بسم الله الرحمن الرحيم. king saud university college of engineering department of...
Post on 20-Dec-2015
230 views
TRANSCRIPT
الرحمن الله الرحمن بسم الله بسمالرحيمالرحيم
King Saud UniversityKing Saud UniversityCollege of EngineeringCollege of EngineeringDepartment of Industrial EngineeringDepartment of Industrial Engineering
Improve The Value of PM Activities of Passengers Coach at (SRO)
By
ZAKI ALAWI AL-ALWAYETZAKI ALAWI AL-ALWAYET
420001889420001889
Advisor: Dr. Adel Al-ShayeaAdvisor: Dr. Adel Al-Shayea
Examiner: Dr. Mohammed Zaki RamadanExaminer: Dr. Mohammed Zaki Ramadan
OutlinesOutlines• Introduction.
• The aim of the project.
• (PM) activities in(SRO).• The Selected PM Activities to be
Studied and Improved.
• Solution methodology.
• Conclusions
•Maintenance function is a set of activities that are performed in order to keep system’s equipment in their best working condition.
•The objective of maintenance is to maintain the capability of the system while controlling the resultant costs of performing maintenance function.
IntroductionIntroduction
IntroductionIntroduction
Studying and then improving the function value of the PM activities are vital for improving the way of doing these activities and in turn for reducing their costs.
The Aim of the The Aim of theProjectProject
This project is a study of the PM operations at SRO. The aim of the project is to improve the function value of the PM operation and activities by using the value engineering tools.In particular, improve value function in preventive maintenance program activities for passengers coach (Quarterly inspection, Semi-annually inspection, Annually inspection)
Maintenance activities at the Saudi Railway have an effective role in achieving the organization targets by ensuring operation demands and travel schedule achievements. Any problem in maintenance activities, especially PM activities, will decrease the number of travels, and therefore the organization will not reach the planned optimal schedule.
PM activities in PM activities in (SRO)(SRO)
The Selected PM The Selected PM Activities to be Studied Activities to be Studied
and Improvedand Improved •I selected preventive maintenance program of passengers coach to be studied and improved.
The reason behind this is:
• preventive maintenance program of the passengers coach and its activities help to restore the condition of passengers coach items to an acceptable level, which is in turn necessary to maintain the passengers coach average desired life.
Solution Solution methodologymethodologyOne way of studying and improving the function value of these activities is by using the value engineering technique.
The reasons behind this is:
1.The ability of this technique in improving the value of the activities function at a minimum possible cost.
2.Ability to balance the cost and the function in such a way that required quality and performance, are maintained at the right costing level
Solution Solution methodologymethodology
The value engineering technique involves six phases. These are
1.The information phase.
2.The function analysis phase.
3.The creativity phase
4.The evaluation phase.
5.The development phase.
6.The presentation phase.
Information Phase Information Phase::Coach Classification Coach Classification
Coach Classification
Number Of Coaches
TotalOn Use
Coaches GermanFrenchSwitzerland
1st Class604*106
2nd Class7138*2820
Restaurant333*96
Baggage33399
Royal11-22
Total2020185843
On Use Coaches2020343
Information Phase Information Phase : :Average times need to perform Average times need to perform PM Activities PM Activities
Summarizes the average times needed to maintain a single coach for each section and for each type of inspection:
Three MonthsSix MonthsAnnually
#WorkersAverage
Time #Workers
Average Time
#WorkersAverage
Time
Air Break1414211
Air Conditioning22.923.427.58
Bogie232538
Body Repair1626211.5
Electric1827.25110
Painting3739ـــــــــــــــــ
Carpenter151616.35
Pipefitting13.751517.5
Upholster12.5612.512.5
Total1035.41547.61673.7
Information Phase Information Phase : :Quarterly activities relationships and Quarterly activities relationships and dependenciesdependencies
Activity ID
Activity DescriptionDurationPredecessorType
ELCSElectrical Semi-annually Items 9
ACSAir Conditioning Semi-annually 3ELCSFinish-Start
BRSBody Repair Quarterly Items6
ABSAir Break Semi-annually Items4
BGSBogie Semi-annually Items 6
PFSPipefitting Semi-annually Items5ABSFinish-Start
CRSCarpenter Semi-annually Items6
HSSUpholstery Semi-annually
Items2.5CRSFinish-Start
PTSPainting Semi-annually Items7BGS-ELCSFinish-Start
Information Phase Information Phase : :Quarterly activities Gantt ChartQuarterly activities Gantt Chart
This means the real time that had consumed for quarterly inspection on the average is 1.56 days. Real time that had consumed for semi-annually
inspection on the average is 2 days. Real time that had consumed for annually inspection on
the average is 4 days. (The day in the Gantt chart represents the working hours which is
from 7:00 am until 2:00 pm).
Information Phase Information Phase : :Average times need to perform Average times need to perform PM Activities PM Activities
Three MonthsSix MonthsAnnually
Air Break2.35.59.5
Air Conditioning
0.711.7
Bogie24.28.7
Body Repair0.30.50.8
Electric2.84.79.2
Painting-----------------------1.22.5
Carpenter0.311.5
Pipefitting11.73
Upholster0.31.21.7
Total10.520.838.5
Information Phase Information Phase : :Average Number of breakdownsAverage Number of breakdowns
Each breakdown in the passengers coach was happened it cause losses to the Saudi Railway Organization depend to the size
of failure and in which part was happened. For example, the failure is
happen in electric part is not like is happen in upholster part.
Information Phase Information Phase : :Average Number of breakdownsAverage Number of breakdowns
The total cost of preventive maintenance=spare parts cost + labor cost + tools cost + losses Cost.
The average hour salary for workers in the Saudi Railway Organization is SR. 28.5/hour. This means
the labor cost = hour work* 28.5. The tools cost is depend on the working hour and the cost of tool per
hour. In spare parts cost there are difference between the sections, which means the cost of spare
parts depending in which parts the spare parts was used. The losses cost include the cost due to the
passengers coach is stop, for the inspection or for repair the failure. And the costs for repair the
failure.
Information Phase Information Phase : :Average Cost in each PM ProgramAverage Cost in each PM Program
Three MonthsSix MonthsAnnually
Total costTotal costTotal cost
Air Break292646579684
Air Conditioning4658563010870
Bogie327854608990
Body Repair211141507432
Electric7808874716580
Painting037607415
Carpenter124320904200
Pipefitting182226583986
Upholster116717863540
Total250133893872697
Information Phase Information Phase : :Average Cost in each PM ProgramAverage Cost in each PM Program
UNIT
ITEMFUNCTIONKIND
PRESENT(SR)
WORTH(SR)
P/WREMARKSVERBNOUN
1Air BreakMaintainAvailabilityB292630000.98
2Air
ConditioningMaintainAvailabilityB465833201.4
Problem in the way of
putting priorities
3BogieMaintainAvailabilityB327833000.99
4Body RepairMaintainAvailabilityB211120001.05
5ElectricMaintainAvailabilityB680854701.24
Workers skills
problem & Spear Parts
6CarpenterMaintainAvailabilityB124312001.03
7PipefittingMaintainAvailabilityB182219000.95
8UpholsterMaintainAvailabilityB116712000.97
Function Analysis Function AnalysisPhasePhase
Function Analysis Function AnalysisPhasePhase
UNIT
ITEMFUNCTIONKIND
PRESENT(SR)
WORTH(SR)
P/W
REMARKSVERBNOUN
1Air BreakMaintainAvailabilityB465746001.01
2Air
ConditioningMaintainAvailabilityB563054000.99
3BogieMaintainAvailabilityB546048701.12Problem of the way doing the
job
4Body RepairMaintainAvailabilityB415041001.01
5ElectricMaintainAvailabilityB874773271.19Problem in the way of putting
priorities
6PaintingMaintainAvailabilityB376023401.6Problem in the way of putting
priorities
7CarpenterMaintainAvailabilityB209020001.04
8PipefittingMaintainAvailabilityB265828000.94
9UpholsterMaintainAvailabilityB178618000.99
Function Analysis Function AnalysisPhasePhase
UNIT
ITEMFUNCTIONKIND
PRESENT(SR)
WORTH(SR)
P/W
REMARKSVERBNOUN
1Air BreakMaintainAvailabilityB968487501.11Problem in the way of putting
priorities
2Air
ConditioningMaintainAvailabilityB10870105001.03
3BogieMaintainAvailabilityB899073001.23Problem in the way of putting
priorities
4Body RepairMaintainAvailabilityB743275000.99
5ElectricMaintainAvailabilityB16580165001.00
6PaintingMaintainAvailabilityB741554301.35Problem in the way of putting
priorities
7CarpenterMaintainAvailabilityB420041501.01
8PipefittingMaintainAvailabilityB398640000.99
9UpholsterMaintainAvailabilityB354035001.01
CreativeCreative& & Evaluation EvaluationPhasePhases s
#
FactorIdea
Simplicity of Implementation
Satisfying Safety
Measures
Satisfying Operation
RequirementsBenefits
Average Rank
1
Restudy the relationship between the air
conditioning section and electric section in the quarterly inspection
10910109.8
2Increase the number of
worker in the air conditioning section
69998.3
3Used other spare parts in
electric section79998.5
4Increase the number of
worker in electric section69998.3
CreativeCreative& & Evaluation EvaluationPhasePhases s
# Factor
IdeaSimplicity of
Implementation
Satisfying Safety
Measures
Satisfying Operation
RequirementsBenefits
Average Rank
1
Restudy the relationship between the air conditioning section and
electric section in the semi-annually inspection
10109109.8
2
Restudy the relationship between the painting section and electric
section in the semi-annually inspection
10109109.8
3Contract with company to inspection the bogie system 8101089
4Increase the number of worker in
electric section69998.3
5Increase the number of worker in
the air conditioning section 69998.3
6Increase the number of worker in
the bogie section69998.3
CreativeCreative& & Evaluation EvaluationPhasePhases s
# Factor
IdeaSimplicity of
Implementation
Satisfying Safety
Measures
Satisfying Operation
RequirementsBenefits
Average Rank
1Restudy the relationship between the air break section and bogie
section in the annually inspection10910109.8
2Restudy the relationship between the painting section and electric section in the annually inspection
10910109.8
3Restudy the relationship between bogie and electric section in the
annually inspection10910109.8
4Increase the number of worker in
the air break section69998.3
5Increase the number of worker in
the bogie section69998.3
6Increase the number of worker in
the electric section69998.3
Development Phase Development Phase
After evaluation process, I selected the best idea (higher average rank) for develop.
The best idea is the restudy the relationship between the sections. This is done by breaking down the items in checking lists then fined the relationships and dependencies between sections and items.
Activity ID
Activity DescriptionDurationPredecessorType
ELCQ1Electrical Quarterly Items from 1 to 13 4.25ELCQ2Finish-Start
ELQC2Electrical Quarterly Items from 14 to 192.75
ACQ1Air Conditioning Quarterly Items2
ACQ2Air Conditioning Quarterly Items0.92ELCQ2Finish-Start
BRQBody Repair Quarterly Items6
ABQAir Break Quarterly Items4
BGQ1Bogie Quarterly Items from 1 – 121.5
BGQ2Bogie Quarterly Items from 13 – 181 BGQ1
BGQ3Bogie Quarterly Items from 19 – 210.5ABQStart-Start
PFQ1Pipefitting Quarterly Items 1 to 72.75PFQ2Finish-Start
PFQ2Pipefitting Quarterly Items 8 and 91ABQ
CRQCarpenter Quarterly Items5
HSQUpholstery Quarterly Items2.5
Development Phase Development Phase
Development Phase Development Phase
Development Phase Development Phase
Development Phase Development Phase
Cost Summary
Quarterly Inspection
Semi-Annually
Inspection
Annually Inspection
Original250133893872697
Proposed226003476063881
Total Cost Saving
241341788816
Development Phase Development Phase
ConclusionsConclusions
1. Finding the value index for the preventive maintenance program activity is very important for service sector in order to maximize service equipment availability while keeping the cost of performing maintenance activities at the lower level.
2. The improvement of the preventive maintenance program activity by increase its value index helps in increasing the total cost saving.
3. Value engineering techniques are very useful in increasing value index for preventive maintenance activities such as quarterly inspection, semi-annually inspection, annually inspection.
Thank YouThank You