISH LEGEND / SHEET A8.00 CORRIDORS

SYMBOL SHADE

TYPE NOTES

SH-1MANUAL ROLLER SHADE WITH SHADE MATERIAL WS-1. SEE FINISH LEGEND FOR MORE INFORMATION

REFER TO FINISH LEGEND / SHEET A8.00 ATRIUM, CORRIDORS

EXP

GYP-1

ACP-1

REFER TO FINISH LEGEND / SHEET A8.00 OFFICES, LABS, CLASSROOMS, UTILITY.

ACP-2

AWC-1

REFER TO FINISH LEGEND / SHEET A8.00 ATRIUM.

ACP-3

EXPANSION JOINT COVER SCHEDULE

EXTERIOR EXPANSION JOINT COVERS (EM-SEAL BRAND OR EQ)

XEJC-01

INTERIOR EXPANSION JOINT COVERS (CS BRAND OR EQ)

XEJC-10

DUAL-SIDED EXPANSION JOINT

FOR PRIMARY USE

ROOF EXPANSION JOINT

EJC-02 FLOOR-TO-WALL

EJC-01 FLOOR-TO-FLOOR

EJC-10 CEILING-TO-CEILING

XEJC-00 DUAL-SIDED BELOW GRADE

EXPANSION JOINT FOR

PRIMARY USE

PRE-COMPRESSED, SILICONE-AND-

IMPREGNATED FOAM

TAG DESCRIPTION SYSTEM

PRE-COMPRESSED, SILICONE-AND-

IMPREGNATED FOAM

EXTRUDED THERMO-PLASTIC

RUBBER SYSTEM

EXTRUDED ALUMINUM PAN

EXTRUDED ALUMINUM PAN

EXTRUDED ALUMINUM FRAME

W/FLEXIBLE GASKET

EJC-11 CEILING-TO-WALL EXTRUDED ALUMINUM FRAME

W/FLEXIBLE GASKET

EJC-12 WALL-TO-WALL EXTRUDED ALUMINUM FRAME

W/FLEXIBLE GASKET

Th

ese d

raw

ing

s a

re t

he p

rop

ert

y o

f W

ats

on T

ate

Savo

ry,

Inc.

and

may n

ot

be u

se

d in w

ho

le o

r in

part

with

ou

t w

ritt

en c

onsent

of

the a

rch

itects

and

any

infr

ing

em

en

t is

su

bje

ct

to leg

al actio

n.

Project Number:

Date:

Revisions:

NO. ISSUED FOR DATE

CLA

SS

RO

OM

/LA

BO

RA

TOR

Y R

EDEV

ELO

PM

ENT

PA

CK

AG

E 4:

BU

ILD

ING

CO

NS

TRU

CTI

ON

H27-6118-FW-D

30 APRIL 2018

BIM

360

://U

SC

CT

L B

uild

ing

/US

C C

lassro

om

an

d L

ab

Ren

ova

tion

A18

.rvt

5/5

/20

20 6

:22

:39

PM

A2.14A

WEST TOWER -

LEVEL 4 - RCP

CO

LUM

BIA

, SC

UN

IVER

SIT

Y O

F S

OU

TH C

AR

OLI

NA

CONSTRUCTION DOCUMENTS

1/8" = 1'-0"A2.14A

1 WEST TOWER - LEVEL 4 - RCPN

4'0' 8' 16' 32'

4

4

4

4

4

6

6

6

14

20

20

20

20

20

20

20

20

20

PT-13 GYP CEILINGS IN ATRIUM, TYP

20

34

34

34

34

34

34

4 Addendum 02 02/01/18

6 OSE/Coordination 02/26/18

8 Conformed Set 04/30/18

14 Const. Bulletin 4.09 11/07/2018

18 RFI 00161 01/10/19

20 Const. Bulletin 4.15 02/06/19

34 Const. Bulletin 4.24 08/21/19

FOR INFORMATION ONLYADDENDUM 03 - 05.06.20