BONCHARI CONSTITUENCY

NATIONAL GOVERNMENT CONSTITUENCY DEVELOPMENT FUND

PROJECT PROPOSAL

2017/2018 FINANCIAL YEAR

SUBMITTED

7th FEBRUARY, 2018

BONCHARI NG-CDFC MEETING HELD ON 1 ST FEBRUARY 2018 AT SUNEKA CDF OFFICE

MEMBERS PRESENT:

1. Salome O. Miruka - Fund Account Manager2. Solomon Anthony Nyamao - Male Representative -

Chairman3. Helina Kemunto Moranga - Constituency Nominee - Secretary4. Fred Mapoa Asiago - Youth Representative5. Sabina Nyamao - Female Representative6. Ednah Nyanchoka - Female Youth Representative7. Geoffrey Mwendo Omwando - Constituency Nominee8. Kaunda Osiemo - Persons Living with Disability9. Kipkoech Araap Kigen - National Government Representative

Agenda

1. Proposal for 2017/2018 financial year

2. A.O.B

MIN 01/02/2018. CONFIRMATION OF PREVIOUS MEETING MINUTES:The meeting was started with the word of prayer from Ednah Nyanchoka and the Chairman welcomed all members and thanked them for being punctual, he urged members to contribute to the meeting agendas. The secretary read through the minutes of the previous meeting. The minutes were confirmed to be the true record of the meeting by Geoffrey Mwendo who was seconded by Ednah Nyanchoka.

MIN 02/02/2018: CDF PROJECTS PROPOSAL BUDGET FOR FINANCIAL YEAR 2017/2018The Chairman briefed members that the committee is required to submit project proposals for the financial year 2017/2018 in time to get funds, the fund account Manager told members that the NG- CDF Committee is supposed to submit projects proposals to the NG - CDF Board by the 7th February, 2018

The Fund Account Manager informed members that the constituency had been allocated a total of Kshs. 86,810,344.82. She referred to a circular ref CDF Board/ Circulars Vol. I (121) which outlined the eligible projects.The Fund Account Manager briefed members on the guidelines for project proposal presentation. she also informed members on the eligible projects. The Manager informed members that all devolved functions are no longer eligible under the new NG-CDF act.After lengthy deliberations the NG-CDF committee resolved that the following projects be funded in the Financial Year 2017-2018

Table of projects proposed for 2017/2018

Project Name Activity Amount Status Employees’ Salaries Payment of staff salaries and gratu-

ity 2,528,840.00 Ongoing

Goods and Services Purchase of fuel, repairs and mainte-nance, printing, stationery, tele-phone, travel and subsistence, office tea

1,586,593.10 Ongoing

NSSF Payment of NSSF Deductions 53,260.00 Ongoing

NHIF Payment of NHIF Deductions 90,300.00 Ongoing

Committee Ex-penses

Payment of Committee sitting al-lowances, transport, conferences 949,627.59 Ongoing

Goods and Services Purchase of fuel, repairs and mainte-nance, printing, stationery, Airtime, travel and subsistence

824,896.50 Ongoing

Committee Ex-penses

Payment of Committee sitting al-lowances, transport, conferences 832,000.00 Ongoing

NGCDFC/PMC Ca-pacity Building

Undertake Training of the PMCs/NGCDFCs on NGCDF Related issues 947,413.84 Ongoing

Emergency To cater for any Urgent unforeseen occurrences in the constituency dur-ing the financial year

4,568,965.52 New

Sports Organize Constituency sports tourna-ment and award of balls and game skits to the participating teams

1,736,206.90 Ongoing

Environmental projects

Purchase and planting of tree seedlings in the following schools: Masagoye pry,Riamagige pry,Ekerore pry,Kirwanda pry, Mwamisoko pry, Nyakungu pry, Nyamerako pry,Nya-mare pry, Nyangiti pry, Itibo pry,Ri-anyapara pry,Isamwera pry, Kioge pry, Mugori pry, Sugunana pry, Nya-maya pry, Ebate pry, Mwata High,Ny-otoima High and Ekerubo High Each @ Kshs. 86,810.35

1,736,206.90 Ongoing

Strategic plan and website

Development of constituency strate-gic plan (Kshs. 3,000,000) and Devel-opment of Constituency Website (Kshs. 600,000)

3,600,000.00 New

ICT Hub (CIH) One off cost to Telkom

Installation of constituency ICT Hub and one off cost to Telkom in four constituency sites (NGCDF Office Suneka, Kerina DCC's office, Ri-anyabaro Centre of Excellence school and Igonga secondary school

4,677,027.20 New

Bursary Secondary Schools Payment of bursary to needy student 5,383,620.69 Ongoing Bursary Tertiary Schools Payment of bursary to needy student 19,271,551.72 Ongoing Kirwanda Primary School

construction of 1 classroom to com-pletion 500,000.00 New

Mosando Primary School S

construction of 1 classroom to com-pletion 500,000.00 New

Nyakung’u Primary School

construction of ground floor of a storey administration block to com-pletion i.e flooring, walling, plaster-ing, dooring, windows and painting

2,000,000.00 On going

Nyamare Primary School

construction of 1 classroom to com-pletion 500,000.00 New

Mugori Primary School

construction of 1 classroom to com-pletion 500,000.00 New

Ekerubo Primary School

completion of admin block i.e roof-ing, plastering, flooring 500,000.00 on going

Kebute Primary School

completion of 2 classrooms i.e roof-ing, plastering, flooring, doors and windows

500,000.00 on going

Botoro Primary School

construction of 1 classroom to com-pletion 500,000.00 New

Kiabusura Primary School

construction of 1 classroom to com-pletion 500,000.00 New

Bomariba Primary School

construction of 1 classroom to com-pletion 500,000.00 New

Nyabieyo Primary School

construction of 1 classroom to com-pletion 500,000.00 New

Riamagige Primary School

completion of 3 classrooms i.e plas-tering, flooring, doors and windows 500,000.00 on going

Nyamaya Primary School

construction of 1 classroom to com-pletion 500,000.00 New

Masagoye Primary School

Completion of the 3 classrooms i. e slab, walling, roofing, doors, win-dows, plastering, flooring, and paint-ing

1,800,000.00 Ongoing

Itibo Primary School construction of 1 classroom to com-pletion 500,000.00 New

Bitare Primary School

Completion of 2 classrooms i.e plas-tering, flooring, painting, doors and windows

750,000.00 Ongoing

Kerina Special School

Completion of 2 classrooms i.e plas-tering, flooring, painting, doors and windows

800,000.00 Ongoing

Nyangiti Primary School

Completion of 4 classrooms i.e plas-tering, doors, windows, floors, paint-ing, veranda

900,000.00 Ongoing

Nyamerako Ekerubo Secondary School

Completion of Administration block i.e foundation, walling, doors, win-dows, painting, floors, roofing

1,000,000.00 on going

St. Theresa's Bo-giakumu Secondary School

Completion of laboratory i.e plaster-ing, flooring, doors, windows and painting

700,000.00 on going

Ekerore Secondary school

Completion of 10 doors pit latrines i.e walling, roofing, doors, painting, ve-randa and flooring

600,000.00 Ongoing

Iruma Secondary School

Construction of 1 classroom to com-pletion i.e foundation, walling, roof-ing, doors, windows, plastering and painting

700,000.00 New

Mwata Secondary School

Completion of tuition block i.e floor-ing, plastering, veranda, painting and ceilling.

700,000.00 on going

Botoro Secondary School

construction of storey tuition block 1st floor i.e pillars, and slab. 1,000,000.00 on going

St. Anns Nyangoge Girls Secondary School

Completion of dormitory at Lintel level i.e roofing, plastering, flooring, windows, painting and doors

1,050,000.00 on going

Ekerubo High School Construction of dormitory to comple-tion. i.e foundation, slab, walling, roofing, plastering, doors, windows , veranda and painting

1,000,000.00 New

Bonyaoro Girls Sec-ondary School

Construction of 1 classroom to com-pletion i.e foundation, walling, roof-ing, dooring, windows, plastering and painting

700,000.00 New

Isamwera Sec-ondary School

construction of storey tuition block i.e 2nd floor pillars, and slab 900,000.00 on going

Nyabieyo Secondary School

Completion of laboratory i.e plaster-ing, flooring, dooring, windowing and painting

700,000.00 on going

Riamonting'a Sec-ondary School

Completion of tuition block i.e floor-ing, plastering, veranda, painting and ceilling.

700,000.00 on going

Sugunana Sec-ondary School

Construction of 1 classroom to com-pletion i.e foundation, walling, roof-ing, dooring, windows, plastering and painting

700,000.00 New

Itibo Secondary School

Construction of 1 classroom to com-pletion i.e foundation, walling, roof-ing, dooring, windows, plastering and painting

700,000.00 New

Bitare Secondary School

Completion of laboratory i.e roofing, plastering, flooring, dooring, window-ing and painting

700,000.00 on going

Kiabusura sec-ondary school

Construction of 1 classroom to com-pletion @ Kshs. 500,000 and con-struction of 6 doors pit latrines i.e digging, foundation, basement, walling, roofing, doors, plastering and painting @ Kshs. 473,834.86

973,834.86 New

St. Anns Nyangoge Secondary School

Drilling and equipping of school borehole 4,850,000.00 New

Botoro Market cen-tre

Purchase and Installation of 4 High Mast solar lighting system 400,000.00 New

Ekerorano Market centre

Purchase and Installation of 4 High Mast solar lighting system 400,000.00 New

Nyabioto centre Purchase and Installation of 4 High Mast solar lighting system 400,000.00 New

Nyagwekoa centre Purchase and Installation of 4 High Mast solar lighting system 400,000.00 New

Bonyanchaire Chiefs office

Construction of chiefs office (founda-tion, walling, roofing) 2,000,000.00 New

Nyamwari chiefs office

Construction of chiefs office (founda-tion, walling, roofing) 2,000,000.00 New

Bokeire chiefs office Construction of chiefs office (founda-tion, walling, roofing) 2,000,000.00 New

      TOTAL   86810344.82  

The committee members requested the Fund Account Manager to do the necessary documentation for project proposal approval by NG-CDF board.

MIN 03/02/2018 A.O.B.Committee members agreed on the following

1. Not to allow any student drop out of school for lack of school fees2. Keep monitoring ongoing projects to ensure they have value for mon3. Ongoing projects to take precedence during funding.4. There being no other business the meeting was adjourned at 6:00p.m. with a

word of prayer from Geoffrey Omwando

Minutes Compiled by; Minutes Confirmed by;

(The Secretary) (The Chairman)

Helina Moran’ga Solomon Nyamao

Signature…………………………………. Signature………………..........

Date…………………………………………. Date……………….................

1946

2015 National Government Constituencies Development Fund No. 30

THIRD SCHEDULE CONSTITUENCY PROJECTS SUBMISSION FORM

Constituency No 261 Constituency Name BONCHARI Financial Year 2017/2018

Serial Name of Project Amount Allocated

261/AP1 ADMINISTRATION/RECURENT 5,208,620.69

261/AP2 MONITORING AND EVALUATION/CAPACITY

BUILDING

2,604,310.34

261/264020

0

EMERGENCY 4,568,965.

52

261/264010

0

BURSARY ACTIVITIES 24,655,172.41

261/263020

4

PRIMARY SCHOOL PROJECTS 12,750,000.00

261/263020

5

SECONDARY SCHOOL PROJECTS 17,673,834.86

261/264050

9

SPORTS ACTIVITIES 1,736,206.90

261/264051

0

ENVIRONMENTAL ACTIVITIES 1,736,206.90

261/264050

7

SECURITY PROJECTS 7,600,000.00

261/221131

1

ICT HUB (CONSTITUENCY INNOVATION HUB) 4,677,027.20

261/221131

0

STRATEGIC PLAN AND WEBSITE 3,600,000.00

TOTAL 86,810,344.82

Chairman NG- CDF Committee …………………… Signature…………………..

Date………………

Fund Account Manager ……………………………

Signature…………………….Date………………

1947

2015 National Government Constituencies Development Fund (s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORMConstituency No: 261 Constituency Name BONCHARI County KISIIProject Number 261/AP1Project Title 6% Administration/RecurrentSector AdministrationStatus of projects (tick one) New………………. Extension……………….. On-going…√…..Rehabilitation ………………….Brief statement on project status at time of submission

The allocation is to cater for NGCDFC Allowance, staff salaries, vehicle expenses and other administration costs.Financial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs. 5,208,620.69 dated…………………Amount allocated last financial year 4,913,793.10Amount allocated this financial year 5,208,620.69Project Name Project

NumberActivity Amount STATUS

Employees’ Salaries

4-045-261-2110000-100-2017/18-001

Payment of staff salaries and gratuity

2,528,840.00

Ongoing

Goods and Services

4-045-261-2210000-100-2017/18-002

Purchase of fuel, repairs and maintenance, printing, stationery, telephone, travel and subsistence, office tea

1,586,593.10

Ongoing

NSSF 4-045-261-2120101-100-2017/2018-005

Payment of NSSF Deductions

53,260.00 Ongoing

NHIF 4-045-261-2120201-100-2017/18-006

Payment of NHIF Deductions

90,300.00 Ongoing

Committee Expenses

4-045-261-2210802-100-2017/18-007

Payment of Committee sitting allowances, transport, conferences

949,627.59 Ongoing

TOTAL 5,208,620.69

Person completing form: Name ……………………….. Position Fund Account ManagerSignature…………………… Date………………………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISII Project Number 261/AP2Project Title 3% Monitoring & Evaluation/Capacity BuildingSector Monitoring & EvaluationStatus of projects (tick one) New………………. Extension……………….. On-going…√…..Rehabilitation ………………….Brief statement on project status at time of submission To cater for Monitoring and Evaluation of NGCDF projects and capacity building of NGCDFC and PMCs in the constituency Financial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs.2,604,310.34 dated…………………Amount allocated last financial year 2,456,896.50Amount allocated this financial year 2,604,310.34Project Name Project

NumberActivity Amount STATU

SGoods and Services

4-045-261-2210000-111-2017/18-001

Purchase of fuel, repairs and maintenance, printing, stationery, Airtime, travel and subsistence

824,896.50 Ongoing

Committee Expenses

4-045-261-2210802-111-2017/18-002

Payment of Committee sitting allowances, transport, conferences

832,000.00 Ongoing

NGCDFC/PMC Capacity Building

4-045-261-2210700-111-2017/18-003

Undertake Training of the PMCs/NGCDFCs on NGCDF Related issues

947,413.84 Ongoing

TOTAL 2,604,310.34

Person completing form: Name ……………………… Position Fund Account Manager

Signature…………………… Date………………………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE

PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISIIProject Number 261/2640200Project Title Emergency Reserve (5% of the fund)Sector EmergencyStatus of projects (tick one) New………………. Extension……………….. On-going…√…..Rehabilitation ………………….Brief statement on project status at time of submission Unallocated amount meant for emergencies that may occur within the ConstituencyFinancial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs. 4,568,965.52 dated…………………Amount allocated last financial year 4,094,827.59Amount allocated this financial year 4,568,965.52

Project Name

Project Code Project Activity Amount Allocated

STATUS

Emergency 4-045-261-2640200-101-2017/2018-001

To cater for any Urgent unforeseen occurrences in the constituency during the financial year

4,568,965.52

NEW

Total 4,568,965.52

Person completing form: Name ………………………….. Position Fund Account Manager

Signature…………………… Date………………………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISIIProject Number 261/2640509Project Title 2% Sports ActivitiesSector SportsStatus of projects (tick one) New………………. Extension……………….. On-going…√…..Rehabilitation ………………….Brief statement on project status at time of submission Organize Constituency sports tournament Financial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs. 1,736,206.90dated…………………Amount allocated last financial year 1,637,931.00Amount allocated this financial year 1,736,206.90

Project Name Project Code Project Activity Amount Allocated

STATUS

Sports 4-045-261-2640509-112-2017/2018-001

Organize Constituency sports tournament and award of balls and game skits to the participating teams

1,736,206.90

Ongoing

Total 1,736,206.90

Person completing form: Name ……………………… Position Fund Account Manager

Signature…………………… Date………………………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISIIProject Number 261/2640509Project Title 2% Environment ActivitiesSector EnvironmentStatus of projects (tick one) New………………. Extension……………….. On-going…√…..Rehabilitation ………………….Brief statement on project status at time of submission Purchase and planting of tree seedling for schools in the constituencyFinancial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs. 1,736,206.90 dated…………………Amount allocated last financial year 1,637,931.00Amount allocated this financial year 1,736,206.90

Project Name

Project Code

Project Activity Amount Allocated

STATUS

Environmental projects

4-045-261-2640510-110-2017/2018-001

Purchase and planting of tree seedlings in the following schools: Masagoye pry, Riamagige pry,Ekerore pry,Kirwanda pry, Mwamisoko pry, Nyakungu pry, Nyamerako pry,Nyamare pry, Nyangiti pry, Itibo pry,Rianyapara pry,Isamwera pry, Kioge pry, Mugori pry, Sugunana pry, Nyamaya pry, Ebate pry, Mwata High,Nyotoima High and Ekerubo High Each @ Kshs. 86,810.35

1,736,206.90

Ongoing

Total 1,736,206.90

Person completing form: Name ……………………… Position Fund Account Manager

Signature…………………… Date………………………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISII Project Number 261/2640100Project Title Bursary Scheme Sector Bursary Status of projects (tick one) New………………. Extension……………….. On-going…√….. Rehabilitation ………………….Brief statement on project status at time of submission Towards Bursary for payment of fees for needy studentsFinancial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs. 35,000,000 Amount allocated last financial year 28,055,000Amount allocated this financial year 24,655,172.41

Project Name Project Code Project Activity Amount Allocated

STATUS

Bursary Secondary Schools

4-045-261-2640101-103-2017/2018-001

Payment of bursary to needy student

5,383,620.69 Ongoing

Bursary Tertiary Schools

4-045-261-2640102-103-2017/2018-002

Payment of bursary to needy student

19,271,551.72

Ongoing

TOTAL 24,655,172.41

Person completing form: Name ……………………….. Position Fund Account Manager

Signature…………………… Date………………………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISII Project Number 261/2211310Project Title Strategic Plan and website Sector Strategic PlanStatus of projects (tick one) New………√………. Extension……………….. On-going…….. Rehabilitation ………………….Brief statement on project status at time of submission Towards Development of the constituency Strategic plan and websiteFinancial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs. 6,000,000Amount allocated last financial year NilAmount allocated this financial year 3,600,000

Project Name Project Code Project Activity Amount Allocated

STATUS

Strategic plan 4-045-261-2211310-108-2017/2018-001

Development of constituency 5 year strategic plan

3,000,000.00 NEW

NG-CDF Office Website

4-045-261-2211310-108-2017/2018-002

Development of constituency website

600,000.00 NEW

TOTAL 3,600,000.00

Person completing form: Name ……………………….. Position Fund Account Manager

Signature…………………… Date………………………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISII Project Number 261/2211311Project Title ICT HUB (CIH) Sector ICT HUBStatus of projects (tick one) New……√…………. Extension……………….. On-going…….. Rehabilitation ………………….Brief statement on project status at time of submission Towards Implementation of ICT HUB in 4 sites.Financial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs. 4,677,027.20 Amount allocated last financial year NilAmount allocated this financial year 4,677,027.20

Project Name Project Code Project Activity Amount Allocated

STATUS

ICT HUB 4-045-261-2211311-108-2017/2018-001

Installation of satellite Antenna, Router, Digital Access Kit and Digital Ruggedized tablets, Wi-Fi with outdoor wireless devise complete with 12U cabinet complete with installation accessories at (NG-CDF Office, Suneka, Kerina DCC office, Rianyabaro centre of excellence Secondary school and Igonga secondary school @Kshs. 1,169,256.80

4,677,027.20

NEW

TOTAL 4,677,027.20

Person completing form: Name ……………………….. Position Fund Account Manager

Signature…………………… Date………………………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORMConstituency No: 261 Constituency Name BONCHARI County KISIIProject Number 261/2630204Project Title Primary Education ProjectsSector EducationStatus of projects (tick one) New………………. Extension……………….. On-going…√…..Rehabilitation ………………….Brief statement on project status at time of submission To enhancing better learning conditions in the primary schools institutions by improving the infrastructure Financial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs. 13,500,000 Amount allocated last financial year 20,100,172 Amount allocated this financial year 8,200,000

Project Name Project Code Activity Amount Status

Kirwanda Pri-mary School

4-045-261-2630204-104-2017/2018-024

construction of 1 classroom to comple-tion

500,000.00 New

Mosando Pri-mary School

4-045-261-2630204-104-2017/2018-029

construction of 1 classroom to comple-tion

500,000.00 New

Nyakung’u Primary School

4-045-261-2630204-104-2017/2018-026

completion of storey building i.e flooring, roofing, walling, plas-tering, dooring, win-dows and painting

2,000,000.00

On go-ing

Nyamare Pri-mary School

4-045-261-2630204-104-2017/2018-022

construction of 1 classroom to comple-tion

500,000.00 New

Mugori Pri-mary School

4-045-261-2630204-104-2017/2018-004

construction of 1 classroom to comple-tion

500,000.00 New

Ekerubo Pri-mary School

4-045-261-2630204-104-2017/2018-019

completion of admin block i.e roofing, plas-tering, flooring

500,000.00

on go-ing

Kebute Pri-mary School

4-045-261-2630204-104-2017/2018-020

completion of 2 class-rooms i.e roofing, plas-tering, flooring, doors

500,000.00

on go-ing

and windows Botoro Pri-mary School

4-045-261-2630204-104-2017/2018-015

construction of 1 classroom to comple-tion

500,000.00 New

Kiabusura Pri-mary School

4-045-261-2630204-104-2017/2018-017

construction of 1 classroom to comple-tion

500,000.00 New

Bomariba Pri-mary School

4-045-261-2630204-104-2017/2018-012

construction of 1 classroom to comple-tion

500,000.00 New

Nyabieyo Pri-mary School

4-045-261-2630204-104-2017/2018-023

construction of 1 classroom to comple-tion

500,000.00 New

Riamagige Primary School

4-045-261-2630204-104-2017/2018-006

completion of 3 class-rooms i.e plastering, flooring, doors and win-dows

500,000.00

Ongo-ing

Nyamaya Pri-mary School

4-045-261-2630204-104-2017/2018-005

construction of 1 classroom to comple-tion

500,000.00 New

Masagoye Primary School

4-045-261-2630204-104-2017/2018-016

Completion of the 3 classrooms i. e slab, walling, roofing, doors, windows, plastering, flooring, and painting

1,800,000.00

Ongo-ing

Itibo Primary School

4-045-261-2630204-104-2017/2018-008

construction of 1 classroom to comple-tion

500,000.00 New

Bitare Primary School

4-045-261-2630204-104-2017/2018-022

Completion of 2 class-rooms i.e plastering, flooring, painting, doors and windows

750,000.00 Ongo-ing

Kerina Special School

4-045-261-2630204-104-2017/2018-021

Completion of 2 class-room i.e plastering, flooring,doors, win-dows, veranda and painting

800,000.00 Ongo-ing

Nyangiti Pri-mary School

4-045-261-2630204-104-2017/2018-023

Completion of 4 class-rooms i.e plastering, doors, windows, floors, painting, veranda

900,000.00 Ongo-ing

TOTALS 12,750,000.00

Person completing form: Name ……………………………………..………. Position Fund Account Manager

Signature…………………… Date……………

19472015 National Government Constituencies Development Fund

(s. 30)

FOURTH SCHEDULE PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISIIProject Number 261/2030205Project Title Secondary School Projects Sector EducationStatus of projects (tick one) New………………. Extension……………….. On-going…√…..Rehabilitation ………………….Brief statement on project status at time of submission To enhancing better learning conditions of Secondary by improving the infrastructure Financial year 2017 1st July To 30th June 2018Original Cost estimates, in Kshs.19,000,000 Amount allocated last financial year 12,200,000Amount allocated this financial year 17,673,834.86

Project Name Project Code Activity Amount StatusNyamerako Ekerubo Sec-ondary School

4-045-261-2630205-104-2017/2018-011

Construction of Admin-istration block i.e foun-dation, walling, roofing

1,000,000.00

on going

St. Theresa's Bogiakumu Sec-ondary School

4-045-261-2630205-104-2017/2018-010

Completion of labora-tory i.e plastering, flooring, doors, win-dows and painting

700,000.00 on going

Iruma Sec-ondary School

4-045-261-2630205-104-2017/2018-006

Construction of 1 class-room to completion i.e foundation, walling, roofing, doors, win-dows, plastering and painting

700,000.00 New

Mwata Sec-ondary School

4-045-261-2630205-104-2017/2018-012

Completion of tuition block i.e flooring, plas-tering, veranda, paint-ing and ceiling.

700,000.00 on going

Botoro Sec-ondary School

4-045-261-2630205-104-2017/2018-028

construction of storey tuition block 1st floor i.e pillars, and slab.

1,000,000.00

on going

St. Anns Nyan- 4-045-261- construction of dormi- on going

goge Girls Sec-ondary School

2630205-104-2017/2018-009

tory to completion i.e roofing, windows, plas-tering, doors, windows and painting

1,050,000.00

Ekerubo High School

4-045-261-2630205-104-2017/2018-005

Construction of dormi-tory to completion. i.e foundation, slab, walling, roofing, plas-tering, doors, windows , veranda and painting

1,000,000.00

New

Bonyaoro Girls Secondary School

4-045-261-2630205-104-2017/2018-013

Construction of 1 class-room to completion i.e foundation, walling, roofing, doors, win-dows, plastering and painting

700,000.00 New

Isamwera Sec-ondary School

4-045-261-2630205-104-2017/2018-003

construction of storey tuition block i.e 2nd floor pillars, and slab

900,000.00 on going

Nyabieyo Sec-ondary School

4-045-261-2630205-104-2017/2018-004

Completion of labora-tory i.e plastering, flooring, doors, win-dows and painting

700,000.00 on going

Riamonting'a Secondary School

4-045-261-2630205-104-2017/2018-002

Completion of tuition block i.e flooring, plas-tering, veranda, paint-ing and ceiling.

700,000.00 on going

Sugunana Sec-ondary School

4-045-261-2630205-104-2017/2018-008

Construction of 1 class-room to completion i.e foundation, walling, roofing, doors, win-dows, plastering and painting

700,000.00 New

Itibo Secondary School

4-045-261-2630205-104-2017/2018-015

Construction of 1 class-room to completion i.e foundation, walling, roofing, doors, win-dows, plastering and painting

700,000.00 New

Bitare Sec-ondary School

4-045-261-2630205-104-2017/2018-022

Completion of labora-tory i.e roofing, plaster-ing, flooring, doors, windowing and painting

700,000.00 on going

Kiabusura sec-ondary school

4-045-261-2630205-104-2017/2018-028

Construction of 1 class-room to completion Kshs. 500,000 and con-struction of 6 doors pit latrines Kshs. 473,834.86

973,834.86 New

Ekerore Sec- 4-045-261- Construction of 10 600,000.00 Ongoing

ondary school 2630205-104-2017/2018-021

doors pit latrines to completion i.e walling, roofing, doors, painting, veranda and flooring

St. Anns Nyan-goge Secondary School

4-045-261-2630205-104-2017/2018-009

Drilling and equipping of school borehole

4,850,000.00

New

TOTALS 17,673,834.86

Person completing form: Name ………………………………………. Position Fund

Account Manager

Signature…………………… Date………………………

9072015 National Government Constituencies Development Fund No. 30

FOURTH SCHEDULE (s. 16)

PROJECT DESCRIPTION FORM

Constituency No: 261 Constituency Name BONCHARI County KISIIProject Number 261/2640507Project Title Security ProjectsSector SecurityStatus of projects (tick one) New………………. Extension……………….. On-going…√…..Rehabilitation ………………….Brief statement on project status at time of submission Projects to ensure proper security in the constituency through establishing Police PostFinancial year 2018 1st July To 30th June 2018Original Cost estimates, in Kshs. 11,000,000.00 dated…………………Amount allocated last financial year 6,800,000.00Amount allocated this financial year 7,600,000.00

Project Name Project Code Project Activity Amount Sta-tus

Botoro Market centre

4-045-261-2640507-113-2017/2018-001

Purchase and Instal-lation of 4 High Mast solar lighting system

400,000.00

New

Ekerorano Mar-ket centre

4-045-261-2640507-113-2017/2018-002

Purchase and Instal-lation of 4 High Mast solar lighting system

400,000.00

New

Nyabioto cen-tre

4-045-261-2640507-113-2017/2018-003

Purchase and Instal-lation of 4 High Mast solar lighting system

400,000.00

New

Nyagwekoa centre

4-045-261-2640507-113-2017/2018-004

Purchase and Instal-lation of 4 High Mast solar lighting system

400,000.00

New

Bonyanchaire Chiefs office

4-045-261-2640507-113-2017/2018-006

Construction of chiefs office (foundation, walling, roofing)

2,000,000.00

New

Nyamwari chiefs office

4-045-261-2640507-113-2017/2018-007

Construction of chiefs office (foundation, walling, roofing)

2,000,000.00

New

Bokeire chiefs office

4-045-261-2640507-113-2017/2018-008

Construction of chiefs office (foundation, walling, roofing)

2,000,000.00

New

TOTALS 7,600,000.00

Person completing form: Name ……………………………. Position Fund Account

Manager

Signature…………………… Date………………………

BONCHARI NATIONAL GOVERNMENT CONSTITUENCY DEVELOPMENT FUNDPROJECT CODELIST FOR THE FINANCIAL YEAR 2017/2018

Project Name Project Num-ber

Original Cost

Cumula-tive allo-cation

Activity Amount Status

Employees’ Salaries

4-045-261-2110000-100-2017/2018-001

2,528,840.00

  Payment of staff salaries and gratuity

2,528,840.00

Ongo-ing

Goods and Ser-vices

4-045-261-2210000-100-2017/2018-002

1,586,593.10

 

Purchase of fuel, repairs and maintenance, print-ing, stationery, tele-phone, travel and sub-sistence, office tea

1,586,593.10

Ongo-ing

NSSF 4-045-261-2120101-100-2017/2018-005

53,260.00   Payment of NSSF De-

ductions 53,260.00

Ongo-ing

NHIF 4-045-261-2120201-100-2017/2018-006

90,300.00   Payment of NHIF Deduc-

tions 90,300.00

Ongo-ing

Committee Ex-penses

4-045-261-2210802-100-2017/2018-007

949,627.59  

Payment of Committee sitting allowances, trans-port, conferences

949,627.59

Ongo-ing

Goods and Ser-vices

4-045-261-2210000-111-2017/2018-001

824,896.50  

Purchase of fuel, repairs and maintenance, print-ing, stationery, Airtime, travel and subsistence

824,896.50

Ongo-ing

Committee Ex-penses

4-045-261-2210802-111-2017/2018-002

832,000.00  

Payment of Committee sitting allowances, trans-port, conferences

832,000.00

Ongo-ing

NGCDFC/PMC Capacity Build-ing

4-045-261-2210700-111-2017/2018-003

947,413.84  

Undertake Training of the PMCs/NGCDFCs on NGCDF Related issues

947,413.84

Ongo-ing

Emergency 4-045-261-2640200-1K01-2017/2018-001

4,568,965.52

  To cater for any Urgent unforeseen occurrences in the constituency dur-

4,568,965.52

Ongo-ing

ing the financial year

Sports 4-045-261-2640509-112-2017/2018-001

1,736,206.90

 

Organize Constituency sports tournament and award of balls and game skits to the participating teams

1,736,206.90

Ongo-ing

Environmental projects

4-045-261-2640510-110-2017/2018-001

1,736,206.90

 

Purchase and planting of tree seedlings in the following schools: Masagoye pry,Ria-magige pry,Ekerore pry,Kirwanda pry, Mwamisoko pry, Nyakungu pry, Nyamer-ako pry,Nyamare pry, Nyangiti pry, Itibo pry,Ri-anyapara pry,Isamwera pry, Kioge pry, Mugori pry, Sugunana pry, Nya-maya pry, Ebate pry, Mwata High,Nyotoima High and Ekerubo High Each @ Kshs. 86,810.35

1,736,206.90

Ongo-ing

Strategic plan and website

4-045-261-2211310-108-2017/2018-001

4,000,000.00

 

Development of con-stituency strategic plan (Kshs. 3,000,000) and Development of Con-stituency Website (Kshs. 600,000)

3,600,000.00

New

ICT Hub (CIH) One off cost to Telkom

4-045-261-2211311-108-2017/2018-001

4,677,027.20

 

Installation of con-stituency ICT Hub and one off cost to Telkom in four constituency sites (NGCDF Office Suneka, Kerina DCC's office, Ri-anyabaro Centre of Ex-cellence school and Igonga secondary school

4,677,027.20

New

Bursary Sec-ondary Schools

4-045-261-2640101-103-2017/2018-001

5,383,620.69

Payment of bursary to needy student

5,383,620.69

New

Bursary Ter-tiary Schools

4-045-261-2640102-103-2017/2018-002

19,271,551.72

Payment of bursary to needy student

19,271,551.72

New

Kirwanda Pri-mary School

4-045-261-2630204-104-2017/2018-024

600,000.00 construction of 1 class-

room to completion 500,000.00 New

Mosando Pri-mary School

4-045-261-2630204-104-2017/2018-029

600,000.00

construction of 1 class-room to completion

500,000.00 New

Nyakung’u Pri-mary School

4-045-261-2630204-104-2017/2018-026

3,500,000.00

1,500,000.00

construction of ground floor of a storey adminis-tration block to comple-tion i.e flooring, walling, slab, plastering, dooring, windows and painting

2,000,000.00

On go-ing

Nyamare Pri-mary School

4-045-261-2630204-104-2017/2018-022

650,000.00 construction of 1 class-

room to completion 500,000.00 New

Mugori Primary School

4-045-261-2630204-104-2017/2018-004

550,000.00 construction of 1 class-

room to completion 500,000.00 New

Ekerubo Pri-mary School

4-045-261-2630204-104-2017/2018-019

1,100,000.00

400,000.00

completion of admin block i.e roofing, plaster-ing, flooring, windows, doors and painting

500,000.00

on go-ing

Kebute Primary School

4-045-261-2630204-104-2017/2018-020

2,000,000.00

400,000.00 completion of 2 class-rooms i.e roofing, plas-tering, flooring, doors and windows

500,000.00

on go-ing

Botoro Primary School

4-045-261-2630204-104-2017/2018-015

650,000.00 construction of 1 class-

room to completion 500,000.00 New

Kiabusura Pri-mary School

4-045-261-2630204-104-2017/2018-017

650,000.00 construction of 1 class-

room to completion 500,000.00 New

Bomariba Pri-mary School

4-045-261-2630204-104-2017/2018-012

700,000.00 construction of 1 class-

room to completion 500,000.00 New

Nyabieyo Pri-mary School

4-045-261-2630204-104-2017/2018-023

850,000.00 construction of 1 class-

room to completion 500,000.00 New

Riamagige Pri-mary School

4-045-261-2630204-104-2017/2018-006

1,800,000.00

750,000.00 completion of 3 class-rooms i.e plastering, flooring, panting,doors and windows

500,000.00

on go-ing

Nyamaya Pri-mary School

4-045-261-2630204-104-2017/2018-005

800,000.00 construction of 1 class-

room to completion 500,000.00 New

Masagoye Pri-mary School

4-045-261-2630204-104-2017/2018-016

3,000,000.00

1,200,000.00

Completion of the 3 classrooms i. e slab, walling, roofing, doors, windows, plastering, flooring, and painting

1,800,000.00

Ongo-ing

Itibo Primary School

4-045-261-2630204-104-2017/2018-008

900,000.00 construction of 1 class-

room to completion 500,000.00 New

Bitare Primary School

4-045-261-2630204-104-2017/2018-022

1,500,000.00 750,000.00

Completion of 2 class-rooms i.e plastering, flooring, painting, roof-ing, doors and windows

750,000.00 Ongo-ing

Kerina Special School

4-045-261-2630204-104-2017/2018-021

1,200,000.00 400,000.00

Completion of 2 class-rooms i.e plastering, flooring, doors, roofing, windows, veranda and painting

800,000.00 Ongo-ing

Nyangiti Pri-mary School

4-045-261-2630204-104-2017/2018-023

2,400,000.00

1,500,000.00

Completion of 4 class-rooms i.e plastering, doors, windows, floors, painting, veranda

900,000.00 Ongo-ing

Nyamerako Ekerubo Sec-ondary School

4-045-261-2630205-104-2017/2018-011

2,000,000.00

500,000.00

Completion of Adminis-tration block i.e walling, roofing, doors, and win-dows and painting

1,000,000.00

Ongo-ing

St. Theresa's Bogiakumu Secondary School

4-045-261-2630205-104-2017/2018-010

1,500,000.00

500,000.00

Completion of labora-tory i.e plastering, floor-ing, doors, windowing and painting

700,000.00

Ongo-ing

Iruma Sec-ondary School

4-045-261-2630205-104-2017/2018-006

1,000,000.00

Construction of 1 class-room to completion i.e foundation, walling, roofing, doors, windows, plastering and painting

700,000.00 New

Mwata Sec-ondary School

4-045-261-2630205-104-2017/2018-012

2,000,000.00

750,000.00

Completion of tuition block i.e flooring, plas-tering, veranda, painting and ceiling.

700,000.00

on go-ing

Botoro Sec-ondary School

4-045-261-2630205-104-2017/2018-028

1,350,000.00

500,000.00

construction of storey tuition block 1st floor i.e pillars, and slab.

1,000,000.00

on go-ing

St. Anns Nyan-goge Girls Sec-ondary School

4-045-261-2630205-104-2017/2018-009

1,800,000.00

750,000.00

Completion of dormitory at Lintel level i.e roofing,plastering, floor-ing, windows, painting and doors

1,050,000.00

on go-ing

Ekerubo High School

4-045-261-2630205-104-2017/2018-005

1,450,000.00

Construction of dormi-tory to completion. i.e foundation, slab, walling, roofing, plastering, doors, windows , ve-randa and painting

1,000,000.00

New

Bonyaoro Girls Secondary School

4-045-261-2630205-104-2017/2018-013

1,050,000.00

Construction of 1 class-room to completion i.e foundation, walling, roofing, doors, windows, plastering and painting

700,000.00 New

Isamwera Sec-ondary School

4-045-261-2630205-104-2017/2018-003

8,000,000.00

1,250,000.00

construction of storey tuition block i.e 2nd floor pillars, and slab

900,000.00

on go-ing

Nyabieyo Sec-ondary School

4-045-261-2630205-104-2017/2018-004

2,000,000.00

1,200,000.00

Completion of labora-tory i.e plastering, floor-ing, doors, windowing

700,000.00

on go-ing

and painting Riamonting'a Secondary School

4-045-261-2630205-104-2017/2018-002

2,000,000.00

1,000,000.00

Completion of tuition block i.e flooring, plas-tering, veranda, painting and ceiling.

700,000.00

on go-ing

Sugunana Sec-ondary School

4-045-261-2630205-104-2017/2018-008

1,430,000.00

Construction of 1 class-room to completion i.e foundation, walling, roofing, doors, windows, plastering and painting

700,000.00 New

Itibo Sec-ondary School

4-045-261-2630205-104-2017/2018-015

1,300,000.00

Construction of 1 class-room to completion i.e foundation, walling, roofing, doors, windows, plastering and painting

700,000.00 New

Bitare Sec-ondary School

4-045-261-2630205-104-2017/2018-022

2,000,000.00

1,000,000.00

Completion of labora-tory i.e roofing, plaster-ing, flooring, doors, win-dowing and painting

700,000.00

Ongo-ing

Kiabusura sec-ondary school

4-045-261-2630205-104-2017/2018-028

1,500,000.00

Construction of 1 class-room to completion @ Kshs. 500,000 and con-struction of 6 doors pit latrines i.e digging, foun-dation, basement, walling, roofing, doors, plastering and painting @ Kshs. 473,834.86

973,834.86 New

St. Anns Nyan-goge Sec-ondary School

4-045-261-2630205-104-2017/2018-009

6,000,000.00

Drilling and equipping of school borehole

4,850,000.00

New

Ekerore Sec-ondary School

4-045-261-2630205-104-2017/2018-021

1,000,000.00 400,000

Completion of 10 doors pit latrines i.e walling, roofing, doors, painting, veranda and flooring

600,000.00 Ongo-ing

Botoro Market centre

4-045-261-2640507-113-2017/2018-001

500,000.00

Purchase and Installa-tion of 4 High Mast solar lighting system

400,000.00 New

Ekerorano Mar-ket centre

4-045-261-2640507-113-2017/2018-002

500,000.00

Purchase and Installa-tion of 4 High Mast solar lighting system

400,000.00 New

Nyabioto cen-tre

4-045-261-2640507-113-2017/2018-003

500,000.00

Purchase and Installa-tion of 4 High Mast solar lighting system

400,000.00 New

Nyagwekoa centre

4-045-261-2640507-113-2017/2018-004

500,000.00

Purchase and Installa-tion of 4 High Mast solar lighting system

400,000.00 New

Bonyanchaire Chiefs office

4-045-261-2640507-113-2017/2018-006

2,500,000.00

Construction of chiefs office (foundation, walling, roofing)

2,000,000.00

New

Nyamwari chiefs office

4-045-261-2640507-113-2017/2018-007

2,500,000.00

Construction of chiefs office (foundation, walling, roofing)

2,000,000.00

New

Bokeire chiefs office

4-045-261-2640507-113-2017/2018-008

2,500,000.00

Construction of chiefs office (foundation, walling, roofing)

2,000,000.00

New

              TOTAL         86,810

,344.82