zeta design + build product design vp taeko takagi: hack the housing crisis slides
DESCRIPTION
Taeko Takagi presented to the San Francisco Public Press and Shareable's Hack the Housing Crisis in June, 2014.TRANSCRIPT
What Is FBH?
Highest Quality with Differentiated
Product
Factory Built HOUSING
How can FBH Help?
FBH Casestudy
SHIFT FROM: Project-Based Construction to Process Based Housing
PROCESS DRIVEN System
Profound Changes to Established Attitudes, Norms and Regulations
-An Actual Program Run By CA -HCDCalifornia Department Of Housing and Community Development
2 of 9Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
www.zetadesignbuild.com
Factory Built HOUSINGProvide California residents with reduced housing costs through mass production techniques resulting from a factory production environment.
-Build % Of Project In Off-Site Factory-Residential Units Delevered 90-100% Completed
3 of 8Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
www.zetadesignbuild.com
Factory Built HOUSING
-Build % Of Project In Off-Site Factory-Residential Units Delevered 90-100% Completed
Collaborate w/ Developers to Create Their Own Repeatable & Scaleable Solution
PRODUCT DRIVEN Development
INTEGRATED BIM SYSTEMEnhance Clients Confidence in Ability to Execute!Reduce RISK at every phase
Efficiency= Clients Plug and Play with ZETA Prototypes. EASY to USE. EASY to UNDERSTAND. EASY to BUY!
Profitability= ZETA ADDS Value at Every Phase
Assurance= Risk Reduction for Developer & GC
Repeatability= The MORE you Buy the MORE you SAVE
ZETA ‘s Automated Product
INNOVATION THROUGH BIMIMPLEMENTATION OF BIM2D-Drawing3D-Modeling, Constructability, Coordination4D-Scheduling and Production Control 5D- Estimating/ Cost Planning Purchase Ordering
Integrated Project Delivery System- Autodesk Revit +
Flawless Execution
4 of 9Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
www.zetadesignbuild.com
100% Pre-Built Virtually
100% Conflict Resolution
100% Satisfaction
0% Change Orders
Guarantees – Time & Cost
Mainstream Adoption
Benefits of Building Housing Off-
Site
5 of 9Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
www.zetadesignbuild.com
50% Time Reduced Market Risk
Accelerated Income
Budget Cost Stabilization
Less Waste
Higher Quality Precision Built
Quality Higher Quality Material
Energy Efficient
SOLUTIONSTHROUGH RISK REMOVALASSURANCE THROUGH CREDIBLE ANALYIS
6 of 9Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
THROUGH RISK REMOVALDirect Competetive Advantage
Creates Predictable Outcomes and Success Through Conflict Resolution and Full Scale Collaboration Utilizing BIM
ZETA Design + Build
Optimizes Developers Proformas & Budget and Collaborates with GC Schedule Fastrack. Quantifiable Data for Assurance.
Feasibility & Pre-Construction
Data Information Control and Live Updates Throughout Entire Team Workflow. CONTROLS Issue Management and Waste & Cost Overruns
Fabrication & Construction
“I” in BIM. Updated Material Quantities & Cost Analysis. Business Management Tools.
Information Management & Optimization
SOLUTIONS
PROJECTCASE STUDYHolliday Development: Intersection
ZETA Design + Build
7 of 9Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
DESIGN and Engineer Units for Modular Fabrication and BIM
CONSOLIDATE and Manage Numerous Building Trades for Better Time, Energy, and Cost Efficiencies
FABRICATE Modules in our Energy Star Rated and Climate Controlled Factory Environments
ENSURE that Modules are Completed within Budget and Schedule. No Cost Overruns. No Unexpected Delays
ENABLE Marginal Projects to Financing/Construction
FACILITATE Affordable & Sustainable Housing Availability
PROJECTCASE STUDYUrban Core: Warren Apartments
ZETA Design + Build
7 of 9Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
DESIGN and Engineer Units for Modular Fabrication and BIM
CONSOLIDATE and Manage Numerous Building Trades for Better Time, Energy, and Cost Efficiencies
FABRICATE Modules in our Energy Star Rated and Climate Controlled Factory Environments
ENSURE that Modules are Completed within Budget and Schedule. No Cost Overruns. No Unexpected Delays
ENABLE Marginal Projects to Financing/Construction
FACILITATE Affordable & Sustainable Housing Availability
PROJECTCASE STUDYEDEN Housing: Charlotte Drive Apartments
191 Unit Multi-Family Apartment in San Jose, CA For Affordable Housing Developer in conjunction with a 40acre Lennar Homes Master Plan
ZETA Design + Build
Completed Submittal 100% Construction Document Set in 1/10th standard time through Project Templates and BIM.
Documents
ZETA engaged and managed large team effort on tight schedule for on-time delivery and for extremely satisfied client
Coordination
Established ZETA’s ability to execute flawless delivery and fully coordinated effort for Phase 1 enhancing clients confidence for finished product & created data for future projects.
Execution
8 of 9Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
PROJECT Execution CASE STUDYPanaoramic Interest: 38 Harriet St.
23 Unit Micro Studio Apartment in San Francisco, CA For Innovative Bay Area Developer
ZETA Design + Build
Developer Engaged in Multiple Micro Unit Projects
$7.4M Selling = $628/SF
Client Satisfaction & Profitable
Proof of Concept of removing negative connotations surrounding modular and factory built housing quality. Can sell in highest most competitive markets.
Mainstream Adoption
9 of 9Contact UsZETA Communities Inc.300-951 Mariners Island BoulevardSan Mateo, CA 94404
www.zetadesignbuild.com