Christian J. Schmidt
GSI Production of ALICE TRDs
Progress and Quality Development
Alice TRD Chamber Production Meeting
Darmstadt Feb. 27th 2006
L4 and L5 chambers often show severe gain inhomogeneities up to +- 40%
Problem can be cured by shimming side ledges with 100 or 200 micron shims, depending upon the outcome of pre-glue scan(s).
Homogeneity Distortions Could be Resolved
2 4 6 8 10 12
2
4
6
8
10
L5C1006 pre glue, no shimming
Z-Position
Phi
-Pos
ition
12 10 8 6 4 2
10
8
6
4
2
L5C1006 pre glue with various foils on ledges 200mu to 300mu on right half
Z-Position
Phi
-Pos
ition
12 10 8 6 4 2
10
8
6
4
2
L5C1006 pre glue second scan, third shimming trial
Z-PositionP
hi-P
ositi
on
0.6000
0.7000
0.8000
0.9000
1.000
1.100
1.200
1.300
1.400
Final Glueing Alters Things Slightly
12 10 8 6 4 2
10
8
6
4
2
L5C1006 pre glue third shimming trial
Z-Position
Phi
-Pos
ition
12 10 8 6 4 2
10
8
6
4
2
Z-Position
Phi
-Pos
ition
0.8600
0.9000
0.9400
0.9800
1.020
1.060
1.1001.120
L5C1006 final post glueing, deviation -14% to 12%
Statistics on Homogeneity over Current Production
Statistics on Maximum Deviations (Histogram)
Maximaly deviating points per chamber collected.Outlyers may be attributed to various problems
Leakage Currents
Apply HV immediately after chamber installation,
initial leakage currents would identify surface leakage.
Ever since the employment of the cleaning procedure, no
more leakage across glue surfaces encountered.
Leakage due to dust and dirt remains but seldom in winter
Leakage due to bad HV-cables with missing currents has
resurfaced due to bad cables that had been used in the past.
Gas Leak Determination
Normal behaviour: Time constant of Oxygen level ~ 12 h
By now quite a few cases ( ~ 8 ) with ~ 50 to 100 h
Strong indication for virtual leaks No external leaks measurable
Oxygen level scales inversely with gas flow
Taken typical initial Oxygen content of 80 ppm at 20 l/h, implying a leak of 8 mbar l/h, the time constant would indicate a hidden volume of several hundred ml.
too little for the radiator
too much for the pad plane
At GSI chambers in doubt are rapidly moved to a separate leak test stand where they can be flushed for many days.
Statistics on Leakage over Current Production
Statistics on Gain MeasurementsHistogram on measured gain at 1600 V Anode voltage
Gain determination is difficult at GSI as strong EMIdisturbances are intermittendly present.
Mistakes on Radiator Unveiled
-20 0 20 40 60 80 100 120 140 160
300
350
400
450
500
550
600
650
Anode C
urr
ent (
a.u
.)
Z-Position
scan across the top scan across center
L5C1001 final
Just intended as an example for funny data and straight forward explanations:
12 10 8 6 4 2
10
8
6
4
2
L5C1001 final post glue
Z-Position
phi-P
ositi
on
0.9000
0.9375
0.9750
1.013
1.050
1.088
1.125
1.163
1.200
Diagnosis: one out of seven radiator pads missing in one compartment
Dubna Chambers under Repair
Out of 18 chambers, 4 have a broken radiator towards the inside of the chamber
All 18 chambers need to be refurbished: Radiator needs to be carefully reworked and closed again.
Yuri and Nicolai are at GSI until March 11th to work on chambers
They are experimenting on best techniques for refurbishment
Bernd Voss (GSI) has successfully repaired one of the broken chambers
Proposed Reassembly Procedure
Pressure applied through slab: 5 g/cm2 ~ 5 mbar
Radiator
Pad-panel
GasVolume Spacer
supportbars
Gas Inlet
Conclusion on Current Situation at GSI
Production is running smoothly
Production rate at 1.5 chambers per week, limited by infrastructure
Various problems have been settled and quality is improving
Dubna chambers are under repair, no reason to be pessimistic here.