Project: AIDA Prima Project & AIDA Perla Project Client: Mitsubishi Heavy Industries, LTD. Location : MHI Shipyard, Nagasaki, Japan Period: May 2015 ~ Apr. 2017 Peak M/P : 90 Scope of Work: - Machinery Part : Plant Keeping Operation, System Commissioning - Hull Part : Flooding Sensor / Main Bilge System / Water Fog System / Potable Water System / Black Water System / Provision Ref. System / Local CO2 System / Plant Keeping Operation - Elect. Part : I/O Check, PA Commissioning, Local Entertainment System Commissioning * Reference Commissioning 1 >> MHI AIDA Prima & Perla Commissioning

Upload: others

Post on 23-Feb-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

Project: AIDA Prima Project & AIDA Perla Project

Client: Mitsubishi Heavy Industries, LTD.

Location: MHI Shipyard, Nagasaki, Japan

Period: May 2015 ~ Apr. 2017

Peak M/P: 90

Scope of Work:

- Machinery Part : Plant Keeping Operation,

System Commissioning

- Hull Part : Flooding Sensor / Main Bilge System /

Water Fog System / Potable Water System /

Black Water System / Provision Ref. System /

Local CO2 System / Plant Keeping Operation

- Elect. Part : I/O Check, PA Commissioning,

Local Entertainment System Commissioning

* Reference –Commissioning

1

>> MHI AIDA Prima & Perla Commissioning

Page 2: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

Project: JMU LNG Project

Client: Japan Marine United

Period: Aug. 2016 ~ Ongoing

Peak M/P: 16

Scope of Work:

- Discipline : Design work, Cargo Commissioning, Electrical

Commissioning, Mechanical Commissioning, QA

- Commissioning Team : Technical Advice, Education of Safety Rules,

Schedule Management of Machineries, Trouble Shooting,

Preparation of Commissioning Work Check List,

Pre-test Inspection and Result Management,

IAS Monitoring List Modification and Schedule Management Request

- QA Team : QA Inspection (General Hull Part, Cargo Tank, Insulation)

Machinery QCDB Preparation, General Management,

Pre-Test Inspection Result Management,

Inspection Result Submission to Leader, Ship Owner, Class,

Preparation of Trouble Shooting List and Punch List

* Reference –Commissioning

2

>> JMU LNG Commissioning

Page 3: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

3

4. Commissioning

1) COMMISSIONING

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Aug. 2016 Ongoing Japan Marine United JMU LNG LNG ship JMU (Japan)

2 Oct. 2015 Ongoing Seadrill West libra Drillship DSME

3 June 2015. Ongoing Seadrill West Aquila Drillship DSME

4 Apr. 2015 Ongoing Vantage Cobalt Explorer Drillship DSME

5 Mar. 2016 Apr. 2017 Mitsubishi Heavy Industries AIDA #2 Perla Cruise ship MHI

6 Feb. 2016 Feb. 2017 Maersk Invincible Drillship DSME

7 Mar. 2016 June 2016 ADMA-OPCO SARB Package 4 E-house KOSPEC

8 Oct. 2015 May 2016 Sonangol Sonangol Quenguela Drillship DSME

9 Aug. 2015. Mar. 2016 Songa Offshore Enabler #4 Semi-Rig DSME

10 June 2015. Mar. 2016 Sonangol Sonangol Libongos Drillship DSME

11 Mar. 2015 Mar. 2016 Mitsubishi Heavy Industries AIDA #1 Prima Cruise shipMHI (Nagasa

ki, Japan)

12 Aug. 2015. Dec. 2015 Songa Offshore Encourage Semi-Rig DSME

13 May 2015. Nov. 2015 Atwood Admiral Drillship DSME

14 Mar. 2015 Sep. 2015 Transocean Thalasse Drillship DSME

15 Apr. 2014 June 2015 Songa Offshore Equinox #1 Semi-Rig DSME

16 Apr. 2014 Sep. 2014 Diamond Offshore Diamond Ultra Deep–water Drillship #4 Drillship HHI

17 Jan. 2014 Aug. 2014 Noble Noble Drillship #4 Drillship HHI

18 July 2012 July 2015 Chevron EGP Phase 3B Platform Nigeria

Page 4: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

4

4. Commissioning

1) COMMISSIONING

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

19 July 2013 May 2014 Exxon Mobil Arkutun DagiFixed

PlatformDSME

20 Nov. 2013 Mar. 2014 Diamond Offshore Diamond Ultra Deep –water Drillship #3 Drillship HHI

21 Nov. 2012 Feb. 2014 Fred Olsen Energy Fred Olsen Drillship #1 Drillship HHI

22 Jan. 2013 Jan. 2014 Atwood Advantage #1 Drillship DSME

23 Jan. 2012 Jan. 2014 Diamond Offshore Diamond Ultra Deepwater Drillship #1 Drillship HHI

24 Jan. 2013 Dec. 2013 Transocean Edward Drillship #1 Drillship DSME

25 May 2013 Sep. 2013 Diamond Offshore Diamond Ultra Deepwater Drillship #2 Drillship HHI

26 Jan. 2012 July 2013 Vantage Tungsten Explorer Drillship DSME

27 May 2012 Jan. 2013 Transocean GSF- High island Jack UpDRY DOCK

(Dubai )

28 Apr. 2012 Aug. 2012 KNOC Panama Zhambyl Rig ERSAI

29 May 201 July 2012 Corporative Grupo-R Grupo-R GVA7500 Rig DSME

30 Feb. 2012 Apr. 2012 Odebrecht ODN #2 Drillship DSME

31 June 2011 Apr. 2012 Odebrecht ODN #1 Drillship DSME

32 Jan. 2011 Apr. 2012 Vantage TMT 2 (Dragon Quest) Drillship DSME

33 Sep. 2010 June 2011 Technip H6001 OPS PLV STX Dalian

34 Oct. 2010 May 2011 Odebrecht NORBE IX Drillship DSME

35 Jan. 2011 Apr. 2011 SeaDrill West Pegasus Rig Jurong

36 Dec. 2009 Feb. 2011 Vantage Sea Dragon Rig Jurong

Page 5: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

5

4. Commissioning

1) COMMISSIONING

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

37 Apr. 2010 Nov. 2010 Vantage TMT 1 (Platinum Explorer) Drillship DSME

38 Sep. 2009 Aug. 2010 Transocean Discoverer India Drillship DSME

39 June 2009 Mar. 2010 Transocean Discoverer Luanda Drillship DSME

40 Dec. 2008 July 2009 Transocean Discoverer Americas Drillship DSME

41 May 2008. Mar. 2009 Transocean Discoverer Clear Leader Drillship DSME

42 May 2008 Jan. 2009 Seadrill West Aquarius Rig DSME

43 Feb. 2008 Oct. 2008 Seadrill West Hercules Rig DSME

Page 6: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

6

2) COMMISSIONING PROCEDURE

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Apr. 2014 May 2016 STX MOG F1006 FSO STX

2 June 2012 Feb. 2014 DSME South Nemba Auxiliary Fixed Platform DSME

3 Sep. 2012 May 2013 DSME Allseas Pieter ScheltePlatform,

Pipe LayingDSME

4 Nov. 2011 Jan. 2013 DSME Heerema AegirPipe Laying

VesselDSME

5 Apr. 2008 Aug. 2008 Transocean Discover Americas Drillship DSME

6 Nov. 2011 July 2008 Odfjell Deepsea Atlantic Rig DSME

7 Sep. 2007 Mar. 2008 Transocean Discoverer Clear Leader Drillship DSME

8 Feb. 2007 Dec. 2007 Seadrill West Hercules/Aquarius Rig DSME

4. Commissioning

Page 7: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

7

5. Mechanical Completion

NO.PERIOD

CLIENT PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Dec. 2015 June 2017 SBM Shell Prelude FLNG Supervising of MCTopside / Hullside MC Inspection Completion,

Punch Control

2 Feb. 2015 June 2017 SHI / Shell Shell Prelude FLNG Punch Clearance Hull part Punch Clearance of E&I, Structure

3 Oct. 2016 Mar. 2017 Maersk Maersk XLE4 MC11 Work Packs including IT Equipment

Installation

4 Nov. 2015 Mar. 2017 Technip Technip Martin Linge Punch Clearance Pipeline QC inspection, MC of Piping Work

5 Aug. 2016 Oct. 2016 Transocean GSS Transocean Conqueror MC Cable Pulling & Sensor Installation

6 May 2016 Oct. 2016 KNPG Kinabalu KNPG MC MC Inspection Completion, Punch Control

7 July 2016 Aug. 2016 Diamond Ocean Great White MC F.O cable installation

8 Mar. 2016 June 2016 Songa Offshore Songa #2 Enabler Post Delivery Work 10 Work Packs including MC of Wire Line

9 Nov. 2014 June 2016 ABBElectrical Substation SARB Package 4

MCMC Inspection Completion, Punch Control

10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage Post Delivery Work 9 Work Packs including MC of Wire Line

11 Oct. 2015 Nov. 2015 Transocean Transocean_Thalassa MC MC of Wire line Tower & etc.

12 Oct. 2015 Nov. 2015 Maersk Maersk #3 Venturer MC Sea Fixing / Accumulator Rack Installation

13 Aug. 2015 Dec. 2015 Songa Offshore Songa #2 Endurance Post Delivery Work 8 Work Packs including MC of Wire Line

14 June 2015 Nov. 2015 BP BP Quad 204 Hydro Test & FlushingHydrostatic Test & Oil Flushing & Chemical

Clean

15 June 2015 Oct. 2015 Songa Offshore Songa #1 Equinox Post Delivery Work 8 Work Packs including MC of Wire Line

16 Oct. 2014 Dec. 2015 BP BP Quad 204 Topside PunchMC of ULL & Topside Lighting System /

R.P(240V) System

17 Oct. 2013 Nov. 2015 BP BP Quad 204 & Clair Ridge Punch Work MC of E&I, Pipe, Structure

Page 8: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

8

6. Modification Work

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

1 Oct. 2017 Dec. 2017 RNT Transocean GSS Development Driller I Semi-Sub Las Palmas

2 Mar. 2017 Aug. 2017 Statoil Cat-J 1 & 2 Jack-up SHI

3 July 2016 Mar. 2017 Maersk Drilling XL Enhanced-4 Jack-up DSME

4 June 2016 Oct. 2016 Transocean Deepwater Conqueror Drillship DSME

5 Mar. 2016 Aug. 2016 Diamond Ocean Great White Semi-Sub HHI

6 Mar. 2016 July 2016 Songa Offshore Enabler Semi-Sub DSME

7 Dec. 2015 Dec. 2015 Transocean Proteus Drillship DSME

8 Sep. 2015 Nov. 2015 Transocean Thalassa Drillship DSME

9 Dec. 2015 Mar. 2016 Songa Offshore Encourage Semi-Sub DSME

10 Aug. 2015 Dec. 2015 Songa Offshore Endurance Semi-Sub DSME

11 June 2015 Oct. 2015 Songa Offshore Equinox Semi-Sub DSME

12 Oct. 2014 Apr. 2015 Maersk Drilling Voyager Drillship SHI

13 Feb. 2015 Mar. 2015 Ocean Rig Apollo Drillship SHI

14 Feb. 2015 Feb. 2015 Seadrill West Carina Drillship SHI

15 Mar. 2014 Nov. 2014 Seadrill West Saturn Drillship SHI

16 Sep. 2014 Sep. 2014 ODFJELL Deepsea Aberdeen Semi-Sub DSME

17 Sep. 2014 Sep. 2014 Seadrill West Jupiter Drillship SHI

18 Apr. 2014 Sep. 2014 Atwood Oceanics Achiever Drillship DSME

19 Mar. 2014 Sep. 2014 Seadrill West Neptune Drillship SHI

20 Mar. 2014 June 2014 Maersk Drilling Venturer Drillship SHI

Page 9: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

9

6. Modification Work

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

21 Apr. 2014 June 2014 Noble Sam Croft Drillship HHI

22 Mar. 2014 June 2014 Maersk Drilling Valiant Drillship SHI

23 Mar. 2014 Apr. 2014 Ocean-Rig Athena Drillship SHI

24 Feb. 2014 Apr. 2014 Maersk Drilling Viking Drillship SHI

25 Jan. 2014 Feb. 2014 Atwood Advantage Drillship DSME

26 Jan. 2014 Feb. 2014 Ocean-Rig Skyros Drillship SHI

27 Oct. 2013 Nov. 2013 Seadrill West-Tellus Drillship SHI

28 Aug. 2013 Oct. 2013 Ocean-Rig Mylos Drillship SHI

29 July 2013 Aug. 2013 PDC Khamsin Drillship SHI

30 May 2013 June 2013 Vantage Drilling Tungsten Explorer Drillship DSME

31 Oct. 2011 Dec. 2012 Ocean Rig AS Ocean Rig Mykonos Drillship SHI

32 Apr. 2012 May 2012 STENA STENA DrillMAX Drillship SHI

33 Mar. 2012 May 2012 Vantage Drilling Vantage #2 Dragonquest Drillship DSME

34 Apr. 2011 May 2012 Ocean Rig AS Ocean Rig Olympia Drillship SHI

35 Nov. 2011 Jan. 2012 Odfjell Drilling AS Odfjell Deep Sea Metro II Drillship HHI

36 May 2011 Jan. 2012 Odfjell Drilling AS ODFJELL Deep Sea Metro I Drillship HHI

37 Sep. 2011 Oct. 2011 Korea National Oil Company Doo Sung Rig Semi-Sub DSME

38 July 2011 Aug. 2011 Ocean Rig AS OCEAN RIG #3 Poseidon Drillship SHI

39 Oct. 2010 May 2011 Pacific Drilling Bora Drillship SHI

40 Apr. 2010 May 2011 Schahin #2 Sertao Drillship SHI

Page 10: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

10

6. Modification Work

NO.PERIOD

CLIENT PROJECT NAME TYPE YARDSTART DELIVERY

41 Oct. 2010 Apr. 2011 COSL Pioneer Semi-SubYantai Raffles

Shipyard

42 Jan. 2010 Feb. 2011 Schahin #1 Cerrado Drillship SHI

43 Nov. 2010 Dec. 2010 Vantage Platinum Explorer Drillship DSME

44 May 2010 Dec. 2010 BP Skarv FPSO FPSO SHI

45 Sep. 2010 Nov. 2010 Transocean Deapwater Champion Drillship HHI

46 Aug. 2010 Sep. 2010 Transocean Discoverer India Drillship DSME

47 July 2010 Sep. 2010 ODFJELL Deapsea Stavanger Semi-Sub DSME

48 July 2010 Sep. 2010 Ensco Deepocean Clarion Drillship SHI

49 July 2009 Apr. 2010 Transocean Discoverer Inspiration Drillship DSME

50 July 2009 Mar. 2010 Transocean Discoverer Luanda Drillship DSME

51 Aug. 2009 Sep. 2009 PETROSERV S/A Victoria Semi-Sub DSME

52 Mar. 2009 Sep. 2009 Transocean Discoverer Americas Drillship DSME

53 July 2009 Aug. 2009 Stena Drilling Drill Max Drillship SHI

54 May 2009 Aug. 2009 Petrobras Petrobras 10000 Drillship SHI

55 Jan. 2009 Mar. 2009 Seadrill West Eminence Semi-Sub SHI

56 Dec. 2008 Feb. 2009 Seadrill West Aquarius Semi-Sub DSME

57 Dec. 2008 Feb. 2009 Seadrill West Hercules Semi-Sub DSME

58 Dec. 2008 Feb. 2009 Seadrill West Hercules Semi-Sub DSME

59 Dec. 2008 Dec. 2008 ODFJELL Deepsea Atlantic Semi-Sub DSME

Page 11: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

11

7. Pipeline / Pipe Laying

NO. YEAR CONTRACTOR OWNER PROJECT WORK TRADE FACILITIES COUNTRY

1 2014 HHI SEC Jeddah Power Plant A/G Piping Power Plant Saudi Arabia

2 2014 HHIPTB (Partnerships Tech. Bur

eau)Az Zour North Power Plant Storage Tank Power Plant Kuwait

3 2014 SCnTMAROC PHOSPHORE SA.

(OCP)Jorf Lasfar ODI Fertilizer Plant P2&P5 A/G Piping Fertilizer Plant Morocco

4 2013 DWECMAROC PHOSPHORE SA. (O

CP)Jorf Lasfar ODI Fertilizer Plant P1&P3 A/G Piping Fertilizer Plant Morocco

5 2013 HDECMaaden Bauxite

& AluminaMaaden Alumina Refinery A/G Piping Alumina Plant Saudi Arabia

6 2012 KITO NIOC SP 17/18/19 Pipeline Construction Gas Pipeline Iran

7 2012 DOT TASDIT, IOEC Reshadat Pipeline Construction Gas Pipeline Iran

8 2012 KITO NIOC, POGC SP 19 Pipeline Construction Gas Pipeline Iran

9 2011 HHI MOGE, DAEWOO SHWE Pipeline Construction Gas Pipeline Myanmar

10 2011 HHI RAS GAS Bazan Pipeline Construction Gas Pipeline Qatar

1) PIPELINE

2) PIPE LAYING

NO.PERIOD

CLIENT PROJECT NAME PIPE METHODSTART DELIVERY

1 Apr. 2012 Oct. 2012 KOCKOC-1 Onshore Pipeline Project

(Kuwait)

48″ x 12.7mmt x 39km24″ x 14.3m

mt x 39km24″ x 11.1mmt x 39kmAutomatic

2 Apr. 2011 Aug. 2011 IOECForoozan Offshore Pipeline Project

(Iran)24″ x 14.3mmt x 103km Automatic

Page 12: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

12

7. Pipeline / Pipe Laying

2) PIPE LAYING

NO.PERIOD

CLIENT PROJECT NAME PIPE METHODSTART DELIVERY

3 Apr. 2011 July 2011 PTT Offshore Gas Spur Lines (Thailand)24″ X 15.9mmt x 38km28″ X

17.5mmt x 48kmAutomatic

4 Nov. 2010 Mar. 2011 IOCL Pardip SPM Project (India) 48″ x 22.2mmt x 71km Automatic

5 Sep. 2009 May 2010 Hyundai E&C Colombo Port Expansion (Sri Lanka) 36″ x 15.6mmt x 9km Manual

6 Feb. 2009 Sep. 2009 HHI / COOEC Bohai Bay Pipeline (China)12″ x 12.7mmt x 98km12″ x

14.3mmt x 19kmAutomatic

7 Aug. 2008 Dec. 2008 HHI / CNOOC Shanghai LNG (China 36″ x 20.6mmt x 36km Automatic

8 Mar. 2008 Aug. 2008 HHI / SK EnergySK Crude Oil Unloading System

Relocation (Korea)42″ 25 4mmt x 10km Automatic

9 Jan. 2007 Mar. 2007 HHI / TOTAL Indonesia Sisi Nubi Pipeline Project (Indonesia)16″ x 20.6mmt x 6.2km22″ x 24.3m

mt x 15.2km26″ 27 5mmt x 33kmAutomatic

10 June 2006 Dec. 2006HHI/Perusahaan

Gas NegaraPGN Gas Pipeline (Indonesia) 32″ x 23.9mmt x 155km Automatic

11 July 2006 Nov. 2006 HHI / KOC KOC Crude Export Facilities (Korea) 56″ x 25.4mmt x 71km Automatic

12 Apr. 2006 July 2006 HHI / KNOC Rong Doi Pipeline Project (Vietnam) 18″ x 15.9mmt x 58km Automatic

13 Sep. 2005 Feb. 2006HHI / PTT

Public Company Ltd

PTT Third Transmission Pipeline

(Thailand42″ x 23.9mmt x 120km Automatic

14 Sep. 2004 Apr. 2005 HHI / CNOOC Chunxiao Gas Pipeline Project (China)28″ x 15.9mmt x 225km16″ x 11mm

t x 12km8″ x 9.5mmt x 63km

Automatic &

Manual

Page 13: * Reference Commissioning · 2018. 4. 9. · Electrical Substation SARB Package 4 MC MC Inspection Completion, Punch Control 10 Dec. 2014 Mar. 2016 Songa Offshore Songa #3 Encourage

13

8. Module Fabrication

1) ALUMINUM HELIDECK

2) ALUMINUM OUTFITTING

NO.PERIOD

CLIENT EPC PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Aug. 2016 Ongoing MA SHI Johan Sverdrup Assembly, Piping, E&I installation, Outfitting

2 Dec. 2011 Dec. 2014 MA HHI Goliat FPSO Project

Handrail: 2,400m

Stair: 350m

Platform: 31.5 Ton

3 Dec. 2013 Sep. 2014 MA HHI BP Clair Ridge ProjectExternal Walkway:16 Ton

Stair Tower: North / South

4 July 2013 June 2014 MA SHI Valemon ProjectStair Tower: East / West

Handrail: 1,000 m

NO.PERIOD

CLIENT EPC PROJECT NAME SCOPE OF WORKSTART DELIVERY

1 Mar. 2016 Aug. 2016 MA HHI HESS E&P Bergading Project Assembly, Piping, E&I installation, Outfitting

2 Sep. 2015 Mar. 2016 MA SHI Statoil Mariner FSU Assembly, Piping, E&I installation, Outfitting

3 Dec. 2011 Dec. 2014 MA HHI Goliat FPSO Project Assembly, Piping, E&I installation, Outfitting

4 June 2014 Aug. 2014 MA DSME Dong Project Assembly, Piping, E&I installation, Outfitting

5 Feb. 2014 Mar. 2014 MA HHI BP Clair Ridge Project Assembly, Piping, E&I installation, Outfitting

6 Dec. 2013 Feb. 2014 MA HHI Sea Drill West Mira Project COW (Heat Tracing, Piping, E&I)