© 2015, Fiatech

Preconference Panel Session

Bridging gaps between front end project

planning and execution

Page 2: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Capital Project Expenditures (US Dollars)

2014 Revenue: $ 1.416 Trillion International (Outside the US): $ 544 B Domestic (Inside the US): $ 872 B Total: $ 1,416 B

2015 New Contractors Awarded: $1.800 Trillion International (Outside the US): $ 629 B Domestic (Inside the US): $ 1,171 B Total: $ 1,800 B

These figures are taken from the 2014 Top International Contractors ENR issue.

Page 3: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Owners

Procurement

Quality & Compliance

Suppliers & Fabricators

Logistics

Project Planning

Operations & Maintenance

Construction

Standards & Regulations

Enabling Systems & Technologies

Handover & Commissioning

Analysis & Design

A World of Worlds

Page 4: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Page 5: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

A C

hang

e in

Per

spec

tive

Sto

ry

Page 6: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Page 7: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Page 8: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

The takeaway is….“You can’t always get what You want… You can’t always get what You want… You can’t always get what You want… but…

If you try sometime… You might find… You get what you NEED ” Mick Jagger Process Improvement Engineer & Singer

Page 9: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Discussion Flow

Challenge

Vision/Approach

Status

Owner Example & Discussion

Contact & More Information

Dis

cuss

ion

Flow

Page 10: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Safe

ty M

omen

t

Safety Moment

Page 11: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

The

Chal

leng

e

Relative Life Cycle Costs

Reported by Fiatech Member on their facilities

Planning 0.1%Design 0.9%

Construction 8.7%

Transition 3.1%

Operations 87%

Other 13%

Page 12: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Visi

on/A

ppro

ach

Vision/Approach

Topic Tiger Team (T3)

Fiatech Roadmap Elements

Industry Adoption

Page 13: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

VoO

Dis

cuss

ion

Out

reac

h80+ Owner Organizations Invited to VoO Discussions

3MAdmworldAera Energy LLCAir ProductsAirLiquideAnheueser-BushAramcoArevaArkemaAscendAxiallBPCaterpillarCelaneseChemturaChevronCitgoCompanyCompass MineralsConocoPhillipsCrossrail

DAK AmericasDevonDirect EnergyDivision of the State Architect CalfDowDuPontEastmanEvonik IndustriesExxonMobilFBDFlint Hills ResourcesFMCGEGoogle Inc.HalliburtonHessHolly FrontierHoneywellHuntsmanIneos

IntelInvistaKaiser PermanenteLockheed MartinLubrizolLyondellbaseIIMaine DOTMallinckrodMarriottMerckMonentiveMonsantoMosaiccoNASANetwork RailOxypasadenarefiningPetrobrasPhiladelpha Energy SolutionsPhillips66Pioneer Natural Resources

RECSiLICONReskaidiRockTennSABICSasolSecundaSekisuiSellafield LtdShellSouthernSuncorTargetTotal E&P Canada Ltd.TSOROTVAVAVALE SAZEONDow Chemical

Page 14: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

VoO

Dis

cuss

ion

Topi

cs

1) Kickoff Discussion Fiatech Scenario-Based Project Planning

2) Handover Asset Management Conversion & Integration Challenges

3) Southern Company Approach to Asset Life Cycle Information Management

4) DuPont Balancing Owner Deliverables with Contract Execution

5) Owner Stimulated Paradigm Shifts Needed to Realize Integrated Materials Management

6) Dow’s Plans for Improving Project Performance

7) Eastman’s Approach to Bridging Boundaries through Integrated Project Controls

8) Interactive Planning Practice, Bridging Gaps In Project Definition and Execution

9) Phillips 66, Fraudulent Materials Impacting Project Integrity

Previous VoO Discussion Topics

Page 15: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

T3 O

utpu

t Exa

mpl

e

Topic Tiger Team (T3) VoO Output Example

Purpose: Early and formal owner/EPC engagement to ensure project understanding and optimal performance

Supporting Research Uncovered: Planning in Construction: Longitudinal Study of Pre-Contract Planning Model Demonstrates Reduction in Project Cost and Schedule Growth*

Research Indication: “Analysis revealed that the pre-contract planning model reduced cost and schedule growth by as much as 54% and 70% percent, respectively…”

Page 16: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

VoO

Dis

cuss

ion

Topi

cs

1) Challenges and Strategies in Bridging Design Practices Between Owner and EPC

2) Challenges and Strategies in Cultivating Productivity Improvement

3) Shifting from Handover to Seamless Rollover

4) Integrated Requirement Compliance Monitoring Framework

5) Driving Consolidated Project Status Awareness

6) Use Case Methods to Identify and Organize Project Requirements

7) Achieving and Maintaining Complete Product Information

8) Mapping and Understanding Complex Materials Flows

9) Oil & Gas Challenges and Strategies

10) Commercial Building Industry Challenges and Strategies

11) Characterizing Surplus Construction Materials (follow up)

12) Interactive Planning Practice Guide (follow up)

Future VoO Discussion Topics TBD

Page 17: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

Thank You…

For More Information Please Contact: Reg Hunter Sr. Program Director Fiatech [email protected] Skype: hunter.reg

Cont

act &

Mor

e In

form

ation

Voice of the OwnerBridging Gaps Between Front

End Project Planning And Execution

Page 18: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

VoO

Dis

cuss

ion

Pane

lVoO Preconference Panel Discussion

Tedd Weitzman Project Manager - Performance Improvement Team Southern Company - Engineering & Construction Services

Deborah McNeil Project Productivity Program Manager The Dow Chemical Company

Scott Bell Executive Director, Facilities Planning and Design National Facilities Services Kaiser Permanente

Chris Schwander Project Manager – Engineering Systems & Interoperability Engineering Center of Excellence DuPont

Page 19: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution
Page 20: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution
Page 21: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution
Page 22: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution
Page 23: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

PLN001-1FPLN001-1FAC

PLN001-1FAC-AAPLN0001-1FAC-AAAA

PLN01C-FA-TU-3001

Materials Management Solution

Hierarchy Management Solution

Page 24: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

PLN001-1FPLN0001-1FAC

PLN001-1FAC-AAPLN0001-1FAC-AAAA

PLN01C-FA-TU-3001 Hierarchy Management Solution

Materials Management Solution

Documents

Documents

Documents

Documents

Engineering Data

Engineering Data

WBS

Vendor

Vendor

Manufacturer

Manufacturer

Turnover Code

Related Equipment

Page 25: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

PLN001-1FA HIGH PRESSURE

PLN001-1FB INTERMEDIATE PRESSURE

PLN001-1FC LOW PRESSURE

PLN001-1FD TURBINE HYDRAULIC CONTROLS

PLN001-1FE TURBINE STEAM SEAL

PLN001-1FF TURBINE LUBE

PLN001-1FG FRONT STANDARD

PLN001-1FH TURBINE TURNING GEAR

PLN001-1FJ TURBINE STEAM VALVES

PLN001-1FK EXTRACTIONS

PLN001-1FPLN001-1F TURBINE SYSTEM

Page 26: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

PLN001-1FA HIGH PRESSURE

PLN001-1FB INTERMEDIATE PRESSURE

PLN001-1FC LOW PRESSURE

PLN001-1FD TURBINE HYDRAULIC CONTROLS

PLN001-1FE TURBINE STEAM SEAL

PLN001-1FF TURBINE LUBE

PLN001-1FG FRONT STANDARD

PLN001-1FH TURBINE TURNING GEAR

PLN001-1FJ TURBINE STEAM VALVES

PLN001-1FK EXTRACTIONS

PLN001-1FPLN001-1F TURBINE SYSTEM

PLN001-1FAC TRAIN COMMON, STEAM TURBINE, HIGH PRESSURE

PLN001-1FAC-AA STEAM TURBINE; HP

PLN001-1FAC-AB HIGH PRESSURE

Page 27: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

PLN001-1FA HIGH PRESSURE

PLN001-1FPLN001-1F TURBINE SYSTEM

PLN001-1FAC TRAIN COMMON, STEAM TURBINE, HIGH PRESSURE

PLN001-1FAC-AA STEAM TURBINE; HP

PLN001-1FAC-AB HIGH PRESSUREPLN001-1FAC-AAAA STEAM TURBINE (01C-FA-TU-3001) PLN01C-FA-TU-3001PLN001-1FAC-AAAB BEARING #1

Page 28: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

PLN001-1FA HIGH PRESSURE

PLN001-1FPLN001-1F TURBINE SYSTEM

PLN001-1FAC TRAIN COMMON, STEAM TURBINE, HIGH PRESSURE

PLN001-1FAC-AA STEAM TURBINE; HP

PLN001-1FAC-AB HIGH PRESSURE

PLN001-1FAC-AAAA STEAM TURBINE (01C-FA-TU-3001) PLN01C-FA-TU-3001PLN001-1FAC-AAAB BEARING #1

PLN01C-FA-TU-3001

Page 29: © 2015, Fiatech Preconference Panel Session Bridging gaps between front end project planning and execution

© 2015, Fiatech

VoO

Dis

cuss

ion

Pane

lVoO Preconference Panel Discussion

Tedd Weitzman Project Manager - Performance Improvement Team Southern Company - Engineering & Construction Services

Deborah McNeil Project Productivity Program Manager The Dow Chemical Company

Scott Bell Executive Director, Facilities Planning and Design National Facilities Services Kaiser Permanente

Chris Schwander Project Manager – Engineering Systems & Interoperability Engineering Center of Excellence DuPont