ZUARI BRIDGE The State P.W.D., Goa Construct the Four/Six Lane Bridge including Approaches across Rivers Zuari (NH-66) (Panaji – Mangalore Section) on PPP Model. It is a connectivity of existing N.H. 17 via Goa- Velha bypass through Panaji to North Goa. The tremendous traffic growth in existing bridge has necessary to new construction of 4/ 6-lane bridge. Total Length 13.635 Km MANDOVI BRIDGE Construction of Bridge across river Mandovi at Panaji on NH-17 between Pundalik Nagar Junction (Porvorim) and Merces Junction. Length of Bridge 3771.23 m

Upload: phungquynh

Post on 19-Aug-2018

277 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

ZUARI BRIDGE

The State P.W.D., Goa Construct the Four/Six Lane Bridge including Approaches across Rivers Zuari

(NH-66) (Panaji – Mangalore Section) on PPP Model. It is a connectivity of existing N.H. 17 via Goa-

Velha bypass through Panaji to North Goa. The tremendous traffic growth in existing bridge has

necessary to new construction of 4/ 6-lane bridge. Total Length 13.635 Km

MANDOVI BRIDGE

Construction of Bridge across river Mandovi at Panaji on NH-17 between Pundalik Nagar Junction

(Porvorim) and Merces Junction. Length of Bridge 3771.23 m

Page 2: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

FIVE MUMBAI ENTRY POINTS

Independent Engineer for BOT work of Securitization of Toll at Five Mumbai Entry Points in Mumbai

with Maintenance of Flyovers and allied Structures

KANDIVALI SKYWALK

Development of Pedestrian Skywalk Bridges (Package-I) at Kandivali (E )

Length of Bridge – 1025 Mtr.

Page 3: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

ALDONA CABLE STAY BRIDGE

Design and construction of cable stayed bridge across river Mapusa with total three spans; there

being no pier in mid river. Well-developed approach roads are extended up to the junction f main

village roads on Aldona & Corjuem side. Length – 600mtrs

POIRA BRIDGE

Construction of bridge of total span of 54.09 m in which single span of 37 m is horizontal openable

steel structure with a bitumen in fill deck which is stitched to Reinforced Cement Concrete anchor

span by prestressing of 32 nos. of 50 mm dia. Mac alloy bolts. The central span is openable in 90%

with a rotation system which is manually / hydraulically operated to have 25 m clear opening for

Navigational traffic.

Page 4: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

PAWANA RIVER BRIDGE

This iconic structure , one of its kind in India, is a predominantly Steel structure bridge having Viaduct

length of 195.50 metres with a “basket handle type” steel arches jointed at crest with height of the

crown of arches 22.5 meter above RTL. The RCC slab of main span is supported by structural steel

work and high tension rods suspended from arches. The “BASKET HANDLE” look of the bridge itself

makes it a very aesthetic landmark structure. The total length of the bridge is 342 metres including

the approaches on either side

KENGERI GRADE SEPARATOR

M/s S.N. Bhobe & Associates Pvt. Ltd. were selected for providing effective solution and design for

this. KRDCL decided to provide inter section at this junction to have free movement to the traffic in all

directions inter section. The curved length of the span is 82 m Arch Bridge in composite construction (

MS Steel- Main Beam, Diaphragm, Arch & RCC decking )

Page 5: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

GRANT ROAD SKYWALK

The special feature of this project is the one centre pylon supporting the skywalk sections

GAUNDALIM BRIDGE

Widening & Strengthening of the existing road from Old Goa Junction to Gaundali Bridge approach

including asphalting from Old Goa Junction to Khandola College

Page 6: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

MILAN ROB

Construction of ROB at Milan Subway, including vehicular underpass along with development of roads

at Santacruz, Mumbai. Length of Bridge:- 588.35mtrs.

AMBEDKAR ROAD FLYOVER

Design and Construction of Elevated Road on Dr.Ambedkar Road in Mumbai.

Length:- 4.5Kms

Page 7: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

KAPURBAWDI FLYOVER

Construction of Flyover at Kapurbawdi Junction on Thane Ghodbunder Road (SH-42), Thane (W)

Length:- Ghodbunder to Mumbai – 1813.521mtr, Mumbai to Ghodbunder – 766.852mtr, Bhiwandi

bypass to Nashik – 323.020mtr, Old Bhiwandi Road to Mumbai – 404.098mtr, Mumbai to Bhiwandi

Road – 542.928mtr

M G SETU

Consultancy services for Rehabilitation of Mahatma Gandhi Setu on NH-19 in Patna in the State of

Bihar on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Bridge Length :- 5575mtr

Page 8: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

BANKOT

Construction of Major Bridge across Bankot Creek between village Kolmandla in Raigad District and

Village Veshvi in Ratnagiri District on Major State Highway no 4 (Revas Reddi Coastal Highway) in

Raigad District in the State of Maharashtra Amendment in FRL for Bankot side approach. About 1.5Km

Length

KALWA BRIDGE

Consultancy services for Detailed Survey, Preparation of conceptual General Arrangement Drawing

(GAD) for the proposed bridge over Thane Creek joining Kalwa bridge Junction (Jail Side) and

Chhatrapati Shivaji Chowk Kalwa. Length:- Thane bridgre (Parallel Bridge) - 310mtrs, Cable Stay Bridge

– 230mtrs, Viaduct towards Belapur & Kalwa – 912mtrs, Towards Thane Station, Ghodbunder Road &

Saket Road – 990mtrs, Total length of Cable Stay Bridge (2 to 4 ) – 2132mtrs

Page 9: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

TIRACOL

Design and Construction of Bridge connecting Keri to Tiracol over river Tiracol including approaches

CAMURLIM

Consultancy Services for the work of "Construction of Bridge at Camurlim to Tuem"

Page 10: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

KAMLA PARK

Project Cable Stay Bridge at Kamla Park, Bhopal

VASHISHTA

Construction of high level submersible bridge across VASHISHTI Creek on Govalkot-chiplun road SH 79

at km 3/00, near BAZAR bridge, Taluka Chiplun, District Ratnagiri

Page 11: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

NAIGAON

Development of Pedestrian Skywalk Bridges at Naigaon Package IV

DHOLA

Construction of a 12.9m wide & 9.15mtr. Long Segmental Construction Bridge on river Brahmaputra &

Lohit between Dhola & Sadia Ghats along with connecting roads from near about Dhola to Islampur

Tinali in the state of Assam (about 25.8 km)

Page 12: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

BHIWANDI KALYAN SHILPHATA HIGHWAY (B.O.T.)

Independent Consultant for the B.O.T. work of four Laning and Improvement, Toll Connection and

Operation and Maintenance of Bhiwandi Kalyan Shilphata Highway. Length:- 21.6Km (2 Lane to 4

lane)

PUNTAMBA PHATA – SINNER – GHOTI

Feasibility Study and Detailed Project Report of the project “Consultancy services for Feasibility Study

and Pre-Tender activities for the proposed Four Lanning of existing Two Lane/New construction on

BOT basis from Puntamba Phata – Sinner – Ghoti including Sinner Bypass (SH-39), Maharashta State

Road Development Corporation, Auangabad Length – 107.800Km

Page 13: ZUARI BRIDGE - CEAI · ZUARI BRIDGE The State P.W.D ... POIRA BRIDGE Construction of bridge of total span of 54.09 m in which single span of ... (GAD) for the proposed bridge over

NAGPUR-MUMBAI-SINGHKHEDRAJA-PUNTAMBA

Preparation of Feasibility Report and detailed Project Report of the Project Consultancy Service for "Feasibility Study and pretender activities for the proposed four lanning of existing two lane / New construction of Nagpur-Aurangabad-Sinner-Ghoti-Mumbai Road basis (BOT) Phase I" A) Sindhkhedraja To Jalna 26.30 Km

B) Aurangabad -Lasur - Vaijapur - Puntamba Phata 85.55 Km