zemin yang_porfolio

21

Upload: geoffrey-yang

Post on 26-Jul-2016

230 views

Category:

Documents


0 download

DESCRIPTION

Selected works from 2013 to 2016 in China and Australia.

TRANSCRIPT

Gallery Wall

Coceptual

Section

Arrangement

eptual

on

I start from gallery wall. When visiting

the gallery, we look the painting and

artworks. If we changed roles, we

regard ourselves as the painting, sight-

ing gallery from paintings’ sight, so the

life and moment will be different paint-

ings. I majorly focus on façade design,

facing the La Trobe St.

According to the urban context analy-

sis, street views, I determined the func-

tions and circulation to make good

connection between city and this

building.

In my project, my concept is recording

people activities by frame to lead city

movements into buildings with more

sharing spaces and art energy .

4 : 3

16 : 9

4 : 1

2 : 3

Image Radio

Street View

Podium Programs

Office

Coference

Studio

Studio

Studio

Gallery Gallery

Gallery

Gallery

Cafe

Jazz Club

Bar

1F Plan

2F Plan

3F Plan

4F Plan

Exhibition

& Cafe

La Trobe St

GF Plan

La Trobe

St

Bennettes Lane

City sights Community Combination