0 m r 3 .0 in 8 3 w 6 -2 2 0 - maine

22

Upload: others

Post on 09-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine
Page 2: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

BRID

GE\

MS

TA\

002

_Estim

ate.d

gn

Userna

me:

Date:1

0/2

9/2

018

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

2OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

ES

TI

MA

TE

D

QU

AN

TITIE

S

ESTIMATED QUANTITIES

ITEM NO. DESCRIPTION QUANTITY UNIT

ESTIMATED QUANTITIES

ITEM NO. DESCRIPTION QUANTITY UNIT

535.622

530.31

530.30

527.34

526.34

526.301

515.21

514.06

513.22

512.081

511.07

511.07

510.10

507.0821

503.27

503.26

503.13

503.12

502.49

502.31

502.291

502.261

502.22

502.219

461.131

409.15

403.213

403.211

403.209

403.208

304.10

206.092

206.082

203.25

203.24

203.20

202.202

202.19

PRESTRESSED STRUCTURAL CONCRETE NEXT BEAM

GLASS FIBER REINFORCED POLYMER, PLACING

GLASS FIBER REINFORCED POLYMER, FABRICATED & DELIVERED

WORK ZONE CRASH CUSHIONS

PERMANENT CONCRETE TRANSITION BARRIER

TEMPORARY CONCRETE BARRIER, TYPE I

PROTECTIVE COATING FOR CONCRETE SURFACES

CURING BOX FOR CONCRETE CYLINDERS

CRUSHED STONE SLOPE PROTECTION

FRENCH DRAINS

COFFERDAM: ABUTMENT NO.2

COFFERDAM: ABUTMENT NO.1

SPECIAL DETOUR, 18 FOOT ROADWAY WIDTH VEHICULAR AND PEDESTRIAN TRAFFIC NOT SEPARATED

STEEL BRIDGE RAILING, 3 BAR

STAINLESS STEEL REINFORCEMENT, PLACING

STAINLESS STEEL REINFORCEMENT, FABRICATED AND DELIVERED

REINFORCING STEEL, PLACING

REINFORCING STEEL, FABRICATED AND DELIVERED

STRUCTURAL CONCRETE CURBS AND SIDEWALKS

STRUCTURAL CONCRETE APPROACH SLAB

SAW CUT GROOVING

STRUCTURAL CONCRETE ROADWAY AND SIDEWALK SLAB ON CONCRETE BRIDGES

STRUCTURAL CONCRETE, ABUTMENTS AND RETAINING WALLS (PLACED UNDER WATER)

STRUCTURAL CONCRETE, ABUTMENTS AND RETAINING WALLS

TEMPORARY PAVEMENT

BITUMINOUS TACK COAT, APPLIED

HOT MIX ASPHALT, 12.5 MM NOMINAL MAXIMUM SIZE (BASE AND INTERMEDIATE BASE COURSE)

HOT MIX ASPHALT, 9.5 MM NOMINAL MAXIMUM SIZE (SHIMMING)

HOT MIX ASPHALT, 9.5 MM NOMINAL MAXIMUM SIZE (SIDEWALKS, DRIVES, ISLANDS & INCIDENTALS)

HOT MIX ASPHALT, 12.5 MM NOMINAL MAXIMUM SIZE

AGGREGATE SUBBASE COURSE - GRAVEL

STRUCTURAL ROCK EXCAVATION - MAJOR STRUCTURES

STRUCTURAL EARTH EXCAVATION - MAJOR STRUCTURES, PLAN QUANTITY

GRANULAR BORROW

COMMON BORROW

COMMON EXCAVATION

REMOVING PAVEMENT SURFACE

REMOVING EXISTING BRIDGE

CY)(61

LF)(400

SY)(330

LF)(116

LF)(208

CY)(10

CY)(23

SF)(1711

CY)(84

CY)(207

CY)(335

CD)(240

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

1

14820

14820

4

4

1

1

1

26

1

1

1

1

1

6300

6300

24600

24600

1

1

1

1

280

1

110

78

170

10

22

99

828

60

1000

390

10

790

290

1

LS

LF

LF

UN

EA

LS

LS

EA

SY

LS

LS

LS

LS

LS

LB

LB

LB

LB

LS

LS

LS

LS

CY

LS

T

G

T

T

T

T

CY

CY

CY

CY

CY

CY

SY

LS

659.10

656.75

652.38

652.361

652.35

652.34

652.33

652.312

643.72

639.19

637.071

631.172

631.15

631.14

631.12

629.05

627.78

627.77

627.733

620.58

619.14

619.12

618.14

615.07

610.18

610.16

610.08

606.78

606.353

606.265

606.259

606.232

606.231

606.1722

606.1722

603.17

MOBILIZATION

TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL

FLAGGERS

MAINTENANCE OF TRAFFIC CONTROL DEVICES

CONSTRUCTION SIGNS

CONE

DRUM

TYPE III BARRICADES

TEMPORARY TRAFFIC SIGNAL: HODGDON MILLS ROAD

FIELD OFFICE, TYPE B

DUST CONTROL

TRUCK - LARGE (INCLUDING OPERATOR)

ROLLER, EARTH AND BASE COURSE (INCLUDING OPERATOR)

GRADER (INCLUDING OPERATOR)

ALL PURPOSE EXCAVATOR (INCLUDING OPERATOR)

HAND LABOR, STRAIGHT TIME

TEMPORARY 4" PAINTED PAVEMENT MARKING LINE, WHITE OR YELLOW

REMOVING EXISTING PAVEMENT MARKING

4" WHITE OR YELLOW PAINTED PAVEMENT MARKING LINE

EROSION CONTROL GEOTEXTILE

EROSION CONTROL MIX

MULCH

SEEDING METHOD NUMBER 2

LOAM

STONE DITCH PROTECTION

HEAVY RIPRAP

PLAIN RIPRAP

LOW VOLUME GUARDRAIL END - TYPE 3

REFLECTORIZED FLEXIBLE GUARDRAIL MARKER

TERMINAL END-SINGLE RAIL - GALVANIZED STEEL

ANCHORAGE ASSEMBLY

GUARDRAIL TYPE 3C - OVER 15 FT RADIUS

GUARDRAIL TYPE 3C - 15 FT RADIUS AND LESS

BRIDGE TRANSITION - TYPE II - MODIFIED

BRIDGE TRANSITION - TYPE II

18 INCH CULVERT PIPE OPTION I

1

1

400

1

270

50

50

6

1

1

1

20

20

20

20

40

800

200

1350

410

8

1

1

4

17

140

120

1

8

3

3

25

32

2

2

37

LS

LS

HR

LS

SF

EA

EA

EA

LS

EA

LS

HR

HR

HR

HR

HR

LF

SF

LF

SY

CY

UN

UN

CY

CY

CY

CY

EA

EA

EA

EA

LF

LF

EA

EA

LF

Page 3: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

00\

BRID

GE\

MS

TA\

003

_N

otes.d

gn

Userna

me:

Date:1

0/2

9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

3OF 22

BRID

GE N

O. 3103

GE

NE

RA

L

NO

TE

S

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

GENERAL CONSTRUCTION NOTES

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

Compensation and Time.

with Standard Specifications Section 109.7, Equitable Adjustments to

Lump Sum pay items, price adjustments will be made in accordance

c. If a design change results in changes to estimated quantities for

for a Lump Sum pay item, those requirements will be followed.

b. If other Contract Documents specifically allow a change in payment

Specifications Section 109.2, Elimination of Items, will take precedence.

a. If a Lump Sum pay item is eliminated, the requirements of Standard

quantities, except as follows:

actual final quantities are different from the MaineDOT provided estimated

amount, with no addition or reduction in payment to the Contractor if the

purposes only. Lump Sum pay items will be paid for at the Contract Bid

are estimated quantities and are provided by MaineDOT for informational

16. Quantities included for pay items measured and paid for by Lump Sum

conditions between the boring locations.

locations. Data provided may not be representative of the subsurface

factual and interpretive subsurface information collected at discrete

geotechnical information. The boring logs contained in the plan set present

Bidders' or Contractor's interpretations of, or conclusions drawn from, the

conditions at the construction site. MaineDOT will not be responsible for the

information or interpretations will be representative of actual subsurface

the use of the Bidders and the Contractor. No assurance is given that the

15. Geotechnical information furnished or referred to in this plan set is for

may be accessed at the MaineDOT web address.

Meduxnekeag River, Hodgdon, Maine, Soils Report 2018-32, September 7, 2018,

Replacement of Hodgdon Mills Bridge, Hodgdon Mills Road over S. Br.

14. The project geotechnical report titled: Geotechnical Design Report for the

representative of actual conditions at the time of construction.

is given that the information or the conclusions of the report will be

interpretation of the information obtained for the subject site. No assurance

MaineDOT web address. The hydrologic report is based on MaineDOT's

13. The hydrologic report of the bridge site may be accessed at the

been made to the bridge during its life span.

show any construction field changes or any alterations which may have

for the construction of the bridge. It is very unlikely that the plans will

address. The plans are reproductions of the original drawings as prepared

12. The existing bridge plans may be accessed at the MaineDOT web

http://www.maine.gov/mdot/contractors/.

accessed at the following MaineDOT web address:

11. Project information referred to below (notes 12 thru 14) may be

wingwalls on the back side.

Top of wingwalls and to one foot below the top of

Concrete wearing surfaces,

All exposed surfaces of Concrete Transition Barriers,

Fascias down to the drip notch,

All exposed surfaces of concrete curbs,

following areas:

10. Protective Coating for Concrete Surfaces shall be applied to the

appropriate Contract items.

runoff will cause continual erosion. Payment will be made under the

after paving and shoulder work is completed, where it is apparent that

and other gutters lined with Stone Ditch Protection shall be constructed

9. Extended-use Erosion Control Blanket, seeded gutters, riprap downspouts,

made under Item No. 619.14, Erosion Control Mix.

accordance with Standard Specifications Section 619, Mulch. Payment will be

loam and seed as directed by the Resident. Placement shall be in

8. Erosion Control Mix may be substituted in those areas normally receiving

directed by the Resident.

7. Place loam 2 inches deep on all new or reconstructed sideslopes or as

taper length of 4 feet per inch of transition depth.

6. For speed limits under 50 MPH: Temporary pavement ramps shall have a

equipment rental items.

of new subbase 6 inches or less thick will be made under appropriate

grubbing, shaping, ditching, and compacting the existing subbase and layers

subgrade line shown on the plans, payment for removing existing pavement,

5. In areas where the Resident directs the Contractor not to excavate to the

suitable as determined by the Resident.

4. Do not excavate for Aggregate Subbase Course where existing material is

otherwise noted.

3. All utility facilities shall be adjusted by the respective utilities unless

will be considered incidental to Contract items.

limits will be established in the field by the Resident. Payment for clearing

2. The clearing limits as shown on the plans are approximate. The exact

of Way Map.

1. For easements, construction limits and right of way lines, refer to Right

Page 4: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

405

405

405

410

410

410

410

415

415

415

415

420

420

420

420

425

425

425

430

3 STORY HOUSE

15" CMP

#213

18" WIDE STONET&S MARKET 1 STORY

#27

#28

ONE STEP

15" CMP

CMP not used BRICK

3 STEPS

18" CMP

#62/29

ONE STEP

6" WIDE WOOD

#30S

#621/62/30 FP

AREAMANAGEMENT

WILDLIFE

Sill EL

WG

Sill E

L

Sill E

L

Sill EL

Sill EL

WELL

10+00 11+00 12+00 13+00 14+00 15+00 15+7215+72

PO

B

=

ST

A. 10

+00.00

PC

=

ST

A. 10

+73.61

PR

C

=

ST

A. 11

+51.61

PT

=

ST

A. 12

+53.27

PC

=

ST

A. 15

+05.97

PT

=

ST

A. 15

+72.30

E = 0.24'

T = 39.00'

L = 78.00'

R = 3200.00'

PI = 11+12.61

CURVE DATA #1

E = 0.40'

T = 50.83'

L = 101.66'

R = 3200.00'

PI = 12+02.44

CURVE DATA #2

E = 0.28'

T = 33.17'

L = 66.33'

R = 2000.00'

PI = 15+39.14

CURVE DATA #3

57'-6" Span

Flo

w

Reset upon Completion (By Others)

Remove Existing Utility Pole and

With Terminal End and Anchorage Unit

Guardrail Type 3c - 15' Radius and Less

Bridge Transition Type 2 Modified

Gravel

Paved Apron

Hodgdon Mills Road

Limit of

Work

Sta. 11

+00

To Linneus

Project (By Others)

Pole 62/29 During

Service Removed from

Gravel

Bridge Transition Type 2

Low Volume End

Paved

To Hodgdon

With Terminal End and Anchorage Unit

Guardrail Type 3c - 15' Radius and Less

Bridge Transition Type 2 Modified

with Alley Arm (By Others)

Temporary Utility Pole

Paved

Limit of

Work

Sta. 15

+00

Existing Utility Pole (By Others)

Temporary Alley Arm on

Trees

Retain and Protect

Plain Riprap (1'-6" Thick) (Typ.)

Sta. 12+75.00

Brg Abut. No. 1|

Sta. 13+32.50

Brg Abut. No. 2|

Pipe (Option 1)

18" Culvert

With Terminal End and Anchorage Unit

Guardrail Type 3c - Over 15' Radius

Bridge Transition Type 2

(See Note)

Exclusion Zone

Stone Ditch Protection (1'-6" Thick)

Protection (6" Thick)

Crushed Stone Slope

(Typ.)

Heavy Riprap

2 - 7 Foot (Typ.)

Terminal Curb Type

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

00\

BRID

GE\

MS

TA\

004

_B

DPla

n.d

gn

Userna

me:

Date:1

0/2

9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

4OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

WIN

BRID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

Scale of Feet

PLAN

25 0 25 50

STP-2

263(8

00)

022638.0

0G

EN

ER

AL

PL

AN

No work allowed in Exclusion Zone area.

NOTE

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

Page 5: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

00\

BRID

GE\

MS

TA\

005

_Profile.d

gn

Userna

me:

Date:1

0/2

9/2

018

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

5OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

PR

OFIL

E(6

03) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

385

390

395

400

405

410

415

420

425

430

435

440440

385

390

395

400

405

410

415

420

425

430

435

440440

10+00 11+00 12+00 13+00 14+00 15+00 16+00

10+00 11+00 12+00 13+00 14+00 15+00 16+00

PV

C =

ST

A. 11+2

5.0

0

ELE

V. =

422.5

8

LOW POINT = STA. 12+18.99

ELEV. = 421.41

PVI =

ST

A. 12

+50.0

0

ELE

V. =

419.4

6

PVT =

ST

A. 13

+75.0

0

ELE

V. =

424.6

5

PVI =

ST

A. 14

+50.0

0

ELE

V. =

427.7

6

V.C.L. = 250'

E = 2.078'

SD = 205'

EL. 422.5

8

EL. 422.0

4

EL. 421.67

EL. 421.46

EL. 421.41

EL. 421.54

EL. 421.83

EL. 422.2

8

EL. 422.9

0

EL. 423.6

9

EL. 424.6

5

EL. 425.6

8

EL. 426.7

2

EL. 427.7

6

EL. 429.1

1

EL. 427.4

9

EL. 425.9

5

EL. 424.5

1

EL. 423.3

6

EL. 428.8

6

EL. 430.0

7

EL. 431.3

0

EL. 432.4

8

G2 = 4.15%

150' Project

G1 = -2.50%

445

450

445

450

410.42 EL.

Q50

PROFILE

50' Mill & Overlay 50' Mill & Overlay

Subfooting (Typ.)

Subgrade (Typ.)

5:1

Bedrock Surface

Approximate Top of

Streambed

Approximate

Proposed Finished Grade

57'-6"

5:1

G = 4.15

%

Existing Grade

75' Transition75' Transition

Approach Slab (Typ.)

Stone Abutment to Bedrock

Remove Existing Concrete and

to Bedrock

Concrete Abutment

Remove Existing

(EL. 421.83)

Sta. 12+75.00

Brg. Abut. No. 1É

(EL. 423.13)

Sta. 13+32.50

Brg. Abut. No. 2É

and Granular Borrow (Typ.)

Limit of Structural Excavation

Page 6: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine
Page 7: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine
Page 8: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

BRID

GE\

MS

TA\

008

_Btypic

al.dgn

Userna

me:

Date:1

0/2

9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

8OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

AN

D

DE

TAIL

S

AP

PR

OA

CH

SE

CTIO

NS

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

24" Aggregate Subbase Course - Gravel

-2.00% -2.00%-2.00% -2.00%

-2.00%

É Construction

17'-0"

17'-0"

6" HMA

11'-0" Travel Lane

6" HMA

11'-0" Travel Lane

Shoulder

4'-0"2'-0" 2'-0"

Shoulder

4'-0"

ROADWAY APPROACHFull Construction

Sta. 12+25 to 13+75

3" HMA

6'-0"

3" HMA

6'-0"

(see plan)

Treatment VariesPlain Riprap

Varies

MILL AND OVERLAY DETAIL

75'-0"

Transition

Full Depth Construction

5'-0"Existing Grade

Variable Depth Mill

HMA

50'-0"

Mill and Overlay

Sta. 11+00 to 12+25

Sta. 13+75 to 15+00

(Limit of Work)

Match Existing

Varies

Bridge Transition - Type IIBridge Transition - Type II - Modified

Page 9: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

009_

XS

EC

T_

10

+7

5_

001.d

gn

Userna

me:

Date:1

0/2

9/2

018

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

CR

OS

S

SE

CTIO

NS

9415

420

425

430

435

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

10+75.00

415

420

425

430

435

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

11+00.00

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

11+25.00

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 10+75.00 to Sta. 11+25.00

EL. 422.58

7.4% -2.0% -3.7% 0.1% -6.3%

Match Exist.

EL. 423.36

Match Exist.

Begin Mill and Overlay

Match Existing

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

Page 10: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

010_

XS

EC

T_

11+5

0_

002.d

gn

Userna

me:

Date:1

0/2

9/2

018

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

CR

OS

S

SE

CTIO

NS

10

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

11+50.00

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

11+75.00

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

405

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

12+00.00

405

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 11+50.00 to Sta. 12+00.00

EL. 422.04

5.2% -2.0% 0.0% -5.0%

EL. 421.67

5.3% -2.0% -0.7% -5.0%

EL. 421.46

3.3% -2.0% -1.3% -2.0% 1.3%

Remove Existing 18" CMP

EXIST. 62 29 fp

STA. 12+01.87

24.38 LT.

Construct Gravel Drive

Sta. 12+00 RT

Construct Gravel Drive

Sta. 12+00 LT

Begin Transition

End Mill and Overlay

(Match Existing Inverts)

Install 37' x 18" Culvert Pipe Option 1

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

Page 11: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

011_

XS

EC

T_

12

+2

5_

003.d

gn

Userna

me:

Date:1

0/2

9/2

018

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

CR

OS

S

SE

CTIO

NS

11

405

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

12+25.00

405

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

400

405

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

12+50.00

400

405

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 12+25.00 to Sta. 12+50.00

EL. 421.41

3.6% -2.0% -2.0% -5.0%

-4:12:1

EL. 421.54

-3:1

-8.1%

-2.0% -2.0%

-6:1

BRIDGE

417.9

5

With Terminal End and Anchorage Unit

Install Guardrail Type 3c - Over 15' Radius

Sta. 12+14.85 RT to 12+34.42 RT

With Terminal End and Anchorage Unit

Install Guardrail Type 3c - 15' Radius and Less

Sta. 12+27.43 LT to 12+40.54 LT

Begin Project

End Transition

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

Page 12: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

012

_X

SE

CT_

13

+5

0_

004.d

gn

Userna

me:

Date:1

0/2

9/2

018

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

CR

OS

S

SE

CTIO

NS

12405

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

13+50.00

405

410

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

13+75.00

415

420

425

430

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

415

420

425

430

435

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

14+00.00

415

420

425

430

435

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 13+50.00 to Sta. 14+00.00

EL. 423.69

-4:1

-2.0% -2.0%

-5:1

EL. 424.65

-5.0%-2.0% -2.0%

-4:14:1

EL. 425.68

-8.0%-5.0% -2.4% -2.9% -5.0% -4:1 4:1

13.2%

5.2%

4.0%

EXIST. 28

STA. 13+61.16

23.49 LT.

422.3

1

424.3

8

With Terminal End and Anchorage Unit

Install Guardrail Type 3c - 15' Radius and Less

13+76.44 LTSta. 13+66.90 LT to

Install Low Volume End Unit

14+09.52 RTSta. 13+73.15 RT to

Construct Paved Drive

Sta. 14+00 LT

Begin Transition

End Project

Temp. Pole

27.00 Lt

Sta. 13+68

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

Page 13: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

013

_X

SE

CT_

14

+2

5_

005.d

gn

Userna

me:

Date:1

0/2

9/2

018

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

CR

OS

S

SE

CTIO

NS

13415

420

425

430

435

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

14+25.00

415

420

425

430

435

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

415

420

425

430

435

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

14+50.00

415

420

425

430

435

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

420

425

430

435

440

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

14+75.00

420

425

430

435

440

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 14+25.00 to Sta. 14+75.00

EL. 426.72

-7.2% -2.9% -3.9%-5.0% 1.5%

EL. 427.76

-7.2% -3.3% -4.8% -12.3% 3.0%

Match Exist.

EL. 428.86

Match Exist.

Construct Paved Drive

Sta. 14+25 RT

Begin Mill and Overlay

End Transition

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

Page 14: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

014

_X

SE

CT

_15

+00_

006.d

gn

Userna

me:

Date:1

0/2

9/2

018

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

CR

OS

S

SE

CTIO

NS

14

420

425

430

435

440

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

15+00.00

420

425

430

435

440

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

420

425

430

435

440

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

15+25.00

420

425

430

435

440

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

425

430

435

440

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

15+50.00

425

430

435

440

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70-5-10-15-20-25-30-35-40-45-50-55-60-65-70

Sta. 15+00.00 to Sta. 15+50.00

Match Exist.

EL. 430.07

Match Exist.

Match Existing

End Mill and Overlay

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

Page 15: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

(Typ.)

1'-0"

9'-6" (T

yp.)

4'-6"

Sla

b Seat

6"

Approach

(Typ.)

2'-0"

20'-0" (T

yp.)

(Typ.)

2'-0"

16'-8" (Typ.)

3'-0"

33'-4"

17'-8" (Typ.)

35'-4"

2'-0"

1'-0

"

1'-3

"1'-3

"

2'-0"

90°0'0" (Typ.)

28'-9"

(Typ.)

2'-0"

(Typ.)

8'-2"

(Typ.)

1'-8"

90°0'0"

7'-1"

7'-10

"6'-0"

1'-6

"

90°0'0"

5'-6†" 5'-6†"

(Typ.)

2'-0"

(Typ.)

1'-0

"

2'-0"

(Flyin

g

Win

g)

12'-0" (T

yp.)

9"

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

015

_Abut

ment_

1.d

gn

Userna

me:

Date:1

0/2

9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

15OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

(1

OF

2)

AB

UT

ME

NT

DE

TAIL

S

SEAL COFFERDAM NOTES

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

incidental to the appropriate Pay Item.

Formwork required will not be paid for separately, but will be considered

formwork for the surrounding concrete installed inside the cofferdam.

Cofferdams with an irregular inside surface, such as sand bags, shall have

7. The concrete subfooting shall have a smooth, regular vertical surface.

6. Seal/subfooting concrete shall be Class A.

the bedrock surface shall be benched in level steps or made completely level.

fractured bedrock, boulders, and soil. Where the bedrock slope exceeds 4H:1V,

5. Seal concrete shall be placed on bedrock cleaned of weathered rock, loose

listed on the Qualified Products List of Grout Materials.

by the Resident. Anchoring material, if applicable, shall be one of the products

4. The method of placing dowels in the subfooting concrete shall be approved

outside these limits.

shown on the plans. No additional payment will be made for concrete placed

3. The horizontal pay limit for subfooting concrete will be to the dimensions

any particular sheet pile section.

size necessary to meet design requirements and are not based on the use of

2. The subfooting concrete placement dimensions shown represent the minimum

the subfooting concrete dimensions shown.

shall be used, and the inside face of the sheet piling shall be at or outside of

1. When sheet piling is used for cofferdams, appropriate rolled corners

| Construction

A

Sta. 12+75.00

A

| Construction

Sta. 13+32.50

A

A

ABUTMENT NO. 1 PLAN

ABUTMENT NO. 2 PLAN(See Abut. No. 1 for Dimensions)

(Curb Batter not Shown for Clarity)

(See Abut. No. 2 for Footing Reinforcement)

Abut. No. 1

É Brg.,

Subfooting

Footing

Barrier (Typ.)

Concrete Transition (T

yp.)

Rail Layout

Face of Abutment

Abut. No. 2

É Brg.,

B B B B

(Typ.)

Break

Slope

(Typ.)

90°0'0"

9 Bottom)

(9 Top,

18 ~ A502 @ 12"

9 Bottom)

(9 Top,

18 ~ A502 @ 12"

12 ~

A503

@ 12

" (B

otto

m)

23 ~

A503

@ 6" (T

op)

12 ~

A503

@ 12

" (B

otto

m)

23 ~

A503

@ 6" (T

op)

(17 Top, 17

Botto

m)

34 ~

A504

@ 6"

71 ~ A501 @ 6" (Bottom)

36 ~ A601 @ 12" (Top)

34 ~ A650 @ 12"

30 ~ A650 @ 12"

(18

Each

Win

gwall)

36 ~

A650

@ 12

"

(31 Each

Win

gwall)

62 ~

A650

@ 6"

(18

Each

Win

gwall)

36 ~

A500

Dowels

@ 18

"

2'-3"2'-0" 6'-3" 2'-0" 7'-2"2'-0" 2'-0"

1'-6" 1'-6"

(Typ.)

1'-6

"

(Typ.)

4'-0"

(Typ.)

4'-0"

1'-0"

SECTION A-A SECTION B-B

EL. 409.00 EL. 409.00

EL. 411.00 EL. 411.00

É Brg.

12"x•" Shear Key

‚" Profile Min.

Roughen Surface

Subfooting

A601

A504

A501

A503

(Typ.)

A500

A502 7"x1•" Shear Key

‚" Profile Min.

Roughen Surface

A650 A650

Page 16: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

(Typ.)

1'-8"

(Typ.)

9'-1…"

(Typ.)

1'-0

"

(Typ.)

1'-2

" Min.

9"

(Typ.)

5'-6†"

1'-3"6"

1'-3"

2'-0"±

(Typ.)

9'-7•"

(Typ.)

4'-8"

= 1'-6" (Typ.)

2 Sp. @ 9"

= 3'-0" (Typ.)

4 Sp. @ 9"

(Typ.)

1'-6"

•"

Pad

Neoprene

Embd

mt.

1'-3

"

Embd

mt.

1'-3

"

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

016_

Abut

ment_

2.d

gn

Userna

me:

Date:1

1/9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

16OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

(2

OF

2)

AB

UT

ME

NT

DE

TAIL

S(6

03) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

ABUTMENT NOTES

KEY

= Far FaceFF

= Near FaceNF

vertical plane located 10 feet behind the walls in fill areas.

Borrow. Pay limits will be the structural excavation limits in cut areas and a

8. Abutments, wingwalls and their footings shall be backfilled with Granular

accordance with Standard Specifications Section 512, French Drains.

7. Construct French Drains behind the abutments and wingwalls in

Standard Details Section 502.

6. Cover joints where waterstops are not required in accordance with

concrete.

shown in Standard Details Section 526, prior to the placement of the curb

5. The Contractor shall install Transition Barrier vertical closed stirrups, as

beams to ensure an accurate match with the superstructure.

4. Place the parapet portions of the wingwalls after erection of the precast

maximum spacing. The exact location will be determined by the Resident.

3. Place 4-in. diameter drains in the breastwall and wingwalls at 10-ft

walls and 3 inches in the footings unless otherwise noted.

2. Reinforcing steel shall have a minimum concrete cover of 2 inches in the

State).

1. The maximum factored applied footing pressure is 12 ksf (Strength Limit

| Construction

Seat

Approach Slab

See Note 3 (Typ.)

EL. 409.00

EL. 411.00

A

A

Slope Break

ABUTMENT ELEVATION

B

B

Sheet (Typ.)

See Wingwall Details

4" (Level)

(Typ.)

Slope Break

Preparation

Surface after Subgrade

Approximate Bedrock

Slab

Approach

12 ~ 1A

557

@ 12

"

(6 Each Corner)

14 ~ 2

A557

@ 12

"

(7 Each Corner)

12 ~ 1A

520

@ 12

" (6 E

F)

14 ~ 2

A520

@ 12

" (7 E

F)

EL. 417.88 (FF)

EL. 417.94 (NF)

Abut. No. 1

EL. 419.24 (FF)

EL. 419.18 (NF)

Abut. No. 2

34 ~ A556 @ 12"

(Lap to A505)

29 ~ A550 @ 12" (FF)

34 ~ A505 @ 12" (NF)

(Lap to A650)

10 ~ 2

A557

@ 12

"

(5

Each

Win

g)

8 ~ 1A

557

@ 12

"

(4 Each

Win

g)

30 ~ A602 @ 12" (FF)

(Lap to A650)

(Abut. No. 1 Shown, unless Noted)

(A800 Dowels not Shown)

(Both Sides)

EL. 417.70 (FF)

EL. 417.76 (NF)

Abut. No. 1

(Both Sides)

EL. 419.06 (FF)

EL. 419.00 (NF)

Abut. No. 2

(Left to Right)

Level

SECTION A-A

É Brg.

EL. 409.00

EL. 411.00

Granular Borrow

French Drain

Approach Slab

Subgrade Preparation

Surface after

Approximate Bedrock

Drain

4"

A550

A650 (Typ.)

2'-6" Min Lap (FF)

1'-8 Min Lap (NF)

A602 A505

A520 (EF)

4 ~ A520

Anchor Dowel Layout)

21 ~ A800 (Per

(Abutment No. 1 Shown)

A556

Joint

Construction

VIEW B-B

Sealant (All Around)

1"x1" Polyurethane

Wingwall

NEXT Beam

Curb

(See Superstructure Notes)

and Superstructure

Inside Corner of Wingwall

Geotextile (beyond) along

Joint Filler

Expansion

1" Preformed

Abutment

Face of

Cell Filler

1" Closed

Abutment

Face of

ANCHOR DOWEL LAYOUT(21 per Abutment)

Dowels

É Brg. &

É Construction

Dowel (Typ.)

A800

Seat

Bridge

ANCHOR DOWEL DETAIL

Diaphragm

End

Abutment

Top of

A800 Dowel

the End Diaphragm)

Anchor Dowels to Be Cast Directly into

Joint Sealant (Abut. No. 2 Only, Abut. No. 1

2" Ì PVC (Sch. 40) Sleeve Filled with

Page 17: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

9"

9"

9"

9"

(Typ.)

1'-0

"

3"

5'-6"

1'-8"

2'-0"

1'-0" 2'-0"

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

017

_Abut

ment_

3.d

gn

Userna

me:

Date:1

0/2

9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

17OF 22

BRID

GE N

O. 3103

WIN

GW

AL

L

DE

TAIL

S

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

SW WINGWALL ELEVATION

ABUTMENT NO. 1

NW WINGWALL ELEVATION

ABUTMENT NO. 1

NE WINGWALL ELEVATION

ABUTMENT NO. 2

SE WINGWALL ELEVATION

ABUTMENT NO. 2

D

D

EL. 409.00

EL. 411.00

EL. 409.00

EL. 411.00

EL. 422.25 EL. 422.25

EL. 409.00

EL. 411.00

EL. 409.00

EL. 411.00

EL. 423.61EL. 423.61

D

D

DD

Barrier (Typ.)

Concrete Transition

(Typ.)

Construction Joint

V-Groove and

Sta. 12+60.00

EL. 422.08

Sta. 12+60.00

EL. 422.08

Sta. 13+47.50

EL. 424.06

Sta. 13+47.50

EL. 424.06

(Reinforcing Similar to Abut. No. 1)(Reinforcing Similar to Abut. No. 1, Except as Noted)

A

B

C

D

E

F

Point Elevation

SW Wingwall

C

B

A

416.55

417.70

421.95

416.55

417.70

421.95

F

E

D

NW Wingwall

Abutm

ent

No. 1

ElevationPoint

SW Wingwall

I

H

G

NW Wingwall

L

K

JAbutm

ent

No. 2

G

H

I

J

K

L

416.55

419.06

424.55

416.55

419.06

424.55

ELEVATIONS TABLE

END OF WINGWALL

D D

Preparation (Typ.)

after Subgrade

Bedrock Surface

Approximate

(7 Each

Win

gwall)

14 ~ 1A

611 (FF)

Win

gwall)

(FF) (1 E

ach

2 ~ 1A

610

@ 12

"

2 ~ 1A

605 thru

Win

gwall)

(4 Each

8 ~ 1A

559

Win

gwall)

(5

Each

10 ~ 2

A559

(9 Each

Win

gwall)

18 ~ 2

A611 (FF)

(Typ.)

Construction Joint

(Typ.)

Construction Joint

(31 Each Wingwall)

62 ~ 1A603 @ 6" (FF)

Wingwall)

(12 Each

24 ~ 1A558 @ 12"

(2 Each Wingwall)

4 ~ 2A610 (FF)

(2 Each Wingwall)

4 ~ 2A526 (NF)

Win

gwall)

(FF) (1 E

ach

2 ~ 2

A610

@ 12

"

2 ~ 2

A605 thru

(2 Each Wingwall)

4 ~ 1A505 (NF)

(16 Each Wingwall)

32 ~ 1A506 @ 12" (NF)

Wingwall)

(EF) (2 Each

4 ~ 1A518 @ 12"

4 ~ 1A507 thru

(55 Each Wingwall)

110 ~ 1A560SS @ 6"

Wingwall)

End Face) (2 Each

2 ~ 1A518 (Centered on

(NF) (1 E

ach

Win

gwall)

2 ~ 1A

526

@ 12

"

2 ~ 1A

521 thru

(1 Each Wingwall)

2 ~ 1A610 (FF)

(1 Each Wingwall)

2 ~ 1A526 (NF)

(5 Each Wingwall)

10 ~ 2A530 (NF)

(4 Each Wingwall)

8 ~ 1A530 (NF)

SECTION D-D

EL. 411.00

EL. 409.00

Subgrade Preparation

Surface after

Approximate Bedrock

Drain

French Granular Borrow

Roadway Items

(1'-0" Thick)

Cushion

Aggregate

Protective

A650 (Typ.)

A560SS

#5 (NF)

A506

A603

1'-8" Min Lap (NF)

2'-6" Min Lap (FF)

Riprap

Heavy

#6 (FF)

A611 (FF)

Equally Spaced

Approach SlabShear Key

7"x1•"

A530 (NF)

Equally Spaced

Geotextile

Erosion Control

Class I, Non-Woven

6 ~ A540SS (Top)

(3 per Wingwall)

Page 18: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

Concrete Slab

(Typ.)

Diaphragm

End

Seat

Abutment

Corner of Wingwall and Superstructure

Geotextile (beyond) along Inside

Slab Seat

Approach

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

018

_Superstructure_

1.d

gn

Userna

me:

Date:1

1/9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

18OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

(1

OF

2)

SU

PE

RS

TR

UC

TU

RE

DE

TAIL

S(6

03) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

5'-6•"

B1 B2 B3

11'-1•"11'-1•" 5'-6•"

1'-8"

33'-4"

Travel Lane

11'-0"

Travel Lane

11'-0"

Shoulder

4'-0"

Shoulder

4'-0"1'-8"

Railing 3-Bar (Typ.)

Steel Bridge

(Typ.)

Face of Curb

-2%

Wearing Surface)

(Includes 1" Integral

9" Min. Concrete Slab

É Construction

15'-0" 15'-0"

SECTION A-A

-2%

(Typ.)

Next 32F

(Beyond)

Wingwall

Face of

(Typ.)

Beam

NEXT

2'-0"±

6"

1'-3" 1'-3"

3'-0"

SECTION C-C

(Min.)

1'-2

"

Min.

1'-0"

Min.

1'-0

"

É Brg. Concrete Slab

NEXT Beam

Sealant (E.F.)

1"x1" Polyurethane

Diaphragm

End

Filler (Typ.)

1" Closed Cell

1" Chamfer (Typ.)

Finished Grade

Approach SlabAbutment

Face of

Neoprene Pad

1"x18"xFull Width

Waterproofing

Sheet Membrane

Chamfer

4"x4" Mortar

SUPERSTRUCTURE PLAN

(Typ. Both Sides)

7 Spaces @ 8'-0" = 56'-0"

16'-8"

16'-8"

A

A

B

B

C C

B1

B2

B3

Details Sheet Details Sheet

57'-6"

Spacing, See Abutment

For Wingwall Rail Post

Spacing, See Abutment

For Wingwall Rail Post

9" 9"

15'-0"

15'-0"

30'-0"

1'-8

"

1'-8

"

Abutment (Typ.)

Face of End Diaphragm and

and Bridge

| Construction

Out-to-O

ut

33'-4"

90°0'0" (Typ.)

(See Superstructure Details 2 of 2 for Additional Reinforcing)

(Typ.)

6"

32 ~ S554S

S (16

@ 24" Each End

Alt.

with S553

SS)

34 ~ S553

SS (17

@ 24" Each End

Alt.

with S554S

S)

(Typ.)

12"

240 ~ S600G @ 6" (120 Top, 120 Bottom)

166 ~ S550SS (59 @ 12" Each Curb with 3 Additional per Rail Post)

S502GS501G

S554SS (Typ.)

S553SS (Typ.)

(Fixed)

Sta. 12+75.00

É Brg., Abut. No. 1

(Expansion)

Sta. 13+32.50

É Brg., Abut. No. 2

5'-4"

34 ~ S502

G

@ 12

" (T

op)

34 ~ S501G

@ 12

" (T

op)

Lap and

Alt.

with

(3

Lin

es of 2

Each Curb)

12 ~ S504S

S

Eq Sp (T

op)

12 ~ S503

SS

Eq Sp (T

op)

Lap and

Alt.

with

S503SS S504SS2'-6"

9" 9"

1'-3"

3" 3"

1'-3"

(Typ.)

Beam

End of

118 ~ S552SS (59 @ 12" Each Fascia Alt. with S551SS) (Top)

120 ~ S551SS (60 @ 12" Each Fascia Alt. with S552SS) (Top)

67 ~ S502

G

@ 6" (B

otto

m)

67 ~ S501G

@ 6" (B

otto

m)

Lap and

Alt.

with

VIEW B-B

Page 19: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

MS

TA\

019_

Superstructure_

2.d

gn

Userna

me:

Date:1

1/9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

19OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

(2

OF

2)

SU

PE

RS

TR

UC

TU

RE

DE

TAIL

S(6

03) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

SUPERSTRUCTURE NOTES

ELASTOMERIC BEARING PAD NOTES

NEXT Beam stems.

allowed, provided that the seams are located approximately half way between

2. Neoprene Pad seams perpendicular to the centerline of bearing will be

be considered incidental to related contract items.

Specifications, 4th Edition. Neoprene pads will not be paid for directly but will

requirements of Section 18.2 of the LRFD Bridge Construction

a shear modulus of 0.160 ksi and shall conform to the

1. Neoprene pads shall be either polychloroprene or natural polyisoprene with

rod.

provide additional clearance between the top of deck and bottom of anchor

10. Shortened anchor rods for the steel bridge rail posts is required to

be made directly but incidental to related Contract Items.

9. Payment for geotextile between the wingwalls and superstructure will not

Contract Items.

Expansion Joint Filler will not be made for directly but incidental to related

8. Payment for Polyurethane Sealant, 1" Closed Cell Filler and •" Preformed

corrected dimensions are provided on the Reinforcing Schedule sheet.

reduced in height by 3-inches to account for a curb height of 9". The

7. Bars TB651 and TB652 detailed in Standard Detail 526 (37) shall be

to the Resident for approval.

Alternate methods of sealing the gap between both flanges may be submitted

be made directly and shall be considered incidental to related Contract items.

6. Payment for Sheet Waterproofing Membrane and Mortared Chamfer will not

Structural Concrete Roadway and Sidewalk Slabs on Concrete Bridges.

5. Payment for End Diaphragm Concrete shall be paid under Item 502.261,

Special Provision 535, Superstructure, Camber.

4. Deck thickness and curb stirrups shall be adjusted in accordance with

been made.

be placed continuously and shall be kept plastic until the entire placement has

3. The superstructure slab and end diaphragm concrete for each span shall

the curb and slab.

2. Form a one inch V-groove on the fascias at the horizontal joint between

otherwise noted.

1. Reinforcing steel shall have a minimum concrete cover of 2 inches unless

É Gap between Beams

Exterior BeamInterior Beam

Tolerance

•" ± •"

as Required

Seal Material

Camber

Differential

BLOCKING AND GAP FORM DETAIL

Bearing (See Camber Special Provision)

9" Minimum at Midspan, 12ƒ" at Centerline

Grade

Slab and Finish

Depth Concrete

Top of Variable

Wearing Surface)

(Including 1" Integral

Concrete Slab

of 9" Structural

Theoretical Bottom

TYPICAL REINFORCING SECTION

@ 6" (Bottom)

S501G or S502G

@ 12" (Top)

S501G or S502G

S553SS or S554SS @ 24" (F.F)

AT ENDSALONG SPAN

3"

Clr.

Cover Varies

(1•" Min.)

10 ~ S600G (F.F)

(5 Each End @ 6")

32 ~ S555SS (N.F.)

(4 Locations @ 8")

36 ~ S555SS (N.F.)

(6 Locations @ 8")

16 ~ S555SS (N.F.)

(4 Each Corner @ 8")

A

A

(Top and Bottom)

S600G

or S552SS

S551SS

(4 Locations, Evenly Spaced)

16 ~ S558SS (N.F.)

(6 Locations, Evenly Spaced)

24 ~ S557SS (N.F.)

(4 Locations, Evenly Spaced)

16 ~ S556SS (N.F.)

(Typ.)

S550SS

Diaphragm

End

(Typ.)

S504SS

S503SS or

S551SS

S552SS or

S553SS or S554SS

S555SS

or S558SS

S556SS, S557SS,

Concrete Slab

NEXT Beam

SECTION A-A

S600

G

@ 6"

Page 20: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

(Typ.)

11'-1"

5'-6•

"É Beam

57'-6"

NEXT 32F PLAN

B

B

A

A

C C

(Typ.)

Detail A

90°0'0"

90°0'0"

(Typ.)

9"

É Brg., Abut. No. 1 É Brg., Abut. No. 2

Stem (Typ.)

SECTION A-A

(Typ.)

Inverted U Shaped Bar.

be Combined into One

Double Bars Shown May

Equivalent Multiple Bends.

6" Inside Radius or

Zone Reinforcing (Typ.)

#5 J Bar (20"x10") End [ #4, See Section C-C (Typ.)

End Zone Verticals

(Typ.)

1"

#4 Stirrup (Typ.)

of Strand Grid (Typ.)

Verticals in Middle

Anchor Rear Face

#4 11'-1"

Detail B

2'-8"

(Typ.)

1'-1Š"

#4 Stirrup (Typ.)

1ƒ" Cover With

Flange (Typ.)

Mid-Depth of the Top

#4 @ 12" E.W. Placed at

SECTION B-B

(Typ.)

4" ±

É Brg.

(See Section A-A)

#5 J Bars @ 6" = 3'-0"

2"12" Spacing

4"±

Clr.

1•"

2" Stirrup Spacing

36"

36"

27"

90°0'0"

#4

VIEW C-C

Ste

m

É Stem

(Typ.)

1'-2

"

#4 @ 12"

#4

@ 12

"

DETAIL A(Stirrups Not Shown)

#4 @ 6" = 4'-6"2"

1'-6"

É 4" Ì Blockout

(Typ.)

at Beam Ends

(6'-0" Long) @ 12"

Additional #4

(Typ.)

to clear blockouts

Adjust Reinforcing #4 @ End

Bundled

É 4" Ì Blockout

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

BRID

GE

Divisio

n:

Filena

me:...\

00\

BRID

GE\

MS

TA\

02

0_

Precast.d

gn

Userna

me:

Date:1

1/9/2

018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

20OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

NE

XT

BE

AM

DE

TAIL

S(6

03) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

PRECAST NEXT BEAM NOTES

feet from each beam end.

8. Lifting loops and temporary/storage/shipping dunnage shall be a maximum of 2

the surface finish will be considered incidental to related contract items.

achieving an equivalent roughened surface may be proposed. Payment for achieving

nominal „-inch roughened surface with exposed aggregate. Alternate methods of

All such surfaces shall be power washed with water prior to installation to provide a

beam stems that will come in contact with the cast-in-place concrete end diaphragms.

7. Concrete retarding admixture shall be applied to the form surfaces of the NEXT

tools on the beams will not be permitted.

6. The drilling of holes in the prestressed beams and the use of powder actuated

facilitate taking elevations for setting bottom of slab elevations.

At the blocking point locations a flattened area of sufficient size shall be finished to

points and along the edges if membrane is used to seal the joints between beams.

surface roughness of ± ‚ inch, except at locations corresponding to the blocking

5. The top surface of the upper flange of the prestressed beams shall be raked to a

otherwise noted. Stirrups shall be epoxy coated.

4. Reinforcing steel shall have a minimum concrete cover of 2 inches unless

per prestressing strand.

3. Prestressing strands shall be 0.6-in. diameter. The tensioning force is 44 kips

curve ordinate for the sag profile is 1.3 inches.

estimated deflection from curbs and railings is 0.1 inches at mid span. The vertical

estimated deflection from the cast-in-place slab is 0.5 inches at mid span. The

2. The estimated camber at release is 1.30 inches and 2.4 inches at erection. The

Standardized properties and details may be found at http://www.pcine.org.

1. NEXT F Beams are a non-proprietary shape developed by PCI Northeast (PCINE).

DETAIL B

3"•" Drip Notch (Terminate Drip Notch at

Low End of Beam 12" from

Face of Abutment and Extend

45° to Daylight at Fascia)

Provide a Smooth Trowel

Finish at Interior Edges if

Joints between Precast Units

are Sealed with a Membrane

3"

STRAND PATTERN

2•

"

(36 Per Beam, 18 Per Stem)

É Stem

Bundled #4 @ End

3 Sp. @ 2" = 6"

2" = 8"

4 SP @

2" =

6"

3

SP

@1'-8

"

Strands debonded 8ft

Strands debonded 6ft

Page 21: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

BRID

GE

Divisio

n:

Filena

me:...\

00\

BRID

GE\

MS

TA\

02

1_

Rebar.d

gn

Userna

me:

Date:1

0/2

9/2

018

QTY. LENGTH TYPE A B C D E F G H O R LOCATION

BENT BARS

MARKMARK QTY. LENGTH LOCATION MARK QTY. LENGTH LOCATION

STRAIGHT BARS

MARK QTY. LENGTH LOCATION MARK QTY. LENGTH LOCATION QTY. LENGTH TYPE A B C D E F G H O R LOCATIONMARK

GENERAL NOTES

TYPE - BENDING DIAGRAMS

C

B

A

B

A

D

C

GA

B

B

A

C

D

G

A

B

C

D

G

E

D

L SH SC

VC

H

EO

DE

SIG

N-

DE

TAIL

ED

BY

DA

TE

PR

OJ.

MA

NA

GE

R

SHEET NUMBER

FIE

LD

CH

AN

GE

S

RE

VISIO

NS

1

RE

VISIO

NS

2

RE

VISIO

NS

3

RE

VISIO

NS

4

CH

EC

KE

D-

RE

VIE

WE

DO.

Krauss

S.

Hodgdon

Aug.

2018

HO

DG

DO

N

MIL

LS

BRID

GE

HO

DG

DO

NA

RO

OS

TO

OK

CO

UN

TY

SO

UT

H

BR

AN

CH

ME

DU

XN

EK

EA

G

RIV

ER

21OF 22

BRID

GE N

O. 3103

M.

Wig

ht

DE

SIG

N2-

DE

TAIL

ED

2

DE

SIG

N3-

DE

TAIL

ED

3

S.

Hodgdon

P.

Dustin

STP-2

263(8

00)

WIN

022638.0

0B

RID

GE P

LA

NS

Apr.

2018

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ST

AT

E O

F M

AIN

E

S600G

S504SS

S503SS

S502G

S501G

AS601

AS501

116

32

15'-2"

28'-8"

Longitudinal

Transverse S558SS

S557SS

S556SS

S555SS

S554SS

S553SS

S552SS

S551SS

S550SS

5'-10"

4'-9"

3'-5"

6'-4"

9'-0"

6'-0"

6'-1"

8'-1"

4'-7"

S

S

S

S

L

L

C

C

SC

0

0

0

0

3'-0"

3'-0"

0'-7"

0'-7"

0'-6"

4'-6"

3'-5"

2'-1"

2'-0"

0

0

1'-3"

0'-8"

0'-8"

0'-8"

2'-2"

1'-2"

0

0

0

0

0'-6" 1'-4"

TB652*

TB651*

20

8

8'-3"

7'-5"

H

H

0'-6"

0'-6"

1'-1•"

0'-8•"

2'-6"

2'-6"

1'-1•"

0'-8•"

2'-6"

2'-6"

0'-6"

0'-6"

16

24

16

84

32

34

118

120

166

REIN

FO

RCIN

G

SC

HE

DU

LE

(603) 669-5

555 | w

ww.h

oyleta

nner.co

m

150 D

ow Street, M

anchester, N

H 0

3101

21

14

4

2

2

2

2

2

62

30

36

6

8

4

2

2

2

2

2

16

6

4

4

4

4

4

4

4

4

4

4

4

32

38

34

70

36

71

36

2'-6"

27'-1"

28'-8"

26'-3"

23'-10"

21'-5"

19'-0"

16'-7"

10'-0"

5'-3"

8'-0"

27'-1"

27'-1"

29'-8"

26'-3"

24'-10"

22'-5"

20'-0"

17'-7"

32'-11"

4'-3"

4'-8"

5'-1"

5'-6"

5'-11"

6'-4"

6'-9"

7'-2"

7'-7"

8'-0"

8'-5"

8'-10"

10'-0"

6'-6"

34'-10"

7'-8"

13'-3"

8'-0"

3'-0"

Seat Dowels

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Vert. Wing

Vert. Abut. Stem

Footing

Curb - SS

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Abut. Stem

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Abut. Stem

Footing

Footing

Footing

Footing

Footing to Seal Dowels

Seat Dowels

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Vert. Wing

Vert. Abut. Stem

Footing

Curb - SS

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Wing

Horiz. Abut. Stem

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Wing

Vert. Abut. Stem

Footing

Footing

Footing

Footing

Footing to Seal Dowels

21

18

6

2

2

2

2

2

62

30

36

6

10

6

2

2

2

2

2

18

6

4

4

4

4

4

4

4

4

4

4

4

32

38

34

70

36

71

36

2'-6"

27'-1"

28'-8"

26'-3"

23'-10"

21'-5"

19'-0"

16'-7"

11'-7"

6'-6"

8'-0"

27'-1"

27'-1"

29'-8"

27'-3"

24'-10"

22'-5"

20'-0"

17'-7"

32'-11"

6'-10"

7'-2•"

7'-7"

7'-11•"

8'-4"

8'-8•"

9'-1"

9'-5•"

9'-10"

10'-2•"

10'-7"

10'-11•"

11'-8"

7'-9"

34'-10"

7'-8"

13'-3"

8'-0"

3'-0"

250

6

6

101

101

33'-0"

22'-2"

40'-0"

25'-0"

40'-0"

GFRP - Deck, End Diaph.

Curb - SS

Curb - SS

GFRP - Deck

GFRP - Deck

1A800

1A611

1A610

1A609

1A608

1A607

1A606

1A605

1A603

1A602

1A601

1A540SS

1A530

1A526

1A525

1A524

1A523

1A522

1A521

1A520

1A518

1A517

1A516

1A515

1A514

1A513

1A512

1A511

1A510

1A509

1A508

1A507

1A506

1A505

1A504

1A503

1A502

1A501

1A500

2A800

2A611

2A610

2A609

2A608

2A607

2A606

2A605

2A603

2A602

2A601

2A540SS

2A530

2A526

2A525

2A524

2A523

2A522

2A521

2A520

2A518

2A517

2A516

2A515

2A514

2A513

2A512

2A511

2A510

2A509

2A508

2A507

2A506

2A505

2A504

2A503

2A502

2A501

2A500

0'-8"

0'-8"

0'-8"

2'-2"

6'-0"

3'-0"

5'-6"

7'-6"

1'-2"

End Diaphragm - SS

End Diaphragm - SS

End Diaphragm - SS

End Diaphragm - SS

Deck End - SS

Deck End - SS

Deck Overhang - SS

Deck Overhang - SS

Curb - SS

2A650

2A560SS

2A559

2A558

2A557

2A556

2A550

1A650

1A560SS

1A559

1A558

1A557

1A556

1A550

162

110

10

24

24

34

29

162

110

8

24

20

34

29

6'-9"

7'-3"

3'-2•"

3'-4"

2'-6"

6'-6"

4'-0"

6'-9"

7'-3"

3'-2•"

3'-4"

2'-6"

6'-6"

4'-0"

L

S

S

S

L

S

L

L

S

S

S

L

S

L

5'-9"

0

0

0

1'-3"

0

2'-0"

5'-9"

0

0

0

1'-3"

0

2'-0"

1'-0"

3'-0"

1'-0"

1'-0"

1'-3"

2'-2"

2'-0"

1'-0"

3'-0"

1'-0"

1'-0"

1'-3"

2'-2"

2'-0"

1'-3"

1'-2•"

1'-4"

2'-2"

1'-3"

1'-2•"

1'-4"

2'-2"

3'-0"

1'-0"

1'-0"

2'-2"

3'-0"

1'-0"

1'-0"

2'-2"

0

0

0

0

0

0

0

in "SS" indicate stainless steel.

Bar marks ending in "G" indicate GFRP. Bar marks ending

plans.

shall be based on crank bars as schedule on the

bar size as the crank bar. Payment in either case

straight bars (one top and one bottom) of the same

Each crank bar, Type B, may be replaced by two (2)

Mark "S650" = bar size #6

Mark "P805" = bar size #8

Mark "A502" = bar size #5

mark indicate the size ofthe bar:

The first two digits following the letter(s) of the

3.

2.

1.

ACI Standard 315 and ACI Standard 318.

recommendations of the current revision of

Bending details and hooks shall conform to the

All dimensions are out-to-out of bar.

Footing to Stem Dowels

Curb - SS

Horiz. Wing

Vert. Wing

Corners

Bridge Seat

App. Slab Dowels

Footing to Stem Dowels

Curb - SS

Horiz. Wing

Vert. Wing

Corners

Bridge Seat

App. Slab Dowels

Abutment No. 1

Superstructure

Approach Slabs

Abutment No. 2 Abutment No. 1

Abutment No. 2

Transition Barriers

Superstructure

* Bar is incidental to Item 526.34, Permanent Concrete Transition Barrier. All transition barrier reinforcing shall be stainless steel.

Page 22: 0 M R 3 .0 IN 8 3 W 6 -2 2 0 - Maine

Sill EL

WG

Sill E

LSill E

L

Sill EL

Sill EL

WELL

3 STORY HOUSE

15" CMP

DELINEATOR

#213

BB-HMR-102

8" APPLE

DELINEATOR

18" WIDE STONET&S MARKET 1 STORY

#27#28

BB-HMR-101

8" APPLE

DELINEATOR

ONE STEP

15" CMP

4" APPLE

CMP not used

DELINEATOR

8’ DIA. BUSH

BRICK

3 STEPS

10’ DIAM. BUSH

18" CMP

#62/29

18" BIRCH

DELINEATOR

ONE STEP

12" BIRCH CLUMP

2" BIRCH

6" WIDE WOOD

#30S

#621/62/30 FP

DELINEATOR DELINEATOR

GRAVELDELINEATOR

GRAVEL

GRAVEL

GRAVEL

GRAVEL

GRAVEL

PAVED

GRAVEL

PAVED

AREAMANAGEMENT

WILDLIFE

W/ A LEDGE BOTTOMLEDGE OUTCROPS

BOTTOM OF DAM

L.O.W.P.

S

MCIN

TY

RE

RO

AD

P.L. (

APP

RO

X. H

IGH

WA

TE

R)

P.L.

P.L.

P.L.

BEGIN B.L.78.00’

101.66’

LIMITS OF WROUGHT PORTION

25’

25’

25’

TO LINNIUSTO U.S. ROUTE 1

TO

HO

ULT

ON

GRID

MAIN

E 2000

EA

ST

ZO

NE

MEGAN M. ANDERSON

ANDREW J. ANDERSON

0.08î�

L.O.W.P.

+78*

102.45’

4’*

25’

25’

25’

100.86’74’*

+82*

26’*

25’*

+10 +25

40’

35’

STI

MIL

DAO

R .

PMET

STIMIL DAOR .PMET

STIMIL DAOR .PMET

LIMITS OF WROUGHT PORTION

25’*

252.70’+40

P.L.

P.L.

P.L.

P.L.

WROUGHT PORTION (L.O.W.P.)

HIGHWAY PURPOSES WITHIN LIMITS OF

NOTE: PRESCRIPTIVE EASEMENT FOR

DAM

PATRICIA S. SHERMAN

ROGER L. SHERMAN

STEPHANIE S. HARRIS

DAVID G. HARRIS

WILDLIFE MANAGEMENT AREA

LT. GORDON MANUEL

P.L.

P.L.

)R

EVI

R

FO

ENI

LR

ET

NE

C( .

L.P

LEONA COLLIER LIFE ESTATE

NANCY WILSON

+25+20

40’

+25

TE

MP. CONST.

+75

1

95

�

TEMP.

CONST.

LI

MITS

890�

LIMITS

40’

860* S.F.

+10

TO

TA

L

AR

EA

=

0.3

9*

AC. (P

ER

TO

WN)

TE

MP.

CO

NS

T.

RIG

HTS

=

195*

S.F. (1)

IT

EM

NO. (4)

JE

NNIFE

R

L.

WA

LL

AC

E

BR

UC

E

E.

WA

LL

AC

E

ï »¿630î��

STA. 13+75 RT.

DRAINAGE OUTLET

35’

35’

40’ +90+80

35’

EASE.

LIMIT

S

SLOPE

+35

40’

SLOPE EASE.

SLOPE

EASE.

785* S.F.

S.F.96* 1592* S.F.

REM. AREA = 0.39* AC.

TOTAL AREA = 0.51* AC. (PER TOWN)

TEMP. CONST. RIGHTS = 890* S.F. (1)

CONST. & MAINT. EASE. = 220* S.F.(1)

SLOPE EASE. = 785* S.F. (1)

TOTAL LAND TAKEN = 0.12* AC.

LAND TAKEN = 1,688* S.F. (2) (OTHER)

LAND TAKEN = 0.08* AC. (PRESC. EASE.)

PARCEL NO. (1)

HELEN M. FOLSOM

BRUCE E. FOLSOM

437* S.F.81* S.F.

547* S.F. 270* S.F.

REM. AREA = 0.27* AC.

TOTAL AREA = 0.32* AC. (PER TOWN)

TEMP. CONST. RIGHTS = 690* S.F. (1)

CONST. & MAINT. EASE. = 80* S.F. (1)

SLOPE EASE. = 860* S.F. (1)

TOTAL LAND TAKEN = 0.05* AC.

LAND TAKEN = 518* S.F. (2) (OTHER)

LAND TAKEN =1925* S.F. (PRESC. EASE.)

PARCEL NO. (3)

DONALD G. DEE

OF THE RIVER.

PARCEL NO. 1 CALCULATED TO THE CENTERLINE

PAYMENT FOR RIGHTS TAKEN ON THIS

NOTE:

STA. 12+25* RT.

STA. 11+88* RT. TO

DRAINAGE STRUCTURE

ME

DU

XN

EK

EA

G

RIV

ER

SO

UT

H

BR

AN

CH

58+END B.L.

+21*

YEAR 1860 & 4 RODS WIDE (66’) VOLUME 2, PAGE 183 & 280 AROOSTOOK COUNTY COMMISSIONERS RECORDS (WESTERLY OF PROJECT)2) S MCINTYRE ROAD AND HODGDON MILL ROAD

WITHIN LIMITS OF WROUGHT PORTION (L.O.W.P.)1) PRESCRIPTIVE EASEMENT FOR HIGHWAY PURPOSES

EXISTING RIGHT OF WAY INFORMATION

(114’*)

+20*

263* S.F.

166’*

SL

OP

E

EASE.

LIMITS

P.L.

L.O.W.P.

80* S.F.

MAINT. EASE.

CONST. AND

LTS.

MAINT. EASE.

CONST. AND

HODGDON MILLS ROAD / STATE AID HIGHWAY NO. 3

LTS.

L.O.W.P.

S.F.

220*

25’

190* S.F.MAINT. EASE.CONST. &

N89°34’09"E

35’

N89î��59’34"E 7

S.F.

810* 34’*

+18*

0.15* AC.

0.21* AC.

REM. AREA = 6,479.83* AC.

TOTAL AREA = 6,480* AC.

TEMP. ROAD RIGHTS = 0.21* AC. (1)

CONST. & MAINT. EASE. = 190* S.F. (1)

DRAIN. EASE. = (2)

SLOPE EASE. = 1,440* S.F. (2)

TOTAL LAND = 0.17* AC.

LAND = 1,080* S.F. (3) (OTHER)

LAND = 0.15* AC.(PRESC. EASE.)

PARCEL NO. (2)

AND WILDLIFE

DEPARTMENT OF INLAND FISHERIES

STATE OF MAINE

S.F.515*

TOTAL AREA = 0.89* AC. (PER TOWN)

TEMP. ROAD RIGHTS = 515* S.F. (1)

ITEM NO. (5)

BETTY L. SCOTT

(163’*)

36’*

1’*

126.73’ 690* S.F.

76’*51’*

(302’* TOTAL)

16’*

25’

+75

+70 +80

+16*

+15+50+20

+25

+04

33’

33’

40’ 16’

45’

(221’*)

9.0

0’

S.F.1,925*

(70’*)

(334’* TOTAL)10+00 11+00 12+00 13+00 14+00 15+00 15+7215+72

PO

B

=

ST

A. 10

+00.00

PC

=

ST

A. 10

+73.61

PR

C

=

ST

A. 11

+51.61

PT

=

ST

A. 12

+53.27

PC

=

ST

A. 15

+05.97

PT

=

ST

A. 15

+72.30

E = 0.24’

T = 39.00’

L = 78.00’

R = 3,200.00’

PI = 11+12.61

CURVE DATA #1

E = 0.40’

T = 50.83’

L = 101.66’

R = 3,200.00’

PI = 12+02.44

CURVE DATA #2

E = 0.28’

T = 33.17’

L = 66.33’

R = 2,000.00’

PI = 15+39.14

CURVE DATA #3

NO. GRANTOR INSTRUMENT DATE BOOK PAGE

COUNTY RECORDSHEET NUMBER

OFDATE

COMMISSIONER

CHIEF ENGINEER

REVISIONS

NO. DATE DESCRIPTION BY

RIG

HT O

F W

AY M

AP

ST

AT

E O

F M

AIN

E

DE

PA

RT

ME

NT O

F T

RA

NSP

OR

TA

TIO

N

ITE

MT

EC

HC

HE

CK

ED

OVER

RIGHT-OF-WAY MAP

WIN

SCALE 1"= 25’

PLAN FILED IN PLAN BOOK PAGE

RO

WDivisio

n:

Filena

me:...\

00\

RO

W\

MS

TA\

001_

RW

PL

AN

1.d

gn

Userna

me:

Date:1

1/7/2

018

Terri.

L.Blair

STATE OF MAINE

REGISTRY OF DEEDS

COUNTY

RECEIVED

Attest:

,

REGISTER

Plan Book , Page

at h m M and recorded in

Town, County, State

Ledge

Trees

Tree Line

Conifer

Catch Basin

Manhole

Deciduous

Utlity Pole

Telephone Line

Traverse Point

IPFIRF

Electric Line

Sewer Manhole

Control Of Access

Limits of Wrought Portion L.O.W.P.

Water Line

Sanitary Sewer

Guardrail

Existing Right of Way

Water Edge

Bush Line

P.L.

Fence

Underdrain Line

PLAN LEGEND

Culvert

Gas Line

Traveled WayApprox. Property Lines

Sign

Fire Hydrant

Monument

Building

C.O.A.

Cut Line Fill Line

Clearing Limit Line Stonewall

AR

EA

S

EXIS

TIN

G

CO

NDITIO

N

PL

AN

FIN

AL

RIG

HT

OF

WA

Y

New Right of Way

New Easement

New Temporary Rights

10+00 11+00Baseline 12+00

New R/W Along Existing R/W

New R/W Within Existing R/W

Pipe Found

WellWELL

Existing Proposed

Ditch

16 S

TA

TE H

OU

SE ST

ATIO

N - A

UG

UST

A, M

E 0

4333-0

016 - 2

07-6

24-3

460

CHAIN LINK BARB WIRE STOCKADE

Replacement Pin Set

Iron Rod Found

Retaining Wall

Mailbox

Rock/Boulder Flag Pole

Existing Proposed

CurbingScale of Feet

25 0 25 50

ABUTTING PROPERTY OWNERS.

IT CANNOT BE USED TO ESTABLISH LEGAL BOUNDARIES BETWEEN

ACQUISITION OF REAL PROPERTY FOR TRANSPORTATION PURPOSES.

THIS PLAN WAS PREPARED IN CONNECTION WITH THE DEPARTMENT’S

75 100

022638.00

HODGDON MILLS BRIDGE

BRIDGE NO. 3103

FEDERAL AID PROJECT NO. STP-2263(800)

HODGDON

HO

DG

DO

N

AROOSTOOK COUNTY

STATE AID HIGHWAY NO. 3

HODGDON MILLS ROAD

G.L.L.

T.L.B.

DAVID BERNHARDT

JOYCE NOEL TAYLOR

SHEET 1 OF 1

SEPTEMBER 2018

T.L.B.

D.O.T. FILE NO. 2-608

LOCATION UNKNOWN

POSSIBLE U.G. PIPES

SOUTH BRANCH MEDUXNEKEAG RIVER

2222