ZAPATA P. ALIGERADO 300 Kg/m2 TABIQUERIA 120 Kg/m2 ACABADO 100 Kg/m2 P. DE VIGAS 100 Kg/m2 PESO DE COLUMNAS 60 Kg/m2 680 Kg/m2 S/C AULAS 250 Kg/m2 S/C VOLADIZO 400 Kg/m2 S/C AZOTEA 200 Kg/m2 AREA TRIBUTARIA P - 1 930 Kg/m2 10.16 m2 P - 2 1080 Kg/m2 7.21 m2 P - 3 760 Kg/m2 17.37 m2 c. portante suelo 1.07 Kg/Cm2 AZ= 4.90 5.12 T T = 3.2 3.2 S = 1.6 ZAPATA P. ALIGERADO 300 Kg/m2 TABIQUERIA 120 Kg/m2 ACABADO 100 Kg/m2 P. DE VIGAS 100 Kg/m2 PESO DE COLUMNAS 60 Kg/m2 680 Kg/m2 S/C AULAS 250 Kg/m2 S/C VOLADIZO 400 Kg/m2 S/C AZOTEA 200 Kg/m2 AREA TRIBUTARIA P - 1 930 Kg/m2 5.44 m2 P - 2 1080 Kg/m2 3.86 m2 P - 3 760 Kg/m2 9.3 m2 c. portante suelo 1.07 Kg/m2

Upload: esnaiderdark

Post on 12-Jan-2016

2 views

Category:

Documents


0 download

DESCRIPTION

predimensionando zapatas

TRANSCRIPT

Page 1: Zapatas

ZAPATA EXCENTRICAP. ALIGERADO 300 Kg/m2TABIQUERIA 120 Kg/m2ACABADO 100 Kg/m2P. DE VIGAS 100 Kg/m2PESO DE COLUMNAS 60 Kg/m2

680 Kg/m2

S/C AULAS 250 Kg/m2S/C VOLADIZO 400 Kg/m2S/C AZOTEA 200 Kg/m2

AREA TRIBUTARIAP - 1 930 Kg/m2 10.16 m2 18897.6P - 2 1080 Kg/m2 7.21 m2 15573.6P - 3 760 Kg/m2 17.37 m2 13201.2

47,672.40c. portante suelo 1.07 Kg/Cm2

AZ= 4.90 5.12T

T = 3.2 3.2 XS = 1.6

ZAPATA DE ESQUINAP. ALIGERADO 300 Kg/m2TABIQUERIA 120 Kg/m2ACABADO 100 Kg/m2P. DE VIGAS 100 Kg/m2PESO DE COLUMNAS 60 Kg/m2

680 Kg/m2

S/C AULAS 250 Kg/m2S/C VOLADIZO 400 Kg/m2S/C AZOTEA 200 Kg/m2

AREA TRIBUTARIAP - 1 930 Kg/m2 5.44 m2 10118.4P - 2 1080 Kg/m2 3.86 m2 8337.6P - 3 760 Kg/m2 9.3 m2 7068

25,524.00c. portante suelo 1.07 Kg/m2

Page 2: Zapatas

AZ= 2.62 2.72T

1.619865 T = 1.65 1.65 XS = 1.65

Page 3: Zapatas

ZAPATA EXCENTRICA

Kg/m2Kg/m2Kg/m2 -10%Kg/m2 4767.24

S1.6

ZAPATA DE ESQUINA

Kg/m2Kg/m2Kg/m2Kg/m2 2552.4

Page 4: Zapatas

S1.65