Agendau TCAG Introduction
u High Level Facts
u Overview of Revised Red Line Routeu North Thames Portal
u Rail & Muckingford Road Crossing
u New ‘Area’ By Coalhouse Fort
u Short & Long Term Impacts of Route 3u Construction - Route Legacy – Communities - Growth
u Communicate
u What Can I do?
u Revised Timing
u Sales Pitch
u CPRE – Alternatives – Lobby Groups
u Question Time (Q&A)
Matt Jackson 2017 WWW.TCAG.INFO
The Teamu Roger (Chair) - Matt (Vice Chair)
u Laura (Webmaster) – Mark (IT & Technical)
u Kim (Secretary) – Leigh (Legal)
u Su Sammons (Ward Cllr)
u Cllr Smith (Chair Thurrock Council Task Force)
u Alex (CPRE) – James (Kent Campaigner) – Gordon (Rail)
u Thanks To Jan Fawsitt – Rosie Barnes – Linda Mulley The Forum – All Volunteers
WWW.TCAG.INFOMatt Jackson 2017
High Level Factsu 86% Traffic Will Remain at the Existing Crossing
u £8bn worth of Growth (Claim HE / SELEP Support it)
u 70% Crossing Capacity Increase (Thames Gateway)
u A282 Current Daily Average ~150k Crossings
u Thurrock has 17 Air Quality Management Areas
u 2027 – A282 Crossing remains over capacity
u M25 Continues to cause gridlock across Thurrock
u Poor Weather Conditions Continue to close the A282 (Bridge - Southbound)
u 2027 Thurrock sees rise in the number of vehicles crossing the Borough
u 10% of Thurrock Ports freight forwarding put on rail
WWW.TCAG.INFOMatt Jackson 2017
Highways England Development Points
u M25 – New junction design to cross under the M25 to reduce the visual impact. Widening of a section of the M25 to improve traffic flow.
u Ockendon – Realignment to avoid going across the landfill.
u Access to the A13 and Tilbury:
u A13 and A128 – Redesign of the junction with the A13 to reduce congestion. This would allow us to remove the A128 junction from the proposed design.
u New junction near Tilbury – A new junction near east Tilbury and link road to Tilbury to improve traffic flow and provide an alternative route for HGVs.
u A226 junction – Removal of this junction to reduce the traffic impact on local roads.
u A2 – New junction design and widening of A2 to M2, junction 1 to reduce congestion and improve traffic flow.
u Future proofing – Three lanes rather than two for at least some of the route.
u Tunnel portals – Continuing our assessment about the length of the tunnel and where to locate the entrances.
Matt Jackson 2017 WWW.TCAG.INFO
Red Line Overlay
M2
A2
A2
A2M25
HS1
A13
A13
M25
A13
A127
A127
A226
A289
A12
8
A10
89
Grays
M25 J2
Orsett
Tilbury
M25 J30
Dartford
Gravesend
River Thames
East Tilbury
North Ockendon
South Ockendon
Chadwell St.Mary
Chalk
Orsett
Lower Thames Crossing
Client LOWER THAMES CROSSINGDEVELOPMENT PHASE
Project
Drawing t itle
Development BoundaryComparison
Key Plan
Status Original Size Revision
A3Scale
Date -
Date -
Date -
Drawn
Checked
Approved
Drawing number
0 1 2 3 4 5
Kilometres
1:100,000
HE540039-CJV-GEN-GEN-MAP-DCO-00009
JS/KM
TG/T W
SC
10/10/2017
S2 001
Rev Statu s Rev. Date Purpose of revision Drawn Chck'd Apprv'd
JS/KM TG/TW SCS2 Issued for information001
KeyPreviously published boundary
Potential land required to construct and operate the Lower Thames Crossing
Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00010
Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00011
Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00012
Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00013
Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00014
Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00015
Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00016
10/10/2017
16/10/2017
16/10/2017
WWW.TCAG.INFOMatt Jackson 2017
Ask Questionsu How will traffic migrate via Thurrock when the Bridge closes
u Can Highways England provide a simulation showing how route 3 will cope
u How will J30 process traffic efficiently
u Prove to us the A13 Eastbound will cope with M25 traffic diversions to Route 3
u Route 3 cannot allow national traffic to impact our local roads
u Will the docks provide parking provisions for extra HGV shipping
u Construction blight (air, noise, vibration, light, working hours)
u Lasting blight legacy
u 3D Renderings of design
WWW.TCAG.INFOMatt Jackson 2017
What Can You Do?
Matt Jackson 2017
Ockendon
Aveley
Tilbury
Chadwell
Orsett
MPs
Councilors
CommunityGroups
HIGHWAYS ENGLAND
Data Driven
Respectful
Teamwork
Responsibility
Engage
THURROCK
WWW.TCAG.INFO
Next Stepsu Engage with your ward Cllrs & MPs
u Go to Community Forum Meetings
u Submit Your Questions to Thurrock Task Force Meetings
u Take Ownership of your Area
u Write letters / emails to Westminster
Matt Jackson 2017 WWW.TCAG.INFO
QUESTION TIME
u Hands up – your questions will be answered in order
u A mic will come to you to enable the room to hear
u Please be respectful of people speaking
u One question at a time
WWW.TCAG.INFOMatt Jackson 2017